Board of Selectman Regular Meeting Materials (linked)
agenda center agenda
| Board/Commission | Board of Selectmen |
|---|---|
| Meeting Date | September 06, 2022 |
| Pages | 14 |
| File Size | 0.4 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
TO;
FROM:
DATE:
RE:
Ce:
Rob:
WETEEN ROPE PERRY ROAD WATERFORD, CT 06385-2886
WATERFORD RECREATION AND PARKS COMMISSION
First Selectman Robert J. Brule & Board of Selectman
Brian W, Flaherty, Director
8/24/2022
Pleasure Beach Sidewalk/Pathway
File
Please find attached for yout consideration a capital budget request outside the budget cycle.
This pathway needs a permanent repair to address wash-out issues as well as making the beach
ADA accessible. If we wait much longer to address, the pathway will continue to erode. The fall
is a good time to make this repair since patron use drops down. Contact me with any questions.
Thank you for your consideration.
TOWN OF WATERFORD
CAPITAL PROJECT REQUEST FORM
DEPARTMENT/AGENCY CONTACT PERSON
Waterford Recreation & Parks Commission Brian W. Flahesty
PROJECT NAME DEPARTMENT PRIORITY
Pleasure Beach Sidewalk/Pathway Capital Project Outside Budget Cycle
he project)
‘The Pleasure Beach parking area is located on 44 New Shore Road in the Pleasure Beach section tof town. It is:
approximately 0.17 acres with 93+- feet of waterfront on Long Island Sound. In the summer months, a
lifeguard is on duty daily. A portable restroom, benches, and trash cans are on-site. A small parking lot is
available within walking distance, and the beach borders private property. It is frequented by residents and
visitors for swimming and sun bathing, It is a shallow water beach popular with families with young children,
Day care companies in town frequent the beach, In the off-season, the beach is used by walkers. The original
path has been repaired over the years, but continues to wash out, Several residents have requested a better
path to access the beach. A new ADA accessible concrete sidewalk (180 If long x 6' wide x 5" thick to include
landing) is needed for this park. The estimated cost includes labor, equipment, erosion control, gravel fill,
wire mesh, formwork, and ready mixed concrete. Where the sidewalk meets the existing boardwalk, a mobi-
mat will be installed ¢o continue the accessible path over the sand to the beach, The mobi-mat will 5' wide
with 133! If to the beach and will be installed by our maintenance crew.
2: | PROJECT STATUS IF IN PROGRESS
An A-2 property survey for this area has recently been completed. Our department hihas attempted tto make
repairs to the path.
This project should be planned for the Fall so as not to interfere with visitors. The ‘project should take
approximately there +- days to complete, P & Z 8-24 permission will be requested.
-]DESCRIBE THE IMPACT-ON DEPARTMENT OPERATING. BUDGET (include cost estimate if appli:
Routine repairs to the concrete will be required as well as the mobi-mat.
: simply state that.in ‘the below) ~
Property map, pictures, Deschamps Mat System quote & Deedy Construction Company quote. Sidewalk
Construction: $14,980 Mobi-Mat: $6255.37 Utilze Reeve funds for contingency/signage.
= COST/FUNDING SOURCE ‘=:
D
FUNDING SOURCE FUNDING | FY2022 | FY2023| FY2024 | FY2025| FY2026
Current Year Capita)
21,236
Utility Budget/Sewer Cap Maint
Fund
Transfer to CNR
Short/Long-term Bonds
LoCIP (detail in section 5 above)
CNR Undesignated Fund Balance
IEA Jule fw [ro
section 5)
Other Funding (detail in section 5
above)
1,530
TOTALS ©
8/23/22,
2110
PM
:
Waterford
Gt,
Web
Gis
pec
Name,
Address,
Parcel
IO
Patcal
Derails
44
NEW
SHORE
ROAD
44
NEW
SHORE
ROAD
WATERFORD
TOWN
OF
Paros!
ID:
178
5026
View
Dewiis
Shout
WATERFORD
TOWN
OF
45
ROPE
FERRY
RD
WATERFORD,
CT
06385
Parcal
1D:
178
5028
Lot
Size
fac:
%
‘otal
Value:
$$28.290.00
300
OWN
OF
4008
DPE
FERRY
RO
SOR
(eats
T°
{Clear
Abutters
i
Mailing
Zip
0638"
8c:
Assessed
Total
oO
*e
Es
Size:
cee
cece
necesere
Title:
Seale
"=
2ST
lone
TD.
1e8e
Close
|
Print
htins:/nnstina.fiahahond.comiwaterfardet
nublictéifinfa-addrass
1H
Oe.
HO:
on ve
Mobi-mat will extend to beach
People of all abilities will be able to access beach
Deschamps Mats Systems, Inc. Q u ote
218 Little Falls Rd, #12
Cedar Grove, NJ 07009 ; Date Quote #
5/20/2022 E7TL10
Customer Ship To
Town of Waterford ‘Town of Waterford
Brian Flaherty Kerry Sullivan
15 Rope Ferry Road 24 Rope Ferry Road
Waterford, CT 06385 Waterford, CT 06385
860-444-5881
Terms Rep FOB Quotation valid until
Net 30 BAGPR New-Jersey 6/10/2022
Hem Description Qty Cost Total
300263-3040 Mobi-mat (RecPath) AFX golden sand 5' x 100' 2h 20" 1 4,089.00 4,089.00
staples + spikes
300261-1000 Mobi-mat (RecPath) AFX golden sand 5' x 33' 2h 20" 1 1,639.00 1,639.00
staples + spikes
DELIVERY NT Boxing/crating, Shipping, Handling, Delivery 527.37 $27.37
Freight Quote is an estimate only and may be subject to change at time of shipment Subtotal $6,255.37
1255.
If authorized by your terms of sales or approved by your representative your signature below | Sales Tax (0.0%) $0.00
will act as consent to proceed with this order as quoted and will become a binding agreement :
{o purchase.
Credit Card Payments will be assessed a 3.5% fee. Total $6,255.37
Currency Shown in U.S. Dollar « Foreign customers please remit payment in USD to avoid re-invoicing of any exchange rate loss or fees.
Signature
fekphien, Vell tun sth 703
weldsisry
DUEDY CONSTRUCTION CO, INC.
rugrad Managentent and Conuiruttion Managenstnt
Deedy Construction Campany Inc,
4185 Great Neck Road,
Waterford, CT 06385
BILL TO QUOTE # 111
Town of Waterford Parks and Recs Dept QUOTE DATE 08/24/2022
24 Rope Ferry Road
Waterford, CT,06385
Attn: Mr Brian Flaherty
DESCRIPTION AMOUNT
Deedy Construction Company Inc proposes to provide all necessary labor, 14,980.00
equipment, erosion control, gravel Fill, wire mesh, formwork and ready
mixed concrete to construct ADA Sidewalk 180 If long x 6 feet wide x 5”
thick with Landings at access point to Pleasure Beach off of New Shore
Road for a total {ump sum of $14980.00 broken down as follows:
1) Materials, 4400.00
2) Mobilization. 1200.00
3) Labor. 6200.00
4) Equipment. 3180.00
If you should have any questions, please feel free to call me at 8605147958
or email me at nandodazzi@att.net. Thank you !
TOTAL $14,980.00
TERMS & CONDITIONS
Shank gou Full payment upon completion