Oswegatchie Fire Station Building Committee - Minutes - 05/27/2025

agenda center minutes

Board/CommissionOswegatchie Fire Station Building Committee
Meeting DateMay 27, 2025
Pages14
File Size1.2 MB
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
FIFTEEN
ROPE
FERRY
ROAD.
WATERFORD, CT
06385-2886
Members
Present:
Robert
Tuneski,
Rocco
Bracciale,
Wayne
Gilpin,
Ted
Olynciw,
Richard
Board
of
Selectman
meeting
tonight
at
Spm
and
he
is
hopeful
this
meeting
will
be
over
by
Oswegatchie
Lot
Consolidation
Plan.
The
committee
would
need
to
allocate
the
fee
of
$2,500
to
provide
the
lot
consolidation
survey
plan
for
filing
with
the
town.
(Attachment
)
MOTION
by
P.
Rafuse,
second
by
M.
Blankenship
to
authorize
the
survey
by
Langan
Engineering
to
have
the
two
properties
merged
into
one
at
a
cost
not
to
exceed
$2,500.
b.
Director
of
Planning
&
Zoning
Jonathan
Mullen
emailed
B.
Tuneski
indicating
the
need
for
a
Construction
Stormwater
General
Permit
for
the
Oswegatchie
Firehouse.
J.
Mullen

c. Downes invoice number 003, $6,320.00. (Attachment 3)
Downes invoice of $6,320.00.
At the May 6" meeting the committee voted in favor of a commercial kitchen versus a residential
hood.
FOR:
Unanimous

It
was
decided
a
few
meetings
ago
once
the
construction
documents
were
tumed
over
Downes
would
go
out
to
bid
to
get
market
numbers.
Since
then
Downes
was
made
aware
that
CD
estimates
were
desired
instead
and
those
documents
were
turned
over
to
Downes’
CD
estimating
team.
It
will
be
a
3-4
week
lead
for
the
estimate.
This
time
was
included
in
the
schedule
that
S.
Smith
handed
out
to
the
committee.
The
estimate
should
be
available
to
the
committee
by
the
end
of
June.
B.
Tuneski
had
indicated
at
an
earlier
meeting
that
a
Special
Meeting
of
the
RTM
would
be
requested
to
get
approval
and
then
S.
Smith
briefly
went
through
the
Project
Schedule:
(Attachment
6)
GC
RFP
Bid
~
Start
2"
week
of
July
Building
Enclosed
~
End
of
January
2026
iv.
_
New
building
complete
and
old
building
demolished
—
August
2026
The
contents
of
the
letter
submitted
by
T.
Olynciw
to
the
Board
of
Selectmen
was
Confirm
Next
Meeting
Date
and
Objectives:
Next
meeting
is
scheduled
for
6/5/25
at
6:30pm
MOTION
by
R.
Bracciale,
second
by
M.
Blankenship
to
adjourn.
FOR:
Unanimous

Linda
Finnegan
Nicholas
Kepple
<NKepple@sswbgg.com>
Tuesday, May 27, 2025 4:21 PM
Do
not
click
links
or
open
attachments
unless
you
recognize
the
sender's
email
address
and
know
the
content
is.
safe.
From:
Brian
Phillips
<bphilips@langan.com>
To:
Robert
Avena
<RAvena@sswbgg.com>
Good
afternoon
Attorney
Avena,
Great speaking with you earlier. As discussed, we can provide the lot consolidation survey plan for filing
with
the
town
for
$2,500.
Thanks,
Brian
1

Sent:
To:
Attachment
2
Tuesday,
May
27,
2025
4:07
PM
safe.
Begin forwarded message:
From:
Robert
Tuneski
<j_robert_tuneski@sbcglobal.net>
Date: May 20, 2025 at 10:51:58 AM EDT
To:
Linda
Finnegan
<ifinnegan@waterfordct.org>
Linda,
Sent
from
my
iPhone
To:
Robert
Tuneski
<j_robert_tuneski@sbeglobal.net>
Good Afternoon Bob,
One
of
the
project
team
members
form
Langan
Engincering
informed
my
office
that
a
Jonathan
E.
Mullen,
AICP
imulen@waterfordct.org

DOWNES
CONSTRUCTION
DATE:
April
30,2025
INVOICE
ID:
25010552003
INVOICE
NUMBER:
003
CUSTOMER
ID:
WATERFORD
‘Oswegatchie
Fire
House
POH:
em
‘Descrpion
Contract]
Pereent|
Tota
Previous|
Totals|
Balance
to
1000Preconstuction 77,930.00 62.90% 41,225.00 38,905.00 6.32000 96,705.00
1010Constrvction 213,720.00 213,720.00
1020Reimbursabies 10,000.00 10,000.00
L
Total
[29165000]
367%]
4122500]
34,908.00]
6,920.00]_
260,425.00]
Contract
Summary
Approved changes 9.00
Remaining to invoice
Percent
billed
13.87
%
Retainage
balance
0.00
Blaze A Esvado BS

SILVER PETRUCELLI + ASSOCIATES
> 3190 WHITNEY AVENUE HAMDEN CT 06518
DB 311 STATE STREET NEW LONDON CT 06320
silverpetru:
Town of Waterford
Waterford, CT 06385-2886
Date
Project 23.352 Waterford - Oswegatchie Fire
Station
Contract Total Prior Current
Description “Amount Billed Billed Biled
‘Schematic Design Phase ‘66,200.00 65,200.00 66,200.00 0.00
Design Development 110,344.00 110,344.00 110,344.00 0.00
Construction Document Phase 286,000.00 257,400.00 143,000.00 114,400.00
Bid Phase 22,000.00 0.00 0.00 0.00
Construction Administration 132,000.00 0.00 0.00 0.00
Allowances - Traffic Engineering PO 250608 42,500.00 0.00 0.00 0.00
Allowances - Geotechnical Borings 35,000.00 6,000.00 6,000.00 0.00
Allowances - Hazardous Material Testing 25,000.00 0.00 0.00 0.00
- Boundary Survey & Wetland 18,000.00 18,000.00 15,000.00 0.00
- High Performance Buildings 25,000.00 0.00 0.00 0.00 0.00
Invoice total | 114,400.00)
“Town of Wotertors Tevoice number 25-1983 invoice dae 080172028

Project
23.352
Waterford
-
Oswogatchie
Fire
Station
Date
0/01/2025
Invoice
Summary
Description
‘Amount
Billed
Billed
Biled
‘Schematic
Design
Phase
66,200.00
68,200.00
66,200.00
0.00
Design
Development
110,344.00
110,344.00
110,344.00
0.00
Construction
Document
Phase
286,000.00
257,400.00
143,000.00
114,400.00,
Bid
Phase
22,000.00
0.00
0.00
0.00
Construction
Administration
132,000.00
0.00
0.00
0.00
Allowances
-
Geotechnical
Borings
35,000.00
6,000.00
—6,000.00
0.00
Alowances
-
Hazardous
Material
Testing
25,000.00
0.00
0.00
0.00
Allowances-
Boundary
Survey
&
Wetland
Delineation
15,000.00
15,000.00
18,000.00
0.00
Alowances
-
High
Performance
Buildings
25,000.00
0.00
0.00
0.00
Fire
Protection
Design
0.00
400.00
400.00
0.00
Total___759,044.00
455,344.00
340,944.00
114,400.00
Invoice
Number
Invoice
Date__
Outstanding
Current
Over
30
Over
60
Over
90___
Over
120
25-1869
(0470172025
148,517.20
148,517.20
25-1983
05/01/2025
114,400.00
114,400.00
‘Approved by:
David
J.
Stein
)
k
MA

FIFTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
May
27,
2025
I understand that the project architect, SPA, is nearing completion of the final design drawings for
the new Town Fire Station. With that in mind, I respectfully request that you ask the Oswegatchie
Fire Station Building Committee to work with Downes, the Project Manager, to prepare a detailed
cost estimate for the new facility based on SPA’s completed plans.
Having a current and comprehensive estimate will ensure that the Oswegatchie Fire Station
Building Committee, the Board of Selectmen (BOS), the Board of Finance (BOF), and the
Representative Town Meeting (RTM) bave the most accurate and transparent information
available to guide their decision-making, particularly regarding potential bonding for the project.
From what I understand, Downes' estimate should be ready in the second half of June.
In the interest of due diligence and fiscal responsibility, I intend to propose to the Board of
Selectmen tonight that we table the bonding resolution until these updated figures are available. I
will also encourage both the Board of Finance and the Representative Town Meeting to do the
same. A decision of this financial scale requires careful consideration, and we owe it to the
taxpayers of Waterford to proceed with the clearest possible understanding of the costs involved.
Please also extend, on behalf of the Board of Selectmen and the residents of Waterford, our sincere
gratitude to the Oswegatchie Fire Station Building Committee. The dedication and professionalism
demonstrated by the Committee through nearly fifty meetings over the past two and a half years
= 53
BS
S33
Robert Brule, First Selectman = 28
USa
8
w
[=J
& 8

Project Schedule
2026
Name 0 Duration Start Finish
Milestone Mile 255d| 20-Aug-25 | 21-Aug-26 SN 11651077
GC Notice to Proceed, Mobilization M100 od | 20-Aug-25 [@-6C Notice to Proceed, Mobilization
TCO/Substantial Completion _ M1900 od 28-May-26 Completion
‘Owner Occupancy _ M990 od 18-Jun-26 Owner Occupancy
Construction Complete M995 od 21-Aug-26 [t© Construction Complete
Project Closed Out M1005, od 21-Aug-26 (PO | Project Closed Out
Phase 1|New Fire Station WeS21 4,148d| 02-Nov-23 @J|__ 06-Jul-26 Phase‘! New Fire Station
Preconstruction Precon 947d | _02-Nov-23@9| 17-Sep-25 Preconstruction
Schematic Design PRE1010 180d 04-Nov-24 GY | Design
Phase 1 Environmental Assessment PRE1000 16d| 01-Apr-24 @Y] 30-Apr-24 GY
Design Development PRE1020 120d| _04-Nov-24@J| 20-Jan-25 Design Development
P&Z Application/ Initial Review - PRE1030 78d | 11-Nov-24 GQ| 11-Mar-25 @Y
SD Est PRE1040 204 24-Jan-25 EY FREE SD Estimate|s Reconcil
Construct PRE1090 45d 16-May-25 @ | struction Décuments
P&Z Final Review/Approval PRE1130 20d | 07-Apr-25 G9] 29-Apr-25 J Final Review/Af i
Conservation Review Process PRE1060 30d | 15-Apr-25 GY] 23-Apr-25 GY irvation Review Process
CD Estimate and Reconciliation PRE1070 20d| 27-May-25 @§| 23-Jun-25 \d Reconciliation
Value Management & Plan Adjustements PRE1100 tod | 24-Jun-25 08-Jul-25 Mahbgement & Plan Adjustements
RTM Review and Approval PRE1080 24| 27-Jun-25 | 30-Jun-25 IM Reviewfand Approval
Traffic Permit PREI110 20d| 01-Jul-25 29-3ul-25 Permit
CT DEEP (Stormwater) PRE1120 30d] 09-Jul-25 | 19-Aug-25 DEEP (Stormwater)
‘GC RFP Process/Bid Period PREI150 20d| 09-Jul-25 | 05-Aug-25 Process/Bid Period
Scope Reviews and Recommendation to Award PREI160 5d 06-Aug-25 12-Aug-25 dpe Reviews and Recommendation to Award
RTM Approval to Award - PREI170 Sd] 13-Aug-25 | 19-Aug-25 ’M Approval to Award
Building Permit PRET140, 20d| 20-Aug-25 | 17-Sep-25 |
Phase 2 Environmental Soil Characterization PRE1050 tod] 20-Aug-25 | 03-Sep-25 Phase 2 Environmental Soil Characterization
Submittals Material Procurement Submit 2214 | 20-Aug-25 (06-Jul-26. Submittals Material Procurement
PRO1090 40d | 20-Aug-25 16-Oct-25 Submit Major Electrical Submittals
‘Submit Steel & Joist shop drawings PRO1070 35d| 20-Aug-25 | 08-Oct-25 omit Steel & Joist shop drawings
Submit Aluminum Window Shop Drawings PROI040 30d] 20-Aug-25 | 01-Oct-25 _| it Aluminum Window Shop Drawings
Site Logistics and Start Up Submittals PRO1000 tod 20-Aug-25 | 03-Sep-25 _ | ies and Start Up Submitals.
BS Current @ Milestones . . .
Bi Pores FA summary Oswegatchie Fire Station 1]
HB
Critical
foste [Revision [checkea [Approved
20-May-25 lupdate Waterford Connecticut DOWNES,

2
|
E
2025
Planned | Hien [ree i Nov | Dec
Name 10 Duration Start| Finish TUTTE CLI
‘Submit Finishes and Specialty Materials PRO1110 60d] 20-Aug-25 | 14-Nov-25 ‘Submi
‘Submit Steel AB Plans PROI050 tod] 20-Aug-25 | 05-Sep-25 bmi Steel AB Plans
‘Submit Doors Frames and Hardware Submittals | PRO1100 26d| 20-Aug-25 | 25-Sep-25 it Doors Frames and Hardware Submittals
Submit Rebar Shop Drawings «| PROTOGO. Tod | 20-Aug-25 | 03-Sep-25 brit Rebar Shop Orawings
‘Submit Electrical Switchgear _[PRov010 35d | 20-Aug-25 08-Oct-25, omit Electrical Switchgear
‘Submit Major Mechanical Equipment PRO1080 25d] 20-Aug-25 | 24-Sep-25 it Major Mechanical Equipment
‘Submit Sitework Submittals PRO1050 20d| 20-Aug-25 | 17-Sep-25 if Sitework Submittals
Submittals forPoolEquipment «| PROTI20 20d 20-Aug-25 | 17-Sep-25 iftals for Pool Equipment
Submit Roof insulation Shop Drawings __—_—| PRO1020 TOd| 20-Aug-25 03-Sep-25 aod Insulation Shop Drawings.
‘Approve Foundation Rebar Shop Drawings PRO1130 Sd| 04-Sep-25 | 10-Sep-25 Foundation Rebar Shop Drawings
Fabricate and Delivery Concrete Rebar PRO1140 Tod | 11-Sep-25 | 24-Sep-25 irate and Delivery Concrete Rebar
Steel AB Fab & Deliver PRO1160 10d | 18-Sep-25 | o1-0ct-25 | 1 AB Fab & Deliver
Approve Sitework Submittals ____| PROTISO. Sd] 18-Sep-25 | 08-Oct-25 prove Sitework Submittals
MEP Coordination ____| PRO1I70 66d | 25-Sep-25 31-Dec-25 MEP Coordination
‘Approve Major Mechanical Equipment _ ~_| PRO1180 Tod | 25-Sep-25 (08-Oct-25 prove Major Mechanical Equipment
‘Approve Doors, Frames and Hardware Submittals | PRO1190 20d | 26-Sep-25 | 24-Oct-25 "Approve Doors, Frames an Hardware Submits
‘Approve Alurninum Window Shop Drawings PRO1200 Od | 02-Oct-25 16-Oct-25 prove Aluminum Window Shop Drawings
‘Approve Finishes and Specialty ems RO1210 sod| 02-Oct-25 | 30-Dec-25 prove Finishes and Specialty items|
—_| PRO1250 ood | 09-0c-25 | _ 04-Mar-26 fajor Equipment Procujement
PRO1220, 785d _09-0ct-25 06-Jul-26 Electrical Switchgear Procurement
Finalize Steel Shop Drawings and Calculations _| PRO1230 tod | 09-Oct-25 23-Oct-25 Finalize Steel Shop Drawings and Calculations
‘Approve Structural Steel & Deck/Joists PROI240 Sd] 09-Oct-25 16-Oct-25 prove Structufal Steel & Detk/Joists
‘Approve Major Electrical Submittals PROI260 yo] 17-0ct-25 | 30-Oct-25 rove Majgr Electrical Sdibmi |
Fabricate and Delivery Aluminum Windows PRO1270 60d | 17-Oct-25 | 14-Jan-26 fabricate ahd Delivery Aluminum Windows
Fabricate & Delivery Struct Steel, Joist/Dec ‘| PRO1280 45d| 24-Oct-25 | 30-Dec-25 abjicate & Delivery Struct Steel, Doist/Dec
Fabricate and Delivery Door Frames «| PROIZ9O | —_—40d| 27-Oct-25 | _23-Dec-25 brikate and Ulivery Door Fram
Fabricate and Deliver Doors & Hardware PRO1300 65d| 27-Oct-25 | 29-Jan-26 Fabricate and Deliver Doors & Hardware
Procure Finishes and Specilaty Materials PROIS10 20d] 31-Dec-25 | 28-Jan-26 ProcurelFinishes and Specilaty Materials
TemporaryFence ‘SITEI1000 _ 3d| 20-Aug-25 | _ 22-Aug-25 Fempotaly Ferke
Clearing and Grubbing SITEI1010 3d] 25-Aug-25 | 27-Aug-25 ce and Grubbing
TE Current @ Miestones . oe 7
HB Progress P= Summary Oswegatchie Fire Station D>
=
oste vision [checked [approved
foa.san-25 ease
20-May-25 [Vpdote Waterford Connecticut DOWNES

Oswegatchie Fire Station
3
Project Schedule
Planned i Jan [Feb [ Mar [- Feb
Name 1D Duration Start Finish I TTTTLTTLLEL TL
Erosion Control sm 2a] 26-Aug-25 | 27-Aug-25
___ Stripping Topsoil sm td] 28-Aug-25 | 28-Aug-25
| Sanitary Sewersystems sm 206| 29-Aug-25 | 26-Sep-25
Site rough grading sim 24| 29-Aug-25 | 02-Sep-25
‘Storm Water Sewer Systems sim 15d] 29-Sep-25 | 20-Oct-25 ey Systems
Underground FP/Domestic Water Line SITEII070 isd] 21-0c-25 [10-Nov-25 ic Water Line
|
___ Foundation Excavation STRU1000 sd] 18-Sep-25 | 24-Sep-25
___FRP Foundation Footings STRUTOTO Tod | 25-Sep-25 | 08-Oct-25
FRP Foundation Walls/Pier Footings ‘STRUI020 15d] 02-0ct-25 | 23-Oct-25 tings
Underground Plumbing ‘STRUIO40 tod | 24-0ct-25 | 06-Nov-25
Foundation Backfil/Protection Board STRUI030 8d] 24-Oct-25 | 04-Nov-25 \/Protettion Board
Underground E! ee 'STRUIOSO Sd] 31-0ct-25 | 06-Nov-25
Prep for Slab-on-Grade STRUTO6O 2a] 07-Nov-25 | 10-Nov-25
Place Concrete SOG STRU070 2d[ 12-Nov-25 | 15-Nov-25
Building Enveloge
Install Exterior CFMF/Sheathing ENVE1000 20d] 14-Nov-25 | 12-Dec-25 F/Sheathing
Roofing ENVE1010 isd|15-Dec-25 | 06-Jan-26
Install Exterior AVB/Flashings @
Exterior ENVE1020 10d] 15-Dec-25 29-Dec-25 Il Exterio AVB/Flashings @ Exterior
Install Veneer Masonry ENVE1030 15d] 30-Dec-25 20-Jan-26 fall Vepeer Masonty
install Exterior finish ENVE1040 tod | 06-Jan-26 | 19-Jan-26 tall Exterior finish
Windows & Glass ENVE1050 tod| 15-Jan-26 | 28-Jan-26 & Glass
install Exterior siding ENVE1060 tod| 21-Jan-26 | _03-Feb-26 xterior siding
Building Enclosed = ENVE1070 od 28-Jan-26 18 Enclosed
“Temporary Environmental Controls ENVE1080 15d] 29-Jan-26 18-Feb-26 Temporary Environmehtal Controls
Roofing Sheetmetal and Copings ENVE1090 Tod | 04-Feb-26 | _17-Feb-26 Roding Sheetmetal and Cdpings
Set HVAC Equipment ENVE1100 tod | 05-Mar-26 | 18-Mar-26 fet HVAC Equipe
interior Construcl {terior Constfuction
Set Door Frames @ CMU Partitions CONT000 Sd | 24-Dec-25 31-Dec-25 a+ Dogs Frames|@ CMU Partitions
Non-Bearing CMU Partitions CON1070 sd | 24-Dec-25 | 15-Jan-26 [SE on jeesrine MU Pat
Install Plumbing Carriers/Water Supply Lines | CON1020 15d] 02-Jan-26 | 22-Jan-26 {psfal humping Carriers/Water Supply Lines
3 current @ Milestones . . .
HB rege PA summary Oswegatchie Fire Station D
|
Critical
[pate Revision [Checked [Approved
[20-May-25 = Waterford Connecticut DOWNES
7. Moy 25 odaee

27-May-25]
2025 2026
Planned l{-aan [Feb | Mar [ Apr | May | Jun | sul | Aug [Sep [Oct | Nov | Dec | Jan ] Feb | Mar | Apr | May [aun | Jul
Name 1D Duration Start Finish FTTTTLIELEL ELL I TOT
Electrical Overhead Raceways/Conduits/Panel... | CON1060_ tod 09-Jan-26 22-Jan-26 head Racewa}s/Chndu
Fire Protection Mains/Branches CON1040 15d [09-Jan-26 29-Jan-26 Mains /Brarich
(Overhead Ductwork/Boxes CONT050 25d| 09-Jan-26 12-Feb-26 Wverhead Ductwork/Boxes |
Overhead HVAC Piping/Ceiling Eqmt CON1030 20d| 09-Jan-26 | _05-Feb-26 ins Eqrnt |
Plumbing Waste & Vent CON7080 20d| 16-Jan-26 12-Feb-26
Slab Moisture Mitigation CON1070 tod] 16-Jan-26 29-Jan-26
Inwall Electrical@LGMF/Branch Wiring CONT100 isd [23-Jan-26 12-Feb-26 Brajich Wiring
Plumbing Insulation CON1090 Yod| 23-Jan-26 | _05-Feb-26
1ns/w Door Frames CONTI10 tod | 30-Jan-26 12-Feb-26 IMF Partitions/w Dgor Frames
Masonry Chase Walls CONT120 Tod] 06-Feb-26 19-Feb-26 Chase Walls
Low Voltage Systems Rough CON1140 1Od| _13-Feb-26 26-Feb-26 Rough
coni130_ | 15d] 13-Feb-26 | 05-Mar-26
HVAC Insulation con1150__ | Bd] 13-Feb-26 24-Feb-26
Frame LGMF Cellings/Soffits Fascias CONT160 ad| 16-Feb-26 25-Feb-26 ts/Fascias
Install Ceramic Tile Walls @ Toilet Rooms: CON1180 Od| _25-Feb-26 10-Mar-26 @ Toilet Rooms
‘Tape/Sand Walls _ ON1170 0d| _25-Feb-26 10-Mar-26
‘Sheetrock @ GWB Ceilings/Soffits/Fascias CON1190 3d| 26-Feb-26 02-Mar-26 1s/Soffits/Fascias
TTape/Sand GWB Cellings/Soffits Fascias CON1200 4d | 02-Mar-26 | 05-Mar-26 /Soffts/Fakcias
Epoxy Flooring CON1230 tod [11-Mar-26 | 24-Mar-26
Plumbing Fixtures @ Toilet Rooms CONT210 od | 11-Mar-26 | 24-Mar-26 tures @ Toilet Rooms
Prime & 1st Coat Pal CONT220 tod | 11-Mar-26 | 24-Mar-26 it Pajnt
Install Acoustical Ceiling Grid CONT240 Tod | 12-Mar-26 | _ 25-Mar-26 ling Grid
Install Light Fixtures CONT250 tod| 13-Mar-26 | 26-Mar-26 stall Light ie
HVAC Eqmt Startups CONT260 15d| 19-Mar-26 | 08-Apr-26 HVAC Eqmt tarlups
Install RGD's ‘CON1270 Sd] 20-Mar-26 | 26-Mar-26 stall RGD's
(@ Protection Heads _ ee 3d] 23-Mar-26 | 25-Mar-26 fection Heads
Wiring Devices/Light Controls CONT350 10d | 25-Mar-26 07-Apr-26 oe Controls
‘CONT320 15d] 25-Mar-26 15-Apr-26 asework/tinish Carpentry
CONTS40 5d] 25-Mar-26 | 31-Mar-26 Misc Specialties
CON1290 sd] 25-Mar-26 15-Apr-26 Final Coat Pain
CON1330 sd] 25-Mar-26 | 51-Mar-26 tall Toilet Partitjons
CON1300 Sd] 25-Mar-26 | 31-Mar-26 all Fire Alarm Gevices
HE Progress suman Oswegatchie Fire Station
=
iy
ate [Revision ecked [approved
fo-May-25 luodate Waterford Connecticut DOWNES

Oswegatchie Fire Station
Name
2025
2026
‘Jun | Jul | Aug | Sep [ Oct
Finish
IMT
LTT
Mar [Apr | May [jun | sol | Aug | Sep | Oct [ Nov
TOTO TTT TTT TTT TIT
Hang Doors/Hardware 15d] 25-Mar-26 [15-Apr-26
Install LV System Devices/Finishes (CCTV/Sec... Sd] 25-Mar-26 | 31-Mar-26
Final Above Ceiling Inspections 2d] 27-Mar-26 | 30-Mar-26
Padout Tod] 31-Mar-26 | 14-Apr-26
Install Flooring/Base 25d|O1-Apr-26 | 06-May-26
Toilet Accessories 3d] 01-Apr-26 | 03-Apr-26
Fire Alarm Ringout tod] 01-Apr-26 | 15-Apr-26
Testing, Balancing and Inspections Tod] 16-Apr-26 | 29-Apr-26
Pre-Punch/Broom Clean sd] 07-May-26 13-May-26
list & Final Cleaning 7 Tod] 14-May-26 | 28-May-26
Final Completion All Trades Sd] 14-May-26 | 20-May-26
Final Inspections & Substantial Completion Sd] 21-May-26 | 28-May-26
Owner Move-In / Occupancy 75d|_29-May-26 18-Jun-26
10-Feb-26
‘Stormwater Detention Systems tod | 04-Feb-26 17-Feb-26
Paving tod| 18-Feb-26 | 03-Mar-26
Site Improvements 30d| 08-Apr-26 | 20-May-26
Site Signage Sd] 21-May-26 | 28-May-26
Phase 2 Demolition of Existing Bldg. 60d | 29-May-26 21-Aug-26
‘Adjust temporary fence DEMO1000 2d| 29-May-26 | 01-Jun-26
Exist Bldg Hazmat Removal DEMO1010 15d | 02-Jun-26 22-Jun-26
Demolition of exist bldg. DEMO1020 20d | 23-Jun-26 21-Jul-26
Bad ting foundations/grade site DEMO1030 10d] 22-Jul-26 04-Aug-26
Site Concrete DEMO1040 Sd] 05-Aug-26 | 11-Aug-26
Paving DEMO1050 Sd] 12-Aug-26 | 18-Aug-26
Site Improvements DEMO1060 3d] 19-Aug-26 | 21-Aug-26
Closeout cl 40d | 26-Jun-26 21-Aug-26
Final Completion (O&Ms/Asbi 40d| 26-Jun-26 21-Aug-26
|S
current
@
Milestones
| Progress NX Summary
om Revision [checked [Approved
20-May-25 lvosate
Pe7-May-25 lvsdne
stall LV System Bevices/Finishes (CCTV/Security, etc.)
fadout
Ceiling
InstallFlogying/Base
let Accessories
Ppnctist & Final Gearing
i
E I Inspections & Substantial Completion,
"Owner Move-In / Occupancy
Signage
fe
RENEE Closeout
La ot |Completion (O&Ms/Asbu
Oswegatchie Fire Station
Waterford Connecticut