Fire Services Review Special Committee - Minutes - 11/15/2022

agenda center minutes

Board/CommissionFire Services Review Special Committee
Meeting DateNovember 15, 2022
Pages6
File Size0.8 MB
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
PHONE: 860-442-0553
www. water fordct.org
?
(4
paz)
mm.
220
U
Fire Services Review Special Committee
Minutes—Special Meeting November 15, 2022
V Zi 37
Members Present: Robert Tuneski (BoF), Richard Muckle (RTM), Greg Attanasio (RTM), Susan Driscoll (RTM/PP&S), =O
Rob Brule (BoS), Michael Howley (Fire Services), Steven Sinagra (Emergency Management), Todd Patton (Ciféf, Goshén FC),
Tom Martin (Captain, WFS)
Members Absent: Mark Greczkowski (WAS)
Also Present: Nick Kepple (Town Attorney)
1. Call to order: Chair Tuneski called the meeting to order at 6:00 p.m.
2. Public comment: Bob Swansen stated that there is no reason to rush to build a new Oswegatchie firehouse at this time;
with no supporting data and a lack of volunteer membership, such a huge immediate expense and commitment cannot be
justified. If the roof needs immediate repairs, the Town should fix that problem or, he added, the OSW volunteers have
more than $100,000 that they could use to fix it. The committee needs to focus on a 3-5 year plan that considers service
and staffing needs and priorities and the most effective number and location of stations. Spending millions of dollars on a
single firehouse now with no plan, he concluded, is a mistake.
3. Approval of previous minutes: Motion by Muckle, second by Attanasio, to approve October 11, 2022, minutes as
presented. Motion passed by unanimous voice vote.
4. Consideration of FSRSC’s charge from the RTM (6/7/21): Discussion focused on the areas noted in agenda:
A. Staffing plan: Discussion covered several areas, spurred on by Chair Tuneski’s questions on FY24 hiring of three
firefighters, organizational structure of combined department, coordination of on-scene authority, and interaction of
companies’ bylaws, fire services policies, and service agreements currently being revised.
Director Howley explained that call volumes appear to have decreased in the past two years, but that is a combination of
long-running Covid impact and WAS stepping up as primary responder on rescue calls, so that firefighters are now called
out only for Priority 1 calls, as backup. Increasing residential and business developments will add to volume. Current
staffing is Jordan: 2 full-time 24/7 with 2 volunteers; Quaker Hill: 1 part-time 8am-4pm T/Th/F with 15 volunteers;
Oswegatchie: 1 part-time 8am-4pm Sat (and on Sun in summer) with 15 volunteers; Goshen: 2 part-time 8am-4pm M-F,
Sat/Sun 2 part time 6am-2pm and 2 part-time 2pm-10pm, with 10 volunteers; Cohanzie: 2 careers 24/7 with 8 volunteers.
Howley noted that volunteers’ hours are not scheduled; they serve as available. He added that there is no ideal ratio of
careers to volunteers, but that we rely on both and face the nationwide struggles of recruiting and retaining both. And,
since we no longer have the depth of training in our volunteer “bench,” he’s proposed gearing the volunteer stipend
program toward training and education, which is a huge time demand for volunteers.
Howley explained that WFS policies do not differentiate between career firefighters and volunteers, but that the five
companies manage advancement through the ranks internally, through their separate bylaws. The town does require a
certain level of training for various duties and certification and asks the companies for updates on changes in their
members’ ranks. Attanasio asked about the impact on chain of command; Howley said the focus in not on rank, but on
safety of the structure and the responders. In the absence of a volunteer company Chief, said Howley, the shift captain on
scene is the incident commander, or a chief may opt to defer command. Chief Patton explained that if Captain Martin was
in command at an incident and he rolled up, he would ask Tom if he needed to be relieved. If the answer was No, Patton
would then ask “where do you need me?” He added that while that’s the procedure, he can’t say if it happens that way in
the other companies.

FPSRSC Minutes 11/15/22
Chair Tuneski expressed interest in getting copies of the companies’ bylaws and asked Attorney Kepple if the service
agreements being revised now will address accountability and chain of command. Kepple said the agreements will
memorialize the functioning relationship the town and companies have had for decades, and expects they will be longer
than the half-page documents done in the 1970s. Howley and Kepple both stated that accountability and command
structures are addressed in the WFS policies. But there will be more detail than in the current agreements, Kepple added,
and they are working on 5-year terms for the agreements, to allow the companies and the town to review, revise, and
renew as situations change. Howley pointed out that we are blending six organizations and experience the same conflicts
and personalities as every other combined department does—and that everyone agrees we need more people. We're
struggling with an “insufficient bench” that aren’t all certified or haven’t shown up at incidents for the previous two years,
but safety and training qualifications are essential. Martin suggested we get both sides to look at how Sauthington,
Guilford, and Branford have handled the accountability and command structures in their combined departments. He also
noted that when there was a Board of Fire Commissioners, volunteer and career leadership would meet regularly. But
after the creation of the Board of Fire Chiefs in 2011, the Chiefs met only with the Director. He suggested that regular
careers-and-Chiefs meetings be reinstituted.
B. Communications: Howley has been working on replacing about half of the radios (at about $45,000}, because of big
programming issues with the equipment that is too old to be fixed with upgrades. Volunteer Chief are used to having
mobile radios in their personal vehicles and, while defective equipment is a safety and communications risk, it does
become a costly proposition for the town, since the Chiefs change almost yearly. Howley noted that the volunteers and
paid staff can now use smartphone apps hooked into the CAD system, as well as Everbridge. Patton pointed out that not
everyone keeps their phones on ail night so they would miss calls and that occasionally there are late notifications.
Director Sinagra explained that the app is a third-party system that gets the call and then routs to everyone—and that
results can differ depending on an individual's cell service provider. The app is nice to have, he said, but it is not and
should not be the primary form for dispatch. Pagers and radio are primary and reliable tools for dispatch Sinagra added,
and pagers are less expensive. Howley stated he would move forward with radios for staff and Chiefs and then, if possible,
get some to other volunteers.
C. OSW update: Howley distributed engineer’s structural inspection report (attached). He stated that the engineer found
“nothing critical,” and said that we can still operate out of the building for now. Attanasio reiterated his request for
response data showing response times, with districts noted for both the incident location and the responders.
5. New business: Chair Tuneski noted that the committee rose out of a need to find out how the town boards can help the
fire services succeed and that our process so far has been to gather information and gain an understanding of the various
aspects of fire and emergency services. He stated that at our next meeting, he would like the committee to agree on how
we will ultimately present our recommendations and expressed his desire to have all the advisory members—whose
expertise has been an asset—be a part of the presentation team when we get to that point.
6. Next meeting: Dec. 13 at 6:00 p.m. confirmed as next meeting date and time.
7. Adjournment: Motion by Muckle; second by Attanasio to adjourn at 8:11 p.m. Voice vote: Unanimous.
Submitted by
Susan Driscoll, FSRSC Secretary
encl: OSW Engineering Report

New) 5, PA
J.M, ALBAINE ENGINEERING, LLC
14 Lincoin Road, Waterford, CT 06385 Email: jma724@snet.net
www. JMAIbaineEng:com
Oswegaichie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 --- October 31, 2022
ENGINE BRING.
Att. Michael Howley
Director of Fire Services
Public Safety Building
204 Boston Past Road
Waterford, CT 06385
Subject: Oswegaitchie Fire Station
Inspection /Assessment: Building Structural Safety
Project # JMA22-327-062
The following report objective is to provide an update of the current structural condition
of the overall building shoring as designed and constructed per our recommendations. |
met with Rocco Bracciaie at the premises for an inspection / walk through conducted on
October 1%", 2022.
Reference Documents
1) Report / Letter dated March 6", 2011 by JM Albaine Engineering - Project # JMA10-
327-06.
2) Report / Letter dated February 5, 2011 by JM Albaine Engineering - Project # JMA10-
327-06
3) Design /As-Built Drawings By JM Albaine Engineering S-1 to S-7, Revision 2, dated
March 05, 2011.
Executive Summary:
The installed temporary shoring on the original building under scope, built in 1928, is in
good condition and no significant sign of distress or deficiency was observed nor
detected that may indicate a concern regarding the safety of the building in the current
condition as supported by the shoring. The shoring is holding up the damaged main roof
over the Apparatus Room, Day Roam, Hall Room, and Kitchen, all located in the older
building, the subject of the sharing.
Moreover, the intersecting roof framing between the 1928 structure and the flat roof
from the 1985 structure is a critical area where lots of damage on the roof rafters have
been observed sue to the flat roof bearing on the clder 1928 roof.
UM Albaine Engineering, LLC.- 860-705-1631 860-439-1111 Page 1 of 4

Oswegatchie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 -—- October 31, 2022
However, it is also our opinion that the temporary shoring is not a substitute for the
overall building stability as stated in Reference 1 above and quoted below:
“Please note that the installed temporary sharing served the function of stabilizing the roof to
prevent a sudden roof collapse. The shoring are designed to provide a safe working
area/platform during the projected work te repair or replace the roof; this framework has
been designed for temporary application as other elements such as the exterior walls are
subject to local or global failure (such as from high wind pressure or suction induced by
hurricane forces).”
It is factual that since the installation of the-shoring, the building has been. subject
to two major hurricane forces, Irene in August 2011 and Sandy in October 2012.
These hurricanes had wind velocity of 66 mph & 80 mph respectively, and the
building withstood these forces with no major consequences.
The deficient roof framing is being supported by the shoring, however it is
subject to deterioration if water intrusion is present which will further weaken
such framing. It is imperative to keep the existing roof framing in a dry condition.
Furthermore, the current Connecticut Building Code (2022) requires building to
be designed for a wind velocity of 108 mph in Waterford, which translates to
building forces increment of 82% above those from Hurricane Sandy, therefore
presenting a high risk of building damage. and stability in the case that such
storm may come through our area.
Conelusion:
The shoring installed in 2011 are providing the required support.as originally
intended, mainly reinforced the weaken roof framing over the. Apparatus Room,
Dispatcher Room, Day Room, Hall Roo, and the kitchen. These shoring were
installed principally because of the dismal condition of the roof framing (see Ref.
#2).
The shoring was found in good conditions with negligent movement changes
since they were installed, thus ensuring the safe function of those areas under
potential heavy snowstorms.
However, the existing roof framing was stabilized by providing vertical supports
at the peak (ridge) down to solid structure and reinforcing the existing rafter tie
connections to the existing rafters (refer to Reference 3, Section “A’, Dwg S-2
and Section “B" Dwg. 5-3). The existing rafters (2 x 6. @ 24” an-center) were not
reinforced at the time due to the nature of the work (temporary), and they remain
the. weakest link in the chain as water intrusion from the roof will further
deterioration on such elements of the roof framing.
JM Albaine Engineering, LLC - Waterford, CT 06385 860-705-1631 Page 2 of 4

Oswegatchie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 --- October 31,2022
Regarding the building lateral stability caused by hurricane induced lateral forces
and to a lesser degree seismic forces, the area of the building under
consideration is vulnerable as reported previously due to the weakened state of
the exterior walls specially in the Apparatus Room as previously reported.
Although the building has withstood two significant hurricane events in the last 12
years, there still exist a significant risk of building overall stability if a significant
hurricane passes through the areas because of the condition of the exterior
bearing wall (shear walls) and the existing roof rafters that were not reinforced at
the time of the installation of the shoring.
| trust this information is adequate for your needs. if you have any questions or desire
further information regarding this report, please contact meat your convenience.
Respectfully submitted,
Jose-Miguel Albaine, M.S., P.E.
Consulting Design-Structural Engineer
JM Albaine Engineering, LLC - Waterford, CT 06385 860-705-1631 Page 3 of 4

Oswegatchie Fire Station
441 Boston Post Road, Waterford CT
Temporary Framing Inspection
REPORT #1 -— October 31, 2022