FIFTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
PHONE: 860-442-0553
www.waterfordct.org
MINUTES
PUBLIC WORKS, PLANNING & DEVELOPMENT STANDING COMMITTEE OF THE RTM
Special Meeting
Waterford Town Hall — Louise Appleby Room
June 15, 2022
Public Works, Planning & Development Standing Committee Chair Michael Rocchetti called the June 15,
2022 Special Meeting to order at 7:02 P.M.
PLEDGE OF ALLEGIANCE
ROLL CALL
PRESENT: Ryan Healy, Michael Rocchetti, Greg Attanasio, Ted Olynciw.
ABSENT: Mike Bono
EX-OFFICIO MEMBERS PRESENT: RTM Member Susan Driscoll, RTM Member Danielle Steward-Gelinas
ALSO PRESENT: Town Clerk David L. Campo; Town Attorney Nicholas Kepple, Planning Director Abby
Piersall, Public Works Director Gary Schneider.
ITEM 5 — February 22, 2022 Meeting Minutes.
MOTION by Olynciw, seconded by Healy, to approve the Febryuary 22, 2022 Meeting minutes.
MOTION PASSED: Unanimous
CALL ITEM 6A — Appraisal of Sidewalks ordinance and associated safety issues, RTC 02/01/21
Public Works Director Gary Schneider provided an update on the status of sidewalks identifying three
items. The first was a brief discussion on what a sidewalk ordinance may look like. The second was the
results of a windshield survey. This was a drive by survey, performed by the foreman, to identify any
objects that may be obstructing the sidewalks in town. (See Attachment) The third was to consult with a
vendor to do a site walk survey to analyze each section of sidewalk, identifying an order of importance
in regard to maintenance. This would provide the town with a plan and a reason for a funding request.
The estimated price for the survey was $18,800. (See Attachment) Discussion ensued in regard to the
liability of the town, how can utility poles be moved. Members felt that a side walk survey would give
the town the direction it needed.
MOTION by Olynciw, seconded by Healy, to recommend to the RTM the issue of “Appraisal of sidewalks
ordinance and associated safety issues, RTC 02/01/21” out of committee with no action taken because
the committee was assured that Public Works has a plan to address sidewalk conditions throughout the
Town of Waterford.
MOTION PASSED: Unanimous
CALL ITEM 6B — Short Term Rentals, RTC 12/06/21
Town Attorney Nicholas Kepple addressed the committee citing the national phenomenon of the issue.

In 2019 over 44,600 guests stayed in short term rentals with an estimate of over $6,000,000 in revenue
nationally. The town estimates that there are 60-80 of these units and that many communities are
grabbling with this situation. He recommended a development of a plan to engage the community on
the issue, receiving input from both residents and owners of the short term rental properties. Aiso,
examine how other towns are addressing the situation albeit through zoning regulations or ordinance
and what seems to be having success. Attorney Kepple noted that the town needs to “do it one time and
do it right”. Planning Director Abby Piersall noted that the Planning and Zoning Commission was meeting
later in the month on the same topic and that the results of that meeting may help to formulate the
structure and timing of any community engagement.
The committee discussed future meeting dates and decided that July 13, 2022 at 7:00 P.M. should work.
MOTION by Attanasio, seconded by Olynciw, to adjourn at 8:25 P.M.
VOTING IN FAVOR: Unanimous
Respectfully Submitted,
Mike Rocchetti
Chair

Jordan
Area
Mailbox
Pole
Number
Street
Avery
Lane
Boston
Post
Rd
at
Ocean
State
41
Boston
Post
Rd
61
Boston
Post
Rd
43
Fog
Plain
Rd
68
Fog
Plain
Rd
TOTAL
Comments
pole
in
sidewalk
cross
walk
signal
and
post
in
sidewalk
resident
stonewall
edge
of
resient
stonewall
edge
of
sidewalk
hydrant
edge
of
sidewalk
hydrant
edge
of
sidewalk
c Ueoe
uy
abil

Oswegatchie
Area
Number
Street
Mailbox
Pole
Comments
1587,1586,1585,
Daniels
Ave
1584,1582,
Goshen
area
7
Greatneck
Rd
281
with
electrical
box
on
pole
as
well
6348,6344,6343,
hydrant
#504,
6319,
6318,
6317,
6342,6325,6324,
6316,
6314,
6313,
6271,
502,
491,
Niantic
River
Rd
6323,6322,6321,
6320,
490
1094,1095,1096,
Shore
Rd
2393,2394,1094,
hydrant
#790
24
Spithead
Rd
1551,
1550
.
Spithead
Rd
at
Stone
St
750
hydrant
#730
plus
cable
anchor
TOTAL
6

COHANZIE
AREA
Number
Street
Mailbox
Poe
Comments
Dayton
Rd
439,440,441
across
from
firehouse
Dayton
Rd
fire
hydrant
in
sidewalk
132
Dayton
Rd
mailbox
.
109
Dayton
Rd
2858
25
Kenyon
Rd
2858
94
Phillips
St
pole
in
sidewalk
no
#
629
Vauxhal
St
Ext
479
679
Vauxhall
St
Ext
5357
751
Vauxhal
St
Ext
electric
box
on
pole
865
Vauxhall
St
Ext
mailbox
TOTAL
10

QUAKER
HILL
AREA’
Number
Street
Mailbox
278 Bloomingdale Rd
29
Chapman
Ave
31
Chapman
Ave
Chapman
Ave
Fitzgerald
Ave
Fitzgerald
Ave
Fitzgerald
Ave
Old
Norwich
Rd
at
Benham
Ave
6
Pilgrim
Road
65
Scotch
Cap
Rd
mallbox
TOTAL
10
Pole
Comments.
5326
no pole #
8335 with cable anchor 7

To: Gary Schneider Date: March 23, 2022 Memorandum
Director of Public Works
Town of Waterford
Public Works Department
Waterford, CT
Project #: 8006325
From: Angel Bisbee, Gordon Daring Re: Sidewalk Assessment Scope and Fee
In reference to Waterford's request for a sidewalk and sidewalk ramp inventory and condition assessment, the
following document outlines our proposed approach for the evaluation. In summary, we propose to use GIS and
publicly available imagery of Waterford's road network to identify the location of sidewalks and sidewalk ramps,
perform a field evaluation of the sidewalks and ramps in the field, and develop a summary report, listing, and map
describing the findings of our evaluation.
Based on Waterford’s 122 Town and approximately 17 State roadway miles together with the Town's estimate of 33
miles of existing sidewalks, we have developed the following rough estimate of costs associated with this effort:
Prepare the Data $4,000
Collect Data in Field ($335/mile) 11,000
Perform Analysis 3,800
Total $18,800
Please note that the fee for the field data collection task would need to be increased (or decreased) based on the
actual number of miles identified, Also, please note that for an additional fee, VHB could host the sidewalk data
collactad in the sidewalk modula of our “SAM IS” asset management system, where it could be analyzed together with
the pavement data in the pavement module of that same software that the Town currently has access to.
Below is an outline of our proposed approach to this project:
m
oe
sD
nm
Engineers | Scientists | Planners | Designers
100 Great Meadow Road, Suite 200, Wethersfield, Connecticut 06109
P 860.807.4300 F 860.372.4570 — www.vhb.com

st
Gary Schneider Soeut!
Ref: 8006325 =Vvhb,
March 23, 2022 Mernorandi
Page 2 “en
Prepare the Data
Prepare the GIS Data
>» Offset pavement centerlines by (width of road/2) + 6’ on both sides of all roads, Clip and delete lines at each
intersection,
> Use aerial imagery and Googie Streetview to estimate location of sidewalks
> Split the offset centerlines at existing sidewalk locations. Lines where sidewalks do not exist to remain and be
coded as “No Sidewalk” — these lines may be used for planning future additions to the sidewalk network to close
gaps" in the network.
Sidewalk fields typically collected
> Material (Brick, HMA, Pavers, PCC, Slate, Other)
> Condition (Excellent, Good, Fair, Poor)
> Percent Repair
> Width
> Length (calculated from GIs)
> Area (calculated in GIS)
> Comment
> Attaching a picture is possible but adds significant time and cost to the task
Ramp fields typically collected
> Material (Brick, HMA, Pavers, PCC, Slate, Other)
> Condition (Excellent, Good, Fair, Poor)
> Has Detectable Warning Strip (Y/N)
> Attaching a picture is possible but adds significant time and cost to the task
Collect Data in Field
> Perform field evaluation of all sidewalks and ramps identified in previous task on 120 miles of Town maintained
roads and 17 Miles of State maintained roads,
> Perform field and in office data integrity checks to assure quality.
Perform Analysis
> Estimate unit costs cost for sidewalk and ramp repair/replacement
> Develop cost estimates of all maintenance and rehabilitation identified in field
>» Decide criteria and identify high priority sites. Use GIS to buffer to find high priority sidewalks and ramps near
these locations. For instance, these might include:
¢ Schools

Gary Schneider & ysis
1
Ref. 80063.25 vhb,
March 23, 2022 Mernorandurn
Page 3
* Churches
« Commercial Zones
e Parks
> Prepare a brief written report, list (Excel file), and map to present the analysis results
(Optional Additional Scope) ~ Implement Sidewalk Management System
>» Host sidewalk data In SAM IS sidewalk module — allaws viewing and planning far sidewalk projects alongside
pavement improvements in the Town's existing pavement management system