Representative Town Meeting Annual Meeting (linked)

agenda center agenda

Board/CommissionRepresentative Town Meeting (RTM)
Meeting DateDecember 04, 2023
Pages64
File Size5.8 MB
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
oP
~“ZoOmms
PHONE: 860-442-0553
www.waterfordct.org
AGENDA
REPRESENTATIVE TOWN MEETING
REGULAR MEETING
Monday, December 4, 2023/7:00pm — Waterford Town Hall
Pledge of Allegiance
Roll Call
To elect a moderator of the Representative Town Meeting to serve for a term of
one year. (Charter 3.1.12, C)
To consider and act upon the minutes of the October 2, 2023 Regular Meeting.
Correspondence
Public Comment
Committee reports and referrals
Appointee & Liaison updates
Transaction of Business on the Call:
1. Data Center Update.
2. To consider and act upon a recommendation from the Board of Finance
for an additional appropriation in the amount of $48,998 for a new Capital
Project (Fargo Water Tank Antennas), account number to be
determined, from Line #205-31520 Undesignated Fund Balance of the
Capital Nonrecurring Expenditure Fund (CNR).
3. To consider and act upon a recommendation from the Board of Finance
for an appropriation in the amount of $64,000 from funds designated on
Capital and Non-recurring Line Item #20523-57777, SCBA Up-Grade
Program for SCBA replacements over the next three (3) years per the
CIP plan.
4. To consider and act upon a recommendation from the Board of Finance
for an appropriation in the amount of $1,091,200 from funds designated
on Capital and Non-recurring Line Item #20536-57848 Library HVAC
Upgrade for renovation and replacement of the heating, ventilation and air
conditioning systems at the Waterford Public Library.
5. To consider and act upon a recommendation from the Public Protection &
Safety Standing Committee of the RTM to amend Chapter 2.36.075 —
Fire Marshall Fee schedule and enforcement of the Town of
Waterford Code of Ordinances.
regsiven Fon neconn //2/ 2022
“44
uy. ATTEST 220 2 Cate 14h

6. To consider and act upon a request from the First Selectman to approve the
non-union Administrative Support (AS) and Technical Crafts (TC) general
wage increase of 2.25% for fiscal year 2023-2024 (retroactive to July 1,
2023) and a general wage increase of 2.50% for fiscal year 2024-2025. This
also inciudes an increase in employee cost-sharing of health benefits from
13.5% to 14% effective January 1, 2024 and 15% effective July 1, 2024.
7. To consider and act upon a request from the First Selectman to approve the
non-union Management Professionals general wage increase of 2.25% for
fiscal year 2023-2024 (retroactive to July 1, 2023) and a general wage
increase of 2.50% for fiscal year 2024-2025. This also includes an increase
in employee cost-sharing of health benefits from 13% to 14% effective
January 1, 2024 and 15% effective July 1, 2024.
8. To consider and act upon a motion to discuss strategy and/or negotiations
with respect to the Local 818 of Council 4, American Federal of State,
County and Municipal Employees (AFSCME), AFL-CIO bargaining
agreement in executive session.
9. To consider and act upon a motion to approve the funds necessary to
implement the Tentative Agreement between the Town of Waterford and
Local 818 of Council 4, AFSCME, AFL-CIO, to be effective July 1, 2023 —
June 30, 2027, and authorize the First Selectman to sign on the Town’s
behalf.
10.To consider and act upon two appointments to the Personnel Review Board.
(Term 12/01/2023 — 11/30/2026)
11. The establishment of the Committee on Committees membership by the
moderator.
12.To consider and act upon the recommendation of the committee on
committees for the membership of the Standing Committees of the RTM.
13.To consider and act upon the RTM appointments to the Long Range
Fiscal Planning Committee, and the School Building Committee,
14.To consider and act upon two appointments to the Retirement
Commission. (Term 01/01/2024 — 12/31/2025)
15.To consider and act upon two RTM appointments to the Social Services
Grants Review Board. (Term 12/04/2023 — 12/02/2024)
16.To consider and act upon two RTM appointments to the Fire Services
Review Special Committee.
17.To consider and act upon one RTM appointment to the Oswegatchie Fire
Station Building Committee.
18.To consider and act upon the proposed schedule of regular meetings for
the 2024 calendar year.
19. To consider and act upon a proposed Representative Town Meeting budget
for fiscal year 2024-25 in the amount of $18,903.
J. New Business
K. Adjournment

PIPTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
PHONE: 860-442-0553
www.waterfordct.org
MINUTES
REPRESENTATIVE TOWN MEETING
Regular Meeting
October 2, 2023
Moderator Paul Goldstein called the October 2, 2023 Regular Meeting of the Representative Town
Meeting to order at 7:00 P.M.
PLEDGE OF ALLEGIANCE
ROLL CALL
PRESENT: Kyrah Augmon-Bossa, Michael Bono, Mary Childs, Harry Colonis, Thomas J, Dembek, Susan
Driscoll, Timothy Fioravanti, Nick Gauthier, Kevin Girard, Paul Goldstein, Kristin Gonzalez, Ryan Healy,
Richard Holmes, Cheryl Larder, Theodore Olynciw, Dan Radin, Michael Rocchetti(7:13 PM), David
Sugrue, David Welch
ABSENT: Jennifer Bracciale, Timothy Condon, Steve Garvin, Lindsay Khan, Jennifer Kohl, Danielle
Steward-Gelinas.
EX-OFFICIO MEMBERS PRESENT: First Selectman Robert J. Brule, Selectman Richard Muckle
EX-OFFICIO MEMBERS ABSENT: Chair of the Board of Education Pat Fedor, Chair of the Board of Finance
Glenn Patterson
ALSO PRESENT: Town Clerk David L, Campo, Town Attorney Robert Avena, Town Attorney Nicholas
Kepple, and Finance Director Kim Allen _
AGENDA ITEM C — August 7, 2023 Regular Meeting Minutes
MOTION by Bono, séconded by Dembek, to approve the August 7, 2023 Minutes as presented with the
following correction submitted by Town Clerk David Campo: The vote in Section C should have included
an abstention by Cheryl Larder.
MOTION PASSED: Unanimous
AGENDA ITEM D - CORRESPONDENCE:
The following items were received for correspondence: A committee report from Public Health,
Recreation and Environment Standing Committee Chair Michael! Bono. A project status report on the
Oswegatchie Fire House Building Committee from RTM Member Ted Olynciw. A letter from RTM
Member Dan Radin in regard to the proposed Data Center. A letter from Police Chief Marc Balestraccl in
regard to a potential ordinance to regulate illegal use of ATVs and dirt bikes, “Fire Services Review
Special Committee interim Report, January 2023” from Chair Robert Tuneski, Committee report from
the Legislation & Administration Standing Committee Chair Thomas Dembek. A letter from RTM
2 RTM MINUTES 10/02/2023

Member Cheryl Larder to the Public Health and Recreation Standing Committee in regard to its work on
a review of the town’s noise ordinance. A letter from RTM Member Susan Driscoll in regard to the
increasing the roster size of the Police Commission.
PUBLIC COMMENT
The following members af the public spoke in opposition to the proposed Data Center: Laurette Saller, 4
Gun Shot Rd; Kathleen Pavlick(See Attachment}, 11 Race Rock Rd; Judi Leary, 6 Maple Terrace; John
Valliere, 294 Millstone Rd E.(See Attachment); Bryan Sayles, 54 Wintergreen Dr(See Attachment);
Michele Lewis-O’Donneil(See attachment), no address provided; Robert Perry, 35 New Shore Rd; J. Thad
May, 18 Jordan Cove Circle; Robin Schechtel, 14 Huntley Rd, Niantic; Lucas, last name and address not
provided; Deb Roberts, 4 Jordan Cove Circle(See Attachment); Lynn MacMarrow, 10 4" St; Next speaker
provided name or address; Michele Caulkins, 9 Lanyard Ln; JoAnn Harper, 1 Betty St (See Attachment).
The folowing members of the public spoke in support of the proposed Data Center: Keith Brothers, 268
Thames Rd, Groton; Jim Denning, 12 Old Mill Rd, Quaker Hill; Erica Weborg, 13 Main St, town unknown;
Chris Prevost, 17 Knollwood Rd, Niantic; David Jarvis, address unknown; Joseph Toner, 11 Old Mill Ra,
Quaker Hill.
AGENDA ITEM F —- COMMITTEE REPORTS AND REFERRALS
it was noted that committee reports received would be discussed under New Business.
RTM Member Olynciw teft the room.
CALL ITEM 1 ~ Old Norwich Road Pump Station
PRESENTATION: Director of the Utility Commission Jim Bartelli
MOTION by Bono, seconded by Dembek, to approve a recommendation from the Board of Finance for
an additional appropriation in the amount of $755,369 from the Undesignated Fund Balance Line of the
Capital Nonrecurring Expenditure Fund (CNR) Line #205-31520 to Line #20531-57816 (Old Norwich
Road Pump Station).
MOTION by Larder, seconded by Childs, to amend the motion to reduce the request by $66,385 for a
new total of $688,984
Discussion ensued
VOTING IN FAVOR: Augmon-Bossa, Chiids, Driscoll, Gauthier, Larder
VOTING AGAINST: Bona, Colonis, Dembek, Fioravanti, Girard, Goldstein, Gonzalez, Healy, Holmes, Radin,
Rocchetti, Sugrue, Welch
MOTION FAILED: 5-13
ORIGINAL MOTION PASSED: 17-1-0
CALL ITEM 2 ~ Revaluation
MOTION by Bono, seconded by Girard, to approve a recommendation from the Board of Finance for an
appropriation in the amount of $6,547.47 from the Undesignated Fund Balance Line of the Capital
Nonrecurring Expenditure Fund (CNR) Line #205-31526 to Line #20501-57639 (Revaluation).
MOTION PASSED: Unanimous
RTM Member Olynciw returned.
2 RTM MINUTES 16/02/2023

CALL ITEM 3 ~ NE Edge Data Center Update
PRESENTATION: NE Edge Attorney William McCoy
Attorney McCoy provided an update on the project and answered questions from the body.
CALL ITEM 4 — Executive Session
MOTION by Dembek, seconded by Fioravanti, to go into executive session to discuss security matters
pertaining to Waterford Town Buildings and Schools at 8:58 PM and invite the following: First Selectman
Robert Brule, Town Attorney Nick Kepple, Police Chief Marc Balestracci, Fire Director Mike Howley, IT
Manager Jeff Robillard, Finance Director Kim Allen, Superintendent of Schools Thomas Giard, BOE
Finance Director Joe Mancini, BOE IT Director Mark Geer, Planning Director Jon Mullen.
MOTION PASSED: Unanimous
MOTION by Girard, seconded by Dembek, to come out of Executive Session at 9:55 PM,
MOTION PASSED: Unanimous
CALL ITEM 5 ~ Safety Measures for Town and School Facilities
PRESENTATION: None
MOTION by Bona, seconded by Dembek, to approve a recommendation from the Board of Finance for
an additional appropriation in the amount of $1,982,900 from the Undesignated Fund Balance Line of
the Capital Nonrecurring Expenditure Fund (CNR) Line #205-31520 to Line #20560-57842 (Schoo!
Security) for safety measures for town and school facilities.
MOTION by Bono, seconded by Dembek, to amend the motion to read as follows: To consider and act
upon a recommendation from the Board of Finance for an additional appropriation in the amount of
$1,982,900 from the from the Unassigned Genera! Fund Balance to Line #20560-57842 (School
Security) for safety measures for town and school facilities.
MOTION WITH AMENDMENT PASSED: Unanimous
RTM Member Sugrue left the room and did not return.
NEW BUSINESS:
MOTION by Dembek, seconded by Olynciw, to accept the Legislation and Administration committee’s
report (See Attachment) on the EDC issue and recommendation that the RTM take no action.
MOTION PASSED: 17-1-0 (Larder voted no)
MOTION by Bono, seconded by Rocchetti, to accept the Public Health, Recreation & Environment
committee’s report on the review of the town’s noise ordinance and accept the recommendation of the
committee.
VOTING IN FAVOR: Augmon-Bossa, Bono, Childs, Colonis, Dembek, Fioravanti, Girard, Goldstein, Healy,
Hoimes, Olynciw, Rocchetti, Welch
VOTING AGAINST: Driscoll, Gauthier, Gonzalez, Larder, Radin
MOTION PASSED: 13-5-0
MOTION by Bono, seconded by Rocchetti, to send the subject (ATV and Dirt Bike Ordinance
Consideration) of Chief Balestracci’s letter to the Public Protection & Safety Committee.
MOTION PASSED: Unanimous
3 RTM MINUTES 10/02/2023

MOTION by Driscoll, seconded by Gauthier, to move the issue of expanding the Police Commission to
seven members to the Legislation & Administration Committee.
MOTION PASSED: Unanimous
RTM Member Olynciw discussed his submitted Oswegatchie Fire Station Building Committee report
Brief discussion ensued.
RTM Member Olynciw stated that he would discuss his vacant properties report at a future meeting.
MOTION by Rocchetti, seconded by Colonis, to adjourn passed unanimously at 10:28 P.M.
ectfully Submitted,
David L. Campo, CCTC
Town Clerk
4 RTM MINUTES 10/02/2023

RTM Korthleen Gv lice
Warte te (ly C
Money, Money’, Money
a normally vital come uP and read something LC wrale
ale a my concern For he envitenment of Waterford,
“Ri wason L purchased a hame here was because oF
Hig lecauts Cul, geaceful views of wetter anc) natures all
Ange \ost +0 he gollect on Tow dada cewlets, Burts ye
+ bden reQeatedly as Kino, eck wey chai@, fr enul vaywnentell
impact shubies to hz clone be&ve his development gees
ony furthers to no avatl.
— 805 Lin aging dy yal’ ahowk Ye. one lsske nek
envevy one seems +o Cave alsout in Lats bNaacltion
instead MONEY» money; money.
EA all atevrtecd when Forme investment banker) David)
Lewmar. oncd Co Yer not Lamont gassed o.toi\) quickly 5
under “emergency” PROVISIONS Ud Mhaut any. Commi Yew.
weView, oF Public. heating» exem(rt neu) dala cenvers
From payin Ct +oxes, Similiar to WaterParels cash
Ena quote Prom Ho. New) London Day, Taide) Collins gai d
OT turns out enothor ughy companert of “this low. fesk
Fer date centers, which, by re way), don + employ, clok.
of quopley of aererate. much other ecanpinic dew. lopment,
on Vhe. vales “hey. pay Ber eleckeicrtly: “They ee alah”
So, we as herreowners in Wetterfore’ will pay move For

our electyicity than data cents, ond be seconclin \ine.
+6 receive “ret energy, ctor Ye dala emery, uw ho
have. a “belnind Ve moter” aatee ment, and wilt use-
up colossal amourts o€ ener. Oh anc we pay taxes)
Coliing also wrole a The Day the fe “they pay
lieu, o& taxes isa grktance com Paved) ty Wher Would)
be. due in Taxes on builclings Pull oF tens oF
millions oF dollars Worn of con pulled , bai He an
SS acws of land. “the Gees axe esivtractual, anti Ke
taxes, For Which Yreve. 1S an established) ane) sf mple
legal procedure at liens amd f tecles uve, For Wo “TOM,
+o use inthe exont o& nonpay mewt.” Pamises, Proms yes ;
Companies praposing VYeose data cerbes haue veverr
_.jeuilt.one, bet. ery we ace “trash ny Yrem.vo he He...
| Cucue. o& Water els, land, eanronmentt @stdents..
Venn based) on. quest ional j wtegyrhy- Walla foreP
— Jeonet lacs, Zande aid “he wos ooncornee) Vickers
_[eould findit. more economically astble te .aceph
| cena mvioletion of \acal vegulerane one) Pay. A nes
fuottncut makin changes. Vhese sound levels ave
gay He Pings” t's all about the mone j,ond he casino 15

John C. Valliere, Esq.
Attorney At Law
294 Millstone Road East Phone (860) 442-1294
Waterford, CT 06385 Fax (860) 442-1295
Attorney Vatlicre@aol.com
Via Lmail-and Priority Mail
September 6, 2023
os
oy
Melanie A. Bachman, Executive Director a
State of Connecticut se)
Connecticut Siting Council t
Ten Franklin Square a
New Britian, CT 06051 ae)
RE: PETITION # 1586 from Dominion Energy Nuclear Conneeticut, bi i an
a
Dear Ms. Bachman and Members of the Siting Council:
This is written requesting the Siting Council deny the Petition (1586) from Dominion
Energy Nuclear Connecticut, Inc (DENC), DENC is seeking a declaratory ruling
regarding the Dominion property on Millstone Road (off Rope Ferry Read) in Waterford.
While there are dozens of reasons why almost 20 percent of the site’s notth unallocated
fand should not be feased oul and be used for data center projects, | will highlight a few,
First, as you are uwate, this properly was specifically designed over 50 years azo to
accominodate nuclear reactors. Frankly, that plan and the critical thinking put into.it 50
years ago, has been a success and has enabled the property to host 3 nuclear reactors and
generate 50% of Conniecticut’s energy for many years,
The plan 50 yeats ago enabled the facility to have large swaths of land around it,
presumably for safety, security, and to offer a large buffer to protect the surrounding
neighborhoods and communities, including Waterford and East Lyme.
The current site plan allows the reactors, personne! working in the facility, and the
surrounding community to remain safe, The site, with its large tracts. of land, allows the
energy producing equipment to be free from dutside interlaper's (including but aot limited
to, domestic terrorists and iLl-intentioned persons) and allows the energy producing
equipment to-be the-sole equipment on the property,
In terms of security, the long-term design forthe property greatly assists Dominion to
keep the reactors from harm. The reality of domestic terrorism in today’s world is real.
The current plan and layout of the property allows Dominion ta control and secre the
important nuclear reactors by keeping them ata significant distance from the public and
Page (1

public thoroughfiwes, (It was only about 20 years ago when military Hunrvees with
military personnel were stationed outside the entrances of the property to protect the
property during the 9-1) éfisis). Allowing other outside entities to develop-on the
property complicates the ability ta keep the reactors sale and secure. Given the proposal
in the Petition, there will be a much stnatler buffer to keep the reactors isolated, safe, and
secure, reducing the buffer from about a mile down to a Hitile over 1000 feet.
Protection of the surrounding community is also part of the Jong-planned design of the
property. The site as it currently sets, has done a great job af buffering the negative
effects of the power plant from the surrounding neighborhoods. Allowing data centers on
leased land on the Dominion property does not follow that plan. The data center projects
have not been well publicized to the surrounding neighborhoods, and the ill effects,
including but not limited to low level hum noise and environmental damage, have not
been explained nor publicized. There is growing opposition to the plan as it becomes
known,
Issuing a declaratory ruling without any stated long-term plan and allowing data centers
takes away Dominion’s (or any future owner's) ability to develop the land for energy
generation, The property should be used exclusively for the generation of nuclear energy
as it was designed and intended, Although reactor #1 has completed its planned mission,
there are opportunities for newer nuclear reactor technologies to replace il, technologies
that are smaller and more efficient than #1 ever was, Dismantling # | and building
smaller and more efficient reactors, as is being done in Wyoming, is the type of
construction that should be occurring on the Dominion site, not energy drawing data
centers. Building nuclear reactors is what the site logically should be used for and fits
into the past and future long-term plans.
If the Siting Council allows the 50-year plan to be destroyed and allows leasing for non-
energy producing entities, where will it stop? Currently, the plan is for 2 data centers,
one 1.132 million square feet (7 / times the size of the average full scale data center) and
a second 428,000 square feet in size ( times the size of the average full scale data
center). Although it is not outwardly shown, there is a plan for an additional 2 more data
centers on the site in the future, Ifthe Siting Council allows for one or two, it would he
easier (o Chen request for number three and four. The Siting Council would lose centro!
of the ability to limit other “industrial uses” if it allows the data centers to start to grow
on the property.
Issuing a declaratory judgment allowing the leasing and building: of data centers on the
Dominion site with no specifies of how the data center will affect the future of energy
generation at the property is imprudent. There is no plan or documents offered on how
the construction of the massive data centers asd their long-term placament on the
property affects the current operation of the facility as a power generator. Dominion is
asking your permission to allow a company to Jease and build data centers 4 and 1 times
the normal size of average centers by a company that is less than 2 years old and has
never successfully built a data center. fn fact, at least three other towns have rejected the
project, even though it would not have been placed in such a sensitive and secure lovation
Page | 2

as the Dominion site, This project should not just to be allowed to be developed on the
Dominion site just by asking a simple declaratory ruling.
Enclosed, please find pictures of the site as Exhibits | and 2. In contrast to the map
provided by Dominion as their Exhibit 1, the enclosed Exhibits | & 2 demonstrate the
proximity to the neighborhoods and récreational sports fields, the significant amount of
trees, vegetation and woods that would be cleared and destroyed, arid the proximity to a
large pond on the property, with no study of how this project will affect the numerous
osprey nests at that pond as well as other wildlife on the property as a whole,
Also, of concerning note, is the August 30, 2023 responses to interrogatories by
Dominion, whieh some at best are disingenuous and at worst misleading,
Question 1 and 2°s Responses about the Town's expressed concerns and received
comments are misleading, ‘This project appears to be spearheaded.by Waterford's First
Selectman Robert Brule, who ironically is quoted by a local newspaper as saying he
would not want a data center near his residence given the data center's extrame noise
generation. As stated herein, this project has had very litte publicity, as has Walerford’s
entering the Municipal Host Fee Agreement with NE Edge: The “unanimous” vote from
the Board of Selectmen and the Representative Town Meeting (RTM) members was
done, as some would say,” under the radar.”
Enclosed as Exhibit #3 is an email thread between RTM member Dan Radin and myself
tegarding this project. Coming from one of the RTM’s own members, he states on pape
One in paragraph # 4 about the approval being “puvely ceremonial” and about “optics” as
opposed to ihe proposed project being thoroughly explained to town residents and vetted.
He further expressed the First Selectman Brule could have signed the Agreement without
any approval from the Board or RTM.
Even more disturbing is Dan Radin’s assertion in Paragraph #6 that the meeting was
“poorly publicized” and “held on short notice.” This unprecedented, massive project was
well in the works long before thai mecting and yet the document to start the project was
“approved” and entered irito with little public comment or any reasonable notice to the
Town residents, especially and including to the surrounding neighborhoods. If such a
project was truly good for Waterford and the Dominion site, why the seereey and lack of
candor to the publie and allowance for real public review and response early on? ‘There
will be mounting opposition to this project as more details are given to the Town's
residenis, Even with the mounting ppposition, certain lown officials continue to be not
forthcoming with information and deadlines, including this Siting Council Petition and
the ability to offer comment. This is concerning on mahy levels.
Question 3°s Response is also concering in that there is no way to know the impact on
safely. Nobody knows or has demonstrated the effects of removing the large, long
planned buffer of land or what placing non-energy generating buildings on the property
will do to safety, but there is one thing for sure: il will take away any plamed safety
margin in the site’s design,
Pape | 3

Question 9° Response regarding the plan at the end of the lease torm (or the end of the
useful life of the data centers) shows the lack-of plansing and forethought as given to the
original site plan of 50 years ago. Although the data center is supposed to be a 30-year
lease, given the speed of technology, there is no guarantee the data centers wil be viable
for that long. As pointed out by RTM member Dan Radin, just think back to the
technology from 30 years ago as opposed to today. Who gets the cleanup mess if NE
Edge abandons the project early and is gone?
Questian 14, 15 and 16’s Responses in relation (o the number of megawatts the dala
eonters will consume is quite telling, and disturbing, Yanking out 300 MW of power
from the ISO-NE grid would be minimally disastrous. There is alveady energy insecurity
in Connecticut, New England and the country, given the current demand (especially at
peak times} and the known large future increases iu demand in the years ahead. Once the
data centers are plugged in, they will continue fo.suck out 300 megawatts per year and
run 24/7 no matter what the other denvands ate for Connecticut and New England.
Unlike residential and business consumers, data centers cannot cut back on their energy
use when electricity demand is at its peaks in summer and winter. The data centers will
continue to draw-and have the need. Such a draw will lead to higher prices overall for the
residential and business consumers, as simple supply and demand economics occur, Ay
stated earlier, the Dominion site should be used for future power generation. Leasing
large swathes of tand only detracts from this ability and does aot allow for good fiture
planning of energy generation versus energy draining and depletion endeavors,
Question 17's Response leaving any emergency planning to NE Edge is also eye opening.
This is a company that is less than 2 years old, with no previous experience building data
centers, including no completed projects, and is looking to build minimally 2 hyper-sized
data centers in a sensitive nuclear site, Any data projections, including in Response #23,
are just that--projections, The Dominion site should not be gambled with in hopes of
getting il right, especially with no future oversight from the Siting Council.
Given the foregoing, it is respectfully requested the Siting Council deny Petition #1586
for 3 declaratory ruling for the Dominion property.
Sincerely
jor
John C Valliere, Esq.
Page | 4

CERTUMICATE OF SERVICE
| hereby certify that on the 6th day of September 2023, a copy of the foregoing was sent,
via email mail to:
Roberi A. Avena, Waterford Town Attorney
Nicholas F, Kepple, Waterford Town Attorney
Suisman Shapiro
20 South Anguilla Road
P.O, Box 1445
Paweatuck, CT 06379
Robert J. Brule, First Selectman
Town of Waterford
15 Rope Ferry Road Waterford, CT 06385
firstsel(@waterfordct. org
Kenneth C, Baldwin, Attorney. for Dominion
Robinson & Cole
280 Trumbull Street
Hartford, CT 06103
Page [5



Re: Proposed Data Center at Millstone
from, Dan Radin (dan.radin.waterford@gmail.carn)
To: — attorneyvalliere@aol.cora
Date Friday, August 25, 2023 at 12:14 PM EDT
Attcrney Valllere —
Thank you for your note, My apologies for the tarily response,
Altached is my memo to the RTM and Board of Sélactman from February when the Special Meeling was held on this
toni. | believed the tine—and stil do-thal there are significant financial benefits to the data center if the portfolio of
risks is roltigated. | further raised concerns about noise control, deal term, and the competence of the developer in the
Special Meeting. ‘
Before purchasing our home, my family lived in a house we rented in Millstone Point, | know the quiet, peaceful,
beachfront way of life for the neighborhoods surrounding Millstone because I've lived there,
My understanding of the rola of the RTM in the Special Meeting, based on guidance from Town Attorney Kepple, is that
the body's vote was purely ceremonial, and thal the Board of Selectman did not need RTM approval to authorize the
Firs: Selectman to sign. In other words, the RTM’s vote, and the joint meeting, was about optics,
Attorneys also Informed us that signing the MOU was the first step in a lengthy, complex process of subsequent
approvals and checkpoints on the path toward the data ceriler getting built, and that ils signing did not constitute a
hinding agreement to build; rather it opened the possibility that it inight be built,
{ agree that the Special Meeling was poorly publicized and held on short notice; and | agree with concerns that sufficient
safeguards are not in place to protect the peaceful character of the MPA neighborhood. However, as the RTM, or more
directly as a single representative, we and | lack authority.
| have reinforced my concerns and the concems shared with me by other Millstone Point neighbors with the First
Selectman. He has not responded in any substantive way across a umber of occasions. ( wholeheartedly encourage
you and your neighbors to advocate strongly with hin, He has decision authority,
Thanks,
Dan Radin
475 470 6535
On Aug 20, 2023, al 12:42 PM, atlorneyvalliere@aol.com wrote:
Dear 4th District RTM members:
| live in the 4th district af Millstone Point and am writing to get your positions on the
proposed data center at Dominion Power Plant.
My understanding is that the MOU was unanimously approved by the RTM and the
. Selectboard.
: This is written to get your position on if the data center should really go forward, and
. what you are.doing to actively protect our district, and specifically the Millstone Point

neighborhood, from the ill ramifications this project will cause.
Many feel that this project process was started with lille fanfare and is now being
pushed given the millions being offered in payments.
| look forward to your expedient response,
Thank you.
John C, Valliere, Esq.
is) Waterford RTM Data Centers Memo Fel 2023.pdf
! O25RB

Re: Proposed Data Center at Millstone
Froim Dat Radin (danradin.waterford@gmait.com)
fo. attomeyvailiere@aal.com
Date Tuesday, August 29, 2023 at 04:45 PM EDT
Dear Attorney Valliers —
Thank you again for sharing your detailed and thoughtlul insights.
As the Oclobet meeting will be my last on the RTM, | infend to submit a memo to the RTM and Board of Selectmen
summarizing the consistent voice of District 4 residents in opposition to the data center project,
have reinforced my concerns and the concerns shared with me by you and other neighbors with the First Selecinan. {
wholeheartedly encourage you and your neighbors lo advocate strongly with him. He has decision authority.
Sincerely,
Dan Radin
On Aug 26, 2023, at 9:36 PM, attoineyvalliere@aol.com wrote:
fear Mr. Radin:
Thank you for taking the lime to respond to my email. Sadly, only you and Mr. Bono showed
any consideration of a response to this point. Maybe the other four 4th District RTM
members are on vacation this week and will reply in due time.
Ihave read your email and your statement about the data center. You raised some points
which { did not think about, the most important one being the data center's potential
obsolescence in 30 years.(or less), My similar thought was that if the licenses for Dominion's
reactors 2 and 3 are not renewed in the upcoming decades, where will the data centers
obtain the necessary 300 megawatts per year? (And they say there is a shortage of
electricity now especially in the summer! Can't wait for those future bills given the lack of
supply and the huge demandl!)
{also think your analysis about the guaranteed money is also on track. (This is not even
taking into consideration the viability of the developer whose company is 20 months old).
There is a fot to unpack on the data center issue.
Here are same of my many concerns about this project (the proverbial tip of the iceberg):
1. Who drafted the Memorandum of Understanding (MOU)? [ have read if and found quite
of few flaws thal do not protect the Town of Waterford and ieaves Waterford open to future
litigation. There are other MOU sections that leave Waterford in the Jurch, especially if the
state Legislature changes the law regarding data centers. This legislative change is prone
given the changing technology and given the fact the current legislation is flawed in itself and
subject to change.

2. Did all RTM members and Board of Selectmen read the MOU, or just rely on Town
Attomey Nick Kepple's opinion of it? How much questioning was brought forth from the RTM
and BOS and what changes were made from that questioning before voting? | know that
complex contracts take a long time especially if many eyes are reviewing it and making
constructive and beneficial comments. The collective eyes and knowledge of our
representatives should have perfected this MOU.
3. fam guessing that NE Edge drafted the MOU because of how Section 8 regarding Sound
Analysis was written,
a. Why is there only a week's wortfi of lesting? Does sound not change in seasons, weather
and in vegetation cycles (ie leaves on trees)?
b, Should there not be yearlong analysis so the proper sound baseline can be created?
c. Why are the current levels of sound being used as the baseline as outlined in the MOU?
As you may be aware, Dominion can be very noisy at times (in violation of Waterford's noise
ordinances.) Why should ihe Millstone neighborhood have to endure additional noise and
additional violations of the noise ordinances?
cd. Will the passing trains through Millstone (which take 12 seconds on average) be allowed
to increase the average decibel levels of sound allowed for the data centers? The 7 minutes
a day of passing trains (85 X 12 seconds) should not be the basis for allowing the same
sound level of 24/7 hum of data center fans.
What is interesting (and very disturbing) is that FS Brule went to a data center in Manassas,
Virginia and is on record as saying he didn't need the decibel reader he had, saying he coutd
hear the data center noise clearly, and also stated he wouldn't want that next to his house.
That center in Virginia is about 135,000 square feet. N E Edge’s proposal for the first
building is about 10 times thal Virginia plant. | have not seen what buffer exists for the VA
data center but the buffer for the proposed data center at Millstone is about 2000 feet from
the Millstone Road neighborhood.
Has the sound issue also been thought out for the Waterford families who enjoy the
recreational sports flelds in the Millstone area? My guess is that parents and famifies that
enjoy the youth’s games would not really want to hear (he data centers humming in the
background.
4, How will low level hum of the data centers effect the Millstone neighborhood and the
environment? There is nothing in the MOU about this. This is a problem at other data
ceriters and low-level hum has been shown to be detrimental to humans and animals alike.
5. | understand N E Edge is dangling lots of money to Waterford and town officials! eyes
shine green, but has anyone really assessed the whole situation and thought It through?
Has anyone from Waterford spoken with Montville Mayor Ronald McDaniel? | know he has
extensive knowledge about the development of data centers and developers of data centers
and their progeny. My understanding is that there ig a lot of tatk but very little in substance
from the data center developers, A major concern nixing the project in Montville was the
potential sale of the centers to another company. This makes sense in that a 20-month-old
company starts the process, and then at some point of more viability, the project is sold to
another, The MOU has no assurances that N E Edge will make sure any future purchaser
will follow through. Waterford could potentially have to deal with some unknown entity or
potentially be left holding the bag.
Has anyone spoken to any of the other towns who rejected data centers to find the issues?

6, Does Waterford think it can outmaneuver and outsmart Montville, Groton, Norwich,
Griswold, Wallingford and Bozrah and bring success to a 20-month-old company that has yel
to build any data center? The MOU says there is no litigation that would affect the company
from completing its outlined duties in the MOU. | think a $30 piltion lawsuit may Nave some
impact and make the MOU assertion false. Is every selectperson and RTM member sure
that the $20 billion dollar suit will just go away and won't affect NE Edge? Or just because
it's written in the MOU it must be true’?
7. The current MOU allows for 2 data centers (a 1.1 million SQFT and a 350 thousand
SQFT). The MOU does not allow Waterford to stop the second if the first goes awry. Why
cid not one town official raise that issue (or not include it in the MOU)?
Additionally, it's been alleged, there are plans for data center number 3-and 4 and N E Edge
will be looking for a bigger break on those from Waterford. Building these data centers as
. proposed is just like eating chips....once you have one and two, you just can't stop.
8, Lastly, in response to your email below, | am quite disappointed that you and others of the
RTM all voted yes in the "purely cerernonial" vote and that If was done just for "optics." Why
even vole on it if FS Brule can just sign the MOU? Why does there need to be optics
portraying something that is not accurate? Trying to create optics leads ie to believe thal
something js amiss, Jn my opinion, doing so just shows the RTM and the Board of Selectman
have no independent thought. but rather going through the motions and approving a plan
that is not very well thought out.
| would aso disagree that the RTM, and specificalfy one member, would not have made a
difference. In fact, | think by rubber stamping the MOU unanimously gives Waterford
residents the wrong impression as to whether this project is truly good for the Town, and
specifically, good for the 4th District.
in closing, | am not sure if you represent the 4th District directly or just a mernber at large of
the RTM who is from the 4th District. if you do direct representation, | suggest a serious
discussion with aif 4th District residents to see their feelings on this project,
Again, just like you, | arn pro-growth and want the Town to have a solid economic base,
which will hopefully lead to a solid tax base and continued great town services at reasonable
taxes. However, that growth must be done prudently and not al the cost to the 4th District's
quiet enjoyment, quiet enjoyment that you know from experience,
Given how this project has been handied to this point, including, but limited to, the severe
lack of information and total lack of candor from town representatives (as you have honestly
admitted to (and which is appreciated)), | am not corifident at all the issues affecting the
quality of life in the 4th District (and Waterford as a whole) will be properly dealt with and that
town representatives will be concerned about the Millstone neighborhood and Its property
values.
| would request that you oppose the further development of this project and actively advocate
that opposition to FS Brule and the rest of the RTM on behalf of the 4th District.
Thank you for your time in reading this. Please feel free to contact me if you have any
questions about my position.

John C. Valliere, Esq.
On Friday, August 26, 2023 at 12:14:43 PM EDT, Dan Radin <dan.radin.waterford@gmail.com> wrote:
Alttomey Valllere —
Thank you for your note. My apologies for the tardy response.
Atiached ts my remo to the RTM and Board of Selectman from-February when the Special Meeting was held on
this topic. | believed the time—-and still do—that there are significant financiat benefits to the data canter ifthe
portfolio_of risks is mitigated. { further raised concerns about noise control, deal term, and the competence of the
daveloper in the Special Meeting.
Bafore purchasing our horne, my family lived in a house we rented in Millstone Point | know the quiet, peaceful,
bsachfront way of life for the neighborhoods surrounding Millstone because ['ve lived there,
My understanding of te role of the RTM in the Special Meeting, based on guidance from Town Allorney Kepple, is
that the body's vote was purely ceremonial, and that the Board of Selectman did not naed RTM approval to
authorize the First Selectman to sign. In other words, the RTM's vote, ahd the joint menting, was about optics.
Altorneys also informed us thal signing the MOU was the first slep Ina lengthy, complex process of subsequent
approvals and checkpoints on the path toward the data center gatting built, and that its signing did not constitule a
binding agreement to build; rather it opened the possibility that it might be built,
| agree that the Special Meeting was poorly publicized and held on short notice: and | agree with concerns that
sufficiont safeguards are not In place to protect the peaceful character of the MPA neighborhood. However, as the
RTM, or more directly as a single representative, we and i lack authority,
| have reinforced my concerns and the concerns shared with me by other Millstone Point neighbors wilh the First
Selectman. He has not responded in any substantive way across a number of occasions. | wholeheartedly
encourage you and your neighbors to advocate strangly with him. He has decision authority,
Thanks,
Dan Radin
475 470 6535
On Aug 20, 2023, al 12:42 PM, allatneyvalliere@aol.com wrote:
Dear 4th Distict RTM members:
| live in the 4th district at Millstone Point and am writing to get your positions on the
proposed dala center al Dominion Power Plant.
My understanding is that the MOU was unanimously approved by the RTM and the
Selectboard.
This is written to get your position on if the data center should really go forward, and what
you are doing to actively protect our district, and specifically the Millstone Point
neighborhood, from the ill ramifications this project will cause,
Many feel that this project process was started with little fanfare and is now being pushed
given the millions being offered in payments.

| look forward to your expedient response.
Thank you.
Jahn C. Vailiere, Esq.



October 2, 2023
RECEIVED FOR pF
WATERFORM CPO
aTM Meeting HB OCT ~y ~ 2: 38
Rope Ferry Rd,
Waterford, CT 06385
Subject: NE Edge, LLC Waterford Gantt Chart
Dear Mr. Goldstein,
Attached, is a NE Edge, LLC document named WATERFORD GANTT CHART. A few questions if |
may:
1. } Task three: “Zoning Text Amendment:” (s this a reference to Dominions Petition No,
1586? Are there any other requests for zoning changes related to a data center being
built anywhere in Waterford?
2. Tasks four and five: “DECD Modification/DECD Approval:” What is the DECD and what
are they modifying and approving and why? Where can the public have access to that
process and outcome?
3. Task six: “Site Plan Review/Footprint Plan:” Where are the plans and will they be on
public display for a reasonable amount of time much like the proposed town center
development map?
4, Which of the remaining tasks on the NE Edge, LLC Gantt chart are in development?
5. Which of the remaining tasks are incomplete as of today?
Sayles
safle Dr
Quaker Hill, CT 06375

owe
eSEFSFFVTIFIPOSHSSSSSOESSSSSSTISCTEFSITGEGCGE
SG
NE
EDGE
LLC
WATERFORD
GANTT
CHART
+
Commarea
Project
bt
MOU
and
Hast
Fea
Agreement
oem
7)
MQU
and
rand
FieelAgroniren!
.
a
+1
Zoning Text
Amondment
—
Cc
ese)
Taal
Apartt
*)
DECD
Netifcaton
ne
iia
|
f
3}
DECO
Agprovel
Db
os
SEG
poppin
3
7]
Ste
Plan
Review
{FootprintPisn
of
Loven!
faatprle
09
co
Infand
Wetlands
Féing
5
‘
ofan
Fg
TF
—
#L
Placing and
Zoning.
6
Piscine
su
Zhang,
3)
grpesp
wi
ae:
cia
;
Z
1}
Federal Air
Quality
&
ve
{SO-NE
Peniting
q
i.
gol
Pomasly
”
Guldiog
Pamit
if
j
[puta
as
|
—
4
Dé
Constnicion
ir
a
———+
a
1
Copa
Substatloos and
interconnections
—
|
:
na
hye
fost
fred
i

TO:
FIRST
SELECTMAN
ROBERT
BRULE
immediate Town Meeting for information on the Data Center projects at the Dominion Power Plant
property.
NAME
(Print)
PHONE
EMAIL
Linde
Vadle
AAA
ID
[1
Tn
Otsu
WSTERT
Lawrele
Thevs
A
Eade
[his
\ithitd
me.
25-3203
Naseer D\ores Ce > Lu Niwwtre ver 2d Seo Giz zee
L
Dawn
Griswold
Daun
Cuiwebl
5
Decleg
Coort
Nianhe
$6D
-AL1-549)
downaviswold @
reloud
Gem
Dorolyn, Maes | Opralyn Maha? [ps wnelcko Wel poms.ssay |!
Ricert
Shauae
fgpot
longo
|4
Puple
Terses
Bd Pla
Bap

TO:
FIRST
SELECTMAN
ROBERT
BRULE
We,
the
undersigned
resident,
voter,
and/or
property
owner
in
the
town
of
Waterford,
request
an
immediate
Town
Meeting
for
information
on
the
Data
Center
projects
at
the
Dominion
Power
Plant
property.
NAME
(Print)
SIGNATURE
STREET
ADDRESS
fuser
YES
Wel
MAM
13
ie
WolekecS
[reset
Sep
nen
ysscarsl
cm
hich,
Crile
az
\
S&
Danels
Are
tek!
860 fos
ole
3
kei
Ms
ame
|
im
Ss
Daniels
AL
Ledenfor}
LY
§ho
7087
ee
ef
Zo f
LA
Sah’
Cogertsa
erred
Certln
2
MiUtSryve
£2A0
VAren
Gi
Np Vie0372-7
PESO
CC
.
Bap
QyiKe
CGHRE,
ty

TO:
FIRST
SELECTMAN
ROBERT
BRULE
We,
the
undersigned
resident,
voter,
and/or
property
owner
in
the
town
of
Waterford,
request
an
immediate
Town
Meeting
for
information
on
the
Data
Center
projects
at
the
Dominion
Power
Plant
property.
WARE
(Print)
fryn
Lassman
|e
2
SB
rd
Are
lke
287-29|
Crcga
kite
@
oma
yn
wrt
AME
an
[@
CH
|S
2d
kv.
Go
gaze
[feemnengk
@
Pease
Gill
Lun
Tt
go
35
3
she,
$00-235-75¢0
raceegia(ooweatay
Cyphx
Lota
\2
8"
ACE
1/2
bX
Melo
|g,
~
po
ana
GE
Ave
Waderfud
|
BE,
|
SJainzise
..
DMs
Galvin
:
J
ee
oe
“
hae
MANS|
Bee:
0
Diels
Wee
|86550'-Wso
VYZTGLE
Ae
Ce,
napa,
Via
&,
KO
Dinrels
berte—
BuO
SOVIGR2G
pe
DON
Mtoe
Me
|
Migun
Dohh
|
26
Danwls
Fre
_|ytb.5dlgp
Taeyge
VLE
Veen
Barer
Vtg
Be
RO
THe
AVE
[56°
40
AS/9
aaaene
Quay
Goon
W
.
boat
LS
ark
Ave
UWedvfed
205
ABI
YOS|
reveca.em.
lo
Aquat.a
Tuler
buxton
|
Todi
feat
11S
sek
gore
YO
BBS
2444]
f5'02P She
gobel
nef
er
ee.
fore—
\q
Fares
Are
bSheked
[Rooaguna
Dez
SEC
desl)
e/
Nomen
Kefeek
Diba
7
E>
p80
pilsfre
KA
947
98/
(Sc
ben
Rbatbon
Befaho.con

We,
the
undersigned
r
SELECTMAN
ROBERTB
esident, voter, and/or property owner in the town of Waterford, request an
RULE
immediate Town Meeting for information on the Data Center projects at the Dominion Power Plant
property.
NAME (Print)
SIGNATURE
STREET ADDRESS
Fun
WBaade
As
wWiutegcwou
Bo
BAL
a
&
te
~
3
fogs
bec
Wh
Mean
$
+E
melishtne-
zd
4G
HA
ma
ee.
Sul
2a
<
bonus
Douche
S
Laws
Gt
eee
a
Jab
Qe
lense
phason
diel)
het
Lo
Tee
®
Fy can) .
Hess
(e
he
oni
Poh.
Boer
BiniesnAé
2A
he
ss
Seis
bet
iat
hj
Ttrpieaileepeenercot|
Siagtrne
Cisitans}!
&
foe
SE
Mills
wre
Ad
~
6974
CER
Comb
isctans
Saee
/
d
~
Os"
BEO—
qh
Kol
bays
Co. u Baths
v
Texerr
Et
Eures
“Sn.
La
Le
|
da
Toesan
Cow
(prey
Sb
O1G-
RE|
asst
§
mp
Cor,
Kaul C Buckles ators Wu |e tilled RW Jeo Fh: Z4-
_
beed cso ll er
io

RTM Oct 2TM, 2023, Town of Waterford
For Public comment and meeting minutes
Good evening, Town Council members and fellow residents.
Jam a Pleasure Beach resident concerned about the lack of citizen input and involvement
regarding the proposed Data Center at the Dominion Power Plant at Millstone which
appears to be moving forward. Personally, | need more information to understand how it
benefits the town of Waterford and if these benefits outweigh the potential downsides. So
at the moment.! am opposed to the center and request that a town-wide information
meeting be organized to allow listening and discussion with residents of Waterford as well
as neighboring communities that are directly impacted, in particular East Lyme.
There are well known concerns about data centers, including noise pollution, threat to
wildlife, risk of fires (reported at other data centers), and a large carbon footprint. Lesser
known, but emerging research also raises concerns about human health and well-being. In
addition, the massive scale of the proposed buildings on the Millstone site may occupy the
land needed in the future for small modular reactors.
Thank you for your attention and for considering this request,
Michele Lewis-O'Donnell, PsyD
19 Nichols Lane
Waterford, CT 06385

October 2, 2023
To the members of the RTM
From Deborah Roberts, homeowner
4 Jordan Cove Circle RECEIVED FOR RECORD
Waterford WATERF ORE, OT
173 OCT - P23
iam writing to state my concerns regarding the data center agreement entered
into by our town representatives and NE Edge, ATTES i
1. The decision seemsto have been made without input from the community,
especially those of us who live close to the proposed site, and there
continues to be a lack of transparency as to the plan.
2. The payment to the town in lieu of taxes is shortsighted. The huge building
may not prove to be useful for future data needs as technology is ever-
changing. The town would be stuck with the building long after the
company has pulled out, for they would have no incentive to do anything
with it.
3. The land for the power plant is specifically deeded for power generation. If
more land is needed for that purpose in the future, especially since there is
no current plan for moving spent fuel offsite, it would not be available.
4, For such a major project one would expect multiple proposals with bids
going out and research done to evaluate the companies’ background and
record.
5. |am concerned that the developer has no experience with this type of
development, and in fact has multiple lawsuits being filed against them.
6, The agreement would take power directly from Dominion/Millstone
Nuclear power plant. | have concerns about why that power would be
allocated directly to a private company as opposed to regular rate paying
users. What exactly does this agreement entitle them to? What happens
during shutdowns? Will they bear responsibility for security and
environmental impacts?
7. Willan environmental impact study be done? | am concerned about storm
water runoff into surrounding watercourses and wetlands, possible blasting
of bedrock and the disruption of the ecosystem.
8. Noise fram fans to cool the computers in these large data centers has
proven to be detrimental to the health and wellbeing of people and
animals. We have no guarantee that noise will be kept to a reasonable
level, if there even I$ an established one for the kind of low frequency hum
which would be produced.

QS. J, 023
f nl ie qs ‘ 27
sat
[toes noe lu to gt pore Ve
aN es Par ue a
\ : 4 Aap
‘ fae
8 E wi aT Heal y un ne { by
hu r duio, tk an oppo
), bes nen 2 Shot Caused
‘bloe LAALA |
» The L ym rr
ta ourde
ale (Ont
o
2 Og

10-31-2023
To: Robert J, Brule — First Selectman
Kim Allen — Director of Finance
Glenn Patterson & Board of Finance Members
Paul Goldstein & RTM Members
Thomas W. Giard III ~ Superintendent of Schools
Joseph Mancini — Director of Finance & Operations ~ BOE
Pat