Planning & Zoning Commission (linked)
agenda center agenda
| Board/Commission | Planning & Zoning Commission |
|---|---|
| Meeting Date | May 12, 2026 |
| Pages | 13 |
| File Size | 2.0 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
7 0 1/2" 1" 2" ISSUED FOR OWNER REVIEW 03.09.26 ARCHITECT Stabach Architects, LLC 335 Griswold Road Wethersfield, CT 06109 TEL 860.798.1573 1018 Hartford Tpke. Waterford, Connecticut 06385 CONTRACTOR Carlin Construction 5 Shaws Cove, Suite 103 New London CT 06320 860.444.2567 AV ACST AD ADJ ADR AF AFF AGGR AL ANO AP APROX ARCH ASPH ACT AUTO AUX AUDIO VISUAL ACOUSTICAL AREA DRAIN ADJACENT ACCESS DOOR ACCESS FLOOR ABOVE FINISHED FLOOR AGGREGATE ALUMINUM ANODIZED ACCESS PANEL APPROXIMATE(LY) ARCHITECT(URAL) ASPHALT ACOUSTIC CEILING TILE AUTOMATIC AUXILARY BO BD BV BG BLDG BLK BM BRK BRZ BSMT BOTTOM OF BOARD BEVELED BUMPER GUARD BUILDING BLOCK (WOOD BLOCKING) BEAM BRICK BRONZE BASEMENT CBD CG CJ CL CLG CLG HT CLO CLR OPNG CMU CO COL CONC CONT CONV CORR CP CPT CS CT CTR CU CW CEMENT BOARD CORNER GUARD(S) CONTROL JOINT CENTER LINE CEILING CEILING HT CLOSET CLEAR OPENING CONCRETE MASONRY UNIT CLEAN OUT COLUMN CONCRETE CONTINUOUS CONVECTOR CORRIDOR CEMENT PLASTER CARPET(ED) CONCRETE SEALER CERAMIC TILE CENTER CUBIC CURTAIN WALL E EA EHD EJ EL ELEC ELEC CL ELEV EMER ENCL EQ EQPT ESC EXH EXP EXPN EXST EXT EAST EACH ELECTRIC HAND DRYER EXPANSION JOINT ELEVATION ELECTRICAL ELECTRICAL CLOSET ELEVATOR EMERGENCY ENCLOSURE / ENCLOSE(D) EQUAL EQUIPMENT ESCALATOR EXHAUST EXPOSED EXPANSION EXISTING EXTERIOR FA FD FDM FDN FEC FFL FHC FIN FIN FL FIN GR FLEX FLG FLMT FLR FO FRM FRT FS FSS FSE FT FTG FIRE ALARM FLOOR DRAIN FIRE DAMPER FOUNDATION FIRE EXTINGUISHER CABINET FINISH FLOOR LEVEL FIRE HOSE CABINET FINISHED FINISH FLOOR FINISH GRADE FLEXIBLE FLASHING FLUSH MOUNTED FLOOR(S) FINISHED OPENING FRAME FIRE RETARDANT TREATED WOOD FULL SIZE FIRE STOPPING SYSTEM FOOD SERVICE EQUIPMENT FEET (FOOT) FOOTING GA GALV GB GFRC GL GL BLK GND GR GYP GWB GUAGE GALVANIZED GRAB BAR GLASS FIBER REINFORCED CONCRETE GLASS GLASS BLOCK GROUND GRANITE GYPSUM BOARD GYPSUM WALL BOARD HB HD HDW HM HDRL HORIZ HP HR HT HVAC HOSE BIB HEAD HARDWARE HOLLOW METAL HANDRAIL HORIZONTAL HIGH POINT HOUR HEIGHT HEATING, VENTILIATING, AIR CONDITIONING ID INCL INFO INSUL INT ISO INSIDE DIAMETER INCLUDE(D) / INCLUSIVE / INCLUDING INFORMATION INSULATION INTERIOR ISOLATE(D) / ISOLATION JC JF JT JANITOR CLOSET JOINT FILLER JOINT LAB LAM LAV LB(S) LF LH LONG LP LTG LVR LABORATORY LAMINATE LAVATORY POUNDS LIGHT FIXTURE LEFT HAND LONGITUDUNAL LOW POINT LIGHTING LOUVER MAINT MATL MAX MECH MED MEZZ MANU MIN MISC MLWK MO MOD MP MR MTD MTL MUL MAINTAIN / MAINTENANCE MATERIAL MAXIMUM MECHANICAL MEDIUM MEZZANINE MANUFACTURER MINIMUM MISCELLANEOUS MILLWORK MASONRY OPENING MODULE METAL PANEL MIRROR MOUNTED METAL MULLION OA OC OD OFD OFF OPNG OP OPH OVERALL ON CENTER OUTSIDE DIAMETER OVERFLOW DRAIN OFFICE OPENING OPPOSITE OPPOSITE HAND PAR PART PC PERF PERP PL PLAM PLBG PLSTC PLYWD POL PR PREFAB PROP PSF PSI PTD PTN PWR PARALLEL PARTIAL PRECAST CONCRETE PERFORATED PERPENDICULAR PLATE PLASTIC LAMINATE PLUMBING PLASTIC PLYWOOD POLISHED PAIR PREFABRICATE PROPERTY POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PAINTED PARTITION POWER QT QTY QUARRY TILE QUANTITY R RB RCF RCP RD RECT REF REFR REINF REQD REV RF RM RO RH RISER RESILIENT BASE RAISED COMPUTER FLOOR REFLECTED CEILING PLAN ROOF DRAIN RECTANGLE REFERENCE REFRIGERATOR REINFORCED REQUIRED REVISION RESILIENT FLOORING ROOM ROUGH OPENING ROBE HOOK T T.O. TA TD TEL TEMP TG THK THRES T.O.C. TPD TYP TREAD TOP OF TOILET ACCESSORIES TRENCH DRAIN TELEPHONE TEMPORARY TONGUE AND GROOVE THICK(NESS) THRESHOLD TOP OF CURB TOILET PAPER DISPENSER TYPICAL UC UNFIN UNO UPS UR UNDERCUT UNFINISHED UNLESS OTHERWISE NOTED UNINTERRUPTED POWER SUPPLY URINAL VAR VB VERT VEST V.I.F. VOL VCT VWC VARIES VAPOR BARRIER VERTICAL VESTIBULE VERIFY IN FIELD VOLUME VINYL COMPOSITION TILE VINYL WALL COVERING W W/ W/O WC WCV WD WDB WDF WDVR WP WPG WR WS WT WV WWF WEST WITH WITHOUT WATER CLOSET / TOILET WALL COVERING WOOD WOOD BASE WOOD FLOORING WOOD VENEER WORK POINT WATERPROOFING MEMBRANE WEATHER RESISTANT WEATHER STRIPPING WEIGHT WOOD VENEER WELDED WIRE FABRIC & / @ # AND ANGLE AT NUMBER A B ABBREVIATIONS DB DBL DEG DEPT DET DF DIA DIAG DIM DISP DIV DN DP DR DW DWG DECIBEL DOUBLE DEGREE(S) DEPARTMENT DETAIL DRINKING FOUNTAIN DIAMETER DIAGONAL DIMENSION DISPENSER DIVIDE / DIVISION DOWN DEMOUNTABLE PARTITION DRAINAGE DRYWALL DRAWING C D E F G H I J L M O P Q R N NA NC-n NIC NO. NOM NRC NTS NORTH NOT APPLICABLE NOISE CRITERIA NOT IN CONTRACT NUMBER NOMINAL NOISE REDUCTION COEFFICENT NOT TO SCALE N S S SCHED SD SECT SHR SHT SHTHG SIM SJ SK SN SND SP SPEC SQ SS SSL STC STD STL STOR STRUCT SURF MTD SUSP SOUTH SCHEDULE(D) SOAP DISPENSER SECTION SHOWER SHEET SHEATHING SIMILAR SEALANT JOINT SERVICE SINK SANITARY NAPKIN DISPENSER SANITARY NAPKIN DISPOSAL SPECIALTY ITEM(S) SPECIFICATION SQUARE STAINLESS STEEL STRUCTURAL SLAB LEVEL SOUND TRANSMISSION CLASS STANDARD STEEL STORAGE STRUCTURE SURFACE MOUNTED SUSPENDED T U V W SYMBOLS WALL SECTION A101 1 1 View Name 1/8" = 1'-0" ROOM NAME 101 101 ROOM NAME ROOM NUMBER DOOR NUMBER 1T 1K WINDOW TYPE PARTITION TYPE CEILING HEIGHT FF99 EQUIPMENT TAG ELEVATION ON SECTIONS & DETAILS FINISH FLOOR 10'-0" 1 A101 SIM DETAIL SECTION 1 A101 SIM 1 A101 SIM EXTERIOR ELEVATION KEY ON PLANS INTERIOR ELEVATION KEY ON PLANS REVISION TAG 1 0 GRID LINE SPOT ELEVATION - PLAN TRUE NORTH PROJECT NORTH ALIGN SYMBOL A CENTER LINE SYMBOL VIEW REFERENCE / 1 A101 NORTH ARROW SYMBOLS A101 1 Ref 1 Ref 1 Ref 1 Ref SPOT ELEVATION - ELEVATION MATERIAL TAG MT-99 PLAN DETAIL BUILDING SECTION 1 A101 SIM METAL STUD SIZE: 1-5/8" OVERALL DIMENSION: 2-1/4" METAL STUD SIZE: 2-1/2" OVERALL DIMENSION: 3-1/8" F2 F3 METAL STUD SIZE: 3-5/8" OVERALL DIMENSION: 4-1/4" METAL STUD SIZE: 6" OVERALL DIMENSION: 6-5/8" F4 F6 (1) LAYER 5/8" GYPSUM BOARD. SEE NOTES FOR TYPE. SCHEDULED BASE CONTINUOUS SEALANT. SEE NOTES TOP OF STRUCTURE LINE OF CEILING. SEE FINISH SCHEDULE UNDERSIDE OF STRUCTURE HEAD PLAN BASE STEEL STUDS AT 16" O.C. SEE SIZE BELOW F CONTINUOUS METAL RUNNER FASTENERS AT 2'-0" O.C. MAXIMUM WITHIN 1" OF ENDS CONTINUOUS METAL RUNNER A STEEL STUDS AT 16" O.C., SEE SIZE BELOW (1) LAYER 5/8" GYPSUM BOARD EACH SIDE. SEE NOTES FOR TYPE. SCHEDULED BASE TOP OF STRUCTURE CONTINUOUS METAL RUNNER UNDERSIDE OF STRUCTURE HEAD PLAN BASE CONTINUOUS METAL RUNNER FASTENERS AT 2'-0" O.C. MAXIMUM WITHIN 1" OF ENDS LINE OF CEILING. SEE FINISH SCHEDULE CONTINUOUS SEALANT BOTH SIDES. SEE NOTES CONTINUOUS SEALANT BOTH SIDES. SEE NOTES B STEEL STUDS AT 16" O.C. SEE SIZE BELOW (1) LAYER 5/8" GYPSUM BOARD EACH SIDE. SEE NOTES FOR TYPE. SCHEDULED BASE CONTINUOUS SEALANT BOTH SIDES. SEE NOTES TOP OF STRUCTURE HEAD PLAN BASE CONTINUOUS METAL RUNNER FASTENERS AT 2'-0" O.C. MAXIMUM WITHIN 1" OF ENDS METAL STUD SIZE: 1 5/8" OVERALL DIMENSION: 2 7/8" METAL STUD SIZE: 2 1/2" OVERALL DIMENSION: 3 3/4" A2 A3 METAL STUD SIZE: 3 5/8" OVERALL DIMENSION: 4 7/8" METAL STUD SIZE: 6" OVERALL DIMENSION: 7 1/4" A4 A6 METAL STUD SIZE: 1 5/8" OVERALL DIMENSION: 2 7/8" METAL STUD SIZE: 2 1/2" OVERALL DIMENSION: 3 3/4" B2 B3 METAL STUD SIZE: 3 5/8" OVERALL DIMENSION: 4 7/8" METAL STUD SIZE: 6" OVERALL DIMENSION: 7 1/4" B4 B6 PROVIDE ADDITIONAL BRACING AND/OR HEAVIER GAUGE STUDS AT SPANS EXCEEDING THOSE RECOMMENDED BY MANUFACTURER TO PREVENT EXCESSIVE DEFLECTION. USE 20 GAUGE FOR ALL METAL FRAMING COMPONENTS AS STANDARD UNLESS OTHERWISE NOTED. SEE SPECIFICATIONS. FIRE RESISTANT GYPSUM BOARD (ASTM TYPE 'X' GYPSUM BOARD OR APPROVED EQUAL) SHALL BE USED AT ALL FIRE RATED PARTITIONS. ALL PLYWOOD USED IN PARTITIONS SHALL BE FIRE RETARDANT TREATED. WATER RESISTANT GYPSUM BOARD SHALL BE USED AT DAMP SIDE OF ALL BATHROOMS, BAR PARTITIONS, KITCHENS, ETC. IN LIEU OF STANDARD GYPSUM BOARD. WATER RESISTANT GYPSUM BOARD SHALL NOT BE USED FOR CEILING CONSTRUCTION. NOTES: 1. 2. 3. 4. 5. LEGEND INTERIOR PARTITIONS: A2.1 PARTITION TYPE METAL STUD SIZE (EX. 2 = 2-1/2") NOTE: ALLOWABLE DEFLECTION SHALL BE L/360 UNLESS OTHERWISE NOTED. TYPICAL MOUNTING HEIGHTS: 20 GAUGE STUD 22 GAUGE STUD STUD WIDTH ALLOWABLE DEFLECTION ONE LAYER GWB EACH SIDE TWO LAYERS GWB EACH SIDE FURRING ONE LAYER STUD WIDTH ALLOWABLE DEFLECTION ONE LAYER GWB EACH SIDE TWO LAYERS GWB EACH SIDE FURRING ONE LAYER 2-1/2" 3-5/8" 6" L/240 L/360 L/240 L/360 L/240 L/360 13'-0" 11'-6" 17'-3" 15'-0" 25'-3" 22'-0" 14'-0" 12'-3" 18'-0" 15'-9" 26'-0" 22'-9" 12'-0" 10'-6" 16'-0" 14'-0" 23'-9" 20'-9" 2-1/2" 3-5/8" 6" L/240 L/360 L/240 L/360 L/240 L/360 13'-10" 12'-0" 17'-11" 15'-7" 26'-1" 22'-10" 16'-1" 14'-0" 20'-2" 17'-8" 28'-6" 24'-11" 13'-0" 11'-6" 17'-3" 15'-0" 25'-6" 23'-3" CONTINUOUS METAL RUNNER, SEE TOP OF WALL HEIGHT IN DESIGNATION LINE OF CEILING. SEE FINISH SCHEDULE *1-HOUR RATED (UL DES. #U419) - WHERE DESIGNATED WALL RATING (IF NO DESIGNATION IS LISTED, NO RATING IS REQUIRED) SOUND ATTENUATION FIRE BATT INSULATION. SEE NOTES METAL STUD SIZE: MATCH EXISTING OVERALL DIMENSION: MATCH EXISTING AX CMU SIZE: 8"x8"x16" OVERALL DIMENSION: 7-7/8" M8 TOP OF STRUCTURE UNDERSIDE OF STRUCTURE HEAD PLAN BASE M 8"x8"x16" CONCRETE BLOCK *2-HOUR RATED (UL DES. #U905) - WHERE DESIGNATED MORTAR - BLOCKS LAID IN FULL BED OF MORTAR, NOM. 3 /8 IN. THICK, OF NOT LESS THAN 2-1/4 AND NOT MORE THAN 3-1/2 PARTS OF CLEAN SHARP SAND TO 1 PART PORTLAND CEMENT (PROPORTIONED BY VOLUME) AND NOT MORE THAN 50 PERCENT HYDRATED LIME (BY CEMENT VOLUME). VERTICAL JOINTS STAGGERED. CFMF CEILING FRAMING @ 16" 0.C. Revisions Issue Record 5 Shaws Cove, Suite 103 Drawing Number Copyright © 2026 Seal 0 1/2" 1" 2" Drawing Name Drawing Information Date Job Number Scale Drawn Checked progress print NOT FOR CONSTRUCTION 71 Raymond Road West Hartford, CT 06107 DESIGN / BUILDER New London, CT 06320 860.444.2567 3/12/2026 5:23:43 PM As indicated 3/12/2026 5:23:43 PM YST.001 G-010 G-010 G-010 ABBREVIATIONS, PARTITION TYPES AND LIST OF DRAWINGS 03.09.26 ISSUED FOR OWNER REVIEW 1018 Hartford Tpke. Waterford, Connecticut 06385 03.09.26 YST.001 DD JS LIST OF DRAWINGS # DRAWING NAME GENERAL G-000 COVER SHEET G-010 ABBREVIATIONS, PARTITION TYPES AND LIST OF DRAWINGS G-020 TYPICAL ACCESSORY MOUNTING HEIGHTS AND LOCATIONS G-100 PROJECT SPECIFICATIONS G-101 PROJECT SPECIFICATIONS LIFE SAFETY LS-101 LIFE SAFETY PLAN ARCHITECTURE DEMO AD-101 FIRST FLOOR DEMOLITION PLAN ARCHITECTURE A-101 FIRST FLOOR PLAN A-102 ROOF PLAN A-211 REFLECTED CEILING PLAN A-300 OVERALL BUILDING ELEVATIONS A-400 OVERALL BUILDING SECTIONS A-600 DOOR, FRAME AND HARDWARE SCHEDULE CARD READER LIGHT SWITCHES DOOR HARDWARE ELECT OUTLET CORNER LEADING EDGE OR DOOR LEADING EDGE FIRE STROBE/ SPEAKER ELECT OUTLET TYPICAL ADJACENT TO DOOR TYPICAL AT WALL CARD READER LIGHT SWITCHES DOOR HARDWARE 6'-8" MIN. TO B.O. LENS CL CL CL CL 18" 46" 46" 82" 18" 46" 46" 8" FIRE STROBE/ SPEAKER 6'-8" MIN. TO B.O. LENS 82" 18" FIRE EXTINGUISHER FIRE ALARM PULL STATION CL LC 48" 48" FIRE ALARM SPEAKER/STROBE 48" MAX TO F.E. HANDLE 80" TO BOTTOM OF LENS LIGHT SWITCH ELECTRICAL OUTLET MOUNTED 18" A.F.F. 18" 46" REAR TOILET ELEVATION (ACCESSIBLE) SIDE TOILET ELEVATION (ACCESSIBLE) SIDE TOILET ELEVATION (NON-ACCESSIBLE) VANITY/LAVATORY SECTION TOILET TISSUE, AND/OR SANITARY NAPKIN DISPOSAL UNIT FACE OF PARTITION OR WALL INSTALL VALVE ON THE LEFT SIDE OF THE TOILET STALL HOLD ALL PIPING & INSULATION ON WALL SIDE OF DASHED LINE LEVER HANDLED FAUCETS HOLD 1 1/2" MIN CLEARANCE UNDER GRAB BAR 24" 12" 1' - 7" MAX 17" MIN TO TOP OF SEAT 18" 40" 40 3/4" 1' - 7" MAX 17" MIN TO TOP OF SEAT T.O. SEAT 17" TYP 8" 6" 11" 9" 27" 29" 34" 9" MAX 7" MIN 11" 20" 33" - 36" 33" - 36" 80" MIN. 56" 54" MIN. 39" - 41" 86" MIN. 60" 12" MIN. 18" MIN. VERTICAL GRAB BAR 42" MIN. SIDE GRAB BAR R 30 15" 18" 6" MIN. EQ CLEAR FLOOR SPACE AT LAVATORY CL CL 36" MIN. TYPICAL SINGLE TOILET ROOM CLEAR FLOOR SPACE AT LAVATORY 48" MIN. 30" MIN. 17" MIN. TYPICAL RESTROOM LAV. SECTION 34" 27" TO WHICHEVER IS HIGHER, RIM OR COUNTERTOP NO OBSTRUCTIONS BEYOND THIS LINE 8" 9" MIRROR HEIGHT 40" 6" 24" 4" 13" MAX. H.C. COMPLIANT FAUCET CONTROL H.C. COMPLIANT "TRAP WRAP" INSULATION AT ALL EXPOSED UNDERCOUNTER PIPING 6 1/2" MAX BOWL DEPTH Revisions Issue Record 5 Shaws Cove, Suite 103 Drawing Number Copyright © 2026 Seal 0 1/2" 1" 2" Drawing Name Drawing Information Date Job Number Scale Drawn Checked progress print NOT FOR CONSTRUCTION 71 Raymond Road West Hartford, CT 06107 DESIGN / BUILDER New London, CT 06320 860.444.2567 3/12/2026 5:23:43 PM As indicated 3/12/2026 5:23:43 PM YST.001 G-020 G-020 G-020 TYPICAL ACCESSORY MOUNTING HEIGHTS AND LOCATIONS 03.09.26 ISSUED FOR OWNER REVIEW 1018 Hartford Tpke. Waterford, Connecticut 06385 03.09.26 YST.001 DD JS 1/4" = 1'-0" TYP. ELEVATIONS/ DEVICE MOUNTING LOCATIONS 1/4" = 1'-0" TYP. FIRE SAFETY/ CONTROL DEVICES MOUNTING HEIGHT 3/8" = 1'-0" TYP. TOILET FIXTURES/ ACCESSORIES MOUNTING HEIGHT 1/4" = 1'-0" TYP. WATER CLOSETS Revisions Issue Record 5 Shaws Cove, Suite 103 Drawing Number Copyright © 2026 Seal 0 1/2" 1" 2" Drawing Name Drawing Information Date Job Number Scale Drawn Checked progress print NOT FOR CONSTRUCTION 71 Raymond Road West Hartford, CT 06107 DESIGN / BUILDER New London, CT 06320 860.444.2567 3/12/2026 5:23:43 PM 3/12/2026 5:23:43 PM YST.001 G-100 G-100 G-100 PROJECT SPECIFICATIONS 03.09.26 ISSUED FOR OWNER REVIEW 1018 Hartford Tpke. Waterford, Connecticut 06385 03.09.26 YST.001 DD JS A. 1. 1. 1. A. 1. 2. A. A. A. 1. 1. • 2. 3. 4. a. b. c. d. e. f. SECTION 011000 GENERAL REQUIREMENTS PART 1 - GENERAL Restricted Use of Site: Owner and Owner’s tenants will occupy adjacent areas within the existing building(s) during entire construction period. Contractor is prohibited from all public areas, including lobby, corridors, stairs, elevators and other facilities and spaces. Contractor’s access and use for construction operations is limited to areas within Contract limits as indicated on the Drawings. Work with adjacent areas for tie-in’s or construction of new suite entrances shall be coordinated in advance with Owner. Work shall be performed at designated (“off-hours”) time periods so as not to interfere with Owner's or Owner ’s tenants day-to-day operations. B. Permits and Fees: Apply for, obtain, and pay for permits, fees, and utility company backcharges required to perform the work. C. Codes: Comply with applicable codes and regulations of authorities having jurisdiction. Submit copies of inspection reports, notices and similar communications to Architect. D. Dimensions: Verify dimensions indicated on drawings with field dimensions before fabrication or ordering of materials. Do not scale drawings. E. Existing Conditions: Notify Architect of existing conditions differing from those indicated on the drawings. F. Contractor’s Conduct on Premises: The Contractor and their employees shall behave in a respectful, courteous and safe manner. Abusive, harassing, and lewd behavior is prohibited. Music playing is prohibited. Alcohol, tobacco, and drug use is prohibited. Comply with Owner’s Rules and Regulations. G. Digital Project Management: Unless otherwise stipulated in the agreement, provide, administer, and use web- based Project software site for purposes of hosting and managing Project communication and documentation until Final Completion. Software program to include a minimum: Document management for drawings and specifications; Creation, logging and tracking of project communications, submittals, RFI’s, contract modifications, construction schedules, and progress photographs. a. Basis-of-Design Product: Procore Technologies, Inc.; Procore Construction Management Software. 1.3DEFINITIONS General: Basic Contract definitions are included in the Conditions of the Contract. B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract. C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "approved," "required," and "permitted" have the same meaning as "directed." D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated." E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work. F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations. G. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations. H. "Provide": Furnish and install, complete and ready for the intended use. I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built. J. “Substitutions”: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms. Substitutions for Convenience: Changes proposed by Contractor that are not required to meet Project conditions or requirements. 1.4INDUSTRY STANDARDS Referenced standards are part of the Contract Documents and have the same force and effect as if bound with these specifications. B. Except where specifically indicated otherwise, comply with the current standard in effect as of the date of the Owner/Contractor Agreement. Obtain copies of industry standards directly from publisher. C. The titles of industry standard organizations are commonly abbreviated; full titles may be found in Encyclopedia of Associations or consult Architect. 1.5CODES AND REGULATIONS Comply with all applicable codes, ordinances, regulations and requirements of authorities having jurisdiction. B. Submit copies of all permits, licenses, certifications, inspection reports, releases, notices, judgments, and communications from authorities having jurisdiction to the Architect. 1.6PROCEDURES AND CONTROLS Layout: Layout work and be responsible for all lines, elevations, and measurements of the building, grading, utilities and other work executed under the contract. B. Field Measurements: Verify measurements at the building prior to ordering materials or commencing work. No extra charge or compensation will be allowed because of differences between actual dimensions and measurements indicated on the Drawings. Differences which may be found shall be submitted to the Architect for decision before proceeding with the work. C. Project Limit Line: The boundaries of the site do not limit the responsibility of the Contractor to perform the work in its entirety. Make utility connections as indicated. D. Matching: Where matching is indicated, the Architect shall be the sole and final judge of what is an acceptable match. Mockups and sample submissions are required. E. Observation: Notify the Architect and authorities having jurisdiction at least thirty-six hours in advance of concealing any work. F. Utilities: Prior to interrupting utilities, services or facilities, notify the utility owner and the Owner and obtain their written approval a minimum 48 hours in advance. G. Clean-Up: Frequently clean-up all waste, remove from site regularly, and legally dispose of off- site. H. Installer's Acceptance of Conditions: All installers shall inspect substrates and conditions under which work is to be executed and shall report in writing to the Contractor all conditions detrimental to the proper execution and completion of the work. Do not proceed with work until unsatisfactory conditions are corrected. Beginning work means installer accepts previous work and conditions. Coordination: The Contractor shall be fully responsible for coordinating all trades, coordinating construction sequences and schedules, and coordinating the actual installed location and interface of all work. I. Request For Interpretation (RFIs): Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response. Content of the RFI: Include a detailed, legible description of item needing interpretation. Architect's Action: Architect will review each RFI, determine action required, and return it. Allow three working days for Architect's response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day. The following RFIs will be returned without action: Requests for approval of submittals. Requests for approval of substitutions. Requests for coordination information already indicated in the Contract Documents. Requests for adjustments in the Contract Time or the Contract Sum. Requests for interpretation of Architect's actions on submittals. Incomplete RFIs or RFIs with numerous errors. A. 1. 2. 3. 4. 1. 1. 1. 2. 1. 2. A. 1. 2. A. 1. J. Existing Articles of Unusual Value: If during demolition, excavation, or disposal work articles of unusual value or of historical or archaeological significance are encountered, the ownership of such articles is retained by the Owner, and information regarding their discovery shall be immediately furnished to the Architect. If the nature of the article is such that work cannot proceed without danger of damage, work in the area shall be immediately discontinued until the Architect has determined the proper procedure to be followed. Delays in time thereby shall be a condition for which the time of the Contract may be extended. Costs incurred after discovery in the salvaging of such articles shall be borne by the Owner. 1.7SUBMITTALS Required Submittals: Submit shop drawings, product data, initial selection samples, verification samples, calculations, coordination drawings, schedules, and all other submittals as specified in individual specification sections. B. Submittal Schedule: Within 30 days after award of contract and before first application for payment, prepare list of submittals in chronological sequence showing all submittals and proposed date first due at Architect's office and proposed date due to be returned to Contractor. Note relevant specification section number. C. Contractor's Preparation of Submittals: Modify and customize all submittals to show interface with adjacent work and attachment to building. Identify each submittal with name of project, date, Contractor's name, subcontractor's name, manufacturer's name, submittal name, relevant specification section numbers, and Submittal Schedule reference number. Stamp and sign each submittal to show the Contractor's review and approval of each submittal before delivery to Architect's office; unstamped and unsigned submittals will be returned without action by the Architect. Leave 4" x 6" open space for Architect's "action" stamp. Electronic Submittals: Provide a copy of all submittals in electronic format to the Architect. Architect will return a file of reviewed submittal in electronic format to the Contractor for distribution to subcontractors, suppliers, fabricators, governing authorities and others as necessary for proper performance of the Work. Unless otherwise amenable to the Architect, additional hard copies of submittals will not be reviewed by the Architect (or Consultant) and will not be returned to the Contractor. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item. Name file with submittal number or other unique identifier, including revision identifier. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Architect and Construction Manager. D. Product Data: Provide manufacturer's preprinted literature including, without limitation, manufacturer's standard printed description of product, materials and construction, recommendations for application and use, certification of compliance with standards, instructions for installation, and special coordination requirements. Collect data into one submittal for each unit of work or system; mark each copy to show which choices and options are applicable to project. Installer Copy: Verify that the Installer has a current copy of the relevant product data, including installation instructions, before permitting installation to begin. E. Shop Drawings: Provide accurately prepared, large scale and detailed shop drawings prepared specifically for this project. Show adjacent conditions and related work. Show accurate field dimensions and clearly note field conditions. Identify materials and products in the work shown. Note special coordination required. After Architect's action, follow specified distribution procedure. F. Samples: Provide units identical with final materials and products to be installed in the work. Where indicated, prepare samples to match Architect's sample. Label each sample with description, source, generic name or manufacturer's name and model number. Architect will review samples for confirmation of visual design intent, color, pattern, texture and type only; Architect will not test samples for compliance with other Contract requirements which shall remain the exclusive responsibility of the Contractor. Initial Selection Samples Submittal Quantities: For initial selection purposes, submit 1 set of samples showing the complete range of colors and finishes available. Verification Samples Submittal Quantities: For verification of an initial selection, submit 3 sets of samples; one set will be returned to Contractor to be maintained at project site for quality control comparisons. G. Timing of Submittals: Submit submittals in a timely fashion to allow at least 10 business days for each office's review and handling. This means that submittals which have to be reviewed by the Architect and one of their consultants require at least 20 business days for review and handling. Add ten business days for each additional consultant who must review a submission. H. Architect's Action on Submittals: Architect will review submittals, stamp with "action stamp", mark action, and return to Contractor. Architect will review submittals only for conformance with the design concept of the project. The Contractor is responsible for confirming compliance with other Contract requirements, including without limitation, performance requirements, field dimensions, fabrication methods, means, methods, techniques, sequences and procedures of construction, coordination with other work. The Architect's review and approval of submittals shall be held to the limitations stated in the Owner/Architect Agreement and the Conditions of the Contract. In no case shall approval or acceptance by the Architect be interpreted as a release of Contractor of their responsibilities to fulfill all of the requirements of the Contract Documents. Required Resubmittal: Unless submittal is noted "reviewed" or "reviewed except as noted, resubmission not required," make corrections or changes to original and resubmit to Architect. Distribution: When submittal is noted "reviewed" or "reviewed as noted, resubmittal not required," make prints or copies and distribute to Owner, Subcontractors involved, and to all other parties requiring information from the submittal for performance or coordination of related work. 1.8WARRANTIES Warranties Required: Refer to individual trade sections for specific product warranty requirements. B. Procurement: Where a warranty is required, do not purchase or subcontract for materials or work until it has been determined that parties required to countersign warranties are willing to do so. C. Warranty Forms: Submit written warranty to Owner through Architect for approval prior to execution. Furnish two copies of executed warranty to Owner for their records; furnish two additional conformed copies where required for maintenance manual. D. Work Covered: Contractor shall remove and replace other work of project which has been damaged as a result of failure of warranteed work or equipment, or which must be removed and replaced to provide access to work under warranty. Unless otherwise specified, warranty shall cover full cost of replacement or repair, and shall not be pro-rated on basis of useful service life. E. Warranty Extensions: Work repaired or replaced under warranty shall be warranted until the original warranty expiration date or for ninety days whichever is later in time. F. Warranty Effective Starting Date: Guarantee period for all work, material and equipment shall begin on the date of substantial completion of the Project, not when subcontractor has completed their work nor when equipment is turned on. In addition to the one year guarantees for the entire work covered by these Contract Documents, refer to the various sections of the specifications for extended guarantee or maintenance requirements for various material and equipment. G. Warranties are Irrevocable: Warranties issued to the Owner are irrevocable. Non-Payment: If warrantor refuses to issue warranty, or attempts to revoke warranty due to lack of payment by any party other than the Owner, the Contractor shall resolve the payment conflict, and cause the warranty to be issued or reinstated. Incomplete or incorrect Installation: If warrantor refuses to issue warranty, or attempts to revoke warranty due to improper installation or other deficiency, the Contractor shall correct the deficiency and cause the warranty to be issued or reinstated. H. Transferable Warranties: All warranties shall permit Owner to transfer or assign warranties to future owners or other assignors at no additional cost to the Owner for the full warranty period. 1.9CUTTING AND PATCHING Limitations: Do not cut and patch any work in a manner that would result in a failure of the work to perform as intended, decreased energy performance, increased maintenance, decreased operational life, or decreased safety. Structural Work: Do not cut structural work or bearing walls without written approval from Architect. Where cutting and patching of structural work is necessary and approved by Architect, perform work in a manner which will not diminish structural capacity nor increase deflection of member. Provide temporary shoring and bracing as necessary. Ensure the safety of people and property at all times. B. Cutting and Patching Materials: Use materials identical to materials to be cut and patched. If identical materials are not available or cannot be used, use materials that match existing materials to the greatest extent possible. Provide finished work that will result in equal to or better than existing performance characteristics. C. Inspection: Before cutting and patching, examine surfaces and conditions under which work is to be performed and correct unsafe and unsatisfactory conditions prior to proceeding. D. Protection: Protect adjacent work from damage. Protect the work from adverse conditions. E. Cutting: Cut work using methods least likely to damage adjoining work. Use tools designed for sawing or grinding, not hammering or chopping. Use saws or drills to ensure neat, accurately formed holes to sizes required with minimum disturbance to adjacent work. Temporarily cover openings; maintain weathertightness and safety. 1. A. 1. 2. 3. 4. 1. 2. 3. 4. A. A. 1. 2. 3. 4. 5. 6. 7. 1. 2. Utilities: Locate utilities before cutting. Provide temporary utilities as needed. Cap, valve, or plug and seal ends of abandoned utilities to prevent entrance of moisture or other foreign matter. F. Patching: Patch with seams and joints which are durable and not visible. Comply with specified tolerances for similar new work; create true even planes with uniform continuous appearance. Restore finishes of patched areas and, if necessary, extend finish restoration onto adjoining unpatched area to eliminate evidence of patching and refinishing. Repaint entire assemblies, not just patched area. Remove and replace work which has been cut and patched in a visually unsatisfactory manner as determined by the Architect. G. Qualifications: Retain experienced and specialized firms, original installers if possible, to perform cutting and patching. Workmen shall be skilled in type of cutting and patching required. 1.10 TEMPORARY FACILITIES AND UTILITIES Scope of Temporary Work: This article is not intended to limit the scope of temporary work required under the Contract. Provide all temporary facilities and utilities needed. B. Permits and Fees: Obtain and pay for all permits, fees and charges related to temporary work. C. Codes and Authorities Having Jurisdiction for Temporary Facilities and Utilities: Comply with all requirements of authorities having jurisdiction, codes, utility companies, OSHA, and industry standards including, but not limited to the following: NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations. ANSI-A10 Series, Safety Requirements for Construction and Demolition. NECA National Joint Guideline NJG-6, Temporary Job Utilities and Services. Electrical Service: NEMA, NECA, and UL. D. Field Offices: Provide Contractor's field offices as needed. Keep current copies of all Contract Documents and project paperwork neatly on file at jobsite. E. Equipment and Tools: Provide all equipment including, but not limited to, hoists, lifts, scaffolding, machines, tools and the like, as needed for execution of the work. Provide safe access to all parts of the work. F. Temporary Enclosures: Provide temporary enclosures to maintain proper temperatures and to prevent weather damage. Always maintain legal means of egress. G. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel. H. Protection: Protect nearby property and the public from construction activities. Provide and maintain barricades, warning signs and lights, railings, walkways and similar items. Immediately repair damaged property to its condition before being damaged. I. Construction Fencing: Provide construction fencing and barriers as applicable to the project and as required by code to protect personnel, the public, and to control access. J. Fire Prevention: Take every precaution to prevent fire. Provide and maintain in good operating condition suitable and adequate fire protection equipment and services, and comply with recommendations regarding fire protection made by the representative of the fire insurance company carrying insurance on the Work or by the local fire chief or fire marshal. The area within the site limits shall be kept orderly and clean, and all combustible rubbish shall be promptly removed from the site. K. Egress: Maintain safe and legal means of egress at all times. At all times, provide at least two separate means of egress. L. Mold Control and Remediation During Construction: The Contractor shall protect construction materials and building systems from moisture damage and from conditions which promote mold growth during and after construction. The Contractor shall be responsible for mold remediation and replacement of materials which cannot be successfully remediated in accordance with the following requirements: Materials which become wet prior to installation shall be cleaned, treated and dried in accordance with EPA Guidelines. Materials which exhibit mold growth prior to installation shall not be installed and shall be removed from the site. Materials which exhibit mold growth after installation shall be remediated in accordance with EPA Guidelines for Remediating Building Materials with Mold Growth Caused by Clean Water. The Contractor shall engage and pay for a qualified industrial hygienist acceptable to the Owner to determine the cause of the mold growth, and to certify in writing that materials have been successfully remediated. In the event that the industrial hygienist recommends methods of remediation in addition to those in the Guidelines, the Contractor shall also be responsible for the additional remediation. Materials which can not be successfully remediated shall be removed and replaced with new materials at no additional expense to the Owner. Prior to the start of construction, the Contractor shall submit the name of the person in the Contractor's organization responsible for ensuring compliance with these requirements for mold control and remediation. M. Existing Mold-Contaminated Materials: In the event that mold-contaminated materials are encountered during remodeling operations, the Contractor shall stop work in that area and notify the Owner and Architect in writing. The Owner will engage and pay for an industrial hygienist to evaluation the situation to advise the Contractor on the proper course of action. 1.11 DELIVERY, STORAGE AND HANDLING Manufacturer's Instructions: Strictly comply with manufacturer's instructions and recommendations and prevent damage, deterioration and loss, including theft. Minimize long- term storage at the site. Maintain environmental conditions, temperature, ventilation, and humidity within range permitted by manufacturers of materials and products used. 1.12 RECORD DOCUMENTS Definition of As-Constructed Record Drawings: (commonly called “as-builts”) are the record of the Project as constructed based on information the Contractor provides to the Owner under the contract for construction. Because the As-constructed Record Drawings will be based on the Contractor’s mark-ups, the Architect is not responsible for the accuracy or completeness of the As-constructed Record Drawings. B. Definition of As-Designed Record Drawings: The record of everything the Architect designed for the Project, and including the original Construction Documents plus all addenda, Architect’s Supplemental Instructions, Change Orders, Construction Change Directives and minor changes in the work. C. General: Keep as-constructed record documents neatly and accurately. Record information as the work progresses and deliver to Architect at time of final acceptance. Include in record documents all field changes made, all relevant dimensions, and all relevant details of the work. Keep record documents up to date with all Architect’s Supplemental Instructions, Change Orders, Construction Change Directives and minor changes in the work clearly indicated. D. Operating and Maintenance Manuals: Manuals shall be submitted which contain the following: Description of the system provided. Handling, storage, and installation instructions. Detailed description of the function of each principal component of the systems or equipment. Operating procedures, including prestartup, startup, normal operation, emergency shutdown, normal shutdown and troubleshooting. Maintenance procedures including lubrication requirements, intervals between lubrication, preventative and repair procedures, and complete spare parts list with cross reference to original equipment manufacturer's part numbers. Control and alarm features including schematic of control systems, control loop electric ladder diagrams, controller operating set points, settings for alarms and shutdown systems, pump curves and fan curves. Safety and environmental considerations. E. Copies of Operating and Maintenance Manuals: Three copies of the manuals shall be provided within sufficient time to allow for training of Owner's personnel. Submit one copy of the manuals to the Architect for review no later than 90 calendar days prior to substantial completion, or building turn over, whichever comes first. Submit the remaining five copies within 15 days after first review set is returned to contractor. Progress payment may be withheld if this requirement is not met. F. Instructions for Owner's Personnel: Prior to final inspection, instruct the Owner's personnel in operation, adjustment and maintenance of products, equipment and systems. Provide instruction at mutually agreed upon times. Video all instruction sessions and deliver videos to Owner on thumb drive or other suitable media. For equipment that requires seasonal operation provide similar instruction during other seasons. Use operation and maintenance manuals for each piece of equipment or system as the basis of instruction. Review contents in detail to explain all aspects of operation and maintenance. CONTINUED ON THE NEXT PAGE Revisions Issue Record 5 Shaws Cove, Suite 103 Drawing Number Copyright © 2026 Seal 0 1/2" 1" 2" Drawing Name Drawing Information Date Job Number Scale Drawn Checked progress print NOT FOR CONSTRUCTION 71 Raymond Road West Hartford, CT 06107 DESIGN / BUILDER New London, CT 06320 860.444.2567 3/12/2026 5:23:43 PM 3/12/2026 5:23:43 PM YST.001 G-101 G-101 G-101 PROJECT SPECIFICATIONS 03.09.26 ISSUED FOR OWNER REVIEW 1018 Hartford Tpke. Waterford, Connecticut 06385 03.09.26 YST.001 DD JS A. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 1. 2. 3. 4. A. 1. 2. 3. 4. 5. 1. A. 1. 2. 3. 4. 5. 1. A. 1. A. 1. A. A. A. 1. 2. 3. 1.13 PROJECT CLOSE OUT Complete the following prior to Substantial Completion: Provide Contractor's Punch List of incomplete items stating reason for incompletion and value of incompletion. Submit all warranties, maintenance contracts, final certificates and similar documents. Obtain Certificate of Occupancy and similar releases which permit the Owner's full and unrestricted use of the areas claimed "Substantially Complete". Submit record documents. Deliver maintenance stocks of materials where specified. Make final change over of lock cylinders or cores and advise Owner of change of security responsibility. Complete startup of all systems and instruct Owner's personnel in proper operation and routine maintenance of systems and equipment. Complete clean up and restoration of damaged finishes. Remove all temporary facilities and utilities that are no longer needed. Request Architect's inspection for Substantial Completion. B. Architect will either issue a Certificate of Substantial Completion or notify Contractor of work which must be performed prior to issue of certificate. C. Complete the following prior to Final Acceptance and payment: Obtain Certificate of Substantial Completion. Submit final application for payment, showing final accounting of changes in the work. Provide final releases and lien waivers not previously submitted. Submit certified copy of final punch list stating that Contractor has completed or corrected each item. 1.14 FINAL CLEANING AND REPAIR Clean Up: Immediately prior to the Architect's inspection for Substantial Completion, the Contractor shall completely clean the premises and clean and prepare the completed work in order for it to be used for its intended purpose in accordance with the Contract Documents. Such work shall include, but not be limited to the following: Stains, spots, dust, marks and smears shall be removed from all surfaces. Hardware and metal surfaces shall be cleaned and polished. Glass and plastic surfaces shall be thoroughly cleaned by professional window cleaners. Damaged, broken or scratched glass or plastic shall be replaced by the Contractor at the Contractor's expense. Use low-emitting, environmentally friendly cleaning agents and procedures. Do not use ammonia-, chlorine bleach-, or solvent-based cleaners, unless authorized in writing by Architect. B. Repairs: Repair and touch-up all damaged and deteriorated products and surfaces. END OF SECTION SECTION 024119 SELECTIVE DEMOLITION PART 1 - GENERAL DESCRIPTION OF WORK Work Included: Demolition and removal of selected portions of the existing building as required for new work. Refer to the Drawings for additional requirements. Salvage of existing items to be reused or turned over to the facility. Removal and legal disposal of demolished materials off site. Except those items specifically designated to be relocated, reused, or turned over to the facility, all existing removed materials, items, trash and debris shall become property of the Contractor and shall be completely removed from the site and legally disposed of at their expense. Salvage value belongs to the Contractor. On-site sale of materials is not permitted. Demolition and removal work shall properly prepare for alteration work and new construction to be provided under the Contract. Scheduling and sequencing operations without interruption to utilities serving occupied areas. If interruption is required, obtain written permission from the utility company and the Owner. DEFINITIONS Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled. B. Remove and Salvage: Detach items from existing construction and deliver them to the Owner ready for reuse, at a location designated by the Owner. Protect from weather until accepted by Owner. C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated. Protect from weather until reinstallation. D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled. QUALITY ASSURANCE Examination of Existing Conditions: The Contractor shall examine the Contract Drawings for demolition and removal requirements and provisions for new work. Verify all existing conditions and dimensions before commencing work. The Contractor shall visit the site and examine the existing conditions as he finds them and shall inform herself/himself of the character, extent and type of demolition and removal work to be performed. Submit any questions regarding the extent and character of the demolition and removal work in the manner and within the time period established for receipt of such questions during the bidding period. B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. WARRANTY Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties. PART 2 - PRODUCTS 2.1SALVAGING Salvaged for Reinstallation: Materials indicated on the Drawings to be salvaged and reinstalled shall be carefully removed and stored at a location acceptable to the Architect and Owner. B. Salvaged for Storage: Materials indicated on the Drawings or designated in the field by the Owner to be salvaged and stored shall be carefully removed and delivered to the Owner at locations determined by Owner. PART 3 - EXECUTION 3.1EXAMINATION Verify that utilities have been disconnected and capped. B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required. C. Prior to penetrating, coring, or saw cutting and removal of existing concrete slabs, investigate existing conditions to determine location of embedded and below slab items, including structural elements, thickened slabs, reinforcing steel, conduits and piping. Review record documents of existing construction if available from Owner. Provide X-ray or penetrating radar scanning of area. Mark existing slab with locations and approximate size of embedded and below slab items. D. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged. E. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect. A. 1. 2. 3. A. 1. 2. 1. 1. 2. A. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 1. 2. 3. 4. 5. 1. 2. 3. 4. 5. 1. 2. 1. A. A. 3.2UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing. Where entire wall is to be removed, existing services/systems may be removed with removal of the wall. Prior to commencing cutting work in existing surfaces, take all precautionary measures to assure that mechanical and electrical services to the particular area have been made inactive. Coordinate with Plumbing, HVAC, and Electrical subcontractors. Only licensed tradesmen of that particular trade shall disconnect and cap existing mechanical and electrical items that are to be removed, abandoned and/or relocated. 4. If, during the process of cutting work, existing utility lines are encountered which are not indicated on the Drawings, regardless of their condition, immediately report such items to the Architect. Do not proceed with work in such areas until ins