FIC TEEN ROPEFERRY ROAD WATERFORD, CT 06385-2886
ADDENDUM #1
Notice to Bidders
Bid#23-121 Fargo Road Water Tank Recoating and Improvements
May 12, 2023
The purpose of this addendum is to provide information to Bidders.
Bidders are advised as follows:
The Mandatory pre-bid meeting to be held on Wednesday May 17, 2023 at 10 am will
no longer be Mandatory. However, all bidders are highly recommended to attend, as
this will be the only time the tank will be accessible to bidders.
On page 11 (see attached), the updated time for completion is now 365 calendar days from
notice of award.
e Please review a more clear copy of the Drawings & Plans attached.
Feel free to contact me should you require any additional information.
Brandishea Moses
Purchasing Agent
Town of Waterford

15:
executed duplicate of the CONTRACT. Should the OWNER not execute the
CONTRACT within such period, the BIDDER may by written notice withdraw his
signed CONTRACT. Such notice of withdrawal shall be effective upon receipt of
the notice by the OWNER.
The Notice to Proceed shall be issued within ten (10) days of the execution of the
CONTRACT by the OWNER. Should there be reasons why the Notice to Proceed
cannot be issued within such period, the time may be extended by mutual
agreement between the OWNER and the CONTRACTOR. If the Notice to Proceed
has not been issued within the ten (10) day period or within the period mutually
agreed upon, the CONTRACTOR may terminate the CONTRACT, whereupon it
shall become null and void and all rights and obligations created thereunder shall
be extinguished.
Time of Completion and Liquidated Damages
BIDDER must agree to commence work on or before a date to be specified in a
written Notice to Proceed from the OWNER and to fully complete the project within
120 consecutive calendar day there, Bide must agree also to pay as
liquidated damages, the sum of $1,000 for each consecutive calendar day
thereafter as hereinafter provided in the GENERAL CONDITIONS.
It is hereby understood and mutually agreed, by and between the CONTRACTOR
and the OWNER, that the date of beginning and the time for completion during the
working hours as specified in the General Conditions of the work to be done
hereunder are essential conditions of this CONTRACT; and it is further mutually
understood and agreed that the work embraced in this CONTRACT shall be
commenced on a date to be specified in the "Notice to Proceed”.
The CONTRACTOR agrees that said work shall be prosecuted regularly, diligently,
and uninterruptedly at such rate of progress as will insure full completion thereof
within the time specified. It is expressly understood and agreed, by and between
the CONTRACTOR and the OWNER, that the time for the completion of the work
described herein is a reasonable time for the completion of same, taking into
consideration the average climatic range and usual industrial conditions prevailing
in this locality.
If the said CONTRACTOR shall neglect, fail or refuse to complete the work within
the time herein specified, or any proper extensions thereof granted by the OWNER,
then the CONTRACTOR does hereby agree, as a part consideration for the
awarding of this CONTRACT, to pay to the OWNER the amount specified in the
Information for Bidders, not as a penalty but as liquidated damages for such breach
of CONTRACT as hereinafter set forth, for each and every calendar
-11-

DESCRIPTION
BY
CHK.
DATE
DRAWING ISSUE STATUS
REV.
HALEY
WARD
ENGINEERING
ENVIRONMENTAL
SURVEYING
WWW.HALEYWARD.COM
2210 Main St.
Glastonbury, Connecticut 06033
860.659.3100
1
2
3
4
5
6
7
1
2
3
4
5
6
7
PROJECT
TITLE
DATE
SCALE
DRAWN BY
DESIGNED BY
CHECKED BY
PROJECT No.
DRAWING No.
REV.
A
B
C
D
A
B
C
D
FILE LOCATION: K:\21-365 WATERFORD TANK\PRODUCTION DRAWINGS\TANK.DWG, 2023.02.20, 12:44 PM
CONTRACT No.
140 Willow  St. # 8
Winsted, Connecticut 06098
860.909.1031
15 M id State Dr ive, Suite 206
Aubur n, M assachusetts 01501
508.721.7600
FARGO TANK
WATERFORD, CONNECTICUT
PROPOSED IMPROVEMENTS
2/16/2023
NOT TO SCALE
JED
JEE
JEE
21-365
W1
CONTRACT NO.
EXISTING SPHEROID PROFILE
NOT TO SCALE
EXISTING SPHEROID TOP VIEW
NOT TO SCALE
EXISTING ROOF VENT MODIFICATIONS
NOT TO SCALE
PROPOSED 36" ROOF FINIAL (VENT)
NOT TO SCALE
ROOFTOP CIRCUMFERENTIAL HANDRAIL
NOT TO SCALE

Ho ___DOUBLE OBSTRUCTION LIGKTS
TANK
20-DR RARPROOF DOORS W/<H: CURB OS
L- os sew NG)
F ORIENTATION OF MARHOLE HINGES CANNOT BE OBTANED.CHECK WITH B’HAM _ENCNEERING
: 24°DUAFANVENT 99 $0. VENTING AREA AROUND IN
i w~ ; ACCESS TUBE (SCREENED) x0) € BELL DOOR + SEAM IN@-3)
it : c Feu l] x RANPROOF DOORS sem 'ED
‘ EL.* 432.0 USGS DIG q
i a 4270.0. 3 5 eee / © SEAM IN@=1)
H ACCESS. TUBE 20, J
‘ | eH & ACCESS TUBE . kee boenriow
H 3 :
H od ECUATOR. INSDE e U © SEAM IN G2)
i EOUTOR [ran Laboen®°——] 20 c a '
: P (PER osha) , G).4755
Qa
\ = NSE ACCESS
i TUBE LADDER & Az ' & SHAFT
\ (PER O5nA) } 8396S 24 FANVENT- LADDER
i
\ @).9875 3
i 18 X 24 OPENNG W/COVER 1 -@2)
“ a4 Sy {FOR VENT DURE PARTG ESeAM INET2708
H KA
A i BLISS
wv 56-0} —| C4-100-)) 14676 (Bo
‘ S| 7:78 —| - an Lr C100) 1251 & CONDENSATE DRAIN
“9 * $ LOT SEAM BY
s sg ARC ON TOP NS.
{ 2 a ae eS im “= caumea 150 OF KNUCKLE 15*22°-59 SEAM IN
i @e=00°) —
\ z de | U PANTERS RCS =
4 | ae & ! 2.0" DA .RAMPROOF SHAFT DOOR
! as UFPER SHAFT PLATFORM ”
i F 2G p= sar STIFE L6x4 «(2 ReQ/Dr 16° RISER ¢ SEAM
| ol? r SHAFT LADGER, IN @C4-9-1527) |
e val as @i22 (PER osu) q SECTION B
| : ; 7 4 i ts Oo OVERFLOW
i 3 a] 8] 3 4) ae |
al as zt eo’ ~ 1560 1.0.SHAFT INSIDE TANK LADDER GENERAL NOTES
2 PIPE. SUPPORT (2 REQ'D) SFECFICATONS - AWWA D100-79 Me CusTe
3° #) ACCESS TUBE © we xzevenr SFECFI le customer q
q xi oe | _ CONDENSATE PLATFORH HOLE W/Cover SERVICE - MUNICIPAL
i 3 | 3] # SHAFT WATERIL - PL°A2B3-C STRUCTURAL - A36
i} S) a] § NSPECTION - MLL CTRSHOP* WO FELD=O
2 a] 3| 3 \ _—"@ro.152) saiaal ALL BUTT WELOS TO BE 1007 FUSION
1h | al = SANDBLAST - YES (PEK awwa 0100-79)
F 3 7 3 2-3) 1.345 PANT - SEE STRUCTION SHEET (S)
Eb a eS DIAPHRAGM SEAMS MOTE IGP RGERTO BE INSULATED 97 \ SERLGATIN - YES (PER Awwa Drco-79)
Ee gq] 3 & 3 FOUNDATION BY 2° THK. RIGID POLYURETHANE FOAM © \¥AO - 12S MPH
Ss} 2 ei aw CBIL_SUBCONTRACTOR 180" COVERED °# AN INTIMATELY BONDED SEISMIC - ZONE 2
iM 1 | . SECTION CASING OF LAMINATED POLYESTER RESIN] O=CUST, + CBI
if x 3 2-2)1,217 208 a AND FIBERGLASS, THE BONDED CASING _ ) DESKN UNDER ONE Of MORE OF THE FOLLOWNG
e a 3 TAR 13 SHAFT DOOR TRA, TH Uo Mu) PER CUST:) UNTED STATES PATENT NBGERS ©
il B| 2 1 F PARTER’S RING RFLOW ry niSZ rr2ne9d = 2754012 ««-2768432 © 3074564
wl | TIG6RISER jo——— BF, . ‘% SUPPORT PATI
H | 3 /| W/EXE Jol ke Donk - tam PLAT ach eee
ag gi, # af _| tSieT STOP (} ovERFLow W/ EXP JOINT AND, SUPT PLATFORM Mi ¢ 3 Chicago Bridge & Iron Company
4 H PEEN ANCHOR BOLTS 210" 90'~@ SEAM IN BOTTOM GENERAL PLAN FOR
13 | 5 a AFTER TIGHTENNG 10 PREVENT a SHAFT SECTION. ya | 730 Mo sareRsmEROD 92° B.C.
z ete Ee Ze! 3 EASY REMOVAL OF NUTS fa FORM TO aN eee SEAMS 90° rf ‘WATERFORD. CONNECTICUT
af SoS ay # u F :
z one 3 NOTE ed RISER is8
FOREMAN NOTE:GROUT UNDER BASE PLATE. ‘ON 23-1004 BOLT CIRCLE DETAILS IN ELEVATION HAVE BEEN ROTATED.
HE Jettone Ln Tait wi ATER cL Sce SECTIONAL WTO PLANE OF PROJECTION, SEE VEWS AT-
BETWEEN ANCHOR BOLT ANO HOLE IN BASE PLATE
m8. WITH GROUT TO AVOID WATER SOCKETS:
(NOT DRAWN 70 SCALE}
VATION
RKHT & DWC.*20 FOR TRUE ORENTATION .
ClibPOF - www.fastio.com

=] le Dascairrios wee]
: G-Al_lYoo Access Tuas Secrion 124|3: Mii
3 Gil | 3 1E-B9 Vax AL UR-105/0'778)110 |] alADBSC BieO|
. 62) / |e ‘2-829 x/0%1 Y N10 Vu |A285-C1958
6-3 | 3 [P-Suxh (2-20 BAH T% (Az83-C1 8
(D3: LPB LADDER ASS'y. egestas: _O (252)
F z m3 CAEAZAPE’S
T l16"6 OveerrOw Ass%. (coke e S.
482-6] 4 | Barn 68 A A ole [Axe ls
11 6-8! _ |Access Tape Coven Assv = 12
6-4) 1 RST +x Yeurour T A2B5-< | /23.
Tr dlask+% 19 BSWAl 1 | 30% Rawpeoor Dove (co¥Rin) | 7
i Meno”) y 716-5 | eB Crb-B%axii-c) 17) Sie LareSt| 78
: i. TT 6-Cl _IBorrom Access eae Secrion 2219"
I re wo
x : ~6-! | 3 |B-59% wel 2-901 101%) | 10|N pe ADOIC BIO
. = 6-31 6 12 B29 he 5327 A283-C11 64.
arnre ese me ey ie ite [ASO a
: ms] ! 1 Sy ‘on~ 78% (Benz) Ea) (2 [NV
; N baconcewt A telt “s. @ | LPs —[Weconn caopen Assy Cosi |23 19 205.
‘ Vearicas Jounrs| aC} if aT 1DI3-7| 4 | Bnn~ 3x %s : OF | A361 15
‘lg wel + " 1D13-/51 4 | Ban~ 3x 5% Ol¢% 1 A36 15
Q} -g *) 1 Niner —_
3 3 a} \ [2t@-7] |t-3x3am TO \a36 [et] .
yy mD ‘Sy oe [7 (35158 | —[Leooee Seer Asay (BuCenmenl is | O 134
cy whol i led J. ie
Qq 1—_—. fia a . = D T i
1 a £~Mannore-S| 5 | 5
2 View A’ 
.
= + ‘| |-—-D 3 RY (662 Dwe “4 For ORIENTATION) =
eS my
yy x Gengnn, Nores
y q re Sumunace Recowanes Inecucet tn 2 Levern~
% WRINKAGE ALcowance Eguac Te Gae ncivoeo IN
1; a Dimension
OvenFLow Vewrine Area: 99 O"
Tre 7 Sue Gentanr Pran For OMENTATION
. g ‘SwgPThi 2° Ose 1 sei
Q “al 
“Berore’ We.oing.
S } $= +
z Ams) GI x ‘ ,
g . [1 | a28 Vase Open, ‘ol
eT Th i COVER aed ears
_— wR Davit
A 9 neta to be = i , .
m § 2 .
| D, ae é See Dwo*t /ENTATION) : m 0
= I 5 7 mei Cncaps tn consem GED
af 420d. _| a HE (Curour Zon es 7 lege ge & fron Company
a y Yewr Onenine Fess Tarn Te bir Ay 42° ACCESS TUBE
vartene i Swarts! i} FOR 750 MG WATERSPHEROID
“ Dis-2B B Reap Lenarn. 3 s . ; 0-0 H.R)
ow 16, E Fon Aveta = 7 9 é
Boacoara* 2 Fon ae Tonner Puarronn 4 Swarr Prarrone ; —- eel ae
afsevaried= GED pL” iM EEE | 41592
Peta Em clfal faa]
Bi T 7 4
ClibPDF - www.fastio.com

= we (ee aro wat [e[oa)ome| stu | ain
Pe nt eineaigih Pam 1 QA X 3/6 acl_B-31503] 10
10" OVERFLOW TS
. € INS. TANK LADDER ae be 2 {201 ie 223 418 Is-3lzco] 144
1B X 24 PANTERS ACCESS TUBE ‘
ad ae DUPHRACM «INS ACCESS us Te
TUBE LADDER 4 2 [ur-10 in a 2188 lasel lespioo| 6
RE = 2
ok é ++ Ny macs 20 aoa =
q painter's vent [2 [ai 2X 10 GA a] 6m [Hest {c3 a
UPHRAGH CUTOUT UPPER KNUCKLE PLATFORM 10 £5 BENT
FOR FPEIS) ACCESS TUBE LADDER a hots vera: oa | of 3 taso76| 0) @ x
20 > RAINPR OR a 12° OR =
© RANPROOF DOCR —_| RAB BAR t apie} =
- 5 Pee) 2x4 tal 2 eed 7
L/ | 16 @ RISER
. PLATFORM —} SOBMANHOLE T_|iA6-7. (rotty | 3 ah 3)zi00] 7
~ 10° 1 fiag = tt (aout) 15 149 Ase SI uh
. SHAFT LADDER SEUNG
< 0
“PIPE SUPPORT { 1246 c/D FOR 106 OVERFLOW
FELO LOCATE AND BURN PLATFORM TO ACCESS §o Hoes Fouoves GR + 3% owsmes
OUT FOR DERRICK CABLES TUBE LADDER A an /\
_MERE_NEEDED WN PLATEGAHS SHAFT STIFFENER <= =—y— -— ¢--o— - ——_- ——_
a ot :
af Heats tse a
A, RADIO ANTENNA
20°F SHAFT DOOR
30OMH + PRE supPoRTC))_
Ie @ RISER, | SHAFT LAODER
tao"
GENERAL NOTES
SHAFT STIFFENER
mm ‘SUPPORT
ae MANHOLE ——] 3 4
— iP
Typ OF PPI
t oO ORIENTATION OF
‘SUPPORT TO STIFFENER \ d RED OAM SEAM fe H ACCESSORIES IN’ SHAFT
LOWER KNUCKLE CODEN ATE PLATE. " ye € CONDENSATE a WATERSPHEROD
a SLOPE TO RAN? 180 . (A6~11) Ea) H WATERFORD, CONNECTICUT
229 CO FOR 16 a
BELL LADDER (CONDENSATE DRAN anc) Gasen)
: ' SECTION THRU SHAFT 0
—
306 MH. AND
BELL XIN og
TALL CUTOUTS IN SHAFT PLATFORMS % QUAPHRAGH ‘We
To BE MADE IN THE SHOP.
2.5EE SHER A us FOR LOCATION OF PE SUPPORT
BRACKETS IN SHAF!
MAXIMUM SPACING. ¢ PPE SUPPORT BRACKETS
W SHAFT TO BE 32°-0.
4,SEE GENERAL PLAN FOR NUMBER OF STIFFENERS &
SHAFT STD.FOR LOCATION.
Chicago Bridge & Iron Corpary
ClibPDF - www.fastio.com

0S
CAD
?
4G 10" OVERFLOW PIPE
(SEE CUST DWGS. FOR
PIPING BEYOND ‘BASE BEND)
RINGWALL
2* DIA.SLEEVE nN.
‘aPPvO. BY
DATE
MADE BY
oxo. ar
To 5 16° INLET/OUTLET (SEE CUST. DWGS.
FOR PIPING BEYOND BASE BEND)
RAD. 155
RAD.10 ¢ me
AD.T0 ¢ A.B.* 14% 11
N RCL Baa PATTERN
1 A
\ 4 21428 STEEL W SLAB
or roy gael a lo) pw.s 13H :
GALVANIZED four! Pare swt NC || st RADAL BARS
cuev. 010? ‘TM 8 T———tuwenree 1 Ry ii. BACKFLL MUST BE PLACED IN
FOUND +299,5, we) g | ACCORDANCE WITH SPECFICATIONS
Y : TYP BAR PATTERN FOR
GRADE BOTTOM STEEL. CUT OFF
EVERY OTHER BAR TO
CO RAD SHOWN
77- *TEMSX 6-9 LG ‘ N— t6- anes oF Ce
o ABT 14% 0,0. (TE VERTICAL me BEA. FACE (2'-S HN. LAPI 20°
BARS SECURELY 10 DOWELS) i]t ‘
is 71 - *73ARS x 6° F LG.
. « o ABT (5 0.0, (TE VERTICAL
DoweLs . a | BARS SECURELY 10 BOWELS)
77: *TBMS xX B=4 en eel
| ot 14g ot —_ = giec. nous
J} FF H : .
you CONSTRUCTION JONT ~\ in i fo ne xB-F LG.
.
i i]
s a 89 - "4 BARS XT II Ub.
a yk : is os
a4 if 4 \ f eaeT. I7jg@ 0.C. mH 2I~2 RAD.
by [sg ~<a
ee
“] 9--- 9 --9-.-9-- —%%
7 ~ 17et LG. ”
134- "IL one ~1a40 LG, i 32 RINGS-* 4 BARS®
UB 0c. 22 Rw. 4 ‘
_G'-0 6 10-1
2K 4 NOMMAL 47
LUMBER
TYP. CONSTRUCTION JOINT
SECTION THRU FOUNDATION
—
te EA, FACE (1-8 HN. LAX BT BOR) 500
134 * oc
(255. pam, LAPTOP We wy
1 DO NOT CAULK AROUND PPE.
2 108166 PRE MUST BE INSTALLED
BEFORE INSIDE BACKFLL 6
PLACED.
32-35 BRS sig
¢ 2-5 BARS 5-6
4- "4 BARS (18 WN, LAP ~ESTTM Baes)
(a'-S ws. LAP -ToP BARS)
WORK THS DWC. WITH FROJECT SPECIFICATIONS AND DWC. F2,F3¢F4
Pm socerts ounce Frou PacvOUS SUE
Equip, Pap For Radio's
Freie Lecare To Sur Cush)
ANCHOR BOLTS
EQUALLY SPACED AS
SHOWN. ( EXCEPT @ O° €)
TOP OF RIKGWALL
PE)
eo PIPE)
LG.N EA.FACE (10° PIPED
LUG INEA FACE (16 FIPE)
CALCULATED FOUNDATION QUANTITE: TOLERANCES TABLE OF LOADS. Chicago Bridge & Iron Company
lege) ew CONCRETE [REW'F, STEEL || TOP OF ANGWALL TO BE TROWELLED LEVEL ‘HD TO BE WTHN + OR - 4° OF THE THEORETICAL ELEVATION. ua OT et ose a
ii——— aie ANCHOR BOLTS TO BE WITHN 4° OF THEORETICAL POSITION. TO BE PLUM WITHIN 4112, AND WITH WATER 6445.80 |e Hears
VN [nD a ett 53 PROJECTION ABOVE THE TOP OF RNGWALL WITHN + OR - J* OF THE SPECFED HEIGHT, rar 547.17 } 150 Se SPHEROD
VALVE VAT | _8.5 (G25 —j| SPECFICATINS CONCRETE _44 Per ret] 233,03 WATERFORD. CONNECTICUT
Dine. ot 9° = SEE SPECIFICATIONS BY CUSTOMER & CBI
Tot » 199.5 0,642 " ALL CONCRETE TO KAVE 3000 F.S.1. COMP. SiRENGTH IN 26 DAYS. REBFORCNG STEEL TO HAVE TOTAL_W/0_WIND T22G.00 Si}
ies = a 7 a A ; MINIMUM YELD STRENGTH OF GO.COOP.S.1, AND CONFORM TQ ASTM A615 ISI) GR.GO. wo [stitec | oxo [se
ou a IKIMATE.. FUNDA TION “ALL MATERIAL UNLESS CTHERWISE NOTED TO BE FURNISHED AND fISTALLED BY FOUNDATION CONTRACTOR. Drenimwe KENT | 92535]41930 | 201
CONTRACT SMA ON TS STIG ANCHOR BOLTS ARE FURWISHED BT C.B.1. PRE COVER + 4-6 Mev, TO: PRESSIRE Tey 638 0620