Waterford Town Hall September 10, 2025
Regular Meeting 7:00 p.m,
1, Establishment of a quorum and call to order.
2. Public Comment
3. Approval and acceptance of minutes from August 13, 2025.
4, Pending Board of Selectman approval, to consider and act on a request by Paige Walton, Assessor, for an
appropriation in the amount of $378.52 from the Line #20501-57639 (Transfers to CAP & NE Funds), and
forward to the RTM if required.
5. Pending Board of Selectman approval, to consider and act on a request by Gary Schneider, Director of Public
Works, for an additional appropriation in the amount of $25,000 from the Capital and Non-recurring Line #205-
31520 Undesignated CNR Fund Balance to a new project line (Library Electrical Project), and forward to the
RTM if required.
6. Pending Board of Selectman approval, to consider and act on a request by Gary Schneider, Director of Public
‘Works, for an additional appropriation in the amount of $1,533,283 to a new project line within the Capital
Improvements Project Fund for the resurfacing of roads identified in Year 3 of the three-year plan, and
forward to the RTM if required.
7. Pending Board of Selectman approval, to consider and act on a request by Jill Stevens, Director of Utility
‘Commission, for an additional appropriation of $500,000 for the line # 20531-57881 (Plastic Water Service Line
Replacement), and forward to the RTM if required.
8. Pending Board of Selectman approval, to consider and act on a request by Jill Stevens, Director of Utility
Commission, to appropriate $200,000 from designated line # 20531-57881 (Plastic Water Service Line
Replacement), and forward to the RTM if required.
9, Pending Board of Selectman approval, to consider and act on a request by Jill Stevens, Director of Utility
Commission, for an appropriation in the amount of $200,000 from designated line # 20531-57894 (Cross
Country Sewer Main Access), and forward to the RTM if required.
10. Pending Board of Selectman approval, to consider and act on a request by Jill Stevens, Director of Utility
‘Commission, for an appropriation in the amount of $46,222 from designated line # 20531-57895 (Water Tank
Management), and forward to the RTM if required

14, Old Business:
15. New Business:
16. Liaison Reports:
17. Correspondence:
a. Virginia Bielucki, Town Accountant, Periodic Financial Statements FY26 dated August 15, 2025.
b. Virginia Bielucki, Town Accountant, Status of Contingency FY26 dated August 20, 2025.
18. Adjournment
Glenn Patterson, Chairman

d
1
Board of Finance
Wednesday, August 13, 2025
Regular Meeting Minutes
Town Hall Auditorium 7:00 pm
Present: Glenn Patterson, Robert Tuneski, Ron Fedor, Bill Sheehan, Josh Kelly, Michael Rocchetti
Absent: Joseph Filippetti
Elected: Robert Brule, First Selectman, Abbas Danesh, Treasurer
Staff: Kimberly Allen, Director of Finance; Ryan McNamara, Director of Recreation and Parks; Dani
Gorman, Human Services Coordinator; Meaghan Lineburgh, Senior Services Office Assistant/Recording
Secretary
1. Establishment of a quorum and call to order
A quorum was established and the Regular Meeting of the Board of Finance was called to order
at 7:00pm on August 13, 2025
2. Public Comment: None
3. Approval and acceptance of minutes:
Motion by Bill Sheehan and seconded by Josh Kelly to approve the minutes of the July 16, 2025
Regular Meeting as presented.
Vote: 5-0-1 Abstain: Ron Fedor Motion: Passed
4, Toconsider and act on the appointment of Clifton Larson Allen LLP as the town auditor for
the fiscal years 2026, 2027, 2028
Motion by Josh Kelly and seconded by Ron Fedor to appoint Clifton Larson Allen LLP as the
town auditor for the fiscal years 2026, 2027, 2028 on the condition auditors are rotated every
year and stipulated in the contract with Clifton Larson Allen LLP.
Vote: 6-0-0 Motion: Passed
5. To consider and act on the request by the Director of Recreation and Parks, Ryan McNamara
for an appropriation in the amount of $20,000 from designated line #20537-57735 (Leary Park
Access Road & Drainage), and forward to the RTM if required.

To consider and act on a request by Director of Recreation and Parks, Ryan McNamara for an
appropriation in the amount of $25,000 from designated line 20537-57798 (Children’s
Playground Equipment), and forward to the RTM if required.
Motion by Bill Shechan and seconded by Michael Rocchetti to appropriate $25,000 from
designated line #20537-57798 (Children’s Playground Equipment), and forward to the RTM
as required
Vote: 6-0-0 Motion: Passed
To consider an act on a request by Chief of Police, Marc Balestracci for an additional
appropriation in the amount of $7,113.00 to line #10129-51420 (Patrol) for an employee payout
that is required under the current collective bargaining agreement, and forward to the RTM if
required.
Motion made Bill Shechan and seconded by Josh Kelly to transfer $7,113 from Contingency
10121-59010 to line #10129-51420 (Patrol) for an employee payout that is required under the
current collective bargaining agreement, and forward to the RTM as required
Vote: 6-0-0 Motion: Passed.
To consider and act on a FY25 Out-of-Series Transfer from the Director of Finance, Kimberly
Allen, in the amount of $68,823 for various departments as indicated in the Transfer Request
Form.

ra ae eae ‘
Vote: 6-0-0 Motion: Passed
9. Discussion on a possible new project: State Radio Conversion
10. Old Business: None
IL. New Business
a. Bill Sheehan asked First Selectman Robert Brule if Town of Waterford had considered
opting into the Connecticut Municipal Development Authority, seeing as other towns in
region had joined. First Selectman stated that Town was looking into options.
b. Ron Fedor ask the First Selectman if the Town was looking into more energy efficient
options for the town including solar panels. First Selectman informed the board that the
towns Energy's Task Force was looking into it.

j
Motion by Ron Fedor seconded by Robert Tuneski to adjourn the Regular meeting of the Board
of Finance at 7:41pm.
Vote: 6-0-0 Motion: Passed
Respectfully submitted,
John (Bill) W. Sheehan,
Clerk of the Board of Finance

#4

The Bay
‘THE DAY PUBLISHING COMPANY
200 STATE ST
NEW LONDON, CT 06320
[ACCOUNT NUMBER]
‘CUSTOMER
TOWN OF WATERFORD - FINANCE
DEPARTMENT
15 ROPE FERRY ROAD
WATERFORD, CT 06385
United States
93036 ‘TOWN OF WATERFORD - FINANCE DEPARTMENT
CLIENT PAGE NUMBER DUE DATE
Page 1 oft Upon Receipt
Order Number ‘Amount Due
401103731 $378.52
CRE NOMBER
MAKE CHECKS PAYABLE
TO DAY PUBLISHING
‘COMPANY
Include your account # / IOONT PR
‘order # on your check
remittance
PLEASE RETURN UPPER PORTION WITH YOUR REMITTANCE
‘SZEAINES ) GROSS Net
DATE DESCRIPTION PUBLICATION REFERENCER SHELINES GROSS. nem NET
08728725 Invitation to RFPHZE-001 TheOay ——Ieviaton 02h $13.52 $000 s348.se
Rrpwe1
8728725 Invitation to RFPHE-00 Day Cassied —inviiono cad $500 $000 $8.00
Weopage” RFPDE001
8728725 Invitation to RFPH26-001 CT Puble Nols Invlaionto. Not Appkcable-—=«$2800-«$0.00«—=$2500
Wweopoge RFE D1
Tota 
s37as2 $000 savas
Tecoune Nonber Castano? Toaibve
83086, "TOWN OF WATERFORD - FINANCE DEPARTMENT $378.52
Day Credit Department Accounting Fax 860-437-7504
Community Classifieds - Toll Free Advertising Fax 860-437-8780
Day Publishing Company - Toll Free 800-542-3354 Classified Fax 860-442-5443,
APPROVED
VENDOR#__/S7
PO#. FY_2o2e
CLOSEPO Y___ N=
ACCOUNT #_2es?! $7639
AMOUNT_3 29%, 5
Sais id )
SIGN.
lp ¢-—
DATE.

To: Robert Brule, First Selectman
From: Gary J Schneider, Director of Public Works Des
Date: August 26, 2025
Re: Library Electrical Project Request
Replacement of the main disconnect electrical switch and service and parking lot lighting at the
Library is necessary. We are requesting an additional appropriation of $25,000 from the
Unassigned Fund Balance to a new project line within the Capital improvements Project Fund
This will complete the design, cost estimates and bid documents for the project. The cost
estimate will take into account all utility requirements and permitting costs
The Department will request construction funds after the detailed cost estimate has been
Prepared. With the volatile market, cost estimates can better be prepared closer to bidding.
The existing service is hung off a wooden utility pole that holds the main electrical feed from the
street, three transformers, and conduits to the building. It also holds communication utilities.
Conduits from this pole to the basement of the Library are allowing water to enter the main
disconnect electrical switch box. The switch is showing signs of corrosion caused by water
entering the conduit at the pole and must be replaced before failure.
Due to the service size, we must adhere to Eversource's requirements which will require a pad
mounted transformer. The new service, a 600 amp 240 volt service entrance rated main
disconnect switch, will be fed from this pad-mounted transformer which Eversource will own.
The existing pole is planned to be removed by undergrounding electrical and communications
from an existing pole closer to the street. New conduits will be provided for electrical and
communications.
The current parking lighting is powered from the Library basement back out to the pole holding
the existing transformers and then by overhead wire to existing wooden poles that hold the
lights. The project will include the replacement of these poles and lights. The poles have
reached their life expectancy. Light fixtures and poles will match the theme of the civic green.

1 [DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project)
[The facility is currently served by overhead pole mounted transformers located at the end of a pole line nto the property from
Route 156. From the transformers, the cables enter conduits on the pole that then becomes a buried conduit until it enters
the basement. Over the years, water has entered the conduits draining into the disconnect switch, corroding the cabinet and
the electrical connections. it must be replaced. It would be cost effect to underground all utilities that are on the current pole.
[communications (fiber and copper) would be moved underground from the first pole near Rt 156 to the building and the
Joarking lot lighting would be replaced due to the age and condition of the poles.
2 [PROJECT STATUS IF IN PROGRESS
[Schematic design has been completed
LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS
3 REQUEST.
None
“4 [DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (Include cost estimate If applicable)
[Complete failure would close the building until epairs or temporary power could be provided,
[GRANT FUNDING/OTHER FUNDING, If applicable (detailed explanation of grant/other funding, Including the amount,
5 |source of funding, status, town match, Hany. Attach award letter f available)
None
[ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION (ff none, simply state that
in the area below)
lattached expanded narrative memorandum, overall plan of the site, photos.
Z ‘COST/FUNDING SOURCE
‘APPROVED
FUNDING TO
FUNDING SOURCE DATE Fy2oz6_| ryzoz7_| rvzo28 | Fr2029 | Fv2030
[current Year Capital
tity Budget/Sewer Cap Maint Fund
Hransfer to CNR
[short/Long-term Bonds
LOCIP (detail in section $ above)
[CNR Undesignated Fund Balance 25,000]
Federal/State Grants (detail in section
7\5)
lother Funding (detail in section 5
8 Jabove)TALS of 25,000] 0] | | |
BOBO

Main
disconnect
electrical
switch

Pole mounted transformer to
be replaced with pad |
mounted ground transformer |
j

Light Pole

Memo
To: Robert Brule, First Selectman
From: —— Gary J Schneider, Director of Public Works
cet Kimberly Allen, Finance Director
Date: September 2, 2025
Re: Paving Request ~ FY26
Request: To fund a new project, the resurfacing of roads by transferring funds from the
Unassigned Balance of the General Fund to a project line to be created within the Capital
Improvements Project Fund to complete the resurfacing of roads identified in Year 1 of the
three-year plan.
‘The Department is requesting $1,533,283 from the General Fund Balance to be used with
$539,485 (line item 33023-55890) already collected from Eversource for year 1 of the program.
‘Where: The roads are listed in Year 1. Year 1 will see % of the roads resurfaced in Quaker Hill,
which were impacted by the installation of the natural gas infrastructure. In general the roads
are north of Richards Grove Road to the Route 32 connection. It also includes some roads in
this area that did not see the installation of gas service, but makes operational sense to
complete these roads while the contractors are in the area. Year 2 addresses the remainder of
those roads south of Richards Grove Road.
Discussion: | have prepared a 3-year, $4 million resurfacing program to address the needs of
road resurfacing throughout the entire Town. The plan uses our four Districts to distribute the
effort throughout the entire Town. Each year identifies approximately $1 million in resurfacing, a
number that the Department can comfortably support. In the plan, Districts 2, 3 and 4 each will
realize approximately $1 million over the 3 years. District 1 will see less in this plan due to the
recently completion of the resurfacing of roads off of Fog Plain Road and roads in the area of
Tiffany and Vivian streets.

(increased by 9%) used in the determination of Eversource' s reimbursement to resurface the
roads impacted by the installation of their natural gas infrastructure.
‘The program includes an allowance of $250,000 per district for items such as utility resets,
asphalt cost escalation, line striping and resident notifications.
The plan will be reviewed each fall before the next years paving season to verify the roads to be
completed. At the same time, the Department will add the third year to the plan.
| respectfully request to be placed on the Board of Select man's agenda, and forwarded to the
Board of Finance, if approved.

[DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project)
[Ail roads identified in this project fall under the definition of needing structural improvement or rehabiltation. This is.
|2s milling the top several inches of old asphalt from the surface and replacing with new asphalt or full depth reclamation,
|where the asphalt is ground up and mixed with the base to establish a new base and then resurfaced with three inches of
inew asphalt. Year 1 will complete 1/2 of the roads in the Quaker Hill area, those being north of Richards Grove Road. It
includes some roads in this area that were not affected by Eversource, but make optional sense to complete. Also include
lare several roads around Maple Road and several roads around Soljer Drive. Future years will folow the Three Year Pian.
[PROJECT STATUS IF IN PROGRESS.
[LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS
|REQUEST
[Plastic water services and catch basin replacements will be completed before paving starts.
[DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (Include cost estimate lf applicable)
[Minor impact. Current practice is just to make the road condition safe. Minor savings in pot hole patching
materials
[GRANT FUNDING/OTHER FUNDING, If applicable (detalled explanation of grant/other funding, including the amount,
lsource of funding, status, town match, if any. Attach award letter if avallable)
[Eversource deposited with the Town funds to restore the roads in lieu of performing the work themselves. See
lattached Pian for roads that apply to this funding.
[ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION {If none, simply state that
lin the area below)
|Attached Resurfacing Program 2026-2028.
7 ‘COST/FUNDING SOURCE
“APPROVED
FUNDING TO
|FUNDING SOURCE DATE Fy2026_| Fv2027_| Fy20z8 | Fy2029 | Fv2030
[Current Year Capital
Utility Budget/Sewer Cap Maint Fund
[Transfer to CNR
[Short/Long-term Bonds
|LoCIP (detail in section 5 above)
[CNR Undesignated Fund Balance 2,533,283] _ 1,268,573] _ 1,356,011]
[Federal/State Grants (detall in section
1S)
JOther Funding (detail in section 5
labove)
225,493)
[rorais | 1,494,066) _ 1,356,013]

Year Year2 Year3 Paving Allowances
[owners [s ols als sx9s6s [5 s29963 | ¢ 2so000 | $ 770,63
| District 2 S 698,029 | $ 424,353 | $ O | $ 1,122,381 | $ 250,000 1,372,381
District3 | $ 252,004 | $ o|$ 492,815 744819 | $ 250,000 | $ _ 994,819
Losticts | __ 249918 | $__s10,888 | $ 0 | s 760,806 | $ 250,000 | $ _ 1,010,806 |
[rota $ 1199850 | ¢ 95240 | ¢ 1022678 | ¢ 3,157,858 | $ 1,000,000 | ¢ 4,157,868
Year1 Spring 2026 thru Fall 2026
Year2 Spring 2027 thru Fall 2027
Year3 Spring 2028 thru Fall 2028

Clark Place 8 92,103 | $ aos1_| $44,746
Decab Lane $ 33.420 te710_| $38,214
Hardwick Road $ 50,080 25040 27294
Ladley Road $s ssp70_| $ 32s3s_|$ 35463
Laurel Glenn Road $ 47233 23616 25,742
Pennkcott Road $ 55300 _| $ 27650 | $ 30,39
Tanglewylde Place $ 30835 _| $ asais_| $ 16805
Whtergreen Drive. 5 seas33_| $ 92466 | $100,788
$359,528
DisTRICT 2
TOWN ROADS ‘vi 2020 VHB x 15%
Donald Avenue $ 38.932 41322
Maple Rood 11618 $13,361
Red Cedar Avenue 39021 S$ sagra
Marguy Street 78.262 $90,001
Rosemary Lane $s 9316 $10,713
Sunshine Drive $ 65,569 $___ 75519
‘Schoolhouse Lane $ 11,962 $13,756
Northwood Road $ 42,568 $ 48,953
$338,500
DISTRICT 3
EVERSOURCE IMPACTED ROADS Estimate (T) Town (1/2) Town x9%
Soljer Drive $ 237,942, aigo7_| $129,678
‘Ann Road (Non E Road) $ 21554 zisss | $ 23,404
Roseleah Drive $s 181342_| § sos | $s 98.831
$252,008
DISTRICT 4
TOWN ROADS, vis 2020 HO «15%
Mago Point Way 8523 $ 9801
‘Avenue B $ 2182 $ 2,509
Second Street $ 1838, $ 2,10
Fourth Street 131919 $153,198
River Street s 71565 $ 82300.
$249,018

Cove View Drive $ 44308__| $ $_25829
Fitzgerald Avenue $ uss | $ 46,756
James Avenue _ ss ra_| s s 34923
John Avenue s a700__| $ $23,978
May Avenue 4ass7_| $25,603
Miler Avenue $ 1295 | $ $ 35.245
Porter Street $ s6737__| $ $55,624
Roberts Court 36,230 $20,832
Thomas Avenue A axgso_| $ 20925 | $ 24,064
Uncas Avenue $ 7rs1__| $ 32,091 43,804
(Uncas Court 13,068__| $ 6s_| $ 7514
$343,909
DISTRICT2
‘TOWN ROADS = us 2020 ‘VHB x 35%
Totoket Road 69,951 _ $ sos
pistRicT 4
‘TOWN ROADS ‘vi 2020 VHB x.15%
Third Avenue 53.025 S$ 69.979
Fourth Avenue A 90,339 $103,890
Middle Street. $ 37,000 $19,550
High Street 17,000 $19,550
East Wharf Road 77584 $ 99,222
High Ridge Road A 158,980 $182,827
Croyden Court s 30,322 34,870

Summer Street $6519 wm
David Street _ $ 27370 $32,166
Wiliam Street w0.416 S$ _46478
Norman Street $ 53217 $61,200
Wild Rose Place ls 33.839 $ 38915
Wild Rose Avenue $ 50,759. $ ‘$8,373
Avenue A $ 13897 S$ 13682
Sandy Hollow Road i$ 123,830 $s 142,405,
Edgewood Avenue $ 13.661 $ 15,710
Graham Street wow | $46,163
$__ sasess
pistmicr 3
ap 2020 - HB 35%
$ 59,451. $ 68,369
$ 204,987 | 235,620
$ 164,197 $ 188,827
Ls asz35 |
Eversource Roads: These roads were affected by the Installation of gas service. Eversource has made a
‘payment to the Town to resurface % of the width of the road.
‘Town (1/2): The Department had prepared an estimate to resurface the road, (This was also used to
negotiate the EverSource payment) The Town and EverSource shared the cost equally.
‘Town x 9%: The estimate was prepared several years ago. The estimate was increased by 3% each year.
\VHB 2020: The Town has used VHB Consulting Engineers to prepare a pavement management report. The
last report was completed in 2020.
‘VHB x 15%: The estimate prepared in 2020 was increased by 3% each year.


‘Year 1. DISTRICT 2 TOWN ROADS:
Donald Avenue
Maple Road
Red Cedar Avenue
Marguy Street
Rosemary Lane
Sunshine Drive
Schoolhouse Lane
Northwood Road

‘Year 1— DISTRICT 3
EVERSOURCE:
Soljer Drive
‘Ann Road (Non E Road)
Roseleah Drive
Year 1- DISTRICT 4
‘TOWN ROADS:
‘Mago Point Way
Avenue B
Second Street
Fourth Street
River Street


TORE
eSeke
sose)
SeitecsTM
—
eiiline
iil
e282? 2 ag?

‘Year 3— DISTRICT 1 TOWN.
ROADS:
‘Summer Street
David Street
‘William Street
Norman Street
‘Wild Rose Place
Wild Rose Avenue
‘Avenue A
‘Sandy Hollow Road
Edgewood Avenue
Graham Street

u
Paula Lane
Doyle Road

Mr, Rob Brule, First Selectman
Town of Waterford Town Hall
15 Rope Ferry Road
Waterford, CT 06385
Dear Mr. Brule,
The Utility Commission respectfully requests the following appropriations of funds identified
within the FY26 Capital Plan:
L
The Utility Commission respectfully requests an appropriation of the funds currently
designated within 20531-57881, Plastic Water Service Line Replacement in the
amount of $200,000.
The Utility Commission respectfully requests a designation and appropriation of the
funds identified in the First Selectman’s plan for the General Fund Balance for Plastic
Water Service Line Replacements for FY26 in the amount of $500,000.
There are approximately 7900 water services in Town, many of which are plastic and
have exceeded their useful life resulting in unaccounted for water loss and degradation to
the Town roads. The goal of this program is to replace the aging plastic water services
with copper line prior to DPW paving the roads. Since the start of this cooperative project
with DPW 806 water service lines have been investigated, of those 229 water service
lines were found to be plastic and replaced totaling 5,218 linear feet. In FY26 the DPW’s
updated paving plan has identified several roads scheduled to be repaved, within these
roads lie approximately 376 water services, of those approximately 165 may need to be
replaced, as the material type is unconfirmed. Service line replacement costs are on
average $4100 each depending upon the service line length and location, typically we are
finding about 30 percent of the unconfirmed service material types are plastic and require
replacement.
‘The Utility Commission respectfully requests an appropriation of the funds currently
designated within L.I. # 20531-57894, Cross Country Sewer Main Access in the amount
of $200,000.
Sewer mains collect wastewater from our Town’s parcels and convey this wastewater to
downstream pumping stations via a vast network of piping and pumping stations to a
point terminating at the Main pumping station, which then conveys the wastewater to the

p
Contract #1 was the Town's very first sewer construction project, which began in 1970.
This project entailed the installation of approximately 13,000 linier feet of sewer main, A
Special Appropriation in the amount of $250,000 for engineering services was
appropriated for the Contract #1 Sewer Main Access project in 2023. Survey work to
identify the Contract #1 easement area, manholes, intersecting property lines, and other
utilities within the easement area commenced in October of 2023 and was completed in
the spring of 2024. The final design package (drawings and specifications) to be used for
contractor bid solicitation and construction for Phase One of the restoration project was
granted by the Utility Commission at the November 2024 meeting. Phase one
encompasses the southern section of the interceptor beginning at the intersection of Great
Neck Road and Rope Ferry Road to the end of the interceptor at Evergreen Avenue Pump
Station. Phase two which encompasses the northern section of the interceptor from
Boston Post Road to Great Neck Road requires the acquisition of additional easements to
gain access to the interceptor during restoration and for the Utility Commission staff in
the future. Splitting the project into two Phases allows restoration work to begin while
easements are procured, so that once Phase one is complete easements will be in place
and Phase two can begin shortly thereafter. Our engineering firm estimates construction
costs up to $288,600 for Contract One Restoration, there are funds available under LI #
33123-55019 for this project in the amount of $147,200. Phase one went out to bid on
‘August 18" and bids will be opened on September 19", and construction will begin as
soon as the designated funds are made available in October provided the bids do not
exceed the available funds.
4, The Utility Commission respectfully requests an appropriation of the funds currently
designated within L.1, # 20531-57895, Water Tank Management in the amount of
$46,222.00
The Town of Waterford owns three water storage tanks, the 750,000 gallon Fargo Tank,
the 300,000 gallon Vauxhall tank and the 1.25 Million gallon Rogers Hill tank. In 2024
the Fargo Road Tank refurbishment project was completed; prior to this renovation, the
Fargo Road water tank had its original coat of paint, which had far exceeded its useful
life expectancy by approximately 10 years. This work was necessary to preserve the
‘Town's significant investment in its infrastructure and to extend the life of its asset; if
routine maintenance of infrastructure is ignored, it turns into an emergency capital
investment and typically costs three times that of routine maintenance. If this tank had
not undergone the recent rehabilitation, the structural integrity of the tank would have
‘eventually failed, requiring that the tank be replaced at a significant cost to the Town.
Many municipalities do not realize the financial investment they have in their water
storage tanks. These key municipal water distribution system components often receive

spread out over a few years if necessary and all future interior and exterior renovation
costs are included,
Our request is to initiate a funding schedule that would enroll the three water storage
tanks in a Tank Asset Management program progressively, beginning with Fargo Road in
FY26, this tank will not require any Upfront Renovation costs to enroll in the program,
only annual Maintenance plan costs. A draft contract from our coating contractor is
included as backup for this request.
5. The Utility Commission respectfully requests an appropriation of the funds currently
designated within L.1, # 20531-57896, Bartlett Corners Water Booster in the amount of
$166,950.00
In 2006, the Town constructed water system improvements that enhanced water pressures
and fire flows to the Quaker Hill area of Waterford. Included in this project were a new
2500 gpm capacity water booster pumping station near the intersection of Old Colchester
and Old Norwich Roads, and a 1.5 million gallon pre-cast, pre-stressed concrete water
storage tank constructed on Rogers Hill. From 1977 up to 2006, the Bartlett Corners
Hydro-pneumatic Station served a small high service area on a hill in the northeast corner
of Waterford consisting of approximately 20 residential customers on Lathrop Road,
Lower Bartlett Road, Upper Bartlett Road, Pepperidge Road and South Bartlett Road.
‘Once the new Quaker Hill water system improvements were activated in 2006, the
Bartlett Comers Station was inactivated however not fully decommissioned. In 2009 a
decommissioning report was prepared which identified costs of $105,000 to properly
decommission the station. This project has been identified within previous CIPs.
Utilizing the Engineering News Record’s Construction Costs Index inflation factor of
1.59 from 11/2009 to 11/2024, the current decommissioning costs estimate is $166,950
Please see the additional back up material provided in support of each request attached to this
letter.
Thank you.
Jill N. Stevens, Director
Utility Commission
Ce: Utility Commission
Kimberly Alien, Director of Finance

1000 HARTFORD TURNPIKE 
WATERFORD, CT  06385 
August 28, 2025 
Mr. Rob Brule, First Selectman 
Town of Waterford Town Hall 
15 Rope Ferry Road 
Waterford, CT  06385 
Dear Mr. Brule, 
The Utility Commission respectfully requests the following appropriations of funds identified 
within the FY26 Capital Plan: 
1. The Utility Commission respectfully requests an appropriation of the funds currently
designated within L.I. # 20531-57881, Plastic Water Service Line Replacement in the
amount of $200,000.
2. The Utility Commission respectfully requests a designation and appropriation of the
funds identified in the First Selectman’s plan for the General Fund Balance for Plastic
Water Service Line Replacements for FY26 in the amount of $500,000.
There are approximately 7900 water services in Town, many of which are plastic and
have exceeded their useful life resulting in unaccounted for water loss and degradation to
the Town roads. The goal of this program is to replace the aging plastic water services
with copper line prior to DPW paving the roads. Since the start of this cooperative project
with DPW 806 water service lines have been investigated, of those 229 water service
lines were found to be plastic and replaced totaling 5,218 linear feet. In FY26 the DPW’s
updated paving plan has identified several roads scheduled to be repaved, within these
roads lie approximately 376 water services, of those approximately 165 may need to be
replaced, as the material type is unconfirmed. Service line replacement costs are on
average $4100 each depending upon the service line length and location, typically we are
finding about 30 percent of the unconfirmed service material types are plastic and require
replacement.
3. The Utility Commission respectfully requests an appropriation of the funds currently
designated within L.I. # 20531-57894, Cross Country Sewer Main Access in the amount
of $200,000.
Sewer mains collect wastewater from our Town’s parcels and convey this wastewater to
downstream pumping stations via a vast network of piping and pumping stations to a
point terminating at the Main pumping station, which then conveys the wastewater to the

Mr. Rob Brule, First Selectman 
 
Page 2 
 
regional treatment facility in New London. Of the Town’s 150 miles of sewer piping, 
approximately 15.6 miles lie within cross-country easement areas, which are outside of 
roadways. Many of these sewer mains traverse through heavily wooded cross-country 
easement areas, which are becoming more challenging to access. Accessibility is crucial 
in order to conduct a full assessment evaluation and to provide timely access to conduct 
immediate or corrective repairs to the sewer main or structures. The goal of this project is 
to recreate the original easement access areas along all of our cross-country mains or 
create alternate access points. 
 
Contract #1 was the Town's very first sewer construction project, which began in 1970. 
This project entailed the installation of approximately 13,000 linier feet of sewer main.  A 
Special Appropriation in the amount of $250,000 for engineering services was 
appropriated for the Contract #1 Sewer Main Access project in 2023. Survey work to 
identify the Contract #1 easement area, manholes, intersecting property lines, and other 
utilities within the easement area commenced in October of 2023 and was completed in 
the spring of 2024. The final design package (drawings and specifications) to be used for 
contractor bid solicitation and construction for Phase One of the restoration project was 
granted by the Utility Commission at the November 2024 meeting. Phase one 
encompasses the southern section of the interceptor beginning at the intersection of Great 
Neck Road and Rope Ferry Road to the end of the interceptor at Evergreen Avenue Pump 
Station. Phase two which encompasses the northern section of the interceptor from 
Boston Post Road to Great Neck Road requires the acquisition of additional easements to 
gain access to the interceptor during restoration and for the Utility Commission staff in 
the future. Splitting the project into two Phases allows restoration work to begin while 
easements are procured, so that once Phase one is complete easements will be in place 
and Phase two can begin shortly thereafter. Our engineering firm estimates construction 
costs up to $288,600 for Contract One Restoration, there are funds available under LI # 
33123-55019 for this project in the amount of $147,200. Phase one went out to bid on 
August 18th and bids will be opened on September 19th, and construction will begin as 
soon as the designated funds are made available in October provided the bids do not 
exceed the available funds.  
 
4. The Utility Commission respectfully requests an appropriation of the funds currently 
designated within L.I. # 20531-57895, Water Tank Management in the amount of 
$46,222.00 
 
The Town of Waterford owns three water storage tanks, the 750,000 gallon Fargo Tank, 
the 300,000 gallon Vauxhall tank and the 1.25 Million gallon Rogers Hill tank. In 2024 
the Fargo Road Tank refurbishment project was completed; prior to this renovation, the 
Fargo Road water tank had its original coat of paint, which had far exceeded its useful 
life expectancy by approximately 10 years. This work was necessary to preserve the 
Town’s significant investment in its infrastructure and to extend the life of its asset; if 
routine maintenance of infrastructure is ignored, it turns into an emergency capital 
investment and typically costs three times that of routine maintenance. If this tank had 
not undergone the recent rehabilitation, the structural integrity of the tank would have 
eventually failed, requiring that the tank be replaced at a significant cost to the Town. 
Many municipalities do not realize the financial investment they have in their water 
storage tanks. These key municipal water distribution system components often receive 

Mr. Rob Brule, First Selectman 
 
Page 3 
 
the least attention and yet, they can potentially experience serious issues without proper 
tank asset management. Contamination from animals or debris, corrosion and other issues 
can trigger customer complaints, municipal regulatory compliance violations and costly 
water distribution service disruptions. A Water Tank Management Program for these 
valuable assets would preserve the significant investment the Town has made in water 
storage tanks by guaranteeing routine inspections and maintenance of the water storage 
tanks does not fall behind, thus improving the reliability of the system. A sustainable 
water tank management solution also makes budgeting easier as initial repair costs can be 
spread out over a few years if necessary and all future interior and exterior renovation 
costs are included. 
Our request is to initiate a funding schedule that would enroll the three water storage 
tanks in a Tank Asset Management program progressively, beginning with Fargo Road in 
FY26, this tank will not require any Upfront Renovation costs to enroll in the program, 
only annual Maintenance plan costs. A draft contract from our coating contractor is 
included as backup for this request. 
 
5. The Utility Commission respectfully requests an appropriation of the funds currently 
designated within L.I. # 20531-57896, Bartlett Corners Water Booster in the amount of 
$166,950.00 
 
In 2006, the Town constructed water system improvements that enhanced water pressures 
and fire flows to the Quaker Hill area of Waterford. Included in this project were a new 
2500 gpm capacity water booster pumping station near the intersection of Old Colchester 
and Old Norwich Roads, and a 1.5 million gallon pre-cast, pre-stressed concrete water 
storage tank constructed on Rogers Hill. From 1977 up to 2006, the Bartlett Corners 
Hydro-pneumatic Station served a small high service area on a hill in the northeast corner 
of Waterford consisting of approximately 20 residential customers on Lathrop Road, 
Lower Bartlett Road, Upper Bartlett Road, Pepperidge Road and South Bartlett Road.  
Once the new Quaker Hill water system improvements were activated in 2006, the 
Bartlett Corners Station was inactivated however not fully decommissioned. In 2009 a 
decommissioning report was prepared which identified costs of $105,000 to properly 
decommission the station. This project has been identified within previous CIPs. 
Utilizing the Engineering News Record’s Construction Costs Index inflation factor of 
1.59 from 11/2009 to 11/2024, the current decommissioning costs estimate is $166,950 
 
Please see the additional back up material provided in support of each request attached to this 
letter. 
 
Thank you. 
  
 
 
 
Jill N. Stevens, Director 
Utility Commission 
 
Cc:  Utility Commission 
        Kimberly Allen, Director of Finance 

Jill N. Stevens
 
2
1
2
4
5
7
FUNDING SOURCE
APPROVED 
FUNDING TO 
DATE
FY2026
FY2027
FY2028
FY2029
FY2030
1 Current Year Capital
731,000 
2 Utility Budget/Sewer Cap Maint Fund
3 Transfer to CNR
200,000 
275,000 
225,000 
225,000 
250,000 
250,000 
4 Short/Long-term Bonds
5 LoCIP (detail in section 5 above)
6 CNR Undesignated Fund Balance
7
Federal/State Grants (detail in section 
5)
8
Other Funding (detail in section 5 
above)
TOTALS
931,000 
275,000 
225,000 
225,000 
250,000 
250,000 
2025-2026 FISCAL YEAR REQUEST
TOWN OF WATERFORD
CAPITAL PROJECT REQUEST FORM
CONTACT PERSON
DEPARTMENT/AGENCY
COST/FUNDING SOURCE
3
DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project)
DPW Roads Paving Project
DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (include cost estimate if applicable)
GRANT FUNDING/OTHER FUNDING, if applicable (detailed explanation of grant/other funding, including the amount, 
source of funding, status, town match, if any.  Attach award letter if available)
PROJECT STATUS IF IN PROGRESS
To date we have replaced 162 service lines totaling 3,416LF of plastic water piping replaced with copper.
LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS 
REQUEST
The goal of this project is to replace all of the plastic water services prior to DPW paving the roads.There are 
approximately 7900 water services in Town, many of which are plastic and have exceeded their useful life resulting in 
unaccounted for water loss and degradation to the Town roads.  Within the DPW FY26 list of roads scheduled to be 
paved there are nearly 280 water services that require evaluation, once determined which services are plastic the Utility 
Commission will replace them with copper service line. A majority of this work is being conducted by Utility Commission 
staff.
ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION (if none, simply state that 
in the area below)
6
An average cost to replace these lines is $4,100 depending upon length and location.
Utility Commission
Plastic Water Service Replacement Project
DEPARTMENT PRIORITY
PROJECT NAME
Requests 1 & 2

City of New London
Invoice for Waterford Pipe Replacement Program
Assumptions
2,850.00
$  
15
183.33
$      
2.58
$       
Address
Number
Result
Length (ft)
Material
Date
Base Fee
Length over 
Base
Cost over 
Base
Copper 
up charge Total Charge
121
Shore Rd
Replaced WTFD
10 3/4 Copper
‐
$              
130
Shore Rd
Replaced Veolia
20 1" Copper
6/20/2023
2,850.00
$  
5
916.65
$      
51.6
3,818.25
$     
WUC provided tubing
132A
Shore Rd
Replaced Veolia
21 3/4'Copper
6/20/2023
2,850.00
$  
6
1,099.98
$  
3,949.98
$     
132
Shore Rd
Replaced Veolia
32 3/4 Copper
6/19/2023
2,850.00
$  
17
3,116.61
$  
5,966.61
$     
161
Shore Rd
Confirmed Existing Copper
‐
$              
165
Shore Rd
Confirmed Existing Copper
‐
$              
169
Shore Rd
Replaced Veolia
24 3/4 Copper
6/16/2023
2,850.00
$  
9
1,649.97
$  
4,499.97
$     
173
Shore Rd
Cut off at tap
32
17
3,116.61
$  
3,116.61
$     
179
Shore Rd
Replaced Veolia
32 3/4 Copper
6/14/2023
2,850.00
$  
17
3,116.61
$  
5,966.61
$     
181
Shore Rd
Replaced WTFD
‐
$              
184
Shore Rd
Confirmed Existing Copper
‐
$              
191
Shore Rd
Confirmed Existing Copper
‐
$              
193
Shore Rd
Confirmed Existing Copper
‐
$              
194
Shore Rd
Confirmed Existing Copper
‐
$              
195
Shore Rd
Confirmed Existing Copper
‐
$              
196
Shore Rd
Confirmed Existing Copper
‐
$              
198
Shore Rd
Replaced Veolia
22 3/4 Copper
6/6/2023
2,850.00
$  
7
1,283.31
$  
4,133.31
$     
200
Shore Rd
Replaced Veolia
20 3/4 Copper
6/12/2023
2,850.00
$  
5
916.65
$      
3,766.65
$     
200 F
Shore Rd
Replaced Veolia
18 3/4 Copper
6/13/2023
2,850.00
$  
3
549.99
$      
3,399.99
$     
201
Shore Rd
Replaced Veolia
19 1" Copper
2,850.00
$  
4
733.32
$      
49.02
3,632.34
$     
204 R
Shore Rd
Confirmed Existing Copper
‐
$              
205
Shore Rd
Replaced Veolia
23 3/4 Copper
6/8/2023
2,850.00
$  
8
1,466.64
$  
4,316.64
$     
206
Shore Rd
Confirmed Existing Copper
‐
$              
208
Shore Rd
Replaced WTFD
‐
$              
209
Shore Rd
Replaced Veolia
30 3/4 Copper
6/9/2023
2,850.00
$  
15
2,749.95
$  
5,599.95
$     
211
Shore Rd
Replaced Veolia
35 1" Copper
6/12/2023
2,850.00
$  
20
3,666.60
$  
90.3
6,606.90
$     
212
Shore Rd
Replaced Veolia
15 3/4 Copper
6/5/2023
2,850.00
$  
0
2,850.00
$     
212 R
Shore Rd
Cut off at tap
‐
$              
213
Shore Rd
Replaced Veolia
27 3/4 Copper
6/1/23 ?
2,850.00
$  
12
2,199.96
$  
5,049.96
$     
214
Shore Rd
Replaced WTFD
‐
$              
218
Shore Rd
Replaced WTFD
‐
$              
219
Shore Rd
Replaced Veolia
20 3/4 Copper
5/31/2023
2,850.00
$  
5
916.65
$      
3,766.65
$     
220
Shore Rd
Replaced WTFD
‐
$              
222
Shore Rd
Replaced WTFD
‐
$              
224
Shore Rd
Replaced Veolia
18 3/4 Copper
5/23/2023
2,850.00
$  
3
549.99
$      
3,399.99
$     
226
Shore Rd
Replaced Veolia
17 3/4 Copper
5/22/2023
2,850.00
$  
2
366.66
$      
3,216.66
$     
228
Shore Rd
Replaced Veolia
30 3/4 Copper
5/24/2023
2,850.00
$  
15
2,749.95
$  
5,599.95
$     
229
Shore Rd
Replaced WTFD
‐
$              
230
Shore Rd
Replaced WTFD
‐
$              
233
Shore Rd
Replaced Veolia
22 3/4 Copper
5/25/2023
2,850.00
$  
7
1,283.31
$  
4,133.31
$     
234
Shore Rd
Replaced WTFD
239
Shore Rd
Replaced WTFD
Services Replaced
21
Total
86,790.33
$   
Cost/ Service
4,132.87
$     
Days
18
Service / Day
1.2

ROADWAY (AS SHOWN ON PLANS)
PROPERTY LINE
VARIES (AS SHOWN ON PLANS)
B
VARIES (AS SHOWN ON PLANS)
NOTE:
PAVEMENT, GRAVEL, EXCAVATION
AND ALL OTHER WORK RELATED
TO ROADWORK OVER SEWERS
AND HOUSE CONNECTIONS SHALL
|
A
BE PAID FOR UNDER
PART | PORTION OF BID AS
APPLICABLE
/
12” OR SMALLER
5’
EXISTING CURB
12” OR LARGER
4’°+DIA. OF PIPE
1/4” /FT. NOMINAL SLOPE
—=
—_<_ ———
Lee
—_
—— oo
—_——
—_-—— —
ae
— —_——
1” COPPER TUBING
TYPE K
SEE TRENCH PAVEMENT
DETAIL (IF APPLICABLE)
¢ ROADWAY
2 1/2” BITUMINOUS CONC. PAVEMENT—CU
TWO COURSES-—1” NOMINAL LEVELING COU
1 1/2” FINISH COURSE — C
VARIES
——
—_$—
"WAT
—_—_—— ——
—_—_—_—-——_—- ll ———_- S __
—_—_—_—————_- — — __
2 
CO
EX
1/4”/FT. NOMINAL SLOPE
EPTH AS DIRECTEL
~
CORPORATION
STOP TO BE
INSTALLED AT
45° ABOVE HORIZONTAL
OR AS DIRECTED
EXISTING WATER MAIN
1” CORPORATION STOP
COPPER COMPRESSION
FITTINGS MUELLER
H 15008 OR APPROVED EQUAL
_-- Oooo r — —S — _ _ ______ 10
1” 
CO
MU
THR
VARIES (AS SHOWN ON PLANS)
WA TER
SERVICE CONNEC TON DETAIL
IN TYPICAL ROADWAY CROSS SECTION
NOT TO SCALE
WATERFORD UTILITY COMMISSION
TOWN OF WATERFORD, CT

property line
a
driveway apron *
sidewalk
IF APPLICABLE
landscape strip
(6
TYPICAL DRIVEWAY APRON SCHEMATIC
NOT TO SCALE
WATERFORD UTILITY COMMISSION
TOWN OF WATERFORD, CT

2 Plastic Water Service Replaced with Copper Line
1 Plastic Water Service prior to replacement 

Jill N. Stevens
 
1
1
2
4
5
7
FUNDING SOURCE
APPROVED 
FUNDING TO 
DATE
FY2026
FY2027
FY2028
FY2029
FY2030
1 Current Year Capital
250,000 
500,000 
500,000 
400,000 
300,000 
300,000 
2 Utility Budget/Sewer Cap Maint Fund
3 Transfer to CNR
4 Short/Long-term Bonds
5 LoCIP (detail in section 5 above)
6 CNR Undesignated Fund Balance
7
Federal/State Grants (detail in section 
5)
8
Other Funding (detail in section 5 
above)
TOTALS
250,000 
500,000 
500,000 
400,000 
300,000 
300,000 
2025-2026 FISCAL YEAR REQUEST
TOWN OF WATERFORD
CAPITAL PROJECT REQUEST FORM
CONTACT PERSON
DEPARTMENT/AGENCY
COST/FUNDING SOURCE
3
DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project)
Accessibility will allow pipeline evaluation crew to conduct our sewer system evaluation survey and create the ability to 
access the pipeline and manholes in the event of an emergency 
DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (include cost estimate if applicable)
GRANT FUNDING/OTHER FUNDING, if applicable (detailed explanation of grant/other funding, including the amount, 
source of funding, status, town match, if any.  Attach award letter if available)
PROJECT STATUS IF IN PROGRESS
Preliminary design is complete for Contract 1, and the final design package work for Phase One of the restoration project 
will begin in December. A probable cost for restoration is in the range of $250,000 - 350,000
LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS 
REQUEST
Minimal impact on operational budget, however, accessibility will allow staff to conduct routine and emergency repairs 
in a timely manner, in lieu of creating access on a emergency basis which will be far more costly and greatly reduce the 
potential of adverse environmental impact.
The goal of this project is to obtain readily available access to all cross-country sewer mains. Accessibility is crucial in 
order to conduct a full assessment evaluation and to provide timely access to conduct immediate or corrective repairs to 
the sewer main or structures. The goal of this project is to recreate the original easement access area or create alternate 
access points to all areas that are not within paved roadway areas. Funds were granted for the Contract #1 easement 
area in 2023, this request is to continue the access program to the remaining cross country easement areas.
ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION (if none, simply state that 
in the area below)
6
See backup material
Utility Commission
Cross-Country Sewer Main Access
DEPARTMENT PRIORITY
PROJECT NAME
Request 3

S
S
S
S
S
SMH
SMH
SMH
SMH
SMH
SMH
SMH
SMH
SMH
LINE
RAILWAY
MINER LANE
RAILWAY
RAILWAY
RAILWAY
GREAT NECK ROAD
ROPE FERRY ROAD
C-3
C-4
C-3
C-4
C-5
C-5
C-6
C-6
C-7
J:\ENG\CT\WATERFORD\21580-CONTRACTONEROWCLEARING\_DRAWINGS\CIV\21580-CS-KEY PLAN.DWG | 21580-Key Plan | 1:2.5849 | ---- | 7/1/2025 10:05:46 AM | RICHARD.BOURGET
LAST SAVED BY: RICHARD.BOURGET 5/27/2025 9:24 AM
APPROVED:
CHECKED:
CAD:
DATE:
1
2
PROJECT NO:
DATE:
3
4
CAD COORD:
DESIGNED:
DRAWING
REVISIONS
NO
APP'D DATE
SUBMISSION:
5
SCALE: 1"=300'
0
300
600
KEY PLAN
WATERFORD UTILITY COMMISSION
CROSS COUNTRY SEWER EASEMENT
CONTRACT 1 - PHASE I
WATERFORD, CONNECTICUT
 
  
C-2
R. BOURGET
T. MONTGOMERY
07/25
B. PARFITT
07/25
22039
R. BOURGET
B. PARFITT
CONTRACT DRAWINGS
860.343.8297    |    www.wright-pierce.com
169 MAIN STREET, 700 PLAZA MIDDLESEX, MIDDLETOWN, CT 06457
8/13/2025

Cost Estimate for 
Cross Country Sewer Easement Access -  Contract 1 - Phase 1 
Waterford Utilities Commission
Project 22039
Description
Quantity
Unit
Unit Cost
Cost
 Bonds and Insurance
1 LS
$10,000.00 LS
10,000.00
$  
 Mobilization 
1 LS
$10,000.00 LS
10,000.00
$  
 Clearing & Grubbing
160,040 sf
$1.00 per sf
160,040.00
$  
 Temporary S&E Controls
1 LS
$5,000.00 LS
5,000.00
$ 
 Equipment Mat Rental
1 LS 
$10,000.00 LS
10,000.00
$  
 Loam & Seeding
10,000 sf
$0.20 LS
2,000.00
$ 
 Final Cleanup
1 LS
5,000.00
$  
LS
5,000.00
$ 
Sub-Total
$202,040.00
10% Contingency
20,204.00
$  
Rounded Total
$222,000.00
Estimate Range
-20%
177,600.00
$   
30%
288,600.00
$   
7/9/2025

Jill N. Stevens
6
1
2
4
5
7
FUNDING SOURCE
APPROVED 
FUNDING TO 
DATE
FY2026
FY2027
FY2028
FY2029
FY2030
1 Current Year Capital
46,222 
47,272 
95,520 
106,267 
108,358 
2 Utility Budget/Sewer Cap Maint Fund
3 Transfer to CNR
4 Short/Long-term Bonds
5 LoCIP (detail in section 5 above)
6 CNR Undesignated Fund Balance
7
Federal/State Grants (detail in section 
5)
8
Other Funding (detail in section 5 
above)
TOTALS
0 
46,222 
47,272 
95,520 
106,267 
108,358 
Utility Commission
Water Tank Asset Management Program
DEPARTMENT PRIORITY
PROJECT NAME
COST/FUNDING SOURCE
3
DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project)
DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (include cost estimate if applicable)
GRANT FUNDING/OTHER FUNDING, if applicable (detailed explanation of grant/other funding, including the amount, 
source of funding, status, town match, if any.  Attach award letter if available)
PROJECT STATUS IF IN PROGRESS
LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS 
REQUEST
None, the operational costs are borne by the City of New London through the current Inter-local agreement.
A Water Tank  Asset Management Program for these valuable assets would preserve the significant investment the Town 
has made in water storage tanks by guaranteeing routine inspections and maintenance of the water storage tanks does 
not fall behind, thus improving the reliability of the system. A sustainable water tank management solution also makes 
capital budgeting easier as initial repair costs can be spread out over a few years if necessary and all future interior and 
exterior renovation costs are included in the plan. The intent would be to enroll the Fargo Road & Vauxhall Street tanks 
first and add Rogers Hill at a later date.
ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION (if none, simply state that in 
the area below)
6
See attached tank management program and costs, the costs are based upon a phased roll out of this program starting 
with Fargo Road and Vauxhall Street tanks in year one and two and  adding Rogers Hill in year three
2025-2026 FISCAL YEAR REQUEST
TOWN OF WATERFORD
CAPITAL PROJECT REQUEST FORM
CONTACT PERSON
DEPARTMENT/AGENCY
Request 4

Water Tank Asset Management Program 
The Town of Waterford owns three water storage tanks, the 750,000 gallon Fargo Tank, the 
300,000 gallon Vauxhall tank and the 1.25 Million gallon Rogers Hill tank. In 2024 the Fargo Road 
Tank refurbishment project was completed; prior to this renovation, the Fargo Road water tank 
ha