Long Range Fiscal Planning Committee 2nd Quarter Regular Meeting Agenda and Backup

agenda center agenda

Board/CommissionLong Range Fiscal Planning Committee
Meeting DateJune 10, 2025
Pages17
File Size0.9 MB
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
9.
FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886
RECEIVED FOR RECORD
WATERFORD, CT
005 JUN -b 1A 10: 2u
LONG RANGE FISCAL PLANNING COMMITTEE
AGENDA
ATT!
24 Quarter Regular Meeting
Tuesday, June 10, 2025
6:00 P.M. - Waterford Town Hall
BOE Conference Room
Establishment of a quorum and Call to Order
Roll Call
Public Comment
To consider and act upon the minutes from the February 25, 2025 LRFPC meeting.
Consideration and potential action to correct the date for the 4'* Quarter LRFPC meeting. The
published date (December 10") conflicts with the monthly Board of Finance meeting.
Follow-up discussion related to the Town-Wide Building Maintenance Plan presented at the
February Meeting.
Review and discussion of current documents comprising the current Board of Education
Building Maintenance Plan.
Continue discussion of the following items discussed at the February meeting.
a. Incorporating Fire Station Maintenance into the Town Facilities Plan
b. Results of the comparison of the Fleet Size in 2009 vs today.
New Business
10. Adjournment
Glenn Patterson, Chairman
1|Page

S7-94
8
29
0t200m
OL
|
60-AON
at
“NVWLID313S
HOSSISSV
QNId
TIVHSEVIN4
903/384
AYOLSIH
STVLOL
£3314
0
Oot
OsT
002
OSZ

GS'78z
198
6E
LC
ECT
ES
VE9‘6TS
Sp
T9Z‘9€9
S€S2T906T
S9°S60‘STO‘OT
£8°0@2‘6LT
Ov
ZET'Ssz
2£7-09S‘TOT
LO'LSZ'0ZT
12'p06'BSE
EP
OTe
vel'T
OO'LSL‘LZE
S6'SEO'TY
07¢'869‘0TE
00'O8s‘TEZ
ZT'6SS'TES
8T'Se9'TE0’E
00°685‘E8T
TZy8L'9%
6T
T69'0EZ
00°278‘8ET
TO'6S9'ETY
EC
EZTVEO'T
9'60€7T
EC'SLT'T
€8°€66'6T
00°69r'6
LLBTS'8Z
Ov'zv8‘6ZT
SL08S‘T
8720S
67°690°S
6S'0LL°7
E6727
TT
€6'97E'98
65°
99e'Lt
8Y'7E6'S
2385579
SO'SET‘6Z
v9'SE9'6IT
80°879'728
79°
6PO'OL
95°S0Z'TT
TZ
66T'ey
OT'Z68‘0S
ST
LL0°9€T
vG'SE9'Sb0'T
78'876'9E
$9°20¢'9
86°L5S'LZ
£9°9€9'9%
EG
TES
PL
SEO7Z8ES
0s°79S‘T
6S
L612
TLOvL'2T
99°8S8'7T
08'8Zp'es
9L°988'T6L
8E°0T
BO°OLT'T
OE
BrS'E
zp's0s's
R6°6TO'LY
O€'¥SS‘ZET
sve
S6°SPT'T
£9°910'%
66'97E'S
6LL97'TY
v6
LTP‘SOT
{Tos}
(vpz)
{so9)
anna
(zvz)
{soz}
(ToT)
ALLA
TWHENID
=—-JONVNGLNIV
ZONVUNSNI
ONNd
13914
«=
GNNSYND
=
NN
TWHaNd9
uamas
ANNJAIY
LNAWLSIANI
GNNA
(aa)
$207
vz0z
£702
zz0z
Tz0z
oz0z
6102
gtoz
£102
9t0z
S107

sanjo,
Apadoid
Able
anuany
uesayow
87s
UOIsUaT
JaDITS
EYXNeA
GEL
P20"
LIMON
PIO
8&
peoy
Aanley
SE
uonerys
ding
yn0D
sayjog
SNOLLVIS
LHOINOD
8
JOVHOLS
uoners
dung
PeOy
YIIWJON
PIO
uoners
dwing
si[iH
ang
Que]
JUIN
ZS
uoneys
dung
anuany
uae282803
peoy
Auaj
adoy
ST
NOLLWONGA
JO
GYVOd
SIOIAUAS
TvID4adS
peoy
Auay
adoy
ct
FIO
NOLLVINGI
4O
GuvOs
anuaay
el
SOT
JOOUIS
S|PPIAy
Bue7
eID
anuaay
sjalueq
TS
ALIS
TOOHDS
LSAMHLNOS
anuaay
s[atueg
TS
Jooyas
Jauzew
suy
pure
asen3ue}
ysemyinos
peoy
uoldeg
gy
yooyos
aizueyoo
4e91
-
peoy
Auia4
adoy
07
HLOOG
SS3¥d
ONV
Y3HDVATE
IOOHIS
HOIH
Jeas
-
peoy
Auaj
adoy
07
(2)
sunoona
eas
-
peoy
Auay
adoy
9z
SHLOOS
LANOLL
TOOHIS
HOIH
peoy
Auiay
adoy
07
°1d30
JONVNILNIVIN
TOOHDS
HOIH
peoy
Auay
adoy
oz
Pield
HNL
mneyUAS
peoy
Aaj
adoy
02
jOoYss
USIK
ploparemA
PeoY
JOON
1€9ID
TOE
ary
Lsuld
peoy
yen
JeBD
TOE
(Z)
NOILVIS
LYOJNOD
PEOY
JOON
1919
GOE
SNIGTING
JONVNILNIVA
Jeay
-
ayiduiny
puopyeH
QOOT
Q3HS
LVS
SHYOM
ONENd
sbay
~
ayiduiny
projueH
OOOT
YIONVH
WIAVaudS
GNVS
ayiduiny
psoyveH
OOOT
T
Suipiing
Awan
ayidusn]
psojyeH
OOOT
Surpling
xajduso5
jedisjuny
peoy
Auiay
adoy
sg
‘Old
NOILVIYIAY-
ISNOH
AYWd
NOGUOF
peoy
Auay
adoy
67
Aresqyy
oyqnd
peoy
4s0q
U0}SOg
OZT
Oa83Zv9
Seay
~
PROY
ISO
UOISOY
COZY
QNndd
900
4Bdy
-
PROY
1SOg
UOISO"
HOTU
YAMOL
OldVY
310d
Peoy
1s0d
U0jSOg
OZ
xajdwog
Ajajes
a1GNnd
peoy
350g
U0}SCg
OOZ
neaing
SaNAIaS
YINOA
peoy
Auad
adoy
st
[2H
UMOL
399I15
swensuiping

peoy 499N 38819 GOE-SOE
beoy xen I&9D GOE-SOE
PeoY JOON 3B3ID GOE-SOE
peoy 439N 32815 6OE-SOE
PeOY 429N 12219 GOE-SOE
peoy 4I9IN JAD GOE-SOE
DeOY JOSN 1BA1D BOE-SOE
peoy 150d U0ISOg ¥8T
Peoy
[HIN
HO
VSc
Jeay - peoy 191sayrjOD PjO 6
peoy JeAly SNURIN VOEZ
UNOD SOUNDAA ET
‘AMyd anuany UesayoYWy £0S
Jead§ yoo T
ayiduiny puojweH OF
peoy uApeyy 97
YSBY PECY BUOISHIA ZOE
aue’l Alaay Ty
auey Auaay Ty
peoy poonueng PT
peoy Aueg pio £€
BAL [efUC}OD YZP
peoy aioys Z
yyon Aemyed S07
due] JBUIIN $8
Bue] BUI SB
JAAN Yip ZT
Ppeoy 350d UOISOg POT
peoy 4sOd UOISOg POT
peoy 4s0g UOIsSOg #/T
peoy 1s0d UOlsog H/T
33e}}03
UOKnoNpold
€ adeyo9
T adeqoD
433U97)
J2}29YL
[[19N,O
aua8ny
SONITIINGLNO
9349
8
SAUVd
V3UV
TIVH
NMOL
NOILW.LS
dINNd
“GY
THIN
110
uanels
JaIsoog
4318
[ITH
494eND
NOLLW.LS
dd
“GY
YSATY
SILLNVIN
NOLLVLS
dIAINd
AVM
ATININO
NOLLVLS
dINNd 1
SAWISM
NOILVLS
dINNd
“du
JAOUD
SQUVHIIY
NOLLVLS
dINMd
XOOUE
AINOLS
NOILVLS
dINNd
TIVW
TWLSAUD
NOILVLS
dINd
“GY
NATIVAN
NOILVLS
did
‘d¥
GOOM
SYaNIQUY9S
SVUIWV
YOIMSLXS
GNV
YONSLNI
-
WALSAS
VHSIAIVD
~
dd
uol1e1s
aaog
uoneys
duing
peoy
poomuetg
uoieis
dung
peoy
Aueg
pio
NOLLVLS
dd
SAIN
TWIND109
uoneys
dung
peoy
asous
ONIGTING
JOVHOLS
YIMOL
OLDVY
NOISSIININOD
Juld
YILNAD
SNOILVOINNIWWOD
ADNIDUIWA
13id
SNVUALIA
-
ONILHON
YOOGLNO
ald
SNVY3SLIA
GYVOdIWOIS
19935
SWeNSUIpINg

sanjon
Ayadoid
Jaadgs [/eyxneA T98
suojedd]
snoLeA
suolzea07]
SNOLEA
peoy dep y210295 79
peoy
aiays
vEsz
peoy
a1oys
SE
PeOoY Y99N 18289 OT
PRoOYy
s1yD}eTaMsO
YOY
peoy poo JauIpse SZT
peoy Wajveg yINDS SE
peoy Wapieg yinos se
Jeay - peoy odie Sy
aeay - peoy 08k Sy
peoy
Y9N
JB38J5
SOT
paisiy
SSeippy
ON
peoy ajepsuiwoojg $gz
anuaay SjaIUeg TS
anuaay sjaueg TS
peoy Auiay adoy »z
anuaay
sfaiueg
TS
Ulge> 307 YON 18819 GOE-SOE
peoy YON 32315 6OE-SOE
Ppeoy YON 1&3/D GOE-SOE
peoy x9aN 32215 6OE-SOE
PROY YIPN 1821 GOE-SOE
Peoy IAN Je915 GOE-GOE
Peo" YBN JLBAD GOE-SOE
PROY ION 1889 GDE-SOE
JaMO]L
Jaze AA
PeYXneA
d@a
AdOD/ONLLNIUd
FUNLONYISVYANI
a3
NOLLV.LS
dWNd
SNIGNV1
SANVHL
NOLLVLS
dWINd
GVO"
JYOHS
NOILVLS
dWid
JGISVaS
NOLLVLS
dd
JTHALLINVESD
NOLLVLS
dWind
‘GY
ADIN
LSv3
NOLLVLS
dd
‘08
JIHDLYDIMSO
Q3HS
G1ald
TIVELOOI
HLNOA
JOMOL
JBM
IIH
S4aB0y
JUS
TUH
S.waS0"u
OIDVe
-
ALIS
VOY
ODuvd
JOMOL
Ja]eAy
peoy
o81e4
JOOYIS
yan
}eaID
joouss
Arequawayz
arya}esamso
MAN
HOLVdSIO
~
SYALNd
AOD
[ooyss
AejuawaTy
IIH
JeyenD
MeN
7
WOOISSRI)
ajgevlod
T
wioousse[y
ajqeyod
Jaques
AuNWWOD
pue
jooyss
diyspuayy
HOIH
Uf
ANV1
WYVTD
-
SiNnooSnda
(IOOHOS
1SIMHLNOS)
SWOOUSSVTO
J1EV.LUOd
(6)
Vida
Lad
VO/NIGV2
907
-
THAN,O
"3
dOHS
J9V1S/JYLV3HIL/IONVNALNIVI-
THSN,O
“4
JOVLLOD
AMGNNV1-
TH3N,O
*3
[}@H
fesueayay
uosuay
aayeay
-
Weg
|AN,O
auaang
uo|suayxy
197291
-
asnNoyY
Wed
Aloe
UOISUB
Sapis
UOs|
£33205
3835S
SWeNSUIplIng

sanjon
Auadoig
anuany
weyuedg
TS
NOLLW.LS
dIINd
ONIGNY1
NOSIMYVH
peoy
uoyAed
OF
NOILVLS
H31SO08
YILVM
“dy
NOLAVG
peoy
psopueH
Evot
UOIE}S
18]SO0g
JAIEM
BALG
[eLISNPUI
years
aWeNSUIpING

B/4/2025 Long Range Facilities Asset Matrix
Waterford High School Description of building:
20 Rope Ferry Road '296,000Sqft Built
fin 2012 Geothermal /
DX Replacement Cost:
$264,864,000 ($834 per sq ft)
Building Components Description 2024-2029 2030-2035 2036-2041 2042-2047
Building Envelope: Roofs, windows, doors, brick $150,000 $1,200,000
VAC: Geothermal Wells, Heat Pump, DX System $650,000
ADA: Meats currant guidelines of building access,
parking and Intetiar service areas.
Electcical Power Transfer switch, UPS, building service, interior
Distribution: steteibution
Emergency Power Systems: Diesel generator $675,000
Security: Fire, Panic, intrusion
interior Finishes:
‘Specialty Systems: Operational Equip Auditorium
$104,000
UST/AGT:
Site work: Parking lots &
sidewalks: Turf Flefds $450,000
Extertar Lighting:
Pool $275,000
Gyms / Fleldhouse / Turt $875,000 $750,000 $1,600,000
Totals: $679,000 $1,025,000 $2,850,000 $1,875,000

p/4/2025 Long Range Facilities Asset Matrix: Waterford High School (Detail)
Condition:
Building Excellent,
Descriptio Notes 0 029) 030-; 2036-2 2042-2047
Components Bescrintion Good, Fair, “obese 2030-2035 2036-2041
Poor
Building Envelope: [Roof Excellent Sarna, sloped metal roof
$150,000 $1,200,000
Windows Exceltent
Roors Excellent
Metal Excellent
HVAC: Geothermal Wells [Excelfent $200,000
DX System Good $450,000
Chitler Nene
ADA: Exterior Excellent Meets current guidelines.
interior Excellent Meets current guidelines.
Electrical Power Transfer switch Excellent
Distribution:
urs Mone
Main Service
Emergency Power {Generator 26w Good and rellable
systems: $675,000
Security- intrusion, |Are Yes
Fire, Panic, Video:
Panic No
intrusion No
interior Finishes:
Specialty Systems: {Operational Equip,
Commercial Kitchens
UST/AGT; No UST on site
Site work: Parking Ok 4.} Pave anteance. 2)
lots & sidewalks: Resurfacing pavement areas $450,000
around site.
Extertor Lighting:
Pool Fair $275,000
Gyms / Fleldhouse/Turf Poor Flooring fs at end af jife, bleachers
i need refurbishment $575,000 $750,000 $1,600,000
Totais:) $575,000 $1,025,000 $2,850,000 $1,875,000

6/4/2025
Long Range Facilities Asset Matrix
Clark Lane Middle School
105 Clark Lane
Description of building:
129,890 Saft
Built in 1952, renovations in 1955, 1964, 1973,
1986, 1995, 2006
Natural gas hydroponic boiler/heat pumps/Chillers
Replacement Cost: $108,328,260 ($830 sq ft}
Bullding Components Description 2024-2029 2930-2035 2036-2041 2042-2047
Building Envelope: Roots, windows, doors, brick $2,400,000
HVAC: Boiler, VAF/split systems, chiller, roof tap units,
interior units $1,472,000
ADA: Meets current guidelines or building access,
parking and interior service areas
Electrical Power Distribution: |UPS, building service, interior distribution
$1,500,000
Emergency Power Systems: [Diesel generator
Security: Fire, Panic, intrusion
{nterior Finishes:
Specialty Systems: Operational Equip, Commarcial Kitchens
UST/AGT:
Site work: Parking lots &
sidewalks:
Exterior Lighting:
YM / Fleldir
GYM / Fleldhouse $235,000
Totals: $o $1,707,000 $2,400,000 $1,500,000

6/4/2025
Long Range Facilities Asset Matrix: Clark Lane Middle School (Detail)
Condition:
Building : Excellent,
Description Notes 2024-202 20: 2 ~
Components Good, Fair, Nokes 2024-2028 3 36-204), 2042-2047
Poor
Building Envelope: |Reof (Sarnafil) Good installed 2006, Some leaks, but they
have been addressed $2,400,000
Windows exceltent
Doors Excellent
Brick Excellent
HVAC: Boiler Fair Boiler is old, transitioned to natural
gas in 2020, $1,200,000
VRF/Split systems
Chiller Poor Units are being replaced 2025,
Root top units Fair Units are working, but aging $272,000
ADA: Exterior Excellent
interior Excellent
Electrical Power Transfer switch = [Goad
Distribution:
UPS Excellent $350,000
Service Excellent $1,150,000
150,
Emergency Power |Generator N/A
Systems:
Security. Intrusion, (Fire Good
Fire, Panic, Video:
Panic Good
Intrusion Good
interior Finishes:
Specialty Systems: {Operational Equip, IT Learning Boards
Commercial
Kitchens, elevators $265,000
Zs
UST/AGT: No UST on site
Site wark: Parking {Falr
lots & sidewalks:
Exterlor Lighting: {Good
GYM / Fieldhouse — [Fair $235,000
E
Totals: $0 $1,972,000 $2,400,000 $1,500,000

6/4/2025 Long Range Facilities Asset Matrix
Quaker Hill Elementary School
285 Bloomingdale
Description of building:
67,760 Sqft
Built in 2008
Replacement Cost: $56,240,800 ($830 sq ft}
Building Components Description 2024-2029 2030-2035 2036-2041 2042-2047
Building Envelope: Roofs, windows, doors, brick $350,000
HVAC: Geothermal, Gas system in main office
$360,000
ADA: Meets current guidelines or building access,
parking and interior service areas.
Electrical Power Distribution: | Transfer switch, UPS, building service, interior
distribution
Emergency Power Systems: [Oieset generator $450,000
,
Security: Fire, Panic, Intrusion
Interlor Finishes:
Specialty Systems: Operational Equip, Commercial Kitchens
UST/AGT:
Site work: Parking lot,
Sidewalk, and Playscapes $231,000 $450,000
Totals;; $594,000 $0 $1,250,000 30

6/4/2025
Long Range Facilities Asset Matrix: Quaker Hill Elementary {Detail}
Condition:
Bullding : Excellent,
Descriptio lotes 2024-2029 | |2030-2035] | 2036-2041 042-2047
Components Besctiption Good, Fair, Notes 2024-2029 | |2030-2035 | 2036-2041) (2
Poor
Building Envelope: |Roof Excellent $350,000
Windows Excellent
Daors Excellent
Brick Excellent
HVAC; Geothermal excellent
Bullding Poor Systern Is partially updated
Management Sytem| $250,000
Roof top units Fair $110,000
ADA: Exterior excellent.
Interior excellent
Electrical Power Transfer switch Excellent
Distribution:
UPS Excellent
Service Excellent
Emergency Power Generator Good
Systems: $450,000
Security- intrusion, Fire Exceltent
Fire, Panic, Video:
Panic Excellent
intrusion Exceltent
Interior Finishes:
Speclalty Systems: |Operatianal Equip,
Cormercial
Kitchens
UST/AGT:
Site work: Parking
lot, Sidewalk, and $231,000 $450,000
Plaucranas
Exterior Lighting:
Totals:} $592,000 $0 $1,250,000 $0

6/4/2025 Long Range Facilities Asset Matrix
Quaker Hill Elementary School
285 Bloomingdale
Description of building:
67,760 Sqft
Built in 2008
Replacement Cost: $56,240,800 ($830 sq ft)
oh
Building Components Description 2024-2029 2030-2035 2036-2041 2042-2047
Bullding Envelope: Roofs, windows, deors, brick $350,000
HVAC: Geothermal, Gas system In main office
$360,000
ADA: Meats current guidelines or building access,
parking and interior service areas
Electrical Power Distribution: |Transter switch, URS, building service, interior
distribution
3 (Diesel ti
Emergency Power Systems; [Oiesel generator $450,000
Security: Fire, Panic, intrusion
Interior Finishes:
Specialty Systems: ‘Operational Equip, Commercial Kitchens
UST/AGT:
Site work: Parking lot,
Sidewalk, and Playscapes . $198,030 $450,000
Totals:} $558,030 $0 $1,250,000 $0

p/4/2025 Long Range Facilities Asset Matrix: Oswegatchie Elementary (Detail)
Condition:
Builldiny Excellent,
autre. Description | ~ Notes 2024-2029 | |2030-2035| | 2036-2041, [2042-2047]
Components Good, Fair, 
—_,_—_—_
Poor
Building Envelope: [Roof Excellent $350,000
Windows Excelent
Doors Excellent
Brick Excellent
HVAC: Geothermal Excellent
euilding Poor
Management Sytem $255,000
Roof top units Fair $104,750
ADA: Extertor Excellent
Interior Excelleat
Electrical Power Transter switch Excellent
Olstribution:
UPS Excellent
Service Excelent
Emergency Power Generator Good
Systems: $450,000
Security- Intrusion, jFire Excellent
Fire, Panic, Video:
Panic Excellent
Intruston Excellent
interior Finishes:
Specialty Systems: Operational Equip,
Commercial
Kitchens
UST/AGT:
Site work: Parking
lot, Sidewalk, and $198,030 $450,000
Pflaveranne
Exterior Lighting:
Totals:| $557,780 $0 $1,250,000 $0

B/4/2025
Long Range Facilities Asset Matrix
165 Great Neck Road
Great Neck Elementary School
68,331 Saft
Built in 2009
Description of building:
Replacement Cost: $56,714,730 ($830 sq ft)
Building Components Description 2024-2029 2030-2035 2036-2041 2042-2047
Building Envelope: Roofs, windows, daors, brick $350,000
IHRVAC; Geothermal, Gas system In maln office $366,000
ADA: Meets current guidelines or building access,
parking and interior service areas
Electrical Power Distribution:| Transfer switch, UPS, duiiding service, interior
distribution
2 [Diesel generator
Emergency Power Systems: generator $465,000
Security: Fire, Panic, Intrusion
Interior Finishes:
Specialty Systems: Operational Equip, Commercial Kitchens
UST/AGT:
Site work: Parking lot,
Sidewalk, and Playscapes $220,080 $450,000
Totals:| $0 $586,080 $350,000 $915,000

6/4/2025
Long Range Facilities Asset Matrix: Great Neck Elementary (Detail)
Condition:
Building Excellent,
Description = 5 5
Components ‘ood, Fair Notes 2024-2029 | 12030-2035) | 2036-2041 2042-2047
Poor
tdi 3 |Roof Exceflent
Building Envelope ellen $350,000
Windows Excellent
Doors Excellent
Brick Excelent
HVAC: Geothermal Exceflent
Building Poor
Management Sytem $260,000
G
Roof top units ‘alr $106,415
ADA: exterior Excelent
Interior Excellent
Electrical Power Transfer switch Excellent
Distribution:
UPS Excellent
Service Excellent
Emergency Power Generator Goad
Systems: $465,000
Security- intrusion, Fire Excellent
Fire, Panic, Video:
Panic Excellent
intrusion Excellent
Interior Finishes:
Specialty Systems: [Operational Equip,
Commercial
XRchens
UST/AGT:
Site work: Parking
lot, Sidewalk, and $220,080 $450,000
Diaw
€xtartor Lighting:
Totals:| $220,080 $366,415 $0 $1,265,000