Full Text (OCR Extracted)
Wetland Delineations
Wetland Evaluations
Soil Evaluations
1
Ian T. Cole, LLC
Professional Registered Soil Scientist / Professional Wetland Scientist
PO BOX 619
Middletown, CT 06457
Itcole@gmail.com
860-514-5642
November 11, 2021
Maureen FitzGerald, WEO
Environmental Planner
Town of Waterford Conservation Commission
Waterford Town Hall
15 Rope Ferry Road,
Waterford, CT 06385
RE: Annual Wetland Mitigation Inspection Report – Year 1 (2021) - Inland Wetland Permit #C-
20-14, 14B Shore Road, Waterford, Connecticut.
Dear Ms. FitzGerald:
On Behalf of the Applicant Mr. David Mortimer, I am providing the annual update on the success
status of the created wetland required as mitigation for the development of the residential
driveway to access 14B Shore Road as detailed in the Town’s Permit #C 20-14. This report
represents Year 1 of 3 consecutive monitoring years (2021,2022 & 2023).
Background Summary
Permit #C 20-14 granted approval to conduct the filling of inland wetland for the construction of
the residential driveway to access 14B Shore Road. To offset this impact the applicant was
required to construct wetlands on-site and install enhancement buffer plantings to improve
existing wetland habitat.
Wetland Creation Baseline Inventory
B & L Construction, Inc. started the excavation and the rough grading process in October 2020 to
form the wetland creation area (Photos 1 & 2). B & L place 12” + of a rich organic topsoil
consisting of a 1:1 mixture of clean topsoil and compost to provide the soil medium for the
mitigation plantings (Photos 3 & 4). Wetland plants and seed mixtures were secured from New
England Wetland Plants, Inc. out of South Hadley Massachusetts. A total of 84 shrubs were
planted in the wetland creation area (Photo 5). Plantings were placed randomly to simulate
natural variability. Below is a list of quantities and sizing of installed plantings along with seed
mixtures:
Wetland Delineations
Wetland Evaluations
Soil Evaluations
2
Zone
Species
Quantity
Size
Transition / Side Slope
Spice Bush
12
2-3’
Transition / Side Slope
Bay Berry
12
2-3’
Transition / Side Slope
Conservation Mix
3
3 lbs
Basin
Silky Dogwood
30
2-3’
Basin
Winterberry
30
2-3’
Basin
Wetmix
3
3 lbs
Photo 1: October 8, 2020 – Rough Grading Inspection
Wetland Delineations
Wetland Evaluations
Soil Evaluations
3
Photo 2: October 8, 2021 – Rough Grading Inspection
Photo 3: October 15, 2020 – Topsoil Inspection 1:1 Mix of Clean Topsoil & Compost
Wetland Delineations
Wetland Evaluations
Soil Evaluations
4
Photo 4: October 20, 2020, Final Grading / Topsoil Inspection
Photo 5: October 27, 2021 – Planting and seed installation
Wetland Delineations
Wetland Evaluations
Soil Evaluations
5
Photo 6: November 5, 2021 –Inundation of wetland mitigation, photo taken from the outlet to the
mitigation area
Annual Inspection Requirements
Per special conditions note #7 on the approved permit #C 20-14; the created wetland mitigation
area will be assessed for a 3-year monitoring period using the following standards:
1. Inspection reports documenting the success of the wetland restoration plantings shall be
submitted to the Conservation Commission on a yearly basis for three (3) year, with year
1 starting in 2021.
2. The inspection reports shall document a minimum 70% survivability of plantings.
3. The mitigation report shall record invasive species control measures implemented, and
soil stabilization measures needed.
4. Yearly photographs of the mitigation area from established photo stations to best create
sequential timeline photos of the development of the wetland mitigation area.
5. Any corrective actions required.
6. Annually reports shall be submitted to the Commission by October 30 of each of the 3
monitoring years.
Wetland Delineations
Wetland Evaluations
Soil Evaluations
6
Year 1 Annual Inspection
On September 21, 2021, I completed the year one inspection of the created wetland mitigation
area.
1. All 47 shrub plantings were accounted for in various conditions, ranging from stressed
too healthy. This ratio equates to a 55% survivability, which is below the target of 70%
survivorship. Unaccounted prolonged hydrology has affected the long-term survivability
and success of the planted shrub vegetation. To resolve the issue would require
modifying the outlet structure to the created wetland to lower the standing water.
However, the ability to do so is limited because the control to this structure is situated on
the adjacent CTDEEP State owned property. Other engineering solutions would likely
require introducing counterproductive new ground and wetland disturbance to the newly
created wetland.
Within the next growing season, it is anticipated that the created area will transition to a
cattail dominated wetland. Once Cattails take root, they can be a challenge to remove due
to the robust fast growing underground rhizomes. This issue is compounded by the
prolonged hydrology which attracts waterfowl which will continue the cycle of
propagating the cattail seeds as the birds fly across the landscape landing in various
waterbodies. The transition of the created wetland vegetation community to a cattail
persistent emergent marsh, will have the unintended added improvement of water quality
renovation as the thickly vegetated cattails retain sediments and nutrients at a higher
function than the planned scrub-shrub wooded wetland. Because of these factors I do not
recommend corrective shrub plantings to bring the count back to 84 shrubs but would
alternatively suggest continued monitoring to ensure that no undesirable emergent species
take root in the absence of the proposed shrub cover. The vegetated cover would be re-
evaluated in the 2022 growing season.
2. No invasive species control measures were implemented or recommended for the wetland
creation area.
3. No soil stabilization measures are needed, the site is stabilized.
4. My recommendation is the Town considers the natural recruitment of the Cattails to be
satisfactory in replacement of additional shrub plantings and to continue to monitor and
evaluate the vegetative community for compliance with the permit conditions of Inland
Wetland Permit #C 20-14 in the 2022 growing season.
Wetland Delineations
Wetland Evaluations
Soil Evaluations
7
Photo 7: Wetland Creation Area September 2021 (north end)
Photo 8: Wetland Creation Area September 2021 (south end)
Wetland Delineations
Wetland Evaluations
Soil Evaluations
8
Buffer Enhancement Planting Area – Year 1 Inspection
The invasive vegetation and hazard trees around the wetland “former skating pond” were
removed and the ground was scarified, and debris removed offsite. Coconut core logs were then
installed around the ponds perimeter to stabilize the slopes.
During the long lead time securing plant stock during the pandemic and waiting for seasonal
plugs stocks to grow large enough to be available for purchase; the site naturally revegetated, and
all bare soil was sufficiently covered. This natural recruitment of vegetation was sufficient to
stabilize the area and therefore negated the addition of seed and plugs.
60 Shrubs were planted around the upper perimeter to wetland:
Zone
Species
Quantity
Size
Top of bank
Butterfly Bush
12
2-3’
Top of bank
Bay Berry
12
2-3’
Top of bank
Ninebark
12
2-3’
Top of bank
Hydrangeas
12
2-3’
Top of bank
Silky Dogwood
12
2-3’
1. As of September 21, 2021, all 60 shrubs were installed and in good health.
2. A small patch of Mug wort was removed in the northwest corner of the pond. The area
will be continued to be monitored and will actively remove this invasive weed. Because
of the small discrete patch, the vegetation was removed by and bagged for disposal.
3. No corrective actions are required.
4. Site will be monitored during the 2022 growing season.
Wetland Delineations
Wetland Evaluations
Soil Evaluations
9
Photo 9: Wetland Upgradient of driveway crossing – area of proposed Buffer
Enhancement Planting area pre-enhancement activities – November 2020
Photo 10: Vegetation Cleared and Core Logs installed May 2021
Wetland Delineations
Wetland Evaluations
Soil Evaluations
10
Photo 11: Example of Buffer Enhancement Plantings – September 2021
Photo 12: Wetland Placard September 2021
Wetland Delineations
Wetland Evaluations
Soil Evaluations
11
Photo 12: Final Vegetated Cover – September 2021
Photo 13: Wetland Prior to Enhancement Activities – November 2020
Wetland Delineations
Wetland Evaluations
Soil Evaluations
12
Year 2’s annual report will be submitted to the Commission by October 30, 2022. Please do not
hesitate to contact me at itcole@gmail.com; (860) 514-5642 if you have any questions or need
any additional information.
Sincerely,
Ian T. Cole
Professional Registered Soil Scientist
Professional Wetland Scientist #2006