Prepared by: Silver/Petrucelli + Associates, Inc. David Stein AIA Principal
Jan-25
Amended Exhibit C 1 Page
Anticpated Hard Construction Costs
8,000,000.00
$
$800/SF
PHASE I
Schematic Design
62,000.00
$
Design Development
110,344.00
$
sub-total
172,344.00
$
Phase II
Construction Documents
286,000.00
$
5.50% of construct
Bidding & Negotiations
22,000.00
$
Construction Administration
132,000.00
$
sub-total
440,000.00
$
440,000.00
$
Phase I & II
612,344.00
$
7.65% Total Fee
Added Allowances: As required
1
Traffic Engineering
17,500.00
$
42,500.00
$
2
Geotechnical Borings
11,500.00
$
35,000.00
$
3
Hazardous Material Testing
20,000.00
$
25,000.00
$
4
Boundary Survey
15,000.00
$
5
High Performance Builldings
10,000.00
$
25,000.00
$
142,500.00
$
Total Fee Sum
754,844.00
$
9.44%
AIA
® Document G802
® – 2017
Amendment to the Professional Services Agreement
AIA Document G802 – 2017. Copyright © 2000, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American
Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This
draft was produced at 12:15:28 ET on 01/13/2025 under Order No.4104246541 which expires on 02/28/2025, is not for resale, is licensed for
one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-
mail docinfo@aiacontracts.com.
User Notes:
(3B9ADA43)
1
PROJECT: (name and address)
AGREEMENT INFORMATION:
AMENDMENT INFORMATION:
Oswegatchie New Fire Station
441 Boston Post Road
Date: June 06, 2024
Amendment Number: 01
Waterford, CT 06226
Date: 01/13/2025
OWNER: (name and address)
ARCHITECT: (name and address)
Town of Waterford
Silver/Petrucelli + Associations, Inc
3190 Whitney Avenue
Hamden, CT 06518
15 Rope Ferry Road
The Owner and Architect amend the Agreement as follows:
Phase II: Construction Documentd, Bidding and Negotiation, and Construction Administration Services is being
itemized to fixed fee allocation. Construction Documents Only
Construction Documents: $286,000.00
Phase III: To be approved and determined at a later date
Bidding and Negotiations: $22,000.00
Construction Administration: $132,000.00
The Architect’s compensation and schedule shall be adjusted as follows:
Compensation Adjustment:
Construction Documents: $286,000.00 only
Schedule Adjustment:
Schedule remains as anticcpated to date.
SIGNATURES:
Silver/Petrucelli + Associates, Inc.
Town of Waterford
ARCHITECT (Firm name)
OWNER (Firm name)
SIGNATURE
SIGNATURE
David J. Stein, AIA Vice
President
Rob Brule First Selectman
PRINTED NAME AND TITLE
PRINTED NAME AND TITLE
01/13/2025
DATE
DATE
12/17/2024
WATERFORD OSWEGATCHIE FIRE STATION
ARCHITECTURAL UPDATE
Date: 11/25/2024 Time: 15:52 User: afay Style Table: Langan.stb Layout: Layout1 Document Code: 140286501-0501-CS101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24
Date: 11/25/2024 Time: 15:53 User: afay Style Table: Langan.stb Layout: Layout1 Document Code: 140286501-0501-CG101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24
Date: 11/25/2024 Time: 15:53 User: afay Style Table: Langan.stb Layout: Layout1 Document Code: 140286501-0501-CU101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24
Date: 11/25/2024 Time: 15:53 User: afay Style Table: Langan.stb Layout: Layout1 Document Code: 140286501-0501-CE101-0102
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24
Date: 11/25/2024 Time: 15:53 User: afay Style Table: Langan.stb Layout: Layout1 Document Code: 140286501-0501-CE101-0101
www.langan.com
555 Long Wharf Drive, 9th Floor
New Haven, CT 06511
T: 203.562.5771
F: 203.789.6142
Langan CT, Inc.
©
Langan
2024
PROGRESS
PRINT
11/25/24
ADJUSTED PROGRAM
ADJUSTED PROGRAM
E
E
E
E
UP
Range
DN
SYMBOL LEGEND
- NEW METAL STUD PARTITIONS
- DOOR NUMBER
- WINDOW TYPE
- ROOM NUMBER
- PARTITION TYPE
- CONSTRUCTION NOTE
1A
- ROOM NAME
- NEW MASONRY WALL
- NEW CMU WALL
- WALL SECTION NUMBER
- SHEET NUMBER
- FIRE EXTINGUISHER CABINET
F.E.C.
1.
READ ALL GENERAL NOTES ON DRAWING A001.
2.
CONTRACTORS SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS.
3.
ALL DIMENSIONS ARE TO OUTSIDE FACE OF BRICK, CONCRETE
MASONRY UNITS AND METAL FRAMING UNLESS OTHERWISE NOTED.
4.
ALL NEW WALL AND PARTITION ASSEMBLIES SHALL EXTEND TO
UNDERSIDE OF DECK UNLESS OTHERWISE NOTED.
5.
PROVIDE CMU WITH PRE-MANUFACTURED BULLNOSE AT ALL EXPOSED
CORNERS.
6.
WHERE THE WORD "ALIGN" IS INDICATED IT SHALL MEAN TO ALIGN BOTH
SIDES OF WALL.
- FLOOR DRAIN - SLOPE TO DRAIN
FD
Cxx
XX
A
101
- BUILDING SECTION NUMBER
- SHEET NUMBER
- EXTERIOR ELEVATION NUMBER
- SHEET NUMBER
2
- INTERIOR ELEVATION NUMBER
- SHEET NUMBER
- HANDICAPPED DRINKING FOUNTAIN
H.D.F.
GENERAL NOTES
A101
2
A101
Room name
101
2
A101
- CORNER GUARD
C.G.
2
A101
1
A400
2
A400
1
A401
2
A401
4
A420
78 SF
SPRINKLER
3996 SF
APPARATUS BAYS
143 SF
SCBA
78 SF
ELEC
123 SF
GEAR WASH
108 SF
DECON
67 SF
LAUNDRY
67 SF
RR
208 SF
CIRC
97 SF
RR
97 SF
RR
490 SF
TRAINING
447 SF
CIRC
90 SF
DATA
37 SF
VESTIBULE
193 SF
OFD
119 SF
OFFICE
192 SF
EXERCISE
SCBA TANK
RACK
AIR
COMPRESSOR
GEAR
WASHER
GEAR DRYER
5'-0"
54'-0"
10'-8"
7'-4"
8'-0"
9'-4"
20'-0"
20'-1"
13'-6"
5'-0"
7'-6"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
5'-4"
5'-0"
11'-4"
5'-0"
5'-0"
666 SF
DAY ROOM
47 SF
STOR
42 SF
PANTRY
10'-0"
10'-8"
8'-0"
153 SF
GEAR LOCKER
164 SF
WORK BENCH
54 SF
JANITOR
57 SF
RR
209 SF
BUNK
209 SF
BUNK
209 SF
BUNK
85 SF
CIRC
9'-8"
9'-8"
9'-8"
21'-7"
4'-7"
55 SF
STOR
7'-6"
12'-0"
7'-4"
74'-0"
9'-2"
9'-2"
11'-2"
28'-6"
127'-9"
76'-9"
7'-3"
22'-4"
1'-6"
9'-7"
5'-0" 3'-4"
7'-0"
3'-4"
7'-0"
3'-4"
7'-0"
3'-4"
7'-0"
3'-4" 5'-4" 2'-0"
M.O.
3'-4"
14'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
3'-4"
1'-4"
M.O.
13'-4"
62'-0"
8'-6"
17'-11"
17'-1"
23'-6"
5'-0"
5'-2"
9'-0"
6'-2"
6'-4"
3'-2"
M.O.
3'-4"
M.O.
26'-8"
M.O.
18'-0"
M.O.
18'-0"
3'-4"
Department Legend
Assembly
Business
Residential
Storage
3
A421
296 SF
STORAGE
245 SF
MECH
16'-0"
15'-4"
19'-4"
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
As indicated
12/16/2024 2:31:54 PM
A113
FLOOR PLANS
EAC
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
N
CONSTRUCTION NOTES - PLAN
1
CONTINUOUS TRENCH DRAIN AT 1.5" BELOW MAIN LEVEL (0'-0") - ONE PER
APPARATUS BAY; REFER TO PLUMBING AND STRUCTURAL DRAWINGS.
2
FIRE EXTINGUISHER TO SIT WITHIN KITCHEN CASEWORK
3
WALL MOUNTED NETWORK CABINET; REFER TO ELECTRICAL
3/16" = 1'-0"
1
FIRST FLOOR PLAN
ACCENT (2)
12” X 24” LUXURY VINYL TILE - ACCENT
WALL PAINT PALETTE
Floor Tile
GENERAL:
METAL DOOR
FRAMES AND DOORS:
LVT-6” X48” @ CORRIDOR:
ACCENT:
RUBBER
BASE
INTERIOR FINISHES
CARPET TILE:
RUBBER SPORTS FLOORING:
LAY-IN CEILING TILE:
WOOD DOOR FINISH:
Floor Tile
INTERIOR FINISHES
WALL FINISH: PALETTE
STAINLESS STEEL
COUNTERTOP:
BACKSPLASH:
GENERAL:
ACCENT:
SHEET FLOORING:
PLASTIC LAMINATE
BASE CABINETRY:
WOOD DOOR FINISH:
GENERAL:
METAL DOOR
FRAMES AND DOORS:
ACCENT:
LVT-6” X48”:
LVT PATTERN::
FURNITURE EXAMPLES:
INTERIOR FINISHES
CARPET TILE (CPT):
LVT OPTIONS:
RUBBER FLOORING (RSF):
CONCRETE (SC):
FLOOR TILE (PFT):
EPOXY FLOORING (EPX):
LVT-1
LVT-2
CPT
EPX
RCP SYMBOL LEGEND
- ROOM NUMBER
ROOM NAME
101
- ROOM NAME
1.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS.
2.
ALL DIMENSIONS ARE TO FINISH FACE OF METAL/WOOD STUD WALL,
CONCRETE OR MASONRY UNLESS OTHERWISE NOTED.
3.
REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND
FIRE PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION -
IMMEDIATELY NOTIFY ARCHITECT OF ANY DISCREPANCIES IN PLANS.
4.
ALL CEILING GRIDS ARE TO BE CENTERED IN BOTH DIRECTIONS, AS
INDICATED, UNLESS OTHERWISE NOTED.
5.
PROVIDE NON-HARDENING, ACOUSTICAL SEALANT AT ALL NON-FIRE
RATED PENETRATIONS THROUGH GYPSUM CEILINGS.
6.
ALL EXPOSED SPRINKLERS, DUCTWORK, AND HYDRONIC PIPING OT BE
PAINTED (COLOR TO BE SELECTED BY OWNER AND ARCHITECT)
7.
ALL NEW INTERIOR WALL ASSEMBLIES SHALL EXTEND TO UNDERSIDE
OF DECK UNLESS OTHERWISE NOTED.
- CEILING HEIGHT
(10'-0")
GENERAL NOTES
- 2' X 2' ACOUSTICAL CEILING TILES & GRID W/
SUPPORTS
- PAINTED GYPSUM BOARD CEILING
- EXIT SIGN, REFER TO ELECTRICAL DRAWINGS
- RECESSED LIGHT FIXTURES
REFER TO ELECTRICAL DRAWINGS
- 2' X 2' LIGHT FIXTURE
REFER TO ELECTRICAL DRAWINGS
- PENDENT STYLE LIGHT FIXTURE
REFER TO ELECTRICAL DRAWINGS
- SUPPLY DIFFUSER
REFER TO MECHANICAL DRAWINGS
- RETURN DIFFUSER
REFER TO MECHANICAL DRAWINGS
- CONCEALED SPINKLER HEAD
REFER TO FIRE PROTECTION DRAWINGS
- EXPOSED SPINKLER HEAD
REFER TO FIRE PROTECTION DRAWINGS
- CONSTRUCTION NOTE
- PLAN/SECTION/DETAIL NUMBER
- SHEET NUMBER
Cxx
1
A101
SIM
ACT-1
14' - 0"
- CEILING FINISH
- CEILING HEIGHT
REFER TO PROJECT
MANUAL FOR SCHEDULE
OF FINISHES
CEILING TYPES
- 2' X 2' ACOUSTICAL CEILING TILES & GRID
W/ SUPPORTS
1
- PAINTED GWB CEILING
2
- EXPOSED DECK; STRUCTURE & UTILITIES
ABOVE
3
490 SF
TRAINING
90 SF
DATA
67 SF
LAUNDRY
67 SF
RR
97 SF
RR
97 SF
RR
447 SF
CIRC
208 SF
CIRC
119 SF
OFFICE
193 SF
OFD
192 SF
EXERCISE
55 SF
STOR
209 SF
BUNK
209 SF
BUNK
209 SF
BUNK
666 SF
DAY ROOM
42 SF
PANTRY
47 SF
STOR
78 SF
SPRINKLER
78 SF
ELEC
164 SF
WORK BENCH
54 SF
JANITOR
57 SF
RR
85 SF
CIRC
153 SF
GEAR LOCKER
108 SF
DECON
123 SF
GEAR WASH
143 SF
SCBA
3996 SF
APPARATUS BAYS
37 SF
VESTIBULE
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
As indicated
12/16/2024 2:34:27 PM
A211
FIRST FLOOR CEILING PLAN
Author
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
CONSTRUCTION NOTES - RCP
1
ALL EXPOSED STRUCTURE INCLUDING METAL DECKING, BEAMS, COLUMNS,
ANGLES, ETC. TO BE PAINTED (COLOR TO BE SELECTED BY OWNER AND
ARCHITECT)
3/16" = 1'-0"
1
FIRST FLOOR RCP
N
MECHANICAL AREAS
MECHANICAL AREAS
MECHANICAL AREAS
EXTERIOR FINISHES
EXTERIOR FINISHES
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
2
A400
1
A401
2
A401
1'-8"
4'-0"
6 1/2"
23'-5 5/8"
5'-0"
5'-2"
9'-0"
6'-1 7/8"
6'-4"
3'-1 3/8"
M.O.
3'-4 5/8"
12'-8 1/8"
M.O.
14'-0"
M.O.
18'-0"
M.O.
18'-0 3/8"
3'-4"
16'-5 1/2"
6'-4 7/8"
6"
8'-4"
4"
2'-8"
34'-8 1/4"
12'-9 5/8"
3'-0 1/4"
1'-5 7/8"
8'-3 3/4"
6"
2'-8"
5'-6 3/8"
55'-2"
75'-2"
130'-4"
9'-0"
ARCHITECTURAL ASPHALT
SHINGLES
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS;
CONNECT TO STORM
DRAINAGE
FIBER CEMENT LAP SIDING
RUNNING BOND COLONIAL BRICK
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
ARCHITECTURAL ASPHALT
SHINGLES
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS;
CONNECT TO STORM
DRAINAGE
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
4
5
6
3
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
2
A400
1
A401
2
A401
1'-8"
4'-1"
6"
5'-0"
3'-4"
7'-0"
3'-4"
7'-1"
3'-4"
7'-0"
3'-4"
7'-0"
3'-4"
5'-4"
2'-0"
M.O.
3'-4"
14'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
4'-0"
M.O.
14'-0"
3'-4"
12'-10"
3'-0"
1'-6"
8'-4"
6"
2'-8"
5'-11"
16'-5"
6'-3"
8"
8'-2"
2"
4"
2'-8"
5'-8"
55'-2"
75'-2"
34'-8"
ARCHITECTURAL ASPHALT
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS;
CONNECT TO STORM
DRAINAGE
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
ARCHITECTURAL ASPHALT
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS;
CONNECT TO STORM
DRAINAGE
FIBER CEMENT LAP SIDING
RUNNING BOND COLONIAL BRICK
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
4
5
6
3
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
3/16" = 1'-0"
12/16/2024 3:34:45 PM
A300
EXTERIOR ELEVATIONS
EAC
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
3/16" = 1'-0"
2
NORTH ELEVATION - OPTION 1
3/16" = 1'-0"
1
SOUTH ELEVATION - OPTION 1
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
1
A400
9'-0"
1'-4"
13'-4"
55'-6"
6'-6"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
20'-8"
20'-8"
8'-4"
8'-4"
ARCHITECTURAL ASPHALT
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS;
CONNECT TO STORM DRAINAGE
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
BUILDING SIGNAGE
7
13
10
9
12
11
8
16'-5 3/4"
1'-4"
4'-0 5/8"
8"
9'-2"
4"
2'-8"
34'-8 3/8"
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
1
A400
4'-7"
6'-9 1/2"
1'-8"
2'-10 3/8"
5'-0"
2'-10 1/8"
1'-8"
9 1/2"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
6'-7"
3'-4"
7'-5 1/2"
ARCHITECTURAL ASPHALT
SHINGLES
PHOTOVOLTAIC PANELS
5" GUTTER; TYP.
ALUMINUM DOWN SPOUTS;
CONNECT TO STORM
DRAINAGE
FIBER CEMENT LAP SIDING
FIBER CEMENT PANEL SIDING
RUNNING BOND COLONIAL BRICK
WITH 6" METAL STUD BACKUP
CAST STONE SILL BAND
BUILDING SIGNAGE
7
13
10
9
12
11
8
16'-5 3/4"
1'-4"
3'-7"
1'-4"
5 5/8"
8'-6"
4"
2'-8"
34'-8 3/8"
3/16" = 1'-0"
1
EAST ELEVATION - OPTION 1
3/16" = 1'-0"
2
WEST ELEVATION - OPTION 1
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
3/16" = 1'-0"
12/16/2024 3:34:56 PM
A301
EXTERIOR ELEVATIONS
EAC
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
2
A400
1
A401
2
A401
4
5
6
3
490 SF
TRAINING
55 SF
STOR
67 SF
LAUNDRY
97 SF
RR
85 SF
CIRC
3996 SF
APPARATUS BAYS
FIRST FLOOR LEVEL
0' - 0"
BASE OF ROOF /
MEZZANINE
12' - 0"
TOP OF ROOF
34' - 8 3/8"
1
A400
7
13
10
9
12
11
8
Drawing Title:
Revised By:
Date:
Description:
Revision:
Project Title:
Date:
Scale:
Drawn By:
Project Number:
Drawing Number:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
Project Phase:
State Project Number:
3/16" = 1'-0"
12/16/2024 3:34:58 PM
A400
BUILDING SECTIONS
Author
23.352
12/17/2024
OSWEGATCHIE FIRE STATION
441 BOSTON POST RD
WATERFORD, CT 06385
NEW CONSTRUCTION
DESIGN DEVELOPMENT
3/16" = 1'-0"
1
Section 1
3/16" = 1'-0"
2
Section 2
25-01-05
07-Jan-25 12:53 p.m.
Oswegatchie Fire Station 2
Current
Milestones
Progress
Summary
Critical
Date
Revision
Checked
Approved
07-Jan-25
Draft
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
25-01-05
Milestone
Mile
GC Notice to Proceed, Mobilization
M100
TCO/Substantial Completion
M900
Owner Occupancy
M990
Project Complete
M995
Preconstruction
Precon
Phase 1 Environmental Assessm…
P1010
Schematic Design
P1000
Design Development
P1080
P&Z Review
P1090
SD Estimate & Reconciliation
P1180
Phase 2 Environmental Soil Char…
P1030
Conservation Review Process
P1260
DD Estimate and Reconciliation
P1100
RTM DD Review and Approval
P1170
Value Management & Plan Adjus…
P1060
Construction Documents
P1110
Traffic Permit
P1150
P&Z Approval
P1270
CT DEEP (Stormwater)
P1230
GC RFP Process/Bid Period
P1250
Building Permit
P1210
Scope Reviews and Recommend…
P1220
RTM Approval to Award
P1240
Submittals/Material Procurement
Submit
Site Logistics and Start Up Subm…
S1001
Submit Steel & Joist shop drawings S1045
Submittals for Pool Equipment
S1000
Submit Steel AB Plans
S1015
Submit Roof Insulation Shop Dra…
S1040
Submit Major Electrical Submittals
S1060
Submit Finishes and Specialty M…
S1050
Submit Aluminum Window Shop…
S1055
Submit Sitework Submittals
S1005
Submit Rebar Shop Drawings
S1010
Submit Major Mechanical Equip…
S1030
Submit Doors Frames and Hard…
X1175
Submit Electrical Switchgear
S1025
Approve Foundation Rebar Shop…
S1070
Fabricate and Delivery Concrete …
S1085
Steel AB Fab & Deliver
S1065
Approve Sitework Submittals
S1035
MEP Coordination
S1020
Approve Major Mechanical Equi…
S1110
Approve Doors, Frames and Har…
S1075
Approve Aluminum Window Sho…
S1115
Approve Finishes and Specialty I…
S1120
Major Equipment Procurement
S1150
Finalize Steel Shop Drawings an…
S1135
Electrical Switchgear Procurement
S1125
Approve Structural Steel & Deck…
S1130
Fabricate and Delivery Aluminu…
S1145
Approve Major Electrical Submitt…
S1140
Fabricate & Delivery Struct Steel,…
S1155
Fabricate and Deliver Doors & H…
S1105
Fabricate and Delivery Door Fra…
S1100
Procure Finishes and Specilaty M…
S1160
Construction
Cons
Site Prep/Utilities
Site1
Temporary Fence
A1070
Clearing and Grubbing
A1000
Erosion Control
A1010
Stripping Topsoil
A1050
Site rough grading
A1510
Sanitary Sewer Systems
A1020
Storm Water Sewer Systems
A1500
1,153d
01-Apr-24 A
13-Jul-26
278d
06-Jun-25
13-Jul-26
0d
06-Jun-25
0d
27-May-26
0d
17-Jun-26
0d
13-Jul-26
880d
01-Apr-24 A
12-Jun-25
16d
01-Apr-24 A
30-Apr-24 A
180d
03-Jun-24 A
24-Sep-24 A
120d
04-Nov-24 A
21-Jan-25
78d
11-Nov-24 A
10-Mar-25
20d
20-Dec-24 A
27-Jan-25
45d
07-Jan-25
10-Mar-25
30d
07-Jan-25
17-Feb-25
20d
22-Jan-25
18-Feb-25
5d
18-Feb-25
24-Feb-25
10d
19-Feb-25
04-Mar-25
45d
19-Feb-25
23-Apr-25
20d
25-Feb-25
24-Mar-25
5d
11-Mar-25
17-Mar-25
40d
11-Mar-25
06-May-25
25d
24-Apr-25
29-May-25
30d
24-Apr-25
05-Jun-25
5d
30-May-25
05-Jun-25
5d
06-Jun-25
12-Jun-25
277d
25-Mar-25
28-Apr-26
10d
25-Mar-25
07-Apr-25
35d
13-Jun-25
01-Aug-25
20d
13-Jun-25
11-Jul-25
10d
13-Jun-25
26-Jun-25
10d
13-Jun-25
26-Jun-25
40d
13-Jun-25
08-Aug-25
60d
13-Jun-25
08-Sep-25
30d
13-Jun-25
25-Jul-25
20d
13-Jun-25
11-Jul-25
10d
13-Jun-25
26-Jun-25
25d
13-Jun-25
18-Jul-25
26d
13-Jun-25
21-Jul-25
35d
13-Jun-25
01-Aug-25
5d
27-Jun-25
03-Jul-25
10d
07-Jul-25
18-Jul-25
10d
14-Jul-25
25-Jul-25
15d
14-Jul-25
01-Aug-25
66d
21-Jul-25
22-Oct-25
10d
21-Jul-25
01-Aug-25
20d
22-Jul-25
18-Aug-25
10d
28-Jul-25
08-Aug-25
60d
28-Jul-25
21-Oct-25
140d
04-Aug-25
23-Feb-26
10d
04-Aug-25
15-Aug-25
185d
04-Aug-25
28-Apr-26
5d
04-Aug-25
08-Aug-25
60d
11-Aug-25
04-Nov-25
10d
11-Aug-25
22-Aug-25
45d
18-Aug-25
21-Oct-25
65d
19-Aug-25
20-Nov-25
50d
19-Aug-25
29-Oct-25
20d
22-Oct-25
19-Nov-25
385d
07-Jan-25
13-Jul-26
57d
06-Jun-25
26-Aug-25
3d
06-Jun-25
10-Jun-25
3d
11-Jun-25
13-Jun-25
2d
12-Jun-25
13-Jun-25
1d
16-Jun-25
16-Jun-25
2d
17-Jun-25
18-Jun-25
20d
17-Jun-25
15-Jul-25
15d
16-Jul-25
05-Aug-25
2024
2025
2026
2027
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Oswegatchie Fire Station 2
Milestone
Milestone
Milestone
Milestone
Milestone
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
GC Notice to Proceed, Mobilization
TCO/Substantial Completion
TCO/Substantial Completion
TCO/Substantial Completion
TCO/Substantial Completion
TCO/Substantial Completion
Owner Occupancy
Owner Occupancy
Owner Occupancy
Owner Occupancy
Owner Occupancy
Project Complete
Project Complete
Project Complete
Project Complete
Project Complete
Preconstruction
Preconstruction
Preconstruction
Preconstruction
Preconstruction
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Phase 1 Environmental Assessment
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Schematic Design
Design Development
Design Development
Design Development
Design Development
Design Development
P&Z Review
P&Z Review
P&Z Review
P&Z Review
P&Z Review
SD Estimate & Reconciliation
SD Estimate & Reconciliation
SD Estimate & Reconciliation
SD Estimate & Reconciliation
SD Estimate & Reconciliation
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Phase 2 Environmental Soil Characterization
Conservation Review Process
Conservation Review Process
Conservation Review Process
Conservation Review Process
Conservation Review Process
DD Estimate and Reconciliation
DD Estimate and Reconciliation
DD Estimate and Reconciliation
DD Estimate and Reconciliation
DD Estimate and Reconciliation
RTM DD Review and Approval
RTM DD Review and Approval
RTM DD Review and Approval
RTM DD Review and Approval
RTM DD Review and Approval
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Value Management & Plan Adjustements
Construction Documents
Construction Documents
Construction Documents
Construction Documents
Construction Documents
Traffic Permit
Traffic Permit
Traffic Permit
Traffic Permit
Traffic Permit
P&Z Approval
P&Z Approval
P&Z Approval
P&Z Approval
P&Z Approval
CT DEEP (Stormwater)
CT DEEP (Stormwater)
CT DEEP (Stormwater)
CT DEEP (Stormwater)
CT DEEP (Stormwater)
GC RFP Process/Bid Period
GC RFP Process/Bid Period
GC RFP Process/Bid Period
GC RFP Process/Bid Period
GC RFP Process/Bid Period
Building Permit
Building Permit
Building Permit
Building Permit
Building Permit
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
Scope Reviews and Recommendation to Award
RTM Approval to Award
RTM Approval to Award
RTM Approval to Award
RTM Approval to Award
RTM Approval to Award
Submittals/Material Procurement
Submittals/Material Procurement
Submittals/Material Procurement
Submittals/Material Procurement
Submittals/Material Procurement
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Site Logistics and Start Up Submittals
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submit Steel & Joist shop drawings
Submittals for Pool Equipment
Submittals for Pool Equipment
Submittals for Pool Equipment
Submittals for Pool Equipment
Submittals for Pool Equipment
Submit Steel AB Plans
Submit Steel AB Plans
Submit Steel AB Plans
Submit Steel AB Plans
Submit Steel AB Plans
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Roof Insulation Shop Drawings
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Major Electrical Submittals
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Finishes and Specialty Materials
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Aluminum Window Shop Drawings
Submit Sitework Submittals
Submit Sitework Submittals
Submit Sitework Submittals
Submit Sitework Submittals
Submit Sitework Submittals
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Rebar Shop Drawings
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Major Mechanical Equipment
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Doors Frames and Hardware Submittals
Submit Electrical Switchgear
Submit Electrical Switchgear
Submit Electrical Switchgear
Submit Electrical Switchgear
Submit Electrical Switchgear
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Approve Foundation Rebar Shop Drawings
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Fabricate and Delivery Concrete Rebar
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Steel AB Fab & Deliver
Approve Sitework Submittals
Approve Sitework Submittals
Approve Sitework Submittals
Approve Sitework Submittals
Approve Sitework Submittals
MEP Coordination
MEP Coordination
MEP Coordination
MEP Coordination
MEP Coordination
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Major Mechanical Equipment
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Doors, Frames and Hardware Submittals
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Aluminum Window Shop Drawings
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Approve Finishes and Specialty Items
Major Equipment Procurement
Major Equipment Procurement
Major Equipment Procurement
Major Equipment Procurement
Major Equipment Procurement
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Finalize Steel Shop Drawings and Calculations
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Electrical Switchgear Procurement
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Approve Structural Steel & Deck/Joists
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Fabricate and Delivery Aluminum Windows
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Approve Major Electrical Submittals
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate & Delivery Struct Steel, Joist/Dec
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Deliver Doors & Hardware
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Fabricate and Delivery Door Frames
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Procure Finishes and Specilaty Materials
Construction
Construction
Construction
Construction
Construction
Site Prep/Utilities
Site Prep/Utilities
Site Prep/Utilities
Site Prep/Utilities
Site Prep/Utilities
Temporary Fence
Temporary Fence
Temporary Fence
Temporary Fence
Temporary Fence
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Clearing and Grubbing
Erosion Control
Erosion Control
Erosion Control
Erosion Control
Erosion Control
Stripping Topsoil
Stripping Topsoil
Stripping Topsoil
Stripping Topsoil
Stripping Topsoil
Site rough grading
Site rough grading
Site rough grading
Site rough grading
Site rough grading
Sanitary Sewer Systems
Sanitary Sewer Systems
Sanitary Sewer Systems
Sanitary Sewer Systems
Sanitary Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Storm Water Sewer Systems
Name
ID
Planned
Duration
Start
Finish
25-01-05
07-Jan-25 12:53 p.m.
Oswegatchie Fire Station 2
Current
Milestones
Progress
Summary
Critical
Date
Revision
Checked
Approved
07-Jan-25
Draft
Oswegatchie Fire Station 2
Underground FP/Domestic Wat…
B1110
Building Structural
Structural
Foundation Excavation
B1020
FRP Foundation Footings
B1030
FRP Foundation Walls/Pier Foo…
B1050
Foundation Backfill/Protection …
B1140
Underground Plumbing
B1090
Underground Electrical
B1100
Prep for Slab-on-Grade
B1131
Place Concrete SOG
B5230
Building Envelope
Envelope
Install Exterior CFMF/Sheathing
B1440
Roofing
B1435
Install Exterior AVB/Flashings …
B1405
Install Veneer Masonry
B1410
Install Exterior finish
B1420
Windows & Glass
B1470
Install Exterior siding
B1425
Building Enclosed
B1510
Temporary Environmental Cont…
A1060
Roofing Sheetmetal and Copings
B1480
Set HVAC Equipment
B1460
Rooftop HVAC Work
B1490
Power Feeds to Rooftop Equip…
B1500
Interior Construction
Interior
Interior Construction
WBS11
Set Door Frames @ CMU Parti…
B2090
Non-Bearing CMU Partitions
B2100
Install Plumbing Carriers/Wat…
B2110
Fire Protection Mains/Branches
B2160
Overhead Ductwork/Boxes
B2140
Overhead HVAC Piping/Ceilin…
B2180
Electrical Overhead Raceways…
B2200
Slab Moisture Mitigation
B2480
Plumbing Waste & Vent
B2080
Inwall Electrical@LGMF/Branc…
B2240
Plumbing Insulation
B2130
Install LGMF Partitions/w Doo…
B2120
Masonry Chase Walls
B2150
Low Voltage Systems Rough
B2230
GWB Walls
B2260
HVAC Insulation
B2210
Frame LGMF Ceilings/Soffits/…
B2270
Install Ceramic Tile Walls @ To…
B2190
Tape/Sand Walls
B2290
Sheetrock @ GWB Ceilings/S…
B2300
Tape/Sand GWB Ceilings/So…
B2310
Install Plumbing Fixtures @ T…
B2220
Epoxy Flooring
B5100
Prime & 1st Coat Paint
B2320
Install Acoustical Ceiling Grid
B2340
Install Light Fixtures
B2360
Install RGD's
B2350
Adjust Fire Protection Heads
B2330
Final Coat Paint
B2410
Hang Doors/Hardware
B2400
Install Toilet Partitions
B2250
Install LV System Devices/Fini…
B2430
Install Misc Specialties
B2390
Install Wiring Devices/Light C…
B2370
Install Millwork/Casework/Fin…
B2380
Install Fire Alarm Devices
B2420
Final Above Ceiling Inspections
B2460
Padout Ceiling
B2470
Install Toilet Accessories
B2280
Install Flooring/Base
B2490
Pre-Punch/Broom Clean - Mai…
B2500
15d
06-Aug-25
26-Aug-25
39d
14-Jul-25
05-Sep-25
5d
14-Jul-25
18-Jul-25
10d
21-Jul-25
01-Aug-25
15d
28-Jul-25
15-Aug-25
8d
18-Aug-25
27-Aug-25
10d
18-Aug-25
29-Aug-25
5d
25-Aug-25
29-Aug-25
2d
02-Sep-25
03-Sep-25
2d
04-Sep-25
05-Sep-25
151d
08-Sep-25
14-Apr-26
20d
08-Sep-25
03-Oct-25
15d
06-Oct-25
27-Oct-25
10d
06-Oct-25
20-Oct-25
15d
21-Oct-25
10-Nov-25
10d
27-Oct-25
07-Nov-25
10d
05-Nov-25
19-Nov-25
10d
12-Nov-25
25-Nov-25
0d
19-Nov-25
15d
20-Nov-25
11-Dec-25
10d
26-Nov-25
10-Dec-25
10d
24-Feb-26
09-Mar-26
20d
03-Mar-26
30-Mar-26
10d
31-Mar-26
14-Apr-26
108d
30-Oct-25
03-Apr-26
108d
30-Oct-25
03-Apr-26
5d
30-Oct-25
05-Nov-25
15d
30-Oct-25
20-Nov-25
15d
06-Nov-25
28-Nov-25
15d
14-Nov-25
05-Dec-25
25d
14-Nov-25
19-Dec-25
20d
14-Nov-25
12-Dec-25
10d
14-Nov-25
28-Nov-25
10d
21-Nov-25
05-Dec-25
20d
21-Nov-25
19-Dec-25
15d
01-Dec-25
19-Dec-25
10d
01-Dec-25
12-Dec-25
10d
08-Dec-25
19-Dec-25
10d
15-Dec-25
29-Dec-25
10d
22-Dec-25
06-Jan-26
15d
22-Dec-25
13-Jan-26
8d
22-Dec-25
02-Jan-26
8d
23-Dec-25
05-Jan-26
10d
05-Jan-26
16-Jan-26
10d
05-Jan-26
16-Jan-26
3d
06-Jan-26
08-Jan-26
4d
08-Jan-26
13-Jan-26
10d
19-Jan-26
30-Jan-26
10d
19-Jan-26
30-Jan-26
10d
19-Jan-26
30-Jan-26
10d
20-Jan-26
02-Feb-26
10d
21-Jan-26
03-Feb-26
5d
28-Jan-26
03-Feb-26
3d
29-Jan-26
02-Feb-26
15d
02-Feb-26
20-Feb-26
15d
02-Feb-26
20-Feb-26
5d
02-Feb-26
06-Feb-26
5d
02-Feb-26
06-Feb-26
5d
02-Feb-26
06-Feb-26
10d
02-Feb-26
13-Feb-26
15d
02-Feb-26
20-Feb-26
5d
02-Feb-26
06-Feb-26
2d
04-Feb-26
05-Feb-26
10d
06-Feb-26
19-Feb-26
3d
09-Feb-26
11-Feb-26
25d
23-Feb-26
27-Mar-26
5d
30-Mar-26
03-Apr-26
2024
2025
2026
2027
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Underground FP/Domestic Water Line
Building Structural
Building Structural
Building Structural
Building Structural
Building Structural
Foundation Excavation
Foundation Excavation
Foundation Excavation
Foundation Excavation
Foundation Excavation
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
FRP Foundation Walls/Pier Footings
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Foundation Backfill/Protection Board
Underground Plumbing
Underground Plumbing
Underground Plumbing
Underground Plumbing
Underground Plumbing
Underground Electrical
Underground Electrical
Underground Electrical
Underground Electrical
Underground Electrical
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Prep for Slab-on-Grade
Place Concrete SOG
Place Concrete SOG
Place Concrete SOG
Place Concrete SOG
Place Concrete SOG
Building Envelope
Building Envelope
Building Envelope
Building Envelope
Building Envelope
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Install Exterior CFMF/Sheathing
Roofing
Roofing
Roofing
Roofing
Roofing
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Exterior AVB/Flashings @ Exterior
Install Veneer Masonry
Install Veneer Masonry
Install Veneer Masonry
Install Veneer Masonry
Install Veneer Masonry
Install Exterior finish
Install Exterior finish
Install Exterior finish
Install Exterior finish
Install Exterior finish
Windows & Glass
Windows & Glass
Windows & Glass
Windows & Glass
Windows & Glass
Install Exterior siding
Install Exterior siding
Install Exterior siding
Install Exterior siding
Install Exterior siding
Building Enclosed
Building Enclosed
Building Enclosed
Building Enclosed
Building Enclosed
Temporary Environmental Controls
Temporary Environmental Controls
Temporary Environmental Controls
Temporary Environmental Controls
Temporary Environmental Controls
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Roofing Sheetmetal and Copings
Set HVAC Equipment
Set HVAC Equipment
Set HVAC Equipment
Set HVAC Equipment
Set HVAC Equipment
Rooftop HVAC Work
Rooftop HVAC Work
Rooftop HVAC Work
Rooftop HVAC Work
Rooftop HVAC Work
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Power Feeds to Rooftop Equipment
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Interior Construction
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Set Door Frames @ CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Non-Bearing CMU Partitions
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Install Plumbing Carriers/Water Supply Lines
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Fire Protection Mains/Branches
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead Ductwork/Boxes
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Overhead HVAC Piping/Ceiling Eqmt
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Electrical Overhead Raceways/Conduits/Panelboard Tubs
Slab Moisture Mitigation
Slab Moisture Mitigation
Slab Moisture Mitigation
Slab Moisture Mitigation
Slab Moisture Mitigation
Plumbing Waste & Vent
Plumbing Waste & Vent
Plumbing Waste & Vent
Plumbing Waste & Vent
Plumbing Waste & Vent
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Inwall Electrical@LGMF/Branch Wiring
Plumbing Insulation
Plumbing Insulation
Plumbing Insulation
Plumbing Insulation
Plumbing Insulation
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Install LGMF Partitions/w Door Frames
Masonry Chase Walls
Masonry Chase Walls
Masonry Chase Walls
Masonry Chase Walls
Masonry Chase Walls
Low Voltage Systems Rough
Low Voltage Systems Rough
Low Voltage Systems Rough
Low Voltage Systems Rough
Low Voltage Systems Rough
GWB Walls
GWB Walls
GWB Walls
GWB Walls
GWB Walls
HVAC Insulation
HVAC Insulation
HVAC Insulation
HVAC Insulation
HVAC Insulation
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Frame LGMF Ceilings/Soffits/Fascias
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Install Ceramic Tile Walls @ Toilet Rooms
Tape/Sand Walls
Tape/Sand Walls
Tape/Sand Walls
Tape/Sand Walls
Tape/Sand Walls
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Sheetrock @ GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Tape/Sand GWB Ceilings/Soffits/Fascias
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Install Plumbing Fixtures @ Toilet Rooms
Epoxy Flooring
Epoxy Flooring
Epoxy Flooring
Epoxy Flooring
Epoxy Flooring
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Prime & 1st Coat Paint
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Acoustical Ceiling Grid
Install Light Fixtures
Install Light Fixtures
Install Light Fixtures
Install Light Fixtures
Install Light Fixtures
Install RGD's
Install RGD's
Install RGD's
Install RGD's
Install RGD's
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Adjust Fire Protection Heads
Final Coat Paint
Final Coat Paint
Final Coat Paint
Final Coat Paint
Final Coat Paint
Hang Doors/Hardware
Hang Doors/Hardware
Hang Doors/Hardware
Hang Doors/Hardware
Hang Doors/Hardware
Install Toilet Partitions
Install Toilet Partitions
Install Toilet Partitions
Install Toilet Partitions
Install Toilet Partitions
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install LV System Devices/Finishes (CCTV/Security, etc.)
Install Misc Specialties
Install Misc Specialties
Install Misc Specialties
Install Misc Specialties
Install Misc Specialties
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Wiring Devices/Light Controls
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Millwork/Casework/Finish Carpentry
Install Fire Alarm Devices
Install Fire Alarm Devices
Install Fire Alarm Devices
Install Fire Alarm Devices
Install Fire Alarm Devices
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Final Above Ceiling Inspections
Padout Ceiling
Padout Ceiling
Padout Ceiling
Padout Ceiling
Padout Ceiling
Install Toilet Accessories
Install Toilet Accessories
Install Toilet Accessories
Install Toilet Accessories
Install Toilet Accessories
Install Flooring/Base
Install Flooring/Base
Install Flooring/Base
Install Flooring/Base
Install Flooring/Base
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Pre-Punch/Broom Clean - Main Level
Name
ID
Planned
Duration
Start
Finish
25-01-05
07-Jan-25 12:53 p.m.
Oswegatchie Fire Station 2
Current
Milestones
Progress
Summary
Critical
Date
Revision
Checked
Approved
07-Jan-25
Draft
Oswegatchie Fire Station 2
Site Improvements
SI
Parking Lot
A1470
Site Concrete
A1475
Stormwater Detention Systems
A1480
Site Improvements Completion,…
A1490
Site Signage
A1520
Closeout
Close
Fire Alarm Ringout
B5000
Final Completion All Trades
B5040
Punchlist & Final Cleaning
B5050
HVAC Eqmt Startups
B5010
Testing, Balancing and Inspecti…
B5030
Final Inspections & Substantial …
B5060
Final Completion (O&Ms/Asbuil…
B5080
Owner Move-In / Occupancy
B5070
346d
07-Jan-25
18-May-26
30d
07-Jan-25
17-Feb-25
25d
12-Nov-25
17-Dec-25
10d
26-Nov-25
10-Dec-25
50d
02-Mar-26
11-May-26
5d
12-May-26
18-May-26
109d
09-Feb-26
13-Jul-26
10d
09-Feb-26
20-Feb-26
5d
06-Apr-26
13-Apr-26
5d
06-Apr-26
13-Apr-26
15d
15-Apr-26
05-May-26
10d
06-May-26
19-May-26
5d
20-May-26
27-May-26
32d
28-May-26
13-Jul-26
15d
28-May-26
17-Jun-26
2024
2025
2026
2027
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Site Improvements
Site Improvements
Site Improvements
Site Improvements
Site Improvements
Parking Lot
Parking Lot
Parking Lot
Parking Lot
Parking Lot
Site Concrete
Site Concrete
Site Concrete
Site Concrete
Site Concrete
Stormwater Detention Systems
Stormwater Detention Systems
Stormwater Detention Systems
Stormwater Detention Systems
Stormwater Detention Systems
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Improvements Completion, Final Grading & Landscaping
Site Signage
Site Signage
Site Signage
Site Signage
Site Signage
Closeout
Closeout
Closeout
Closeout
Closeout
Fire Alarm Ringout
Fire Alarm Ringout
Fire Alarm Ringout
Fire Alarm Ringout
Fire Alarm Ringout
Final Completion All Trades
Final Completion All Trades
Final Completion All Trades
Final Completion All Trades
Final Completion All Trades
Punchlist & Final Cleaning
Punchlist & Final Cleaning
Punchlist & Final Cleaning
Punchlist & Final Cleaning
Punchlist & Final Cleaning
HVAC Eqmt Startups
HVAC Eqmt Startups
HVAC Eqmt Startups
HVAC Eqmt Startups
HVAC Eqmt Startups
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Testing, Balancing and Inspections
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Inspections & Substantial Completion
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Final Completion (O&Ms/Asbuilts, etc....)
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Owner Move-In / Occupancy
Name
ID
Planned
Duration
Start
Finish