Representative Town Meeting Regular Meeting Materials (linked)
agenda center agenda
| Board/Commission | Representative Town Meeting (RTM) |
|---|---|
| Meeting Date | August 03, 2020 |
| Pages | 10 |
| File Size | 1.3 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Brian Flaherty 1 2 4 5 7 FUNDING SOURCE APPROVED FUNDING TO DATE FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 1 Current Year Capital 2 Utility Budget/Sewer Cap Maint Fund 3 Transfer to CNR 218,987 150,000 4 Short/Long-term Bonds 5 LoCIP (detail in section 5 above) 6 CNR Undesignated Fund Balance 7 Federal/State Grants (detail in section 5) 8 Other Funding (detail in section 5 above) TOTALS 218,987 150,000 0 0 0 0 TOWN OF WATERFORD CAPITAL PROJECT REQUEST FORM CONTACT PERSON DEPARTMENT/AGENCY COST/FUNDING SOURCE 3 DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project) DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (include cost estimate if applicable) GRANT FUNDING/OTHER FUNDING, if applicable (detailed explanation of grant/other funding, including the amount, source of funding, status, town match, if any. Attach award letter if available) PROJECT STATUS IF IN PROGRESS Multiple Town Departments, including Recreation and Parks, DPW, Planning, Building Maintenance, and the Utility Commission are working together to ensure efficiency and minimize costs for the project. Planning, budgeting, and funding appropriation requests are in progress. LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS REQUEST The bathrooms at the Waterford Beach Park are in deteriorating condition, and the Town has identified that they should be replaced. Funds were previously designated for this project and the Recreation and Parks Department is advancing plans to replace bathrooms at both the causeway and pavilion locations. $218,987 was previously designated for this project. The Department is currently requesting the appropriation of these funds. An additional $150,000 is requested to fund the project. The location of the causway bathrooms necessitates additional funds to meet FEMA floodplain and ADA requirements. Some work related to permitting, trenchign, and installation of sewer lines and electrical conduit can be done by Town employees to save costs. The attached estimated project budget, and this request for $150,000 take into account these anticipated savings. ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION (if none, simply state that in the area below) 6 Project Budget, Appropriation Request Memo for funds already designated. Recreation and Parks Waterford Beach Park Improvements DEPARTMENT PRIORITY PROJECT NAME Description Cost Estimate/Quote Date of Quote Luxury Trailer Mounted Restroom $150,000.00 Concrete slab for trailer $22,000.00 Demolition $3,000.00 Concrete work around restroom $15,000.00 Privacy screening for doorways $1,000.00 Transformer pad/Hand Holes $2,085.00 2/13/2020 Primary Electrical Conduits $7,422.00 2/13/2020 Eversource Customer Contribution $5,200.00 1/23/2020 Walkway from parking lot to path $18,000.00 Pathway work‐concrete sidewalk 6' wide by 770' $64,000.00 Plumbing tie in/shower drainage $10,000.00 (2) Sewer pump stations $10,000.00 Low pressure sewer line $6,869.00 Electrical work $4,500.00 Engineering/Drawings $10,000.00 Site work/sand/stone $6,000.00 final site work, including grass seeding $2,000.00 Peter S Turello $14,727.00 2/4/2020 Equipment rental for excavating $7,000.00 Pipe bedding material $6,750.00 Sewer tie in Utility Fee $2,800.00 Total $368,353.00 Material and Equipment Rental/Inhouse Labor Waterford Beach Assigned Description Estimate/Quote Date of Quote Building Maintenan Luxury Trailer Mounted Restroom $150,000.00 Contractor Concrete slab for trailer $22,000.00 Public Works Demolition $10,000.00 Contractor Concrete work around restroom $15,000.00 Building Maintenan Privacy screening for doorways $2,500.00 Building Maintenan Transformer pad/Hand Holes $2,400.00 Building Maintenan Primary Electrical Conduits $8,600.00 Rec and Parks Eversource Customer Contribution $5,200.00 Contractor Walkway from parking lot to path $18,000.00 Contractor Pathway work‐concrete sidewalk 6' wide by 770' $64,000.00 Utilities Plumbing 2 workers @ 150 hrs $35,000.00 Utilities (2) Sewer pump stations $20,000.00 Utilities Low pressure sewer line $8,200.00 Building Maintenan Electrical 2 workers @ 150 hrs $35,000.00 Team/Contractor Engineering/Drawings $30,000.00 3/2/2020 Rec and Parks Site work/sand/stone $7,000.00 Rec and Parks final site work, including grass seeding $4,000.00 Contractor Peter S Turello $14,727.00 2/4/2020 Utilities Excavating 2500 feet Machine/operator/laborer $75,000.00 Utilities Pipe bedding material $6,750.00 Utility Sewer tie in Utility Fee $2,800.00 $536,177.00 Comparable with Labor Rates Based on CT Prevailing Wages 2019 Restroom Project Budget 1 Beach Bathroom Funding Request DEPARTMENT OF PLANNING AND DEVELOPMENT MEMORANDUM TO: Rob Brule, First Selectman FROM: Brian Flaherty, Recreation and Parks Director Abby Y. Piersall, AICP, Planning Director David Garside, Facilities Manager DATE: February 26, 2020 TITLE: Request to Re‐designate and Appropriate Capital Funds for the replacement of bathroom facilities at Waterford Beach Park. The bathrooms at the Waterford Beach Park are in deteriorating condition, and the Town has identified that they should be replaced. Funds were previously designated for this project and the Recreation and Parks Department is advancing plans to replace bathrooms at both the causeway and pavilion locations. Multiple Town Departments, including Recreation and Parks, DPW, Planning, Building Maintenance, and the Utility Commission are working together to ensure efficiency and minimize costs for the project. The project will be implemented in phases. The first phase involves connecting to the sewer system already in place at the Eugene O’Neill Theater. New sewer lines and conduit for electrical service will be trenched to both restrooms locations. This work is intended to be completed prior to the start of beach season in June. The second phase of the project involves replacement of the bathroom at the causeway, demolition of the existing bathroom, installation of a new shower area, abandonment of the existing septic system, and upgrades to the path leading to the new bathroom location. This work will be done before the start of the beach season as time allows, with the installation of the new bathroom taking place near the end of the season, or soon thereafter. The intent is to work diligently to advance the project while minimizing disruptions to beach visitors. The third phase of the project will include installation of the new pavilion bathroom. Designated funds currently total $218,987. An additional $150,000 has been requested in the FY21 CIP which, if approved, would bring the project budget to $368,987. This request is to appropriate the funds already designated in the lines below to a single project line titled: Waterford Beach Park Restrooms. Appropriating these funds is a necessary step to begin work. FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886 2 Beach Bathroom Funding Request Capital Non‐Recurring: Designated: Line Number: 20537‐57781 Project Name: Waterford Beach Pavilion Restroom Balance: $92,687 Line Number: 20537‐57782 Project Replacement of Causeway Bathroom at Waterford Beach Park Balance: $126,300 Combining the funds into one line would allow the first two phases of the project to begin. It is likely that additional funds may be required to complete the installation of the pavilion bathroom. It is anticipated that the pavilion bathroom costs will be lower than the causeway bathroom replacement, as trenching, sewer, and electrical work will be completed during the second project phase. Town of Waterford Purchase Quote ADA + 8 Portable Restroom Trailer - Island Series 3/4/20 Portable Restroom Trailers, LLC 51% Woman-Owned Disadvantaged, Small Business Enterprise DUNS: 806679325 CAGE Code: 4VAL5 TIN: 46-4031428 NAICS: 56291 Prepared For David Garside Town of Waterford (860) 235-9783 dgarside@waterfordct.org *Early season pricing good until March 30, 2020; Quote good for 30 days. Subject to availability. Created By Melanie Brown Portable Restroom Trailers, LLC Melanie@portablerestroomtrailers.com ADA + 8 PORTABLE RESTROOM TRAILER - ISLAND SERIES *Pictures may not be exact representation of layout. 2020 model has new interior 2 ADA + 8 PORTABLE RESTROOM TRAILER - ALL LOWERING TRAILER - ISLAND SERIES Specs Model Year: 2020 Stations: 9 Full Flush Toilets: 5 ADA Toilets: 1 Urinals: 3 Sinks: 4 Fresh Water Tank (Gallons) :200 Waste Tank (Gallons): direct to sewer connection Mechanics Room: Yes Box Length: 28' A/C Unit Type (BTU): 15K A/C Unit Count: 3 Water Supply: City Water- Pressurized Water System- Garden Hose Power Supply/Cords: (1-4) 120 v 20 or 30 amp (varies) 3 Season Package Options: Baby Changing Station: $875.00 Coin Rubber Flooring: $1,680.00 3 Pricing Subtotal $71,643.00 Total $71,643.00 Name Price QTY Subtotal ADA + 8 Portable Restroom Trailer - Island Series *Price increases if trailer purchased after March 30, 2020 to $71,880.00 $69,863.00 1 $69,863.00 Option: Baby Changing Station $875.00 1 $875.00 Option: Coin Rubber Flooring $2,800.00 1 $2,800.00 Freight-Approximate to zip 06375 $1,780.00 1 $1,780.00 This new unit has a 12 Year trailer manufacturer warranty on the roof membrane, a 1 year trailer manufacturer warranty on the trailer, and a 1-3 year warranty on Individual appliances. Registration details are provided by their individual appliance manufacturers and are located in the component binder located in the mechanics room on the backside of the trailer. 4