Oswegatchie Fire Station Building Committee - Minutes - 04/16/2024
agenda center minutes
| Board/Commission | Oswegatchie Fire Station Building Committee |
|---|---|
| Meeting Date | April 16, 2024 |
| Pages | 14 |
| File Size | 0.4 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD. WATERFORD, CT 06385-2886 Oswegatchie Fire Station Building Committee Minutes April 16, 2024 Meeting called to order at 6:32pm Pledge of Allegiance Members Present: Robert Tuneski, Wayne Gilpin, Ted Olynciw, Matthew Blankenship, Rocco Bracciale, Jennifer Bracciale Members Absent: Elizabeth Sabilia, Richard Muckle, Paul Rafuse Guests: Director Howley © Public Comment: None * Opening Remarks: B, Tuneski reported the lease between the Town and Oswegatchie has been signed and the information was forwarded to Director of Finance Kimberly Allen. The architect's contract was sent to Atty. Nick Kepple who indicated he would have it back to the Director of Finance by 4/17/24. At that time the contract will be forwarded to the Purchasing Agent Shea Davy to issue. Expect to have the architect and project manager at the committee's next meeting on May 7, 2024. T. Olynciw indicated Atty. Kepple expects the policies & procedures would be available by the closing on the property. B. Tuneski suggested Atty. Kepple lay out everything that needs to be agreed to by the closing in June. Atty. Kepple breifly looked at the Phase I report. Some asbestos and lead was found, PCBs were okay and there was no mention of PFAS. The recording secretary will email the report to committee members. ° Review and approval of meeting minutes of 3/19/24: MOTION by T. Olynciw, second by J, Bracciale to approve the March 19, 2024 meeting minutes VOTE Unanimous March 5" minutes were amended by removing the transcribed comments of Brian Baker and attaching a copy of his comments. MOTION by W. Gilpin, second by T. Olynciw to approve the March 5, 2024 meeting minutes as amended FOR B Tuneski, T. Olynciw, R. Bracciale, W. Gilpin, J. Bracciale ABSTAIN M. Blankenship Discussion ensued regarding J. Bracciale’s comment that people are asking questions about what the fire service is going to look like in regards to this building. B. Tuneski agreed that this committee needs to be able to explain why we are doing what we are doing . Review of consultant Twig Holland’s March invoice MOTION by R. Bracciale, second by M. Blankenship to approve the payment of Twig Holland’s March invoice of $1,862.50. VOTE Unanimous Review of Barton & Loguidice invoice for Phase I Environental Study MOTION by R. Bracciale, second by M. Blankenship to approve the payment of Barton & Loguidice invoice of $4,839.92. VOTE Unanimous W. Gilpin presented pictures and a description of a fire station under construction in Twin Falls, Idaho. Discussion regarding the committee visiting newly built fire stations in the area in order to get configuration ideas. Will have a more detailed agenda for the meeting with the architect and project manager. Attempt will be made to schedule for the May 7" meeting. Ask architect to lay out a schedule up toa start date. Current Status: a. Phase | status: Covered in opening remarks b. Architect, Project Manager appropriations and authorizations: Covered in opening remarks * Discussion of Design Attributes: Director Howley a. 11,000 sq. ft. should accommodate our needs b. Three drive-through bays are in the current building and should suffice. Current apparatus is sufficient and would be evaluated with future community growth, cc. Currently one large bunkroom with six bunkbeds. Recommend maximum six bunkrooms. W. Gilpin recommended the bunkrooms be individual rooms due to COVID experience, sexual harassament, etc. d. Definite need for a training room. Robert Tuneski: a. Director of Planning & Zoning Jonathan Mullen to be asked for growth potential ‘on this side of Town. Jennifer Bracciale: a. Consider displaying the antique truck and awards in the lobby + New Business: © Adjournment: MOTION to adjoum by M. Blankenship Meeting adjourned 8:05pm Respectfully submitted by Linda Finnegan, Recording Secretary ‘Twig Holland, C.P.M. 2 Gulfview Court Milford, Connecticut 06460 Invoice to: Town of Waterford Date: 21 March 2024 Oswegatchie Fire Station Building Committee Period: 1~ 21 March 2024 c/o Robert Tuneski and Linda Finnegan Due: 30 April 2024 15 Rope Ferry Road Waterford CT 06385-2886 Via email Consulting services to the Oswegatchie Fire Station Building Committee for project initiation; per the hourly rate of $150.00 for consulting + $25.00 per hour travel time as follows: 5 Mar — Telecon and email /town purchasing re: environmental survey scope of services and fees. 2S hours $37.50 5 Mar Attendance at building committee meeting. 2.00 hours $300.00 5 Mar Travel time to meeting 2.00 hours $0.00 6 Mar Develop list of specialty consultants and soft costs. 1.00 hours 150.00 7 Mar — Telecon w/committee chair; refine and email consultant and soft costs by phase; prepare and email to chair draft project process overview by function (2.5 total; 30 min @ no charge). 2.00 hours 300.00 11 Mar Telecon w/SP+A and committce chair; refine and email soft cost estimates and telecom notes. 2.75 hours 412.50 11 Mar Powerpoint presentation & handout of project phases & functions 17S hours 262.50 13 Mar —_Telecon w/committee chair re: project costs 2Shours we 19Mar Attendance at building committee meeting 2.00 hours 300.00 19 Mar Travel time to meeting 2.00 hours $0.00 Sub-total Consulting Time 11.75 hours $1,762.50 Sub-total Travel Time 4.00 hours__10 Total $1,862.50 443 Electronics Parkway Barton.idi : Liverpool, NY 13088 I ice Lic . &Ieguid 315-457-5200 ‘Town of Waterford CT Apatl 02, 2024 15 Rope Ferry Road Project No: 3261.053.001 Waterford, CT 06385 Invoice No: Ca Project 3261.053.001 Boston Rd Phase | & Haz Material Survey Professional Services thru March 23, 2024 Phase 1 Phase | ESA Professional Personnel Hours Rate Amount DUPRE, CASSANDRA 10.25 74.88 767.52 GALLIPEAU, NICHOLAS 25 85.28 21.32 McCARTHY, BRIAN 4.00 145.60 582.40 Totals 14.50 1,371.24 Total Labor 4,374.24 Unit Billing 3/22/2024 Miles from office to site, to 86.0 Miles @ 0.67 87.62 municipal offices, to office Total Units 87.62 57.62 Total this Phase $1,428.86 Phase 2 Hazardous Material Survey Professional Personnel Hours Rate Amount DINGMAN, BRYCE 75 190,32 142.74 DUPRE, CASSANDRA 450 74,88 336.96 REEVES, SEBASTIAN 24.25 118.56 2,875.08 Totals 29.50 3,354.78 Total Labor 3,354.78 Unit Billing 312112024 84.0 Miles @ 0.67 56.28 Total Units 56.28 56.28 Total this Phase $3,411.06 Total Amount Due $4,839.92 Project 3261,053.001 Boston Rd Phase | & Haz Material Survey Invoice 8494 Billing Backup Wednesday, April 3, 2024 Barton & Loguidice, LLC Invoice 8494 Dated 4/3/2024 11:45:59 AM Project 3261.053.001 Boston Rd Phase | & Haz Material Survey Phase 1 Phase | ESA Professional Personnel Hours Rate Amount 001113 DUPRE, 9132028 1.25 74.88 93.60 CASSANDRA Phase | discussion with BM and ERIS order, contact with muni offices 001113 DUPRE, 20/2024 1.50 74.88 112.32 CASSANDRA Check in on timing with town, contact with fire chief, prep for field ‘work tomorrow 001113 DUPRE 3/21/2024 5.00 74.88 374.40 CASSANDRA Phase | site walk and municipal recordsCT DEEP online records research 001113 DUPRE, 222024 250 74.88 187.20 CASSANDRA Phase I municipal research 000802 GALLIPEAU, 37/2024 25 85.28 21.32 NICHOLAS setting up terms 001211 McCARTHY, BRIAN 3/11/2024 50 145.60 72.80 review of project, | am PM on this 001211 McCARTHY, BRIAN 3/12/2024 50 145.60 72.80 site review 001211 McCARTHY, BRIAN 3/13/2024 1.00 145.60 145.60 corres with cassie and Sebastian, corres with Howley, set up time for interview, 001211 McCARTHY, BRIAN 3/13/2024 1.00 145.60 145.60 corres wtih Cassie and Sebastian, Call to Howley, review site aerial, 001211 McCARTHY, BRIAN 3/14/2024 1.00 145.60 145.60 project coordination with cassie and Sebastian Totals 14.50 1,371.24 Total Labor 4,371.24 Unit Billing 312212024 Miles from office to site, to 86.0 Miles @ 0.67 87.62 municipal offices, to office Total Units 587.62 57.62 Total this Phase $1,428.86 Phase 2 Hazardous Material Survey Professional Personnel Hours Rate Amount 000077 DINGMAN, BRYCE —3/7/2024 50 190,32 95.16 Page? Project 3261.053.001 Boston Rd Phase | & Haz Material Survey Invoice 8494 Project setup 000077“ DINGMAN. BRYCE 3/11/2024 25 190.32 47.58 schedule coordination 001113 DUPRE, 3/21/2024 250 74.88 187.20 CASSANDRA Hazardous material survey training with SLR 001113 DUPRE, 222024 200 74.88 149.76 CASSANDRA Hazardous material survey training with SLR o00ss8 REEVES, yiv2024 1.25 118.56 148.20 SEBASTIAN Minor coordination 000858 REEVES. sigi2024 175 118.56 207.48, SEBASTIAN Project coordination 000858 REEVES, 3182024 150 118.56 177.84 ‘SEBASTIAN Prep for survey 000858 REEVES, si2or2024 3.00 118.56 355.68, SEBASTIAN haz prep, hotel 000858 REEVES, 3/21/2024 875 118.56 1,037.40 SEBASTIAN Travel/ survey 000858 REEVES. 3122/2024 8.00 118.56 948.48 SEBASTIAN survey/ travel Totals 29.50 3,354.78 Total Labor 3,354.78 Unit Billing 3/21/2024 84.0 Miles @ 0.67 56.28 Total Units 56.28 56.28 Total this Phase $3,411.06 Total this Project $4,839.92 Total this Report $4,839.92 Page 3 Purchase Order Fiscal Year 2024 Page: 1 of: 1 [__THIS NUMBER MUST APPEAR ONALL | INVOICES, PACKAGES AND SHIPPING PAPERS, TOWN OF WATERFORD N Purchase Aenea oar’ 240642 WATERFORD, CT 06385 Terms and Conditions under which this order ‘sued can be found on the town's website at www. waterfordct.org s BARTON & LOGUIDICE. LLC a A || TOWN OF WATERFORD 443 ELECTRONICS PARKWAY 8] ATTN: FIRE SERVICES 204 BOSTON POST ROAD ps WATERFORD, CT 06385 LIVERPOOL, NY 13088 ‘Vendor Phone Number Requisition Number Delivery Reference 240823 Date Ordered) Vendor Number Freight Method/Terms: Depariment/Location 05/22/2924, 2392 FIRE SERVICES Hem#. Deséfiption/PariNo ary. Unit Price _| Extended Price [Phase | & Haz Material Survey Phase | ESA - Professional Personnel & mileage 1.0 $1,428.86 $1,428.86 Phase 2 Hazardous Material Survey - Professional Personnel & 1.0 $3,411.06) $3,411.06 mileage 20523 - 57792 $4,839.92) By: she. Dav- Ree ee DEPARTMENT COPY Sisi0.92 Twin Falls, Idaho Firehouse Comments: Wayne Gilpin Building 2 stations. This one will have a Battalion Chief & LT. Other station will be aLT only. Offices and adjoining bunkrooms for officers. Design phase 8 months, Construction 1 year. Est. costs $7.6M & $6.1M w/o land. Training facility $3M. https://magicvalley.com/news/local/twin-falls-city-council- approves-contracts-for-new-fire-stations/article_a5186154-2816-5704-a2fc- b79443363a82.html Three double depth, drive thru bays. Interior water connections to refill engine tanks. Bifold instead of overhead bay doors. 1. More headroom 2. Very quick opening 3. Easier to open manually in the event of an opener failure. Doors can be reached regardless of failure location, unlike overhead doors. 4. Time delay closure. Doors will close after a predetermined time unless electric eye is activated. Gear storage & decon area are all on the opposite side of the bays from the living quarters and day room. Space provision for compressor. For the present, an access port to bring in hose to refill cascade system. Polished concrete floors in common areas and hallways. Easy to maintain, but possibly slippery when wet? Individual unisex bunkrooms. Alert system is programable for each room. No need to wake a FF that is not being dispatched. Each bunkroom has 4 separate personal, lockable closets between the hallway and room for storage for 4 different shift members. No need to empty out the room after every shift. Fitness room has full side overhead exterior bay door. Easy access to install and remove exercise equipment and can be opened during use when temperate. Kitchen has full wall windows. Outside patio for relaxation and dining w/ natural gas connection for grill. Day room has sink and coffee bar. Storage lockers for each firefighter for their personal food items. Lobby for public entrance with public restrooms. Remainder of the building can be secured. Dedicated IT room. “Pivot North Architecture and Rice Fergus Miller are collaborating with the Twin Falls Fire Department on the master plan of five fire station” https://pivotnorthdesign.com/portfolio/civic/twin-falls-fire-department- masterplan/