Prepared by:   Silver/Petrucelli + Associates, Inc.  David Stein AIA Principal
Jan-25
Amended Exhibit C 1 Page 
Anticpated Hard Construction Costs
8,000,000.00
$                
$800/SF 
PHASE I
Schematic Design 
62,000.00
$                       
Design Development 
110,344.00
$                    
sub-total
172,344.00
$                    
Phase II
Construction Documents 
286,000.00
$                    
5.50% of construct
Bidding & Negotiations
22,000.00
$                       
Construction Administration
132,000.00
$                    
sub-total
440,000.00
$                    
440,000.00
$      
Phase I & II
612,344.00
$                    
7.65%  Total Fee
Added Allowances:  As required 
1
Traffic Engineering
17,500.00
$                          
42,500.00
$                       
2
Geotechnical Borings 
11,500.00
$                          
35,000.00
$                       
3
Hazardous Material Testing 
20,000.00
$                          
25,000.00
$                       
4
Boundary Survey 
15,000.00
$                       
5
High Performance Builldings 
10,000.00
$                          
25,000.00
$                       
142,500.00
$                    
Total Fee Sum 
754,844.00
$                    
9.44%

 AIA
® Document G802
® – 2017 
Amendment to the Professional Services Agreement 
AIA Document G802 – 2017. Copyright © 2000, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American 
Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This 
draft was produced at 12:15:28 ET on 01/13/2025 under Order No.4104246541 which expires on 02/28/2025, is not for resale, is licensed for 
one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-
mail docinfo@aiacontracts.com. 
User Notes:  
(3B9ADA43) 
1
 
 
PROJECT: (name and address) 
AGREEMENT INFORMATION: 
AMENDMENT INFORMATION: 
Oswegatchie New Fire Station  
441 Boston Post Road 
Date: June 06, 2024 
Amendment Number: 01 
Waterford, CT 06226 
 
Date: 01/13/2025 
 
 
 
OWNER: (name and address) 
ARCHITECT: (name and address) 
 
Town of Waterford  
Silver/Petrucelli + Associations, Inc 
3190 Whitney Avenue 
Hamden, CT 06518 
 
15 Rope Ferry Road 
      
 
 
The Owner and Architect amend the Agreement as follows:  
Phase II: Construction Documentd, Bidding and Negotiation, and Construction Administration Services is being 
itemized to fixed fee allocation. Construction Documents Only 
 
Construction Documents:   $286,000.00 
 
 
Phase III: To be approved and determined at a later date 
 
 
Bidding and Negotiations:          $22,000.00 
Construction Administration:   $132,000.00  
 
The Architect’s compensation and schedule shall be adjusted as follows:  
 
Compensation Adjustment:  
Construction Documents:   $286,000.00 only  
 
 
Schedule Adjustment:  
Schedule remains as anticcpated to date.   
 
  
 
SIGNATURES: 
 
 
 
Silver/Petrucelli + Associates, Inc. 
 
Town of Waterford 
 
 
ARCHITECT (Firm name) 
 
OWNER (Firm name) 
 
 
  
 
  
 
 
SIGNATURE 
 
SIGNATURE 
 
 
David J. Stein, AIA Vice 
President      
 
Rob Brule First Selectman      
 
 
PRINTED NAME AND TITLE
 
PRINTED NAME AND TITLE
 
 
01/13/2025 
 
      
 
 
DATE
 
DATE
 
 

12/17/2024
WATERFORD OSWEGATCHIE FIRE STATION
ARCHITECTURAL UPDATE

Date: 11/25/2024  Time: 15:52  User: afay  Style Table: Langan.stb  Layout: Layout1 Document Code: 140286501-0501-CS101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24

Date: 11/25/2024  Time: 15:53  User: afay  Style Table: Langan.stb  Layout: Layout1 Document Code: 140286501-0501-CG101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24

Date: 11/25/2024  Time: 15:53  User: afay  Style Table: Langan.stb  Layout: Layout1 Document Code: 140286501-0501-CU101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24

Date: 11/25/2024  Time: 15:53  User: afay  Style Table: Langan.stb  Layout: Layout1 Document Code: 140286501-0501-CE101-0102
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24

Date: 11/25/2024  Time: 15:53  User: afay  Style Table: Langan.stb  Layout: Layout1 Document Code: 140286501-0501-CE101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24

ADJUSTED PROGRAM

ADJUSTED PROGRAM

E
E
E
E
UP
Range
DN
SYMBOL LEGEND
- NEW METAL STUD PARTITIONS
- DOOR NUMBER
- WINDOW TYPE 
- ROOM NUMBER
- PARTITION TYPE 
- CONSTRUCTION NOTE
1A
- ROOM NAME
- NEW MASONRY WALL
- NEW CMU WALL
- WALL SECTION NUMBER
- SHEET NUMBER
- FIRE EXTINGUISHER CABINET
F.E.C.
1. 
READ ALL GENERAL NOTES ON DRAWING A001.
2. 
CONTRACTORS SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS.
3. 
ALL DIMENSIONS ARE TO OUTSIDE FACE OF BRICK, CONCRETE 
MASONRY UNITS AND METAL FRAMING UNLESS OTHERWISE NOTED.
4. 
ALL NEW WALL AND PARTITION ASSEMBLIES SHALL EXTEND TO 
UNDERSIDE OF DECK UNLESS OTHERWISE NOTED.
5. 
PROVIDE CMU WITH PRE-MANUFACTURED BULLNOSE AT ALL EXPOSED 
CORNERS.
6. 
WHERE THE WORD "ALIGN" IS INDICATED IT SHALL MEAN TO ALIGN BOTH 
SIDES OF WALL.
- FLOOR DRAIN - SLOPE TO DRAIN
FD
Cxx
XX
A 
101
- BUILDING SECTION NUMBER
- SHEET NUMBER
- EXTERIOR ELEVATION NUMBER
- SHEET NUMBER
2
- INTERIOR ELEVATION NUMBER
- SHEET NUMBER
- HANDICAPPED DRINKING FOUNTAIN
H.D.F.
GENERAL NOTES
A101
2
A101
Room name
101
2
A101
- CORNER GUARD
C.G.
2
A101
1
A400
2
A400
1
A401
2
A401
4
A420
78 SF
SPRINKLER
3996 SF
APPARATUS BAYS
143 SF
SCBA
78 SF
ELEC
123 SF
GEAR WASH
108 SF
DECON
67 SF
LAUNDRY
67 SF
RR
208 SF
CIRC
97 SF
RR
97 SF
RR
490 SF
TRAINING
447 SF
CIRC
90 SF
DATA
37 SF
VESTIBULE
193 SF
OFD
119 SF
OFFICE
192 SF
EXERCISE
SCBA TANK 
RACK
AIR 
COMPRESSOR
GEAR 
WASHER
GEAR DRYER
5'-0"
54'-0"
10'-8"
7'-4"
8'-0"
9'-4"
20'-0"
20'-1"
13'-6"
5'-0"
7'-6"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
5'-4"
5'-0"
11'-4"
5'-0"
5'-0"
666 SF
DAY ROOM
47 SF
STOR
42 SF
PANTRY
10'-0"
10'-8"
8'-0"
153 SF
GEAR LOCKER
164 SF
WORK BENCH
54 SF
JANITOR
57 SF
RR
209 SF
BUNK
209 SF
BUNK
209 SF
BUNK
85 SF
CIRC
9'-8"
9'-8"
9'-8"
21'-7"
4'-7"
55 SF
STOR
7'-6"
12'-0"
7'-4"
74'-0"
9'-2"
9'-2"
11'-2"
28'-6"
127'-9"
76'-9"
7'-3"
22'-4"
1'-6"
9'-7"
5'-0" 3'-4"
7'-0"
3'-4"
7'-0"
3'-4"
7'-0"
3'-4"
7'-0"
3'-4" 5'-4" 2'-0"
M.O.
3'-4"
14'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
3'-4"
1'-4"
M.O.
13'-4"
62'-0"
8'-6"
17'-11"
17'-1"
23'-6"
5'-0"
5'-2"
9'-0"
6'-2"
6'-4"
3'-2"
M.O.
3'-4"
M.O.
26'-8"
M.O.
18'-0"
M.O.
18'-0"
3'-4"
Department Legend
Assembly
Business
Residential
Storage
3
A421
296 SF
STORAGE
245 SF
MECH
16'-0"
15'-4"
19'-4"
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER  PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE  HAMDEN   CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
As indicated
12/16/2024 2:31:54 PM
A113
FLOOR PLANS
EAC
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
N
CONSTRUCTION NOTES - PLAN
1
CONTINUOUS TRENCH DRAIN AT 1.5" BELOW MAIN LEVEL (0'-0") - ONE PER
APPARATUS BAY; REFER TO PLUMBING AND STRUCTURAL DRAWINGS.
2
FIRE EXTINGUISHER TO SIT WITHIN KITCHEN CASEWORK
3
WALL MOUNTED NETWORK CABINET; REFER TO ELECTRICAL
3/16" = 1'-0"
1
FIRST FLOOR PLAN

ACCENT (2)
12” X 24”  LUXURY VINYL TILE - ACCENT
WALL PAINT PALETTE
Floor Tile
GENERAL:
METAL DOOR
FRAMES AND DOORS:
LVT-6” X48” @ CORRIDOR:
ACCENT:
RUBBER 
BASE
INTERIOR FINISHES
CARPET TILE:
RUBBER SPORTS FLOORING:
LAY-IN CEILING TILE:
WOOD DOOR FINISH:
Floor Tile

INTERIOR FINISHES
WALL FINISH: PALETTE
STAINLESS STEEL 
COUNTERTOP:
BACKSPLASH:
GENERAL:
ACCENT:
SHEET FLOORING:
PLASTIC LAMINATE 
BASE CABINETRY:
WOOD DOOR FINISH:
GENERAL:
METAL DOOR
FRAMES AND DOORS:
ACCENT:
LVT-6” X48”:
LVT PATTERN::
FURNITURE EXAMPLES:

INTERIOR FINISHES
CARPET TILE (CPT):
LVT OPTIONS:
RUBBER FLOORING (RSF):
CONCRETE (SC):
FLOOR TILE (PFT):
EPOXY FLOORING (EPX):
LVT-1
LVT-2
CPT
EPX

RCP SYMBOL LEGEND
- ROOM NUMBER
ROOM NAME
101
- ROOM NAME
1. 
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS.
2. 
ALL DIMENSIONS ARE TO FINISH FACE OF METAL/WOOD STUD WALL, 
CONCRETE OR MASONRY UNLESS OTHERWISE NOTED.
3. 
REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND 
FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION -
IMMEDIATELY NOTIFY ARCHITECT OF ANY DISCREPANCIES IN PLANS.
4. 
ALL CEILING GRIDS ARE TO BE CENTERED IN BOTH DIRECTIONS, AS 
INDICATED, UNLESS OTHERWISE NOTED.
5. 
PROVIDE NON-HARDENING, ACOUSTICAL SEALANT AT ALL NON-FIRE 
RATED PENETRATIONS THROUGH GYPSUM CEILINGS.
6. 
ALL EXPOSED SPRINKLERS, DUCTWORK, AND HYDRONIC PIPING OT BE 
PAINTED (COLOR TO BE SELECTED BY OWNER AND ARCHITECT)
7. 
ALL NEW INTERIOR WALL ASSEMBLIES SHALL EXTEND TO UNDERSIDE 
OF DECK UNLESS OTHERWISE NOTED.
- CEILING HEIGHT
(10'-0")
GENERAL NOTES
- 2' X 2' ACOUSTICAL CEILING TILES & GRID W/ 
SUPPORTS
- PAINTED GYPSUM BOARD CEILING
- EXIT SIGN, REFER TO ELECTRICAL DRAWINGS
- RECESSED LIGHT FIXTURES
   REFER TO ELECTRICAL DRAWINGS
- 2' X 2' LIGHT FIXTURE
   REFER TO ELECTRICAL DRAWINGS
- PENDENT STYLE LIGHT FIXTURE
   REFER TO ELECTRICAL DRAWINGS
- SUPPLY DIFFUSER
   REFER TO MECHANICAL DRAWINGS
- RETURN DIFFUSER
   REFER TO MECHANICAL DRAWINGS
- CONCEALED SPINKLER HEAD
   REFER TO FIRE PROTECTION DRAWINGS
- EXPOSED SPINKLER HEAD
   REFER TO FIRE PROTECTION DRAWINGS
- CONSTRUCTION NOTE
- PLAN/SECTION/DETAIL NUMBER
- SHEET NUMBER
Cxx
1
A101
SIM
ACT-1
14' - 0"
- CEILING FINISH
- CEILING HEIGHT
REFER TO PROJECT 
MANUAL FOR SCHEDULE 
OF FINISHES
CEILING TYPES
- 2' X 2' ACOUSTICAL CEILING TILES & GRID 
W/ SUPPORTS
1
- PAINTED GWB CEILING
2
- EXPOSED DECK; STRUCTURE & UTILITIES 
ABOVE
3
490 SF
TRAINING
90 SF
DATA
67 SF
LAUNDRY
67 SF
RR
97 SF
RR
97 SF
RR
447 SF
CIRC
208 SF
CIRC
119 SF
OFFICE
193 SF
OFD
192 SF
EXERCISE
55 SF
STOR
209 SF
BUNK
209 SF
BUNK
209 SF
BUNK
666 SF
DAY ROOM
42 SF
PANTRY
47 SF
STOR
78 SF
SPRINKLER
78 SF
ELEC
164 SF
WORK BENCH
54 SF
JANITOR
57 SF
RR
85 SF
CIRC
153 SF
GEAR LOCKER
108 SF
DECON
123 SF
GEAR WASH
143 SF
SCBA
3996 SF
APPARATUS BAYS
37 SF
VESTIBULE
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER  PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE  HAMDEN   CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
As indicated
12/16/2024 2:34:27 PM
A211
FIRST FLOOR CEILING PLAN
Author
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
CONSTRUCTION NOTES - RCP
1
ALL EXPOSED STRUCTURE INCLUDING METAL DECKING, BEAMS, COLUMNS,
ANGLES, ETC. TO BE PAINTED (COLOR TO BE SELECTED BY OWNER AND
ARCHITECT)
3/16" = 1'-0"
1
FIRST FLOOR RCP
N

MECHANICAL AREAS

MECHANICAL AREAS

MECHANICAL AREAS

EXTERIOR FINISHES

EXTERIOR FINISHES

FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
2
A400
1
A401
2
A401
1'-8"
4'-0"
6 1/2"
23'-5 5/8"
5'-0"
5'-2"
9'-0"
6'-1 7/8"
6'-4"
3'-1 3/8"
M.O.
3'-4 5/8"
12'-8 1/8"
M.O.
14'-0"
M.O.
18'-0"
M.O.
18'-0 3/8"
3'-4"
16'-5 1/2"
6'-4 7/8"
6"
8'-4"
4"
2'-8"
34'-8 1/4"
12'-9 5/8"
3'-0 1/4"
1'-5 7/8"
8'-3 3/4"
6"
2'-8"
5'-6 3/8"
55'-2"
75'-2"
130'-4"
9'-0"
ARCHITECTURAL ASPHALT 
SHINGLES
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS; 
CONNECT TO STORM 
DRAINAGE
FIBER CEMENT LAP SIDING
RUNNING BOND COLONIAL BRICK 
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
ARCHITECTURAL ASPHALT 
SHINGLES
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS; 
CONNECT TO STORM 
DRAINAGE
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK 
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
4
5
6
3
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
2
A400
1
A401
2
A401
1'-8"
4'-1"
6"
5'-0"
3'-4"
7'-0"
3'-4"
7'-1"
3'-4"
7'-0"
3'-4"
7'-0"
3'-4"
5'-4"
2'-0"
M.O.
3'-4"
14'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
3'-4"
12'-10"
3'-0"
1'-6"
8'-4"
6"
2'-8"
5'-11"
16'-5"
6'-3"
8"
8'-2"
2"
4"
2'-8"
5'-8"
55'-2"
75'-2"
34'-8"
ARCHITECTURAL ASPHALT 
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS; 
CONNECT TO STORM 
DRAINAGE
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK 
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
ARCHITECTURAL ASPHALT 
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS; 
CONNECT TO STORM 
DRAINAGE
FIBER CEMENT LAP SIDING
RUNNING BOND COLONIAL BRICK 
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
4
5
6
3
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER  PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE  HAMDEN   CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
3/16" = 1'-0"
12/16/2024 3:34:45 PM
A300
EXTERIOR ELEVATIONS
EAC
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
3/16" = 1'-0"
2
NORTH ELEVATION - OPTION 1
3/16" = 1'-0"
1
SOUTH ELEVATION - OPTION 1

FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
1
A400
9'-0"
1'-4"
13'-4"
55'-6"
6'-6"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
20'-8"
20'-8"
8'-4"
8'-4"
ARCHITECTURAL ASPHALT 
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS; 
CONNECT TO STORM DRAINAGE
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK 
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
BUILDING SIGNAGE
7
13
10
9
12
11
8
16'-5 3/4"
1'-4"
4'-0 5/8"
8"
9'-2"
4"
2'-8"
34'-8 3/8"
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
1
A400
4'-7"
6'-9 1/2"
1'-8"
2'-10 3/8"
5'-0"
2'-10 1/8"
1'-8"
9 1/2"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
7'-5 1/2"
ARCHITECTURAL ASPHALT 
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS; 
CONNECT TO STORM 
DRAINAGE
FIBER CEMENT LAP SIDING
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK 
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
BUILDING SIGNAGE
7
13
10
9
12
11
8
16'-5 3/4"
1'-4"
3'-7"
1'-4"
5 5/8"
8'-6"
4"
2'-8"
34'-8 3/8"
3/16" = 1'-0"
1
EAST ELEVATION  - OPTION 1
3/16" = 1'-0"
2
WEST ELEVATION - OPTION 1
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER  PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE  HAMDEN   CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
3/16" = 1'-0"
12/16/2024 3:34:56 PM
A301
EXTERIOR ELEVATIONS
EAC
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT

FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
2
A400
1
A401
2
A401
4
5
6
3
490 SF
TRAINING
55 SF
STOR
67 SF
LAUNDRY
97 SF
RR
85 SF
CIRC
3996 SF
APPARATUS BAYS
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
1
A400
7
13
10
9
12
11
8
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER  PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE  HAMDEN   CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
3/16" = 1'-0"
12/16/2024 3:34:58 PM
A400
BUILDING SECTIONS
Author
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
3/16" = 1'-0"
1
Section 1
3/16" = 1'-0"
2
Section 2

25-01-05
07-Jan-25 12:53 p.m.
Oswegatchie Fire Station 2
Current

Milestones
Progress
Summary
Critical
Date
Revision
Checked
Approved
07-Jan-25
Draft
Oswegatchie Fire Station 2
 Oswegatchie Fire Station 2
 25-01-05​
 Milestone
 Mile​
 GC Notice to Proceed, Mobilization​
 M100​
 TCO/Substantial Completion​
 M900​
 Owner Occupancy​
 M990​
 Project Complete​
 M995​
 Preconstruction
 Precon​
 Phase 1 Environmental Assessm…
 P1010​
 Schematic Design​
 P1000​
 Design Development​
 P1080​
 P&Z Review​
 P1090​
 SD Estimate & Reconciliation​
 P1180​
 Phase 2 Environmental Soil Char…
 P1030​
 Conservation Review Process​
 P1260​
 DD Estimate and Reconciliation​
 P1100​
 RTM DD Review and Approval​
 P1170​
 Value Management & Plan Adjus…
 P1060​
 Construction Documents​
 P1110​
 Traffic Permit​
 P1150​
 P&Z Approval​
 P1270​
 CT DEEP (Stormwater)​
 P1230​
 GC RFP Process/Bid Period​
 P1250​
 Building Permit​
 P1210​
 Scope Reviews and Recommend…
 P1220​
 RTM Approval to Award​
 P1240​
 Submittals/Material Procurement
 Submit​
 Site Logistics and Start Up Subm…
 S1001​
 Submit Steel & Joist shop drawings​  S1045​
 Submittals for Pool Equipment​
 S1000​
 Submit Steel AB Plans​
 S1015​
 Submit Roof Insulation Shop Dra…
 S1040​
 Submit Major Electrical Submittals​
 S1060​
 Submit Finishes and Specialty M…
 S1050​
 Submit Aluminum Window Shop…
 S1055​
 Submit Sitework Submittals​
 S1005​
 Submit Rebar Shop Drawings​
 S1010​
 Submit Major Mechanical Equip…
 S1030​
 Submit Doors Frames and Hard…
 X1175​
 Submit Electrical Switchgear​
 S1025​
 Approve Foundation Rebar Shop…
 S1070​
 Fabricate and Delivery Concrete …
 S1085​
 Steel AB Fab & Deliver​
 S1065​
 Approve Sitework Submittals​
 S1035​
 MEP Coordination​
 S1020​
 Approve Major Mechanical Equi…
 S1110​
 Approve Doors, Frames and Har…
 S1075​
 Approve Aluminum Window Sho…
 S1115​
 Approve Finishes and Specialty I…
 S1120​
 Major Equipment Procurement​
 S1150​
 Finalize Steel Shop Drawings an…
 S1135​
 Electrical Switchgear Procurement​
 S1125​
 Approve Structural Steel & Deck…
 S1130​
 Fabricate and Delivery Aluminu…
 S1145​
 Approve Major Electrical Submitt…
 S1140​
 Fabricate & Delivery Struct Steel,…
 S1155​
 Fabricate and Deliver Doors & H…
 S1105​
 Fabricate and Delivery Door Fra…
 S1100​
 Procure Finishes and Specilaty M…
 S1160​
 Construction
 Cons​
 Site Prep/Utilities
 Site1​
 Temporary Fence​
 A1070​
 Clearing and Grubbing​
 A1000​
 Erosion Control​
 A1010​
 Stripping Topsoil​
 A1050​
 Site rough grading​
 A1510​
 Sanitary Sewer Systems​
 A1020​
 Storm Water Sewer Systems​
 A1500​
1,153d
01-Apr-24  A
13-Jul-26 
278d
06-Jun-25 
13-Jul-26 
0d​
06-Jun-25​ 
​ 
0d​
​ 
27-May-26​ 
0d​
​ 
17-Jun-26​ 
0d​
​ 
13-Jul-26​ 
880d
01-Apr-24  A
12-Jun-25 
16d​
01-Apr-24​  A
30-Apr-24​  A
180d​
03-Jun-24​  A
24-Sep-24​  A
120d​
04-Nov-24​  A
21-Jan-25​ 
78d​
11-Nov-24​  A
10-Mar-25​ 
20d​
20-Dec-24​  A
27-Jan-25​ 
45d​
07-Jan-25​ 
10-Mar-25​ 
30d​
07-Jan-25​ 
17-Feb-25​ 
20d​
22-Jan-25​ 
18-Feb-25​ 
5d​
18-Feb-25​ 
24-Feb-25​ 
10d​
19-Feb-25​ 
04-Mar-25​ 
45d​
19-Feb-25​ 
23-Apr-25​ 
20d​
25-Feb-25​ 
24-Mar-25​ 
5d​
11-Mar-25​ 
17-Mar-25​ 
40d​
11-Mar-25​ 
06-May-25​ 
25d​
24-Apr-25​ 
29-May-25​ 
30d​
24-Apr-25​ 
05-Jun-25​ 
5d​
30-May-25​ 
05-Jun-25​ 
5d​
06-Jun-25​ 
12-Jun-25​ 
277d
25-Mar-25 
28-Apr-26 
10d​
25-Mar-25​ 
07-Apr-25​ 
35d​
13-Jun-25​ 
01-Aug-25​ 
20d​
13-Jun-25​ 
11-Jul-25​ 
10d​
13-Jun-25​ 
26-Jun-25​ 
10d​
13-Jun-25​ 
26-Jun-25​ 
40d​
13-Jun-25​ 
08-Aug-25​ 
60d​
13-Jun-25​ 
08-Sep-25​ 
30d​
13-Jun-25​ 
25-Jul-25​ 
20d​
13-Jun-25​ 
11-Jul-25​ 
10d​
13-Jun-25​ 
26-Jun-25​ 
25d​
13-Jun-25​ 
18-Jul-25​ 
26d​
13-Jun-25​ 
21-Jul-25​ 
35d​
13-Jun-25​ 
01-Aug-25​ 
5d​
27-Jun-25​ 
03-Jul-25​ 
10d​
07-Jul-25​ 
18-Jul-25​ 
10d​
14-Jul-25​ 
25-Jul-25​ 
15d​
14-Jul-25​ 
01-Aug-25​ 
66d​
21-Jul-25​ 
22-Oct-25​ 
10d​
21-Jul-25​ 
01-Aug-25​ 
20d​
22-Jul-25​ 
18-Aug-25​ 
10d​
28-Jul-25​ 
08-Aug-25​ 
60d​
28-Jul-25​ 
21-Oct-25​ 
140d​
04-Aug-25​ 
23-Feb-26​ 
10d​
04-Aug-25​ 
15-Aug-25​ 
185d​
04-Aug-25​ 
28-Apr-26​ 
5d​
04-Aug-25​ 
08-Aug-25​ 
60d​
11-Aug-25​ 
04-Nov-25​ 
10d​
11-Aug-25​ 
22-Aug-25​ 
45d​
18-Aug-25​ 
21-Oct-25​ 
65d​
19-Aug-25​ 
20-Nov-25​ 
50d​
19-Aug-25​ 
29-Oct-25​ 
20d​
22-Oct-25​ 
19-Nov-25​ 
385d
07-Jan-25 
13-Jul-26 
57d
06-Jun-25 
26-Aug-25 
3d​
06-Jun-25​ 
10-Jun-25​ 
3d​
11-Jun-25​ 
13-Jun-25​ 
2d​
12-Jun-25​ 
13-Jun-25​ 
1d​
16-Jun-25​ 
16-Jun-25​ 
2d​
17-Jun-25​ 
18-Jun-25​ 
20d​
17-Jun-25​ 
15-Jul-25​ 
15d​
16-Jul-25​ 
05-Aug-25​ 
2024
2025
2026
2027
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Milestone
Milestone
Milestone
Milestone
Milestone

GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization

TCO/Substantial Completion
TCO/Substantial Completion
TCO/Substantial Completion
TCO/Substantial Completion
TCO/Substantial Completion

Owner Occupancy
Owner Occupancy
Owner Occupancy
Owner Occupancy
Owner Occupancy

Project Complete
Project Complete
Project Complete
Project Complete
Project Complete
Preconstruction
Preconstruction
Preconstruction
Preconstruction
Preconstruction
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Design Development
Design Development
Design Development
Design Development
Design Development
P&Z Review
P&Z Review
P&Z Review
P&Z Review
P&Z Review
SD Estimate & Reconciliation
SD Estimate & Reconciliation
SD Estimate & Reconciliation
SD Estimate & Reconciliation
SD Estimate & Reconciliation
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Conservation Review Process
Conservation Review Process
Conservation Review Process
Conservation Review Process
Conservation Review Process
DD Estimate and Reconciliation
DD Estimate and Reconciliation
DD Estimate and Reconciliation
DD Estimate and Reconciliation
DD Estimate and Reconciliation
RTM DD Review and Approval
RTM DD Review and Approval
RTM DD Review and Approval
RTM DD Review and Approval
RTM DD Review and Approval
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Construction Documents
Construction Documents
Construction Documents
Construction Documents
Construction Documents
Traffic Permit
Traffic Permit
Traffic Permit
Traffic Permit
Traffic Permit
P&Z Approval
P&Z Approval
P&Z Approval
P&Z Approval
P&Z Approval
CT DEEP (Stormwater)
CT DEEP (Stormwater)
CT DEEP (Stormwater)
CT DEEP (Stormwater)
CT DEEP (Stormwater)
GC RFP Process/Bid Period
GC RFP Process/Bid Period
GC RFP Process/Bid Period
GC RFP Process/Bid Period
GC RFP Process/Bid Period
Building Permit
Building Permit
Building Permit
Building Permit
Building Permit
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
RTM Approval to Award
RTM Approval to Award
RTM Approval to Award
RTM Approval to Award
RTM Approval to Award
Submittals/Material Procurement
Submittals/Material Procurement
Submittals/Material Procurement
Submittals/Material Procurement
Submittals/Material Procurement
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submittals for Pool Equipment
Submittals for Pool Equipment
Submittals for Pool Equipment
Submittals for Pool Equipment
Submittals for Pool Equipment
Submit Steel AB Plans
Submit Steel AB Plans
Submit Steel AB Plans
Submit Steel AB Plans
Submit Steel AB Plans
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Sitework Submittals
Submit Sitework Submittals
Submit Sitework Submittals
Submit Sitework Submittals
Submit Sitework Submittals
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Electrical Switchgear
Submit Electrical Switchgear
Submit Electrical Switchgear
Submit Electrical Switchgear
Submit Electrical Switchgear
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Approve Sitework Submittals
Approve Sitework Submittals
Approve Sitework Submittals
Approve Sitework Submittals
Approve Sitework Submittals
MEP Coordination
MEP Coordination
MEP Coordination
MEP Coordination
MEP Coordination
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Major Equipment Procurement
Major Equipment Procurement
Major Equipment Procurement
Major Equipment Procurement
Major Equipment Procurement
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Construction
Construction
Construction
Construction
Construction
Site Prep/Utilities
Site Prep/Utilities
Site Prep/Utilities
Site Prep/Utilities
Site Prep/Utilities
Temporary Fence
Temporary Fence
Temporary Fence
Temporary Fence
Temporary Fence
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Erosion Control
Erosion Control
Erosion Control
Erosion Control
Erosion Control
Stripping Topsoil
Stripping Topsoil
Stripping Topsoil
Stripping Topsoil
Stripping Topsoil
Site rough grading
Site rough grading
Site rough grading
Site rough grading
Site rough grading
Sanitary Sewer Systems
Sanitary Sewer Systems
Sanitary Sewer Systems
Sanitary Sewer Systems
Sanitary Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Name
ID
Planned
Duration
Start
Finish

25-01-05
07-Jan-25 12:53 p.m.
Oswegatchie Fire Station 2
Current

Milestones
Progress
Summary
Critical
Date
Revision
Checked
Approved
07-Jan-25
Draft
Oswegatchie Fire Station 2
 Underground FP/Domestic Wat…
 B1110​
 Building Structural
 Structural​
 Foundation Excavation​
 B1020​
 FRP Foundation Footings​
 B1030​
 FRP Foundation Walls/Pier Foo…
 B1050​
 Foundation Backfill/Protection …
 B1140​
 Underground Plumbing​
 B1090​
 Underground Electrical​
 B1100​
 Prep for Slab-on-Grade​
 B1131​
 Place Concrete SOG​
 B5230​
 Building Envelope
 Envelope​
 Install Exterior CFMF/Sheathing​
 B1440​
 Roofing​
 B1435​
 Install Exterior AVB/Flashings …
 B1405​
 Install Veneer Masonry​
 B1410​
 Install Exterior finish​
 B1420​
 Windows & Glass​
 B1470​
 Install Exterior siding​
 B1425​
 Building Enclosed​
 B1510​
 Temporary Environmental Cont…
 A1060​
 Roofing Sheetmetal and Copings​
 B1480​
 Set HVAC Equipment​
 B1460​
 Rooftop HVAC Work​
 B1490​
 Power Feeds to Rooftop Equip…
 B1500​
 Interior Construction
 Interior​
 Interior Construction
 WBS11​
 Set Door Frames @ CMU Parti…
 B2090​
 Non-Bearing CMU Partitions​
 B2100​
 Install Plumbing Carriers/Wat…
 B2110​
 Fire Protection Mains/Branches​
 B2160​
 Overhead Ductwork/Boxes​
 B2140​
 Overhead HVAC Piping/Ceilin…
 B2180​
 Electrical Overhead Raceways…
 B2200​
 Slab Moisture Mitigation​
 B2480​
 Plumbing Waste & Vent​
 B2080​
 Inwall Electrical@LGMF/Branc…
 B2240​
 Plumbing Insulation​
 B2130​
 Install LGMF Partitions/w Doo…
 B2120​
 Masonry Chase Walls​
 B2150​
 Low Voltage Systems Rough​
 B2230​
 GWB Walls​
 B2260​
 HVAC Insulation​
 B2210​
 Frame LGMF Ceilings/Soffits/…
 B2270​
 Install Ceramic Tile Walls @ To…
 B2190​
 Tape/Sand Walls​
 B2290​
 Sheetrock @ GWB Ceilings/S…
 B2300​
 Tape/Sand GWB Ceilings/So…
 B2310​
 Install Plumbing Fixtures @ T…
 B2220​
 Epoxy Flooring​
 B5100​
 Prime & 1st Coat Paint​
 B2320​
 Install Acoustical Ceiling Grid​
 B2340​
 Install Light Fixtures​
 B2360​
 Install RGD's​
 B2350​
 Adjust Fire Protection Heads​
 B2330​
 Final Coat Paint​
 B2410​
 Hang Doors/Hardware​
 B2400​
 Install Toilet Partitions​
 B2250​
 Install LV System Devices/Fini…
 B2430​
 Install Misc Specialties​
 B2390​
 Install Wiring Devices/Light C…
 B2370​
 Install Millwork/Casework/Fin…
 B2380​
 Install Fire Alarm Devices​
 B2420​
 Final Above Ceiling Inspections​
 B2460​
 Padout Ceiling​
 B2470​
 Install Toilet Accessories​
 B2280​
 Install Flooring/Base​
 B2490​
 Pre-Punch/Broom Clean - Mai…
 B2500​
15d​
06-Aug-25​ 
26-Aug-25​ 
39d
14-Jul-25 
05-Sep-25 
5d​
14-Jul-25​ 
18-Jul-25​ 
10d​
21-Jul-25​ 
01-Aug-25​ 
15d​
28-Jul-25​ 
15-Aug-25​ 
8d​
18-Aug-25​ 
27-Aug-25​ 
10d​
18-Aug-25​ 
29-Aug-25​ 
5d​
25-Aug-25​ 
29-Aug-25​ 
2d​
02-Sep-25​ 
03-Sep-25​ 
2d​
04-Sep-25​ 
05-Sep-25​ 
151d
08-Sep-25 
14-Apr-26 
20d​
08-Sep-25​ 
03-Oct-25​ 
15d​
06-Oct-25​ 
27-Oct-25​ 
10d​
06-Oct-25​ 
20-Oct-25​ 
15d​
21-Oct-25​ 
10-Nov-25​ 
10d​
27-Oct-25​ 
07-Nov-25​ 
10d​
05-Nov-25​ 
19-Nov-25​ 
10d​
12-Nov-25​ 
25-Nov-25​ 
0d​
​ 
19-Nov-25​ 
15d​
20-Nov-25​ 
11-Dec-25​ 
10d​
26-Nov-25​ 
10-Dec-25​ 
10d​
24-Feb-26​ 
09-Mar-26​ 
20d​
03-Mar-26​ 
30-Mar-26​ 
10d​
31-Mar-26​ 
14-Apr-26​ 
108d
30-Oct-25 
03-Apr-26 
108d
30-Oct-25 
03-Apr-26 
5d​
30-Oct-25​ 
05-Nov-25​ 
15d​
30-Oct-25​ 
20-Nov-25​ 
15d​
06-Nov-25​ 
28-Nov-25​ 
15d​
14-Nov-25​ 
05-Dec-25​ 
25d​
14-Nov-25​ 
19-Dec-25​ 
20d​
14-Nov-25​ 
12-Dec-25​ 
10d​
14-Nov-25​ 
28-Nov-25​ 
10d​
21-Nov-25​ 
05-Dec-25​ 
20d​
21-Nov-25​ 
19-Dec-25​ 
15d​
01-Dec-25​ 
19-Dec-25​ 
10d​
01-Dec-25​ 
12-Dec-25​ 
10d​
08-Dec-25​ 
19-Dec-25​ 
10d​
15-Dec-25​ 
29-Dec-25​ 
10d​
22-Dec-25​ 
06-Jan-26​ 
15d​
22-Dec-25​ 
13-Jan-26​ 
8d​
22-Dec-25​ 
02-Jan-26​ 
8d​
23-Dec-25​ 
05-Jan-26​ 
10d​
05-Jan-26​ 
16-Jan-26​ 
10d​
05-Jan-26​ 
16-Jan-26​ 
3d​
06-Jan-26​ 
08-Jan-26​ 
4d​
08-Jan-26​ 
13-Jan-26​ 
10d​
19-Jan-26​ 
30-Jan-26​ 
10d​
19-Jan-26​ 
30-Jan-26​ 
10d​
19-Jan-26​ 
30-Jan-26​ 
10d​
20-Jan-26​ 
02-Feb-26​ 
10d​
21-Jan-26​ 
03-Feb-26​ 
5d​
28-Jan-26​ 
03-Feb-26​ 
3d​
29-Jan-26​ 
02-Feb-26​ 
15d​
02-Feb-26​ 
20-Feb-26​ 
15d​
02-Feb-26​ 
20-Feb-26​ 
5d​
02-Feb-26​ 
06-Feb-26​ 
5d​
02-Feb-26​ 
06-Feb-26​ 
5d​
02-Feb-26​ 
06-Feb-26​ 
10d​
02-Feb-26​ 
13-Feb-26​ 
15d​
02-Feb-26​ 
20-Feb-26​ 
5d​
02-Feb-26​ 
06-Feb-26​ 
2d​
04-Feb-26​ 
05-Feb-26​ 
10d​
06-Feb-26​ 
19-Feb-26​ 
3d​
09-Feb-26​ 
11-Feb-26​ 
25d​
23-Feb-26​ 
27-Mar-26​ 
5d​
30-Mar-26​ 
03-Apr-26​ 
2024
2025
2026
2027
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Building Structural
Building Structural
Building Structural
Building Structural
Building Structural
Foundation Excavation
Foundation Excavation
Foundation Excavation
Foundation Excavation
Foundation Excavation
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Underground Plumbing
Underground Plumbing
Underground Plumbing
Underground Plumbing
Underground Plumbing
Underground Electrical
Underground Electrical
Underground Electrical
Underground Electrical
Underground Electrical
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Place Concrete SOG
Place Concrete SOG
Place Concrete SOG
Place Concrete SOG
Place Concrete SOG
Building Envelope
Building Envelope
Building Envelope
Building Envelope
Building Envelope
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Roofing
Roofing
Roofing
Roofing
Roofing
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Veneer Masonry
Install Veneer Masonry
Install Veneer Masonry
Install Veneer Masonry
Install Veneer Masonry
Install Exterior finish
Install Exterior finish
Install Exterior finish
Install Exterior finish
Install Exterior finish
Windows & Glass
Windows & Glass
Windows & Glass
Windows & Glass
Windows & Glass
Install Exterior siding
Install Exterior siding
Install Exterior siding
Install Exterior siding
Install Exterior siding

Building Enclosed
Building Enclosed
Building Enclosed
Building Enclosed
Building Enclosed
Temporary Environmental Controls
Temporary Environmental Controls
Temporary Environmental Controls
Temporary Environmental Controls
Temporary Environmental Controls
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Set HVAC Equipment
Set HVAC Equipment
Set HVAC Equipment
Set HVAC Equipment
Set HVAC Equipment
Rooftop HVAC Work
Rooftop HVAC Work
Rooftop HVAC Work
Rooftop HVAC Work
Rooftop HVAC Work
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Slab Moisture Mitigation
Slab Moisture Mitigation
Slab Moisture Mitigation
Slab Moisture Mitigation
Slab Moisture Mitigation
Plumbing Waste & Vent
Plumbing Waste & Vent
Plumbing Waste & Vent
Plumbing Waste & Vent
Plumbing Waste & Vent
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Plumbing Insulation
Plumbing Insulation
Plumbing Insulation
Plumbing Insulation
Plumbing Insulation
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Masonry Chase Walls
Masonry Chase Walls
Masonry Chase Walls
Masonry Chase Walls
Masonry Chase Walls
Low Voltage Systems Rough
Low Voltage Systems Rough
Low Voltage Systems Rough
Low Voltage Systems Rough
Low Voltage Systems Rough
GWB Walls
GWB Walls
GWB Walls
GWB Walls
GWB Walls
HVAC Insulation
HVAC Insulation
HVAC Insulation
HVAC Insulation
HVAC Insulation
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Tape/Sand Walls
Tape/Sand Walls
Tape/Sand Walls
Tape/Sand Walls
Tape/Sand Walls
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Epoxy Flooring
Epoxy Flooring
Epoxy Flooring
Epoxy Flooring
Epoxy Flooring
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Light Fixtures
Install Light Fixtures
Install Light Fixtures
Install Light Fixtures
Install Light Fixtures
Install RGD's
Install RGD's
Install RGD's
Install RGD's
Install RGD's
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Final Coat Paint
Final Coat Paint
Final Coat Paint
Final Coat Paint
Final Coat Paint
Hang Doors/Hardware
Hang Doors/Hardware
Hang Doors/Hardware
Hang Doors/Hardware
Hang Doors/Hardware
Install Toilet Partitions
Install Toilet Partitions
Install Toilet Partitions
Install Toilet Partitions
Install Toilet Partitions
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install Misc Specialties
Install Misc Specialties
Install Misc Specialties
Install Misc Specialties
Install Misc Specialties
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Fire Alarm Devices
Install Fire Alarm Devices
Install Fire Alarm Devices
Install Fire Alarm Devices
Install Fire Alarm Devices
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Padout Ceiling
Padout Ceiling
Padout Ceiling
Padout Ceiling
Padout Ceiling
Install Toilet Accessories
Install Toilet Accessories
Install Toilet Accessories
Install Toilet Accessories
Install Toilet Accessories
Install Flooring/Base
Install Flooring/Base
Install Flooring/Base
Install Flooring/Base
Install Flooring/Base
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Name
ID
Planned
Duration
Start
Finish

25-01-05
07-Jan-25 12:53 p.m.
Oswegatchie Fire Station 2
Current

Milestones
Progress
Summary
Critical
Date
Revision
Checked
Approved
07-Jan-25
Draft
Oswegatchie Fire Station 2
 Site Improvements
 SI​
 Parking Lot​
 A1470​
 Site Concrete​
 A1475​
 Stormwater Detention Systems​
 A1480​
 Site Improvements Completion,…
 A1490​
 Site Signage​
 A1520​
 Closeout
 Close​
 Fire Alarm Ringout​
 B5000​
 Final Completion All Trades​
 B5040​
 Punchlist & Final Cleaning​
 B5050​
 HVAC Eqmt Startups​
 B5010​
 Testing, Balancing and Inspecti…
 B5030​
 Final Inspections & Substantial …
 B5060​
 Final Completion (O&Ms/Asbuil…
 B5080​
 Owner Move-In / Occupancy​
 B5070​
346d
07-Jan-25 
18-May-26 
30d​
07-Jan-25​ 
17-Feb-25​ 
25d​
12-Nov-25​ 
17-Dec-25​ 
10d​
26-Nov-25​ 
10-Dec-25​ 
50d​
02-Mar-26​ 
11-May-26​ 
5d​
12-May-26​ 
18-May-26​ 
109d
09-Feb-26 
13-Jul-26 
10d​
09-Feb-26​ 
20-Feb-26​ 
5d​
06-Apr-26​ 
13-Apr-26​ 
5d​
06-Apr-26​ 
13-Apr-26​ 
15d​
15-Apr-26​ 
05-May-26​ 
10d​
06-May-26​ 
19-May-26​ 
5d​
20-May-26​ 
27-May-26​ 
32d​
28-May-26​ 
13-Jul-26​ 
15d​
28-May-26​ 
17-Jun-26​ 
2024
2025
2026
2027
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Site Improvements
Site Improvements
Site Improvements
Site Improvements
Site Improvements
Parking Lot
Parking Lot
Parking Lot
Parking Lot
Parking Lot
Site Concrete
Site Concrete
Site Concrete
Site Concrete
Site Concrete
Stormwater Detention Systems
Stormwater Detention Systems
Stormwater Detention Systems
Stormwater Detention Systems
Stormwater Detention Systems
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Signage
Site Signage
Site Signage
Site Signage
Site Signage
Closeout
Closeout
Closeout
Closeout
Closeout
Fire Alarm Ringout
Fire Alarm Ringout
Fire Alarm Ringout
Fire Alarm Ringout
Fire Alarm Ringout
Final Completion All Trades
Final Completion All Trades
Final Completion All Trades
Final Completion All Trades
Final Completion All Trades
Punchlist & Final Cleaning
Punchlist & Final Cleaning
Punchlist & Final Cleaning
Punchlist & Final Cleaning
Punchlist & Final Cleaning
HVAC Eqmt Startups
HVAC Eqmt Startups
HVAC Eqmt Startups
HVAC Eqmt Startups
HVAC Eqmt Startups
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Name
ID
Planned
Duration
Start
Finish