Representative Town Meeting (linked)
agenda center agenda
| Board/Commission | Representative Town Meeting (RTM) |
|---|---|
| Meeting Date | August 05, 2024 |
| Pages | 1 |
| File Size | 0.2 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Appointee Report - Oswegatchie Fire house Building Committee date 7-25-24 “1. TRANSFER OF THE OSWEGATCHIE FIRE HOUSEHOUSE PROPERTY TO THE TOWI The original closing date of July1, 2024 was postponed due to the fact that the Phase || Environmental Report has not been received by the Town butis expectec shortly. A closing will be scheduled soon after this report is received. 2s The contract between the Town and the Project Manager (Downs Construction) Is being reviewed by both parties and a contract signing is due shortly. 3. To date we have had 2 meetings with the Architectural firm. Below is a draft of the _“schedule to design and build the complex. a. Schematic DesignPhase Building Committee to provide a program. Due by mid July SP&A to develop a floor. plan and site plan to review. Mid-August SP&A to review MEP Concept ideas. Mid August- -September | SP&A to develop end of August Review project costs and land usé approvals. End of August Perform geo-technical borings once the footprint is established 7. Present Schematic Designs in Mid-End of September for approval DESIGN DEVELOPMENT PHASE- 3 month (Oct.-Nov.-Dec) ‘Construction Documents Phase 3 months (Jan.-Feb.-March) Funding — June Construction Start —~ July 2025-12 month weeks schedule. Com aletion July 2026 og hwN a NOS Ted Olynciw, Committee Member & RTM Rep. ond District LY NMOL £08 V 92 TH He Lo‘Cyosug VA auoda Os GSAI9SY