Conservation Commission - Minutes - 07/09/2020
agenda center minutes
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | July 09, 2020 |
| Pages | 3 |
| File Size | 0.7 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
MEETING MINUTES Conservation Commission 2026 JUL 16 PH 3:49 July 9, 2020 6:30 PM Zoom Remote Access Only ‘ Members Present: Dave Lersch, Tali Maidelis, and Michael Stankov (2 Vacancies) Members Absent: Richard Muckle and Geneva Renegar Alternates Present: Julie Wainscott (1 Vacancy) Alternates Absent: Wade Thomas Staff Present: Maureen FitzGerald, Environmental Planner Katrina Kotfer, Recording Secretary 1. CALL TO ORDER AND APPOINTMENT OF ALTERNATES T. Maidelis called the meeting to order at 6:30 p.m. Julie Wainscott was seated for R. Muckle. 2. APPROVAL of the June 11, 2020 2020 Meeting Minutes Motion: Motion made by M. Stankov, second by J. Wainscott to approve the June 11, 2020 meeting minutes. Vote: 4-0 3. APPLICATION REVIEW C-20-08 15 Leary Drive — In-Ground Pool — Kimberly Devlin/Robert Brule — Owner & Applicant R. Brule was present for the discussion. Staff reviewed a wetlands report prepared by James Cowen, Cowen EcoDesign, LLC. T. Maidelis asked if the previously requested trees have been removed. R. Brule responded that they are waiting to see if they can get approval for the proposed pool and do the work all at the same time. T. Maidelis asked how much disturbance has occurred on the property from previous work. Staff responded 400 sq. ft. for the shed and 1,800 sq. ft. from when the house was built. Staff read Section 4.1(b) of the regulations and noted the application is for a regulated activity. She reviewed her memorandum dated July 6, 2020. Commissioners questioned if alternatives have been considered to reduce the area of wetland impact and temporary disturbance. R. Brule replied he can move the area east for better drainage but he requested the amount of temporary construction disturbance as shown in case it is needed. He stated he wants to maintain the vegetation between the pool and the neighboring property. he lot. Commissioner s recommended he minimize the area of disturbance during construction. M. Stankov requested that if the sweet pepperbush does not re-generate after disturbance, that supplemental plantings be installed to restore the wetlands temporary affected. T. Maidelis asked how large is the wetland. R. Brule stated that is a very robust and dense wetland. Motion: Motion made by M. Stankov, second by J. Wainscott to have staff prepare a draft permit for approval. Conservation Commission Minutes July 9, 2020 p. 2 of 3 D. Lersch asked about a physical barrier for the limit of disturbance. R. Brule noted that he is using the fence line as the barrier. D. Lersch expressed concern with the proposed activity in wetlands and asked what impact can be minimized. Vote: 4-0 C-20-11 Hunts Brook Road — Two Lot Subdivision — Ellen Degaetano, Owner, Evan Degaetano, Applicant, Florek Surveying, LLC, Agent Brian Florek, LS, David Cooley, PE and Evan Degaetano were present for the application. B. Florek explained that the applicant is looking to resubdivide the land and create an additional lot for a single residence house with a septic system. Efforts have been made in the design to minimize impacts and no wetlands should be disturbed. J. Wainscott asked if rain garden could be created near the stone wall to provide a buffer to wetland flags 3-4. B. Florek agreed. Commissioners had questions about the sliver of land that extends to the east towards the Waterford Country School. E. Degaetano noted that the land area is heavily wooded and the only access to the part of the land is through the Waterford Country School. Commissioners will make arrangements with staff to walk the property prior to the next meeting. 4, CORRESPONDENCE Notice of Violation — Inland Wetland Permit #C-13-5, Excavation & Fill in Inland Wetlands, 16 Susan Terrace, Waterford, CT Staff reviewed with the Commission that she had received a planting completion report. Commissioners asked if it conform to standards. Staff will close out the violation as the Commission concurs with her findings that the violation has been rectified. Report of Commission Action: 446 Boston Post Road — Inland Wetland Permit #C-20-09 Staff noted that this was forwarded to the Planning & Zoning Commission. Niantic River Watershed Protection Plan — Update Staff reminded the Commission to forward any review comments on the updated plan to staff. Staff noted that a new application had been received but the agenda had been posted and packets distributed. The application for trail maintenance and a bridge is received and under review. 5. PAYMENT OF BILLS Motion: Motion made by M. Stankov, second by J. Wainscott to approve the bill for $20.00 from the Arbor Day Foundation. Vote: 4-0 Motion: Motion made by T. Maidelis, second by M. Stankov to add a bill from The Day for $78.75 to the agenda. Vote: 4-0 Conservation Commission Minutes July 9, 2020 p. 3 of 3 Motion: Motion made by M. Stankov, second by J. Wainscott to approve the bill from The Day for $78.75. Vote: 4-0 6. ADJOURNMENT Motion: Motion made by M. Stankov, second by D. Lersch, to adjourn at 7:23 p.m. Vote: 4-0 Britis. Katrina Kotfer Recording Secretary