Oswegatchie Fire Station Building Committee Meeting
Minutes
August 1, 2023
Meeting called to order at 6:33pm by Chairman Robert Tuneski
Pledge of Allegiance
Members Present: Robert Tuneski, Rocco Bracciale, Richard Muckle, Wayne Gilpin, Ted
Olynciw, Beth Sabilia ,
Members Not Present: Matthew Blankenship, Michael Rocchetti
Guests: Twig Holland, Attorney Nick Kepple, Director Michael Howley, Jonathan Mullen
Public Comment: None
Remarks: Committee needs to start digging into the general needs assessment and start the
process of capturing inputs.
Motion to approve minutes of July 18, 2023 — Wayne Gilpin
Second — Rick Muckle .
Voting — Unanimous
Ted Olynciw provided handouts of his Revised Oswegatchie Firehouse Questionnaire.
(Attachment 1)
Bob Tuneski introduced Planning Director Jonathan Mullen. Director Mullen provided the
following growth information.
e Director Mullen distributed Population Projection handouts. (Attachment 2)
e The 2010 census had to be relied on longer due to COVID delays of the 2020 census.
The projected numbers are based on this census and the American Community Survey.
e Census projects the population of 2040 in Waterford will decline 15%. Current
population is 19,554. Within the next 20 years it is projected to drop to approximately
15,997. Age 65+ will increase. Planning Conservation & Development demographics
section. Numbers projected in 2016 out to 2040 were not holding true in 2020.
Population was at 700 more people that what 2016 projected.

Developmental hopes are the Mago Point area, Crystal Mall, Airport property and the
Frontage Roads
Ted mentioned looking at residential development impact, specifically -— Cross Road, Boston
Post Road, and I-95.
Twig provided an update on the RFP
The RFP as ready to go.
Dates need to be confirmed to make sure committee members are able to make the
meetings.
Twig clarified the reason it is not necessary to have all needs assessments prior to
sending out the RFP.
Twig received Ted’s comments for her review. Items will be included in the RFP if she
deems appropriate.
Attorney Kepple updated the status of the Oswegatchie ownership transfer agreement.
The Oswegatchie Company is requesting a lease be drawn up to define how their needs
will be taken care of.
Attorney McNamara, the company’s legal advisor, believes a lease is the way to define
what their use will consist of.
Attorney Kepple suggested it would take 30-45 days to develop a lease.
Bob Tuneski suggested continuing with meetings during the development of the lease and then
go forward with the RFP.
Bob suggested a sub-committee be formed to create a Design History Notebook, pulling together
the bigger items for the RFP. This notebook would memorialize what the committee is doing
and why.
Director Howley expressed concern with having a community room in the firehouse.
Discussion ensued regarding public access to firehouses in this day and age.
Public input is still important.
The issuance of the RFP will be suspended until there is an agreement between the Town and
Oswegatchie Company.
New Business:
Ted requested a Phase I Study be initiated.
Motion to have the Purchasing Agent solicit bids for a Phase I Study — Beth Sabilia
Second — Rick Muckle
Voting — Unanimous

Motion to adjourn — Rick Muckle
Second — Wayne Gilpin
Meeting adjourned at 8:20pm
Respectfully submitted by:
Linda Finnegan, Recording Secretary

OSWEGATCHIE FIRE HOUSE a : JULY 7, 2023 INCLUDES ALL DATA COLLECTED TO DATE BY THE COMMITTEE
QUESTIONER , REVISED JULY 21,2023 . . -
__.
A
-
“|
oB
foe
D.
se
a
_G
QUESTIONS _ __lyes. [NO MAYBE (NEED [WANT [REMARKS
|FLAT ROOF | | _
IRITCHED ROOF — —— }—
HEATING FUEL.-OIL
|HEATING FUEL --PROPANE _ ee a
MASONRY & STEELSTRUCTURE fe a
|PRE-ENGINEEREED STRUCTURE _
GREEN HOUSE DESIGN
USING THE BUILDING AS.AN EMERGENCY SHELTER
13: |BOAT STORAGE - INSIDE THE FIRE HOUSE.
|14.|[BOAT STORAGE- OUTSIDE IN A SHED OR BARN
15 INUMBER OF THRU BAYS-3
-16-|NUMBER-OF-THRU-BAYS-4.-
Olaeprilalu] x] wiv] al
—_
mh.
my
17 [NUMBER OF THRU BAYS-5
18 [SOLAR PANELS
19. |GEAR STORAGE ROOM
| 20 |DECON SHOWER:
21 |GEAR WASHER -1 -
| 22|GEAR'WASHER-2
23.|HEATED APRON
| 24.|FIRE SPRINKLER SYSTEM
25 |HEATED-CONCRETE FLOOR IN TRUCK BAYS
26 |A/CFOR THE TRUCK BAYS. __
27 [POSITIVE PRESSURE IN DAYROOM TQ PREVENT
28. CONTAMINATION FROM GEAR ROOM
29: BURIED: FUEL TANK FOR VEHICLES
30 [PRIVATE BUNK ROOMS
| 31. |COMMON BUNK: ROOM —
32 |SOUNDPROOF BUNK ROOMS. .
33 |LOCKER ROOMS FOR WOMEN & MEN WITH BATHROOM

OSWEGATCHIE FIRE HOUSE JULY 7, 2023 INCLUDES, ALL DATA COLLECTED TO DATE BY THE COMMITTEE
QUESTIONER
.
"REVISED
JULY
21,2023
,
_
A
=
B
|.
c
|
D
—E
F
___G
34,
__
SHOWERS &
LOCKERS
YES
_|NO___—s«[MAYBE
[NEED
=
[WANT
_[REMARKS:
35 [JANITOR CLOSET - aaa 7 . i
36 |FILE STORAGE ROOM
_39
|PRE-DEMOLITION
INSPECTION
REPORT:
OF
EXISTING
40
|SOIL.BORINGS
‘41 [ENTRY DOOR FOR THE PUBLIC- ACCESS TO HALL
42
[SEPARATE
MECHANICAL
ROOM_
[43 |SEPARATE’SPRINKLER ROOM __
}-44.
COMBINE
MECHANICAL AND
SPRINLKER
ROOM
INTO
ONE
45 | OUTDOOR EQUIPMENT STORAGE- INSIDE
46 |OUTDOOR EQUIPMENT STORAGE- OUTSIDE IN SHED
|.47 {DISPATCHER
48 DRYING TOWER FOR HOSES
~~-—-~-1-49-| OPERABLE-PARTITION-IN-TRAINING-ROOM-
-50:|FLOOR DRAIN IN TRUCK BAY-‘NEED OIL SEPERATOR
52,1 CONSIDER MASONRY WALLS
| 53 WINDOWS ~ ALUMINUM __
| 54 [ENTRY DOORS- STOREFRONT
55 |KEY PAD ENTRY - ALL EXTERIOR. DOORS.
56 |FOB ENTRY PAD |
58 EQUIPMENT IN TRUCK BAY- EXHAUST, COMPRESSOR _
59] WASHING EQUIP, _
61 JEMERGENCY LOCKDOWN |
62 |MORE'NATURAL LIGHTING
63 [SKYLIGHTS IN BAYS _ .
64 JHYDROGEN OR ELECTRIC POWERED VEHICLES
65 |CHIEF’S:OFFICE - =
‘66 |ITEMS'TO CONSIDER/ INFORMATION/COMMENTS.

QUESTIONER
REVISED
JULY
21,2023
|
-
x
at
aT
=
3
:
DCF
T
—
—<
67
|4,.1f
we.
are.
going
to
have
.a.gathering
room
and.
use
it
for
an
emergency
‘shelter:
or
event
gathering
pla:
iplace
we
have
to'determine
the
max
69:
|2.
Would
it
make
sense'to
enlarge
the:
training
room
‘to
accommodate
item
1
above:
on
1
the
Ast
floor
_
.
70
|3'The
parking
spaces
required
is
based
not
on
the
use
of
thele
building:or
the
square
footajge
of
the
|
building
but
only
on
the
seating
711 capacity which is | parking spot per3.seats.. ff ;
72,13. It is much more economical to: build a 2 story building: than a-one story building id. 7
7314. Aestetics. has'to be: ‘considered. What does the: Surrounding building look tike.. Would a fidflat roof building be more pleasing than
| 74| a pitched roof building. | “|e
75.15, Phase Fenvironmental survey is necessary ifthe Town itis goingto own the property. |
77| Zoning: ap roval which could take. 2-3 months. [Meeting with the: Town Planner is required before submitting to P & Z.
| 78 |7. Soil borings are required In order: to design the foundation
| 79 |8, Has.the old septic tank heen filled in? |
| 80 (9 If we are thinking about a real large hall. we could provide this.on the 2nd floor but: ‘would. need an elevator.
81 |40. The pesent proposed site plan show 74 parking spaces wwhich lallows. _| seating for 222.
-}-82-|41.-WE-NEED-2-WATER-LINES; ONE-FOR-DOMESTIC-&-ONE-FOR-THE-FIRE-SPRINKLER-SYSTEM—
83 |12, WE OBVIOUSLY NEED THE FOLLOWING ROOMS: BUT THE QUESTION IN THE SIZE OF EACH ROOM _
85| DAY ROOM- SEAT 8 AT A TABLE & 9 IN FRONT OF TV
-86{ DECON ROOM
|87{ CHIEF'S ROOM- TABLE & SEATING FOR 8 PLUS DESK A
| 89] FILE'STORAGE -
90| TRAINING ROOM- SEATING FOR 40-50
91} GEARROOM -MIN. OF 25 LOCKERS
92| LAUNDRY ROOM- 2 EACH
93] ADDITIONAL STORAGE SPACE:
94| ‘STORAGE FOR PAPER GOODS, CLEANING ‘SUPPLIES.
95| - HOSE & SCUBA STORAGE
96 |13. BAY DOOR - WIDTH & HEIGHT- 14' X14" ?
97 |44. GENERATOR- LOCATED OUTSIDE
‘98 |15. GENERATOR - LOCATED OUTSIDE
‘99 |45. NUMBER OF HVAC ZONES
de

‘OSWEGATCHIE FIRE HOUSE JULY 7, 2023 INCLUDES: ALL DATA COLLECTED TO DATE BY THE COMMITTEE
QUESTIONER REVISED JULY 21,2023 |
100]46. HOW MANY BATHRTOOMS - PRESENT PLAN SHOWSS bo

Population Projections
¢ Watford’s population
change is expected
to decline through
2040
¢ Note: 2020 actual
population was
nearly 700 higher
than the projection
population for 2020,
ew London County's
was 10,200 lower than
projected!
-10%
15% ~
Projected Population Change 2020-2040 vs.
New London County and State
a% -
5%
~
2020 2025 2030 2035 2040
“@-Waterford =@=New London County =@eCT
Source: CT DECD, 2016 projections
PLAN

Population Projections
* Waterford’s population is projected to shrink 15%
in the next 20 years to approximately 15,997
* People age 65+ are projected to grow the most
in the next 20 yearsid 5-19 20-39 «40-64 HS+
AOS ‘ aa
g4%
aon me 20%
_ 18 T7% a
| pa ae
WH 8% A%
2020 ano at ghd) euaee ee 2020 2hdG 2080 2a
# Waterford = NewLondon County «. Connecticut
Saunte: Comectrur Gata Lente
PLAN
WATERFORD
PI Re,

5-95 CORRIDOR/
FRONTAGE ROADS
OWSWEGATCHIE TM
FIRE HOUSE
TOWN OF WATERFORD