Board of Selectmen Regular Meeting Agenda (linked)
agenda center agenda
| Board/Commission | Board of Selectmen |
|---|---|
| Meeting Date | October 24, 2023 |
| Pages | 81 |
| File Size | 4.6 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
ya
Cll WATERFORD
er | public library Discovery begins here.
September 28, 2023
Mr. Rebert Brule
First Selectman
Town of Waterford
15 Rope Ferry Road
Waterford, CT 06385
Re: Request an appropriation in the amount of $1,091,200 from Capital and Non-recurring designated line #20536-
57848 Library HVAC Uparade
Dear Mr. Brute,
CNR funds in the amount of $1,091,200 were approved in the fiscal year Town 2021-2023 budgets to fund the
renovation and replacement of the heating, ventilation and air conditioning systems at the Waterford Public Library.
The library's systems are obsolete and in need of replacement. The current systems were installed in multiple phases
between 1965 and 1999. They are past their useful operating life and require frequent maintenance. Repairs have been
increasing In frequency and cost as the systems age, deteriorate and fail. The replacement and renovations will result
in energy efficiency, reduced energy consumption and reduced costs of repairs and parts replacements.
tn November 2019, the library was awarded a CT State Library Construction Grant, Per the grant guidelines, the Town
had 3 years (November 2022/FY23) to secure local funding. That local funding was spread over three years with the
first appropriation approved in FY21 and the final appropriation approved in FY23. The $250,000 grant is available to
spend in addition to the CNR appropriations.
An engineering firm has been selected from the response to the Request for Proposals. Although only one firm had
proposed, they are one of firms that the Town has selected to be an On-Call Engineering firm for projects such as this
one.
Staff is requesting the entire amount to expedite the project. We already have fatal failures of one roof top unit and a
split system in the basement. Once the design has been completed, we need to move into the bidding and awarding
of the construction contract. The Library Board has a committee that will be monitoring the project.
Please place this request on the next Board of Selectmen’s agenda for consideration and forward to the Board of
Finance, if approved.
Respectfully submitted,
Christine M. Johnson
Library Director
ce: Kimberly Allen, Finance Director
Gary Schneider, Public Works Director
Aaron Rosenberg, President, Library Board of Trustees
Joy Merrill, Chair, WPL Property & HVAC Project Committees
1000 HARTFORD TURNPIKE
WATERFORD, CT 06385
inter-Office Correspondence
TO: Mr, Rob Brule, First Selectman
FROM: James.A. Bartelli, Director of Utilities ~aie Vp LLL
DATE: October 10, 2023
RE: Funding Request USEPA Lead and Copper Rule Revisions (LCRR} Engineering Services
Proposal.
Dear Mr. Brule,
The US EPA has.developed regulations to protect communities from exposure to Lead in
drinking water. This regulation known as the Lead and Copper Rule Revisions requires al! public
water systems to create an inventory of the water service line material that. serves each home
or business, from the water main up to the building's interior. This inventory list is mandated by
USEPA and the Connecticut Department of Public Health (CTDPH)}. Approximately 7900 water
service lines in Waterford need to be evaluated, we are obligated to submit our service line
inventory list by October 16. 2024. The LCRRregulation requires that Waterford create an
inventory of the existing water service line materials (plastic, copper, lead, galvanized, other) on
the public and private side of the property line in Waterford’s water system and identify which
service lines may be galvanized or contain lead.
Attached for the consideration of the Board of Selectman is an Engineering Services Proposal
from our On-Call engineering firm, Wright —Pierce for services necessary to assure compliance
of the aforementioned mandate. This proposal is in accordance with the previously approved
Master Services Agreement On-Call Engineering Services Agreement. You will note that the
proposal is based on a time charge basis, not to exceed $98,363. In effort to keep time charges
to a minimum, our staff will research and pravide as much information as possible to
accomplish this goal,
Thank you for your consideration.
ce. Waterford Utility Commission
169 Main Street, 700 Piaza Middlesex
WRIGHT-PIERCE == _ tren crosesr
Engineering a Better Environm t Phone: 860.343.8297 | Fax: 860.343.9504
5 ee 8 e onmen www.wright-pierce.com
September 21, 2023
W-P Project No. T17597
James A. Bartelli, Director of Utilities
Waterford Utility Commission
1000 Hartford Road
Waterford, CT 06385
Subject: Waterford Utility Commission ~ Water Distribution System Lead Service Line
Inventory Program - Proposal for Engineering Services
Dear Mr. Bartelli:
The Lead and Copper Rule (LCR), first promulgated in 1991, was enacted by the USEPA to protect public
health and reduce exposure to lead and copper in drinking water. In January 2021 the USEPA published
the Lead and Copper Rule Revisions (LCRR). The LCRR aims to better protect public and get the lead
out of our nation’s drinking water. One major regulatory change included in the LCRR is the requirement
for water systems to develop a lead service line (LSL) material inventory and an LSL replacement (LSLR)
plan if lead or lead goosenecks are found by October 16, 2024.
The LSL inventory which is mandated by USEPA and the Connecticut Department of Public Health
(CTDPH) requires that Waterford creates an inventory of the existing water service lines materials (plastic,
copper, lead, galvanized, other) on public and private side in Waterford’s water system and identify which
service lines may be galvanized or contain lead.
Below is our proposal for engineering services related to the lead service line inventory program.
Scope of Services
L Validation and Evaluation Phase
Task 1 —- Data Collection and Development of a Service Line Inventory
The purpose of Task | is to develop a database of the approximately 7,900 water services based on existing
information obtained from service cards, historical records, contract drawings, data from New
London/Veolia provided by Waterford Utility Commission. The collected available information will be
entered into the Connecticut Department of Public Health LCRR Material Inventory Template (CTDPH
LCRR Material Inventory Spreadsheet) which is due to Connecticut Department of Public Health by
October 16, 2024,
Task 1 will identify known material service lines and unknown material service lines. The unknown
service lines will require further review.
Our efforts under Task 1 will include:
Mr. James A. Bartelli, Director of Utilities
Page 2 of 2 ee
id
1. Conduct a kick-off meeting with Waterford Utility Commission staff.
2. Use existing data obtained from the Waterford Utility Commission including service cards, historical
records, contract drawings, and work orders related to the repair/replacement of service lines to fill in
the CTDPH’s LCRR Material Inventory Template for the 7,900 services. For each of the 7,900 water
services, the template includes 36 various fields for data entry and response to questions.
3. Provide a draft LCRR Material Inventory Template to Water Utility Commission staff for review,
verification and a list of accounts with street addresses of properties with missing information and
unknown service line materials to Waterford Utility Commission for further investigation.
4. Incorporate changes from the draft submittal and provide CTDPH’s LCRR Material Inventory
Template to Waterford Utility Commission for submission to CTDPH by October 16, 2024.
5. Assist Waterford Utility Commission with making the lead line service inventory data available to the
public after it is completed and submitted to the State.
PROPOSED FEE
Wright-Pierce would perform these services on a time charge basis in accordance with our existing Master
Services Agreement. A total of 920 hours is estimated to perform the scope of services described above
under Task 1. We propose to provide these services for a not to exceed fee of $98,763. Should additional
effort be required to finalize the inventory, we will not exceed this fee without prior written authorization.
If the proposed scope and fee are acceptable, we are prepared to begin this work immediately upon
Waterford Utility Commission authorization and would conduct this effort under the terms and conditions
of our existing Master Services Agreement.
We appreciate being considered for this assignment and look forward to working with you and your staff.
Should you need additional information, please feel free to call me with any questions.
Very truly yours,
WRIGHT-PIERCE
ih 0. Buu
Mariusz D. Jedrychowski, PE
Senior Project Manager
mariusz jedrychowski@wright-pierce.com
Waterford,
CT
Lead
Service
Line
Replacement
Program
Tasks
Project
Manager
Engineer
Project
Engineer:
Engineer
GIS
‘Assistant
Total
Hours
Total
M.
Jedrychowski
E.
Doerfler
T.
Henry
A.Kothawala
JDM
KKK
kick-off}
4
4
8
$1,380
Drawings,
Billing
Information
/
Database
,
638
2
8
8
24
°
4,
16
40
36
$6,235
(ass6
minutes
per
service
card
with
a
total
of
16
305
395
806
$84,820
8
8
$1,690
Total
32
38
443
398
8
24
920
$98,763
Understanding the Lead and Copper Rule
EPA established the Lead and Copper Rule (LCR) in 1991 to protect public health and
reduce exposure to lead in drinking water. The most common sources of lead in
drinking water are lead pipes and brass or bronze faucets and fixtures.
MAXIMUM CONTAMINANT LEVEL GOAL
The Lead and Copper Rule established a
Maximum Contaminant Level Goal (MCLG) of
zero for lead. The MCLG is zero because there
is no level of exposure to lead that is without
risk. The Safe Drinking Water Act requires
that EPA establish a treatment technique for
contaminants like lead and copper that
prevents known or anticipated health effects to
the extent feasible.
Since implementation, the Lead
and Copper Rule action level
exceedances have decreased by
over 90%
TREATMENT TECHNIQUE
Lead is rarely found in significant quantities in
naturaily occurring sources of water, such as
streams, lakes, rivers, or ground water, Lead
from lead pipes, faucets, and fixtures can
dissolve into water or sometimes can enter as
flakes or small particles. To keep lead from
entering the water, EPA requires some
systems, including those that are having
difficulty controlling lead, to treat water using
certain chemicals that keep the !ead in place
by reducing corrosion. This treatment is called
corrosion control. When corrosion control
alone is not sufficient to control lead exposure,
EPA requires systems to educate the public
about risks of lead in drinking water and to
replace lead service lines.
OFFICE OF GROUND WATER
AND DRINKING WATER:
EPA OGWDW | Understanding the Lead and Copper Rule
EPA’S LEAD ACTION LEVEL
The lead action level is a measure of the
effectiveness of the corrosion control treatment
in water systems. The action level is not a
standard for establishing a safe level of lead in a
home.
To check if corrosion control is working, EPA
requires water systems to test for lead at the
tap in certain homes, including those with lead
service lines. Systems compare sample results
from homes to EPA’s action level of 0.015 mg/L
(15 ppb). If 10 percent of the samples from
these homes have water concentrations that are
greater than the action level, then the system
must perform actions such as public education
and lead service line replacement.
LCR VIOLATIONS
Exceeding the action level is not a violation.
Violations can be assessed if a system does not
perform certain required actions (e.g., public
education or lead service line replacement) after
the action level is exceeded. Other violations
may also be assessed under the rule. For
example, if samples are collected improperly,
samples are not reported, or if treatment is
done incorrectly.
EPA September 2020
IMPLEMENTATION AND NEXT STEPS
Implementation of the LCR over the past twenty-
five years has resulted in major improvements in
public health. The number of the nation’s large
drinking water systems that have exceeded the
LCR action level has decreased by over 90 percent
since the initial implementation of the rule. Based
on June 2019 SDWIS data, about 97 percent of
the systems have not reported an action level
exceedance in the last 3 years.
EPA is continuing to work with primacy agencies to
ensure that the LCR is being properly
implemented.
EPA has recently released the proposed rule for
public comment. To learn more visit:
www.epa.gov/safewater/Icrproposal.
f=] For more information, visit: epa.gov/safewater
STATE OF CONNECTICUT
DEPARTMENT OF PUBLIC HEALTH
Ned Lamont
Governor
Manisha Juthani, MD
Commissioner
Susan Bysiewicz
Lt. Governor
Environmental Health and Drinking Water Branch
EHDW Circular Letter #2023-33
TO: Community & Non-Transient Non-Community Public Water Systems
Certified Operators
Local Health
FROM: Lori Mathieu, Public Health Branch Chief, eapwe-J) Pubriow.
DATE: August 10, 2023
SUBJECT: Lead and Copper Rule Revisions Final Material Inventery Template
The State of Connecticut Department of Public Health’s (DPH’s) final version of the Lead and Copper
Rule Revisions (LCRR) Material Inventory Template is now available. Public water systems (PWS)
must use and submit the prescribed material inventory template for compliance. For the LCRR final
material inventory template, click on the document link below:
e CTDPH LCRR Final Material Inventory Template.xisx
The National Primary Drinking Water Regulations: LCRR, which was effective on December 16, 2021
with a compliance date of October 16, 2024, requires that all community and non-transient non-
community (NTNC) public water systems develop a lead service line (LSL) inventory that identifies
materials used in the construction and repair of all service lines connected to the distribution system.
The initial LSL inventory must be submitted to the Department of Public Health Drinking Water
Section (DWS) by the compliance date of October 16, 2024.
The LCRR specifies information that PWS must include in their LSL inventory, such as the
requirements for PWS to make their information publicly accessible and to notify all persons served by
the water system at the service connection with a lead, galvanized requiring replacement, or lead status
unknown service line. DWS strongly recommends PWS begin the development of the LSL inventory
immediately, which includes the evaluation of every service connection on the water system using the
required resources specified in the LCRR.
Phone: (860) 509-7101 ¢ Fax: (860) 509-7111 ea tag.
Telecommunications Relay Service 7-1-1 ig ®\
410 Capitol Avenue, P.O. Box 340308 \3 a}
connoctet Department Hartford, Connecticut 06134-0308 Ne
of Public Health www.ct.gov/dph
Affirmative Action/Equal Opportunity Employer
To help PWS comply with the LSL inventory requirements and other LCRR requirements, the DWS
has developed a material inventory template with fillable forms and tables for PWS to document and
organize their initial material inventory, service line material update, and LSL replacement update; to
document the required inventory methods and public accessibility; to help with the determination of
LSLR requirements with the automated service line classification feature; to conduct customer and
property owner notification; to identify schools and childcare facilities on the water system; and to
select compliance tap sampling sites. The column headings in the inventory templates are color coded
to indicated requirements and recommendations. This final inventory template has incorporated
comments received from PWS on the CT DPH Draft LCRR Material Inventory template that was
released on June 28, 2022 with Circular Letter # 2022-35.
The DWS will be hosting educational series on the LCRR Initial Material Inventory requirements and
template. More information will be forthcoming.
If you have any questions on the LCRR and Material Inventory requirements, please contact Cindy Sek
of my staff at cindy.sek@ct.gov.
C: Lisa Morrissey, Deputy Commissioner, DPH
WATERFORD POLICE DEPARTMENT
41 AVERY LANE
WATERFORD, CT 06385-2819
mse
Mare Balestracci (860) 442-9451 TEL
Police Chief mbalestracci@waterfordct.org
To: Finance Director Kim Allen
From: Marc Balestracci, Chief of Police
Date: October 4, 2023
Re: Additional Appropriation for employees payout
lam respectfully requesting an additional appropriation in the amount of $35,951.30 to line item 10129-51420
(Patrol) as these furids are needed for two employee payouts that are required under the current collective
bargaining agreement. The employees’ last day with the town are October 1, 2023 and October 4, 2023.
Thank you. for any consideration.
Thank you,
Marc Balestracci
Chief of Police
Waterford Police Department
a
Office of Fire Services
Waterford Fire Department
204 Boston Post Road
Waterford CT. 06385
October 11, 2023
First Selectman Rob Brule
15 Rope Ferry Road
Waterford, CT 06385
Re: request funds $64,000 be moved from designated to appropriated 20523-57777
On behalf of the Waterford Fire Services, I would like to request the funds $64,000 for SCBA
up-Grade Program line 20523-57777 be moved from designated to appropriated. This project is
currently being worked on as many of our SCBA bottles and equipment are at their end of life
date of fifteen years and need to be replaced over the next three years as part of our CIP plan..
Director of Fire Services
Chief, o/tichael 9. ftowley
CC: Kim Allen, Director of Finance
FINANCE DEPARTMENT
Memo
To: The Board of Selectmen
From: Shea Davy
Date: October 17, 2023
Re: Bid Award - RFP#23-133 On-Call Architectural Services
Dear Mr. Brule:
Proposals for the above mentioned project were opened on September 28, 2023 by Paul
Koelle and I with the attached results,
After careful review of the submitted proposals, the Purchasing Agent on behalf of the
Public Works department recommends the contract for this project be awarded to the
most qualified bidder, Antinozzi Associates Architecture + Interiors.
Sh ex Day
Shea Davy
Purchasing Agent,
Town of Waterford
To: Shea Davy, Purchasing Agent
From: Gary J Schneider, Director of Public Works a
Date: October 17, 2023
Re: On-Call Architectural RFP
The Town received 8 responses to the request to provide On-Call Architectural Services. The
responses were reviewed for completeness, work experience that matches the Tawn needs,
and finally cost (hourly), As each firm listed a variety of job titles, the Department selected the
classification of architect for hourly cost comparisons.
This will provide on call architectural services to all Town departments on an as-needed basis
for a two-year term, with the option to extend the contract for an additional three years upon
agreement by both parties.
The service involves, but are not limited to:
* Perform existing conditions plans showing facilities including buildings, parks, parking lots,
roads, drainage, underground or overhead utilities, topography, ar other facilities as directed,
: Assist the Town in the early stages of project development, including developing project
alternatives and providing analysis and recommendations to develop scopes of work.
+ Prepare architectural designs, details, calculations, plans and specifications for projects.
* Prepare estimates of probable cost.
+ Assist the Town in identifying, preparing, submitting and managing local, State, and Federal
permits,
+ Assist the Town in the bidding and construction stages for projects, including development of
project specifications, attending pre-bid meetings, answering Requests for information, making
recommendations concerning bid awards, attending pre-construction meetings, reviewing shop
drawings and assisting with project management during the construction phase.
“Renovation and repair design.
Building and Fire Code analysis.
There is no guarantee to the amount of work assigned, thus there is no cost to the Town in
having this firm on-call.
All 8 firms were qualified. On one side of the scale, several firms had extensive work in large
municipal projects. The firm that the Department is recommending are on the other side of the
scale, having worked on smaller scale municipal projects that more reflect projects we will
encounter.
| am recommending that the Town enter into a contract with Antinozzi Associates Architecture +
interiors.
‘Wid Fotatalion Sheer REPHPS-139 On-Call ArelMlectorsl Servers
Sepicttber 38,2083 1
are DW Opening,
‘Foial Did/Bid Schedule Submitted
‘Classfleation/ HOUR
~s O'Riordan Migani Architects LLC
TE eee ~ z Sian)
: ~ PB Rasa Tay = ETI
paces Tela Boje Manage z $205.0
Lothrop Associates Architects:D.P,C. P.C: lPaisttianeper Sra s zi s20n00
‘ eae . [Senior Pokct Antec SOSA NRSC = z S108]
seen ht Piet Anite z SEN 7 3188.0
2 7 2 ES Wiens 7 z 5 Chissifleatlaw LOURLY RATES
oe Wy rs a n : ‘y+ [Principe * 2 4. $178.00
AMA- Architects: PC:& BaDesigner Co, ’ [Archieeta Eatiower ew ~ : Sisntal
+ 2 . Eee ie} 22 [Reofeet Coordinator _ eres $178.00]
: Aan rie ~ Stas.
; " ‘Classification HOURLY RATES
om > ~ Principat a 5198.08;
Friar, Architecture Inc.” Seon Peay rrcn et ar : $ sone
ys : 2 : Archivctorol Devigner re
‘S100.60]
“ cura ie 2 | Auto AD Operaies » a a a $95.00]
- a ; Joong: en Sas ChaaalfieatonHOURLY RATES,
Bohs ees a ° 5) [Soler Associate, Project Mazager-2.-" eee zi ‘$135.00)
Bee nccEie ene cee} 227055 [Se treed Manges Abele os - : eS i BES)
‘Anlinozzi Associates:Architécture + [pam Manape ma Saar s ERIE: re ‘309
4 Sepia Batt TE. Lh [se Alochale, Technleel Director, ee : Ta * z ‘Srd0a8|
Seiio rut Interiors ot ga Nene TES To H SNTREES ¢ em
y ws EISEPEEES Se ESSE 80 Ppbjee Atnget 2 z See g ‘S18.60}
2 _ ; {Senior Project Avchiteet 2: a $320.00]
” : [Praject Aschiteet a AEE a 2: ‘ ‘$408,00]
; fAdvsaced AchNociie Deined 7 i)
‘ : Classi JOURLY RATES:
eee s +o) inci iapet Manger eo EDIE
: ; 5 [Pinipsliveped Anite Te TT siea
¥ SRR EAS 2 chee z $412.00)
Silver Petrucelli'+ Associates. chirp aa = 5 $106.00)
~ Penyd z : Project Bogingerbkanages Peptic 3 pa es “S138.00)
: e : at 237: Ninipal BO Engineer ee ee = z ‘sia
EAE Fi : Project Eesincar, 2 wan ‘S1i0.09]
$I
20)
nd)
: z Ea)
epee Arehtecd Engineer Designer ‘i880
7 | Praitel Rdoagere =e ne e : ra
[Benton Nitec pineteesiente ae : 5 ‘sioka8|
Arcee (Lloensed) sae 2 2 : 2 a ‘SeeK0e]
Arhitecoma Dofgrer peer eer 7 eet]
EngiaceeDelgnet aE es Srisoo]
2! Clanificatign/ HOURLY RATES:
isumeyiPrejcet Haron AES)
FConsicion Minscger 5 193.09}
ecient Engineer ‘i : ‘Seal
- [teseiPrshea Meanagee $155.08
Aeiesiem Finepal fo Charge Te Te
SAR 60
rarcutet : aa Teo on 3158.00]
3 S748
Tones : t “sais
: Ce 7 ‘SaKA0|
Bait Anebilea i ee PENS 2 ‘S17b.09]
isk Capt : TEE SSnrernent ss ks IDES ‘S150.
Oupers Fojeet Managenien Ductier Smee nte sec ere ne ° Tinea Sig0.sa}
: [Owveds Pejec Maman. = a
‘Sts.
ANTINOZZI
ASSOCIATES
ARCHITECTURE
+ INTERIORS
REQUEST FOR QUALIFICATIONS
ON-CALL ARCHITECTURAL
SERVICES
RFQ #23-133
TOWN OF WATERFORD
SEPTEMBER 28, 2023
TABLE OF CONTENTS
LETTER OF INTEREST
FIRM PROFILE
FIRM EXPERIENCE
PROJECT UNDERSTANDING
TEAM QUALIFICATIONS
HOURLY RATES
REFERENCES
REQUIRED FORMS
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
f
1sig
+
ARCHITECTURE September 28, 2023
INTERIORS
Brandishea Davy
Purchasing Agent
Town of Waterford
(5 Rope Ferry Road
Waterford, CT 06385
Re: Request for Qualifications; On-Call Architectural Services RFQ #23-133
Dear Ms, Davy and the Town of Waterford,
Antinozzi Associates welcomes this opportunity to provide our firm's qualifications for your
solicitation of On-Call Architectural Services for the Town of Waterford. For over 65 years, our
experience has included the programming, planning, design, and construction administration for
numerous public and private clients and municipalities throughout.
In addition to understanding the critical needs pertaining to on-call support and the importance of
working seamlessly with our clients, Antinozzi Associates has the experience and capacity
required for accommodating rapid response services. Many of our clients’ recent projects have
included ADA/code upgrades, infrastructure and building envelope improvements,
retrofit/adaptive re-use, historic preservation, and various other capital improvements similar to
those wa would expect to work on for the Town of Waterford.
Antinozzi Associates has proven to be a reliable, efficient, and responsive partner in the on-call
design and management of projects for public and private clients including the municipalities of
Trumbull, Greenwich, East Hartford, Fairfield, Groton, Guilford, Hamden, Hartford Housing
Authority, Stratford Housing Authority (since 1986), State of Connecticut Department of
Administration Services, Milford Redevelopment & Housing Partnership, Savin Rock
Communities, Waterbury Housing Authority, Housing Authority of the City of Torrington,
University of Bridgeport, the University of Connecticut and currently finishing a major
renovation project in the City of New Londen for New London High School.
| will lead these professional services as a firm principal, licensed architect, and licensed building
official in the State of Connecticut. We look forward te meeting with you to discuss our
qualifications in further detail. Please contact me if you have questions or need additional
information.
Thank you for your consideration,
Sincerely,
ANTINOZZI ASSOCIATES, P.C.
Paul Lisi, AIA
Principal, On-Call Services
271 Fairfield Avenue Bridgeport, Connecticut 06604 203.377.1300 antinezg.com
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
FIRM PROFILE
VISION
Create inspiring spaces in which to learn, play, work, and
live that exceed client expectations through a diverse
team of collaborative design professionals,
Antinozzi Associates is celebrating more than six decades of
design leadership in Commercial, Corporate, Educational,
Financial, institutional, and Multi-Unit Residential
Properties. Services include Architecture, Interior
Design, Pre-Referendum Planning, Feasibility Studies,
Master Planning, Programming, Project Management, Site
Analysis, Space Planning, Consultant Coordination, and
High Performance Building/LEED Consultation.
Antinozzi Associates takes great pride in having provided
top-tier architectural and interior design services for
hundreds of civic, municipal, and educational organizations
throughout Connecticut, Rhode Island, and much of the
Northeast. Our muiti-disciplined firm is led by principals
Michael Ayles, FAIA, NCARB; Paul Lisi, AIA, BCEO;
and Michael LoSasso, AIA, LEED-AP BD+C. Antinozzi
Associates |s a Professional Corporation and State of
Connecticut Certified Small Business that employs over
20 staff members including several LEED and WELL
Accredited Professionals.
With principal involvement on all of our projects, Antinozzi
Associates has has a solid reputation as a leader in archi-
tectural and interior design. tt is gratifying to think about
the impact we have upon countless individuals who use
our buildings every day. Our approach to fulfilling this
responsibility is to listen closely to our clients, design
beautifully functional spaces, and integrate sustainable
practices,
LOCATION
Antinozzi Associates is located in the 1908 Bijou Theatre
building in the heart of Downtown Bridgeport. In 2006
we extensively renovated and converted the building's
former ballroom into an 11,000 SF, two-story, open-
air workplace with a balcony of architects and interior
designers surrounding the main floor studio.
KNOWLEDGE
Learning is a life-long responsibility for architects and interior
designers; therefore, the entire Antinozzi Associates staff
has the opportunity to learn and work on diverse cross
sections of building types at all levels. The principals of
ANTINOZZI ASSOCIATES
ARCHITECTURE + INTERIORS
FIRM PROFILE
the firrn encourage staff to actively engage in internal and
external professional development as well as with com-
munity organizations to better understand the needs of
society from a variety of perspectives,
ON-CALL DESIGN SERVICES
Antinozzi Associates is pleased to be able to offer a range
of On-Call Design Services to our clients. The “On-
Call” method requires speed, creativity, and efficiency
via immediate team response and situation management.
Principal-led on-call project teams assure that Antinozzi
Associates delivers consistent on-time and on-budget
results for our clients.
TEAM/MANAGEMENT APPROACH
As architects, we recognize that one of our most signifi-
cant roles is to manage a process that may take hundreds
of individuals years to complete. As team leaders with
the responsibility of ensuring efficient utilization of all
resources, proper selection and management of engineers,
consultants, and construction managers are key factors
in the success of our projects. Our team approach and
access to a wide range of consultants capture the best
available expertise. We also work side-by-side with con-
suitants selected by our clients to maintain thelr previously
established strong relationships.
Antinozzi Associates strives to maintain a positive, ener-
getic, and collaborative spirit with a talented and diverse
team of professionals. That team includes our clients.
We firmly believe there is no better incentive for deliver-
ing design excellence than working with individuals and
organizations enthusiastic and passionate about turning
a vision into built form.
PROFESSIONAL AFFILIATIONS
Antinozzi Associates js affiliated with the following
organizations: American Institute of Architects (AIA),
international Interior Design Association (IIDA), U.S.
Green Building Council (USGBC), ACE Mentor Program,
International Code Council, Connecticut Coalition
of Interior Designers (CCID), National Council of
Architecture Registration Boards (NCARB), Bridgeport
Regional Business Council (BRBC), Greater New Haven
Chamber of Commerce (GNHCC), Connecticut Building
Congress, Professional Wornen in Construction, WELL
Building Institute, and the Construction Institute.
ANTINOZZ! ASSOCIATES
ARCHITECTURE + INTERIORS
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
RECENT MUNICIPAL PROJECTS
Town of Trumbull (On-Call)
Town Hall
+ Space Reconfiguration Study
+ Space Consolidation
+ Window Replacement
+ Elevator Replacement
+ Annex Expansion Feasibility Study
* Roof Replacement
+ ADA Upgrades
+ Renovation Study
+ New Generator
+ Exterior Doors
Department of Public Works
+ Roof Replacement
+ Fuel Station Canopy
+ New Administration Building
+ Expansion/Renovation
Building Assessments for Multiple Sites
Exploratory Roof Work for 4 Facilities
Police Department
+ Roof Replacement
+ Window Replacement
+ Elevator Replacement
Berkshire Avenue
+ Garage Roof
Planning & Zoning Department
+ Alterations
‘Tax Assessor Department
+ Alterations
EMS Facility
+ Window and Door Replacement
+ Roof Replacement
Long Hill Village Green
+ Conceptual Designs
Senior Center
* Kitchen Renovation
Beach Park Pool Equipment Building
+ New Facility
Trumbull High School
* New Generator Study
+ Concession/Toilet Facility
« New Generator
Counseling Center
+ Study
+ Renovation
ANTINOZZ1 ASSOCIATES
Health Department
+ Roof Replacement
Trumbull Public Library
* Study
Town of East Hartford
North End Senior Center
* Facility Needs Assessment and Feasibility Study
Veterans Memorial Clubhouse
* Facility Needs Assessment and Feasibility Study
Hockanum Library
* Facility Needs Assessment and Feasibility Study
City of Stamford /
Stamford Public Schools
Northeast School
« Resource Rooms
+ Flood Repairs
Rippowan & Apple Prek
* HVAC Study
Newfield Elementary School
+ HVAC Upgrade
Town of Westport
Westport Public Schoois
* Facilities Study/Master Plan for Seven (7) Schools
State of Connecticut Department of
Administrative Services (On-Cail)
judicial Branch
+ Accessibility Audit/ADA Improvements Study &
Design Services for Five (5) Courthouses :
CT Army National Guard - Enfield Armory
+ Window/Door Replacements
Branford Readiness Center
+ Exterior Restorations
City of Bridgeport
Department of Public Works
» New Vehicle Maintenance Facility
BPT Public Library - Newfield Branch
+ Relocation and Renovation
BPT Public Library - Upper East Side Branch
+ New Construction
Town of Monroe
Town Hail
* Doors and Access Control
ARCHITECTURE + INTERIORS
TOWN OF TRUMBULL
ON-CALL SERVICES
Location: Trumbull, Connecticut
Area: Various a
Completion: Ongoing since 2010 / 3
“CONNECTICUT.
INCORPORATED
Sk TOT
/PRUMBULL.
DESCRIPTION
Our first assignment with the Town of Trumbull was
ta update the Five-Year Capital Improvement Plan for
nine (9) major town buildings totaling approximately
442,000 SF, including two Town Libraries, the Town
Hall and Annex, Police Headquarters, Senior Center,
Public Works Yard, and EMS Facility. The need for facil-
ity improvements throughout the town led to our on-
cal] design services contract with the Town in 2010,
which has since been renewed several times,
In 2015 we were commissioned to conduct a feasibil-
ity study for Town Hall to determine an overall square
footage requirement to house all departments, cur-
rently within three separate buildings, into one con-
solidated location, This assessment provided the Town
with an overview of square footage needed for each
department in comparison with the existing square
footage and included an analysis of the existing space in
each building, as well as the potential for consolidating
all municipal and Board of Education offices into the
existing Trumbull Library building. tn 2019 our firm was
commissioned to conduct an additional space reconfig-
uration study for Town Hall to determine the feasibility
of reconfiguring multipie departments. Our approach
involved an Information Gathering phase followed by a
Conceptual Design Phase.
Other recent projects include the Police Department
upgrades, Department of Public Works renovations,
Mary J. Sherlach Counseling Center study and renova-
tions, senior center renovations, a feasibility study for
renovations of the Trumbull Public Library, and school
projects including various upgrades for Trumbull High
Schoal, Middlebrook School and Madison School roof
replacements, Hillcrest Middle School exterior altera-
tions, Frenchtown Elementary School cooling tow-
ers, exterior stairs for the schoo! bus depot, and roof
replacements for multiple municipal facilities.
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
STATE OF CONNECTICUT
ON-CALL SERVICES
Location: Various Locations Statewide
Completion: Ongoing since 2019
DESCRIPTION
As part of our on-call contract with the State of Con-
necticut Department of Administrative Services, An-
tinozzi Associates has been commissioned for several
projects with various entities. We recently completed
the Accessibility Audit and ADA Improvements Study
of five courthouses for the Judicial Branch and are now
working on the design of the improvements to address
accessibility issues documented in our studies,
Antinozzi Associates has recently provided the archi-
tectural and engineering services to prepare drawings
and specifications for the replacement of the existing
windows and exteriors doors at the Enfield Armory.
Our scope of services has included specifying and detail-
ing new ATFP compliant windows and exterior doors,
replacement of overhead doors, louvers, and window
treatments, painting of lintels and exterior concrete fa-
cade, masonry re-pointing, and installation of insulated
metal panels and security bars.
Our firm has provided architectural and engineer-
ing services for renovations at Camp Nett in Niantic.
Our scope of services includes specifying and detailing
required renovations to the latrines, including replace-
ment of all finishes and accessories, replacement of all
plumbing and electrical fixtures and devices, HVAC up-
grades, reconfiguration/expansion of spaces for code
compliance, and installation of handicap accessible !a-
trines and shower areas, The existing gang type show-
ers will be replaced with individual shower stalls.
We were also recently commissioned to provide archi-
tectural and engineering services to prepare drawings
and specifications for miscellaneous exterior masonry
restorations at the Readiness Center in Branford. Our
services for all of the above-mentioned projects for the
Military Department have included preparation of cost
estimates, Bidding and Construction Documents, and
Construction Administration services,
DAS/DCS
ANTINOZZ] ASSOCIATES | ARCHITECTURE + INTERIORS
TOWN OF EAST HARTFORD
Location: East Hartford, Connecticut
Area: Various
Completion: 2020
DESCRIPTION
In 2019, Antinozzi Associates was awarded the com-
mission to conduct a Facility Needs Assessment and
Feasibility Study of three (3) existing buildings in the
Town of East Hartford. This assessment was intended
to provide the Town of East Hartford an overview of
the deficiencies and for developing a potential renova-
tion plan for each building.
The buildings evaluated as part of the assessment
include the North End Senior Center, Veterans
Memorial Clubhouse, and the Hockanum Library.
The assessment of each building included a field survey
to investigate and evaluate the current conditions of
the facility, as well as to identify possible options to
the manner of any future additions.
The survey of the above listed buildings included the
following elements: Architectural Systems, Site Con-
ditions, Structural Systems, Plumbing Systems, HVAC
Systems, Electrical Systems, Fire Protection Systems
(where applicable), and Environmental Conditions,
ANTINOZZI ASSOCIATES
ARCHITECTURE + INTERIORS
GREENWICH PUBLIC SCHOOLS
ON-CALL SERVICES
Location: Greenwich, Connecticut
Area: Various
Completion: Ongoing since 2015
DESCRIPTION
Antinozzi Associates has provided design services for
numerous Greenwich Public Schools capital improve-
ment projects since being awarded an on-call design
contract in 2015. These services include evaluating
existing conditions, preparing construction drawings
and specifications, securing permits from regulatory
agencies, developing cost estimates, and providing con-
struction administration services. Renovation projects
have included ceiling and lighting replacements, rest-
room renovations, lounge renovations, fire alarm sys-
tem upgrades, roof replacements at various schools as
well as HVAC system upgrades, and curtain walls and
windows at Eastern Middle School.
Prior to our on-call work, Antinozzi Associates was
retained on three major school projects in Greenwich.
The firm was hired by the Town to complete a feasibil-
ity study to address an increase in student enrallment
at two schools - North Mianus Elementary School and
Riverside Elementary School. As a result of the study,
a 12,000 SF addition of ten (10) new classrooms were
added simultaneously to each of the two schools.
Addressing the existing schools’ vernacular style and
existing site layout were, of course, key to the designs.
At Greenwich High School, substantial renovations to
the existing 366,000 SF building, several smail additions,
and a new Science/Technology wing totaling 90,000 SF
were completed. Minimizing relocation while maintain-
ing a safe, non-hazardous environment for students,
construction was phased into six (6) equal phases and
completed on-time and under the $40M budget.
All of these schoo! addition and renovation projects
required local/State funding and Town approvals.
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
UNIVERSITY OF CONNECTICUT
ON-CALL SERVICES
Location: Various Locations Statewide
Completion: Ongoing
DESCRIPTION
Antinozzi Associates was first awarded an on-call
contract with the University of Connecticut in 2014.
Since then we have been the assigned lead on a wide
range of projects, coordinating the appropriate teams
of sub-consultant specialties and successfully managing
the projects in accordance with the University’s spe-
cific business needs, In 2021 our firm was awarded a
renewed On-Call contract with the University of Con-
necticut for both General Architectural Services as well
as Architectural Services for Small Projects.
The project assignments issued under the On-Call con-
tracts vary from feasibility studies and reviews, to ser-
vices for small renovation projects and minor design
work, services in connection with infrastructure, and
renovation projects.
We have recently worked on code remediation for the
Norling Building and Northwest Quad as well as the
relocation of the Department of Physical Therapy to
the Biobehavioral Sciences Building, The facility is a one
story, Butler-type building which currently houses of-
fice and lab spaces. As part our Scape of Work, we
met with the appropriate staff members of the Depart-
ment of Physical Therapy to confirm and update the
space program prepared by the University, Schematic
Designs, Construction Documents, and Construction
Administration Services were provided.
Antinozzi Associates afso recently provided the Univer-
sity with professional design services for their partner-
ship with the Wadsworth Atheneum Museum of Art,
relocating the Master's Degree in Fine Arts Administra-
tion within designated space in the museum, as well as
working with the University on their Middlesex County
Extension Center,
ANTINOZZI ASSOCIATES } ARCHITECTURE + INTERIORS
BRIDGEPORT PUBLIC LIBRARY
Location: Bridgeport, CT
Area: 7,500 - 12,000 Square Feet
Completion: [n progress
DESCRIPTION
In 2013, the Bridgeport Public Library (BPL) embarked
upon the process of creating a master plan of their five
(8) branch facilities throughout the City. In coordina-
tion with MSR of Minneapolis, Antinozzi Associates
was awarded the contract to provide a comprehensive
Bridgeport Public Library '\Master Plan
study of options for the future of the facilities, Based
on the results of the study, and the need to meet chal-
lenging demographic and technological program chang-
es, the BPL. purchased three sites to renovate or newly-
construct branches that would revitalize the City’s East
End neighborhoods and reinvigorate the BPL’s commu-
nity impact.
The library program for each branch revolved around
the idea of “Tech Centers," The main features of these
new tech centers include: spaces dedicated for children,
teen, and adult use; a community room; large/small
study rooms; a library “marketplace”; numerous com-
puter stations; wi-fi capability; and outdoor courtyards
for reading or gathering.
FEATURES
The first tach center was the relocation of the New-
field Library branch back to its original site in the early
20th century. The existing brick masonry building is a
Carnegie library built in 1900. The building is two (2)
levels of approximately 3,400 SF per level and was com-
pletely restored/renovated to meet the program and
code compliance. The second project following the
Newfield Branch was the construction of a new branch
in the Upper East Side of Bridgeport to accommodate
a neighborhood not previously served by the BPL. A
$4M design/build project with Downes Construction,
the building is a single-story 6,400 SF facility incorpo-
rating critical program requirements for the East End
community, The third project, currently underway, will
deliver a full renovation of the Lower East Side Library
Branch that will include code and amenities upgrades.
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
KILLINGLY COMMUNITY CENTER Renovation
Location: Danielson, Connecticut
Area: 149,314 Square Feet
Design: 01/2023 - 07/2023
DESCRIPTION
Antinozzi is providing design services for the Town of
Killingly's Community Center. The building was for-
merly Killingly's second high school, and then was
converted to accommodate both the Board of Educa-
tion Central Offices, and EastCONN, which provides
K-12 student services.
FEATURES
The existing structure has experienced water infiltra-
tion at its exterior walls resulting in deterioration. Most
significant are areas along the South facade where the
brick veneer has been compromised. Our improve-
ments include stabilization of the exterior walls, and the
replacement of the existing roof and exterior window
assemblies.
With the building partially-occupied, the project will
introduce the community center spaces Hike a tenant fit-
out. Upgrades to plumbing fixtures, activity and office
spaces, and the addition of air conditioning are specific
for those spaces to be utilized by the community center.
Supplementation of the existing access control system
will provide access control ta other tenant spaces.
As a centrally-located destination in Killingly, the building
will house community center spaces, as well as a food
bank, a gymnasium, and the “CoffeeHouse”, an assembly
space jn the school's former cafeteria which is capable
of supporting multiple activities such as lectures and the
Squeaky Sneakers’ preschool activity program,
ANTINOZZI ASSOCIATES | ARCHITECTURE + INTERIORS
STERLING HOUSE COMMUNITY CENTER
Location: Stratford, Connecticut
Area: 1,500 SF addition; 2,000 SF reno,
Completed: 2018
DESCRIPTION
Sterling House is a multi-service community center
located in the heart of Stratford, Connecticut. Built in
1886, it is part of the Town Historic District {registered
with the State}, Since its opening in 1932, Sterling House
has served as a resource for all citizens of Stratford and
the surrounding areas. It is dedicated to providing a broad
range of educational, recreational, and social programs to
youth and adults alike, including a preschool, camps, food
pantry, and a referral resource center,
FEATURES
Antinozzi Associates was commissioned to provide a fea-
sibility study and then complete design services for a new
4-stop elevator addition on the west side of the facility.
This included creating a new main entrance, lobby, and
egress stairwell. Renovations on all floors of the house
enabled a spacious administrative suite with waiting
area and new Director's office, revitalized food pantry
entrance, waiting area, and offices on the lower level, and
connections making every floor handicap accessible.
Our services included surveying existing conditions,
multiple conceptual layouts, evaluating building and fire
code impacts, roof modifications, environmental compli-
ance, structural integrity, and interior/exterior historical
details. Finishes and furniture were carefully selected to
seamlessly blend the old with the new,
ANTINOZZE ASSOCIATES | ARCHITECTURE + INTERIORS
THE BARNUM MUSEUM
Location: Bridgeport, Connecticut
Area: 37,300 SF
Current Status: Under Renovation
DESCRIPTION
The Barnum Institute of Science and History (Barnum
Museum) is a Romanesque Revival style masonry build-
ing designed and constructed in 1893 at the bequest of
the nationally renowned entertainment entrepreneur,
Phineas Taylor Barnum. The Barnum Museum property
is designated as a National Historic Landmark.
Following a Tornado and multiple hurricanes in 2040,
the Museum has been engaged in a full-scale restoration
effort. Antinozzi Associates has been actively involved in
this effort from both a volunteer and professional per-
spective since its inception, with a commission of profes-
sional A&E services in 2015.
In 2019, Antinozzi Associates was awarded the com-
mission to provide Architecture & interior Design and
Project Management for the Building Envelope Rehabilita-
tion. Services include Consultant Coordination, CAD and
Construction Document Coordination, Code Consulta-
tion, Contract Documents (drawings and specifications),
CT DECD Coordination, DECD/ Connecticut State His-
toric Preservation Office (SHPO) Reviews, Bidding, and
Construction Administration.
FEATURES
As part of a multi-phase renovation and addition, exte-
rior rehabilitation work will be undertaken to historically
preserve and restore this prominent landmark in coop-
eration with the Connecticut State Historic Preservation
Office (SHPO) and funding from DECD. The building
envelope analysis was used to provide the best harmony
between energy efficiency and proper performance of
the exterior envelope.
Re-envisioning of the Barnum Museum will be culminated
by complete interior renovations, including renovations
of the existing gallery space currently housed in the adja-
cent bank building. The completed project will showcase
state-of-the-art exhibitions using ground-breaking tech-
nology, interactive storytelling, and immersive design to
advance visitor learning and experience,
ANTINOZZI ASSOCIATES
ARCHITECTURE + INTERIORS
CODE EXPERTISE
Paul Lisi, AIA, BCEO, a firm Principat and Senior
Project Manager, is a licensed architect and is in charge
of the majority of the firm’s on-call capital improvement
projects for municipalities, school districts, and housing
authorities. Paul is a Licensed State Building Inspector
and member of the International Code Council (ICC).
He is also a former Planning and Zoning Commissioner
in his hometown of Monroe, CT,
Paul regularly attends professional seminars and indus-
try workshops with local and State regulatory officials.
Much of his involvement on the firm's design work,
including institutional and corporate type projects,
specifically addresses, and solves, issues relating to the
Connecticut Building and Fire Code, Handicap Regula-
tions (ADAVANS)), Life Safety Code, and many more.
With this distinct advantage of utilizing the expertise of
an in-house Licensed Building Official on all of our proj-
ects, we consult early (and often) with local and State
code enforcement authorities, both formally and infor-
mally, to engage additional feedback during the design
process, Since most project schedules do not allow
time for miscues, we must be certain that local and
State pre-construction phase approvals are seamless.
In addition, we also have an excellent working relation-
ship with the State Fire Marshal's Office and Building
Inspector's Office.
ANTINOZZI ASSOCIATES
ARCHITECTURE + INTERIORS
ANTINGZZI ASSOCIATES | ARCHITECTURE + INTERIORS.
PROJECT APPROACH:
ON-CALL DESIGN SERVICES
Antinozzi Associates has been in business for over 60 years
and we are fortunate to have been a part of the design
industry for a very long time, wit