Conservation Commission - Minutes - 06/10/2021
agenda center minutes
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | June 10, 2021 |
| Pages | 2 |
| File Size | 0.4 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
MEETING MINUTES Conservation Commission June 10, 2021 6:30 PM 2021 JUN 16 AM g: 29 Zoom Remote Access Only ~ Members Present: Tali Maidelis, Richard Muckle, Jessica Patterson, and Geneva Renegar (1 Vacancy) Members Absent: Dave Lersch and Wade Thomas Alternates Present: Ivy Plis and Julie Wainscott (1 Vacancy) Staff Present: Maureen FitzGerald, Environmental Planner Katrina Kotfer, Recording Secretary 1. CALL TO ORDER AND APPOINTMENT OF ALTERNATES R. Muckle called the meeting to order at 6:30 p.m. I. Plis was seated for W. Thomas and J. Wainscott seated for the vacancy. 2. APPROVAL of the May 27, 2021 MEETING MINUTES Motion: Motion made by G. Renegar, second by J. Wainscott to approve the May 27, 2021 meeting minutes. Vote: 6-0 3. APPLICATION REVIEW C-21-04: 198 Shore Road: Stream Channel Stabilization — John Lombardi, Applicant & Owner; Joseph Theroux, Agent. Joseph Theroux and John Lombardi were available for the application. J. Theroux reviewed his written responses to staff application review comments dated May 26, 2021. I. Plis questioned how the rip-rap will be placed by the machinery. J. Theroux replied the excavator would deposit the stone along the bank and push it into place, or in some locations it would be placed by hand. Motion: Motion made by J. Wainscott, second by I. Plis to have staff prepare a draft permit with conditions for review at the next meeting. Vote: 6-0 4, NEW APPLICATIONS C-21-6: 394 Willetts Avenue Ext. & 61A Myrock Avenue Install Private Gravity Fed Sewer Main — Waterford Woods, LLC, Owner & Applicant, Yantic River Consultants, LLC; Agent. Brandon Handfield, PE reviewed the proposed plan. The proposed sewer extends across a portion of 61A Myrock Avenue, west of the Eversource building, and through procured easement rights over 61 Myrock Avenue. The approved site plan included a 1,500 ft. force sewer main up to Willets Avenue and the proposed plan is to connect to the municipal sewer by gravity. He noted the wetlands have been delineated and a wetland report will be submitted to the Commission. The proposed activity includes a 20 foot wide construction corridor with excavation between 3 to 3 % feet deep. Approximately 4,400 square feet of wetland area will be affected. The pipe will be installed and the wetland material will be restored. The proposed manholes are to be placed outside of the wetland. Within the upland review area, the sewer installation will be 10 feet to 25 feet away from the wetland edge. Conservation Commission Minutes June 10, 2021 p. 2 of 2 The Commission accepted the application for review. 5. VIOLATIONS 54 Rope Ferry Road — Status of Stream Restoration: Staff updated the Commission the work is on schedule. 6. OTHER BUSINESS No other business discussed 7. ADJOURNMENT Motion: Motion made by T. Maidelis, second by G. Renegar to adjourn at 6:56 pm. Vote: 6-0 Lhe. Lipo Submitted, PipheisantCile Kotfer Recording Secretary