Board of Selectmen Regular Meeting
agenda center agenda
| Board/Commission | Board of Selectmen |
|---|---|
| Meeting Date | May 21, 2024 |
| Pages | 75 |
| File Size | 9.5 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886 PHONE: 860-442-0553 wHENERUE HEGRE CORD WATERFORD, CT WH HAY Tb LA IE OS con AGENDA BOARD OF SELECTMEN REGULAR MEETING Tuesday, May 21, 2024 5:00 PM Waterford Town Hall (Appleby Room) (Procedural Action: Check register to be signed by the Board of Selectmen in accordance with CGS 7-83) 1. Call to Order & Roll Call: 2. Pledge of Allegiance 3. Public Comnient: 4... Recreation and Parks~ Town Hall Post Tension Concrete Account Merge and Additional Appropriation: da. To consider and act-on-a request to consolidate capital improvement ~ projects from the Recreation and Parks Director, Ryari McNamara, in the amount of $91,000, line #33720-55854 Leary Basketball Court Rebuild and $41,000, line #33720-55855 Town Hall Basketball Court Repairs (pertaining to the athletic court surfacing) to one account under line # 33720-55854 (Leary Basketball Court). 4b. To consider and act on a request for a FY24 additional appropriation, fromm the Recreation and Parks Director, Ryan McNamara, in the amount of $249,808, to account #33720-55854 and forward on to the Board of Finance if approved. 5. Human Resources: To consider and act on the following request for a FY24 Out-of-Series Transfer from the Human Resources Director, Christine Walters, in the amount of $1,523 to cover end of year overage in Administration -and FICA due to non-union general wage increase that was approved after the FY24 budget was finalized arid forward on to the Board of Finance if approved. 10. 11. 12. 13. 14, 15. Human Resources: To consider and act on the following request for a FY24 In-Series Transfer from the Human Resources Director, Christine Walters, in the amount of $1,689 to cover year end overage in Administration due to non- union wage increase that was approved after the FY24 budget was finalized. Planning & Zoning: To consider and act on the following request for a FY24 Out-of-Series Transfer from the Planning Director, Jonathan Mullen, in the amount of $2,100 to accommodate contractual salary requirements and forward on to the Board of Finance if approved. Planning: To consider and act on the following request for a FY24 In-Series Transfer from the Director of Planning, Jonathan Mullen, in the amount of $4,000 to cover contractual salary requirements. Utility: To consider and act on the following request from the Utility Commission to accept Caroline Court as a public road and refer the matter to the Planning and Zoning Commission for an 8-24 review and refer it on to the RTM for final action. Fire Services: To consider and act on the following request for a FY24 Out- of-Series Transfer from the Fire Services Administrator, Michael Howley, in the amount of $7,048 to cover apparatus repairs and forward on to the Board of Finance if approved. Fire Services: To consider and act on the following request for a FY24 In- Series Transfer from the Fire Services Administrator, Michael Howley, in the amount of $50,500 to cover year end expenses. Fire Services: To consider and act on the following request from the Fire Services Administrator, Michael Howley, to reallocate funds from account 20523-57838 (fire pre-emption light repairs) to account 20523-57777 SCBA upgrades), Line #20523-57838 will be closed. Appointments & Resignations: 13a. To consider and act on the appointment of Ed Lusher (R) to the Economic Development Commission to fill the term of 9/1/23-8/31/27 as a member. New Business: Old Business: 16. Correspondence: 16a. Resurfacing Roads Memorandum 17. Consent Agenda 17a. Tax Refund 17b. Board of Selectmen Regular Meeting Minutes May 7, 2024 18. Adjournment: TO: Board of Selectmen FROM: Ryan McNamara, Director of Recreation and Parks DATE: May 1, 2024 RE: Town Hall Post Tension Concrete Account Merge and Additional Appropriation I hope this letter finds you well. I am writing to follow up on the request to consolidate capital improvement projects #33720-55854 Leary basketball Court Rebuild ($91,000) and #33720-55855 Town Hall Basketball Court Repairs ($41,000) pertaining to the athletic court surfacing, along with an additional appropriation to ensure the completion of this essential project. I am requesting that funds approved in account 33720-55855 ($41,000) be transferred to account 33720-55854 and then account 33720-55855 be closed. As you are aware, maintaining our athletic facilities to a high standard is crucial for the well-being and development of our community members, particularly our students and athletes. The current condition of the athletic court surfacing has deteriorated significantly over time, posing safety risks and hindering the quality of sports activities conducted on these courts. Consolidating the capital improvement projects related to athletic court surfacing will streamline the allocation of resources and enable us to undertake a comprehensive and efficient renovation process. By consolidating these projects, we can maximize cost-effectiveness and minimize disruptions to our athletic programs. Furthermore, I am requesting an additional appropriation of $117,808 to the merged account 33720- 55854 to ensure that the project can be completed to the desired standard. This additional funding will cover any unforeseen expenses (2% contingency), as well as allow for enhancements that will prolong the lifespan of the surfacing and improve its performance. The funding balance once consolidated is $132,000. The recent quote received (attached) reflects a cost of $244,910. We have included a 2% contingency equal to $4,898 that brings the total request to $249,808. Total projected cost of $249,808 - $132,00 consolidated funding = $117,808 additional appropriation The benefits of investing in our athletic facilities extend beyond providing a safe and conducive environment for sports activities. They also contribute to promoting physical fitness, fostering team spirit, and enhancing the overall well-being of our community members. I am confident that with your support, we can successfully undertake this capital improvement project and deliver a high-quality athletic facility that meets the needs of our community. I am available to discuss this matter further and provide any additional information you may require. Thank you for your attention to this request. IF YOU CAN PLAY ON IT, 5 : i § BUILD IT Durability « Reliability Playability « Engineered to Last Tennis Industry Magazine Contractor of the Year — 10 and Under Tennis (2011) Apr 27, 2024 Town of Waterford Ryan McNamara 15 Rope Ferry Rd, Waterford, CT, 06385 rmcnamara@waterfordct.org RE: Rebuild one existing asphalt basketball court to post tension concrete. court size 70'x125' Dear Ryan, Thank you for considering Hinding Tennis for your recreational needs. It is our goal to provide you with the highest quality sport surfacing products and installation in the industry. We at Hinding Tennis stand committed to excellence and it is our goal to provide you with the highest quality materials. As a current member of the American Sports Builders Association we are always up to date on the newest innovations and industry trends. Our goal is always to exceed your expectations and let the finished product speak for itself. We know you have many options when choosing a sport-surfacing contractor, therefore we continually strive to provide the most competitive pricing without compromising the quality or workmanship. All of us at Hinding Tennis thank you for the opportunity to provide you with this proposal and look forward to working with you in the future. Sincerely, Vincent Rapuano vin@hindingtennis.com PROCEDURE TO BE AS FOLLOWS: Furnish all materials, labor and insurance to perform the Rebuild one existing asphalt basketball court to post tension concrete. court size 70'x125'. Town Hall, 15 Rope Ferry Rd, Waterford, CT, 06385 Specifications of Services to be Provided: Material Description Qty Unit Price Subtotal Fence Removal - Fence Removal: Remove and dispose of fence posts, fabric and fence post footings 1 Included $0.00 Reclaim - Reclaim existing court 1 $4,000.00 $4,000.00 Laser grade - base material and establish 1% pitch East to West. 1 Included $0.00 Basketball System - Furnish and install (1) 72" Dominator Hoop. 4 $4,800.00 $19,200.00 Post Tension Concrete Court - A. Form work will be installed around the entire perimeter of the tennis courts. B. New net post sleeves to be set in their own concrete footings. C. Two layers of 6 mil poly placed over the entire court area. D. Encapsulated Post-tensioning tendons laid out according to PTI specifications. E. A 5" thick, 3000 psi concrete slab poured monolithically inside the forms. F. Post-tensioning cables stressed according to PTI specifications and procedures. G. The concrete surface was checked for flatness, according to the ASBA guidelines. Any deviations will be brought to proper tolerances with 5000 psi epoxy concrete. H. Final cable stress, cable ends cut off inside the cone holes, and the holes filled with no- shrink grout. I. After allowing 30 days for the concrete surface to cure, apply an acid etching solution to abrade the concrete and prepare the surface for subsequent coatings. J. Guarantee: Hinding Tennis, LLC will guarantee the post-tensioned slab against structural cracking for a period of ten (10) years from date of install. Hairline cracks (surface cracks not structural as defined above) are not covered. If structural cracks do develop, the contractor will repair the crack as he deems necessary to make the surface playable again. Abuse, neglect, and acts of God are not covered. 1 $192,000.00 $192,000.00 Acid Etch - Acid Etch and Pressure Wash the entire court 1 Included $0.00 TI-Coat - Apply TI-Coat Apoxy and first coat of Acrylic Resurfacer to the entire court 1 Included $0.00 2 Coat Color System - Furnish and Install the 2 coat acrylic color coating system. This system includes one filler coat and one finish coat of color. 1 Included $0.00 Basketball Lines Full Court - Layout and Stripe full court basketball lines in accordance to NCAA. 2 $1,200.00 $2,400.00 10' Foot Chain Link Fence Installation - 10' Foot Chain Link Fence Installation: Furnish and install 10' High 8 gage fuse-bonded chain link fence 166 $68.00 $11,288.00 Mobilization and Fuel Surcharge - 4% of total proposal price for Mobilization and 3% of total proposal price for Fuel Surcharge 1 $16,022.00 $16,022.00 Pricing as Indicated Below: Non Prevailing Wage Total: $244,910.00 SALES TAX WILL BE CHARGED AT 30% OF THE STATE TAX RATE WHEN APPLICABLE TO ACCOUNT FOR TAX ON LABOR. PAYMENT IS EXPECTED UPON TIMELY COMPLETION. CREDIT CARD PAYMENTS WILL REQUIRE A 2% CREDIT CARD PROCESSING FEE. Payment Schedule is to be as follows unless otherwise specified on the contract: For jobs priced below a threshold of approximately $3,000.00 (subject to vary): 100% “Full payment”, plus applicable tax on total amount, due upon signing and remittance of forthcoming contract if this estimate is approved, before work can begin. Please be ready to include a payment along with a signed contract. For jobs priced above a threshold of approximately $3,000.00 (subject to vary): 50% “Down payment”, plus applicable tax on total amount, due upon signing and remittance of forthcoming contract if this estimate is approved, before work can begin. Please be ready to include a payment along with a signed contract. 25% “Good faith payment”, considered due the day we begin work on your project. 25% “Remainder payment”, considered due the day we end work on your project. PLEASE NOTE: In the event that payment is not made as specified above, it is agreed that Hinding Tennis, LLC will receive interest at a rate of 1.5% per month on the remaining balance due. In the event that payment is not made as specified, Hinding Tennis, LLC retains the right to halt works until past due payments are made. Payment in full not being made within 60 days of job completion renders any warranties on the job null and void. Above prices are submitted for approval within sixty days and after that time may be revised. We reserve the right to take before, during & after photos of your particular job & use photos for marketing purposes. We will never give out your name or street address without your consent. SCOPE OF SERVICES RENDERED: Unless otherwise specified, price does not include the following: Plans, Permits, Design, Layout, Engineering, Town Fees, Testing, Drainage or Drainage Issues and repair of areas around the site that may have been damaged or worn out by equipment being carried to and from court. Warranties if any will be noted on specified items. ACCEPTANCE OF PROPOSAL: Please hit the green accept button and sign your name electronically, if any issues occur please call the office (203-285-3055) or one of the owners directly if someone is not in touch with you shortly and you are intent on proceeding with the work as described. We will provide a contract for you to sign and remit with payment so that we may begin work. ABOUT US “Over the years, Hinding Tennis has helped make GRSC a community club with the best hard court surfaces inside and out, as well as junior lines and stand alone courts, outdoor fighting and pickleball courts. They are a great partner in the tennis business.” — Sarah Boone, Owner, Guilford Racquet & Swim Club Since 1994 the team at Hinding Tennis, LLC has been building superior Recreational Courts for all types of surfaces. We specialize in Post Tension Concrete Courts and our patented Rubberized Cushion System is a very popular Surface among many avid players. Hinding prides itself on quality workmanship and retains over 90% of its work force each season; our crews are extremely knowledgeable and are some of the most experienced in the business. From Har Tru to Post Tension Concrete to Tennis and Basketball Courts to Playgrounds and just about anything recreational, we offer only the best products and services. We are actively involved in the ASBA (American Sports Builders Association) and we are constantly on the cutting edge of new technology. Our reputation speaks for itself and clubs, residential, parks, schools and municipalities count on us everyday. We can customize any job to any size, any color and any speed. Our customer service and sales representatives are extremely knowledgeable of all types of surfaces, coatings and building new courts. So please call us today for a free analysis of your project. if you can play on it, we can build it 24 Spring Street « West Haven, CT O6516 203-285-3055 « HindingTennis.com Official ‘10 and Under Tennis Court Installer ~ CRACK REPAIR The RiteWay Crack Repair System (U.S. Patent No. 7,597,503) utilizes an exclusive technology that allows existing cracks on your court to move without breaking the membrane of this system. Many who have tried other systems have complained about “dead spots,” “hollow sounds” and “bubbling.” Although these other systems have proven to keep cracks from coming back, RiteWay Crack Repair not only keeps cracks from coming back, but its exclusive technology does not have any dead spots, hollow sounds or bubbling. The installation is So unique that many tennis court owners can't believe its proven success until they see it for themselves. No other overlay system can give you the RiteWay results. We've seen the other systems on the market- some have success, some have failures — but none of them can give the guarantee that RiteWay offers. Our proven success and durability will last much longer than the written guarantee. When considering your repair options, there’s only one question to ask yourself: Are you repairing cracks the old traditional way, or are you repairing them the RiteWay? Fix Your Cracks - Do It The RiteWay! For more information go to www.ritewaytennis.com. G If you can play on it, we can build it. 24 Spring Street * West Haven, CT 06516 203-285-3055 ¢ HindingTennis.com Official 10 and Under Tennis Court Installer RESURFACING Court Resurfacing Since 1994, Hinding Tennis has been building and resurfacing tennis courts throughoutthe United States and inthe Caribbean. With headquarters located in West Haven, Connecticut, Hinding Tennis’ major client concentration runs up and down the U.S. East Coast. Resurfacing your tennis court is important in the overall maintenance, upkeep, playability and longevity of the court. Typically, a tennis court should be resurfaced every 4-7 years. This varies depending upon the surface, weather, amount of play, and preservation of the court. Hinding Tennis offers all types of coating and cushion systems and will give you several resurfacing options to keep your court performing at its highest level of playability. Hinding Tennis resurfaces over 400 courts per year. We retain 90% of our professional workforce yearly, therefore we are not training new court technicians each season. Our quality of workmanship, professionalism and customer service is second to none. Examples of our projects include Chelsea Piers, Stamford CT; U.S. Coast Guard, New London CT; and Match Point Tennis, Brooklyn, NY. TO@vt Se. 24 Spring Street *« West Haven, CT 06516 203-285-3055 « HindingTennis.com Official 10 and Under Tennis Court Installer SQUEEGEE MARKS Acrylic color surfacing systems are generally applied with a squeegee in multiple coats. Most systems include one or more filler coats, followed by two to three coats of color. Some systems also include texture or cushion coats between the filler and the top coats. There are several theories regarding the application of color coatings. In any case, coating systems must be applied smoothly to a uniform thickness over the entire court surface, This requires an experienced applicator and careful attention to the technique. Even when color coatings are applied with care by a skilled operator, some squeegee marks and other slight variations in color and texture are inevitable. This is because the formulation of acrylic . causes components to migrate to the edge of the material as it is SPORTS BUELDERS being applied. As a result, an observer will be able to locate the spot —— where the acrylic material was poured on the surface, where the squeegee operator turned to make a pass in the opposite direction or where one pass overlapped another. Squeegee marks will be more visible on lighter colors and more common when coatings are applied in hot weather or when they include coarser sand. Humidity, angle of the sun when the acrylic is applied and other factors also may affect frequency and visibility of these marks. Due to the nature of the material and the human element in tennis court construction, squeegee marks are likely to occur, like marks in newly vacuumed plush carpet or newly mown grass. They will not affect play and will become less visible as the court wears and ages. While squeegee marks are within industry standard, more serious flaws - ridges, drips, tool marks, foot prints, bucket marks and areas of excess material - are unacceptable and should be corrected by the surfacing contractor. Differences in site, weather and soi! conditions to consult a qualified contractor or design if ycw can ay on. wee can Guile it. professional before undertaking construction or 24 Spring Street « West Haven, CT 06516 repair of @ court. Rev. 03/04 203-285-3055 » HindingTennis.com (Official 10 and Under Tennis Court Installer BIRDBATH spors “Birdbath” Is a term commonly used In the tennis Industry to describe a low area on a tennis court that holds water. More precisely, the American Sports Builders Association (ASBA) defines a birdbath as any area where standing water more than 17°16" (2mm - commonly measured using a nickel) remains after drainage of the area has ceased or after one hour of drying at 7O degrees Fahrenheit in sunlight. Birdbaths delay play on the court after rain and may cause staining and/or peeling of the surface. Among the causes of birdbaths are: 1. Unsuitable material in the subsoil; 2. Inadequate drainage around the tennis court; 3. Improper slope or grade; 4, Inadequate compaction of the subgrade; or AMERICAN 5. Paving error f SPORTS AUILDERS ASMA LATIIOS Paving and surfacing, even with laser-guided equipment, involves both skill and judgment. The number of variables impacting the paving and surfacing processes makes it unreasonable to expect perfection. Minor depressions inthe surface, those less than 1/16" deep or those that drain or dry in under and hour, are considered within tolerance and are acceptable. In a new or recently resurfaced court, however, the contractor should correct birdbaths. Because site selection, design and construction can involve compromise, even properly designed and constructed courts may develop birdbaths over time. Tennis courts sometimes are built on sites which are reclaimed or which have been deemed unsuitable for other purposes. In such cases, less than ideal subsoil, grade, or drainage conditions may exist. Additionally, over time, new circumstances may arise which lead to settling or drainage problems. The owner's expectations regarding repair of birdbaths should be based on the nature of the birdbaths that exist to be repaired and the amount of money budgeted for the repair. Owners also should understand that available repair methods and materials are imperfect. Complete removal of standing water may be impossible. Generally the owner should accept that repair of the birdbaths is only a means of reducing the inconvenience they cause and extending the useful life of the court. The number, size and depth of birdbaths is another consideration. The existence of multiple birdbaths or major depressions of 4" or more may indicate more serious problems. Repairing multiple or deeper birdbaths is labor intensive and often results in cosmetic imperfections, which may require resurfacing to correct. The larger the birdbath, the more difficult it can be to repair, Differences in site, weather and soil conditions require variations in construction and repair methods and materials. Readers are advised to consultagualifiedcontractorordesign professional . before undertaking constuction or repay 24 Spring Street * West Haven, CT 06516 of a court. Rev, 11/10 203-285-3055 « HindingTennis.com Official 10 and Under Tennis Court Installer if you can play on dt, we can Guile it Hi nding Tennis is your resource for court equipment and accessories. With close to 20 years of experience in court construction and maintenance, we know what you need to gve your game a boost and keep your court in shape. We work with the best suppliers of quality court products. Quality products come from quality manufacturers and we can provide you with a variety of choices to meet your personal preferences. Fencing, lighting and windscreens, tennis nets, tennis posts and benches. Backboards, score boards, foals, ball machines, roll dries and court brooms ecavaTe —wew you covered. Looking for something? Just ask. 24 Spring Street « West Haven, CT 06516 203-285-3055 « HindingTennis.com Official 10 and Under Tennis Court Installer No Matter What Your Game, Te. Se. HINDING HANDLES IT HuSpING ff you can play on il, we can Build it. Official 10 and Under Tennis Gourt Installer 24 Spring Street « West Haven, CT 06516 203-285-3055 *« HindingTennis.com Like ua on Facebook TOWN OF WATERFORD TRANSFER REQUEST FORM Out of Series Transfer Request ‘DEPARTMENT APPROVED CURRENT ACCOUNT __ ACCOUNT _—REVISED Budget Avaliable (§UINGREASET DECREASE) Avaliable Lino No. Org. Code Object Code ‘Object Description Amount“ Budget Budget 1 1014s 51110 [administration 22,025.00] 12,406.00 382.00 12,788.00 2 10s i920 rica 11,920.00 61800] 1,161.00 1,759.00 3 10145 52030 __[Protessional Fees 7500000[ 2,352.00 1523.00] 29.00, 4 0.00 A 0.00 6 0.00 7 0.00 A 0.00 A 0.00 10 0.00 0.00 0.00 Torat 152300 (0523.00) Explanation ‘Qutot seis ranstor rom Professional Fees needed 1 cover end of year overage in Administration and FICA due to non-union general wage inrease that was approved afte the FY24 budget was finalized Director of Financo First Soreciman ‘Commisston/Board Approval sh3l24 we Jliaby revised 9/9/20 is xorL8 6°96 xS"6E wee wes x98 bed 9€°T6T ¥0"8T9 26°5s9'0T ozs 00°0 00°0 00° 00°0 00°0 SE"p6r'T To"ser'T 82"619'6L 00°29»'T 00°00" gsi sar weston a set 5:40 e02/¥13E6 sponsvine a0en0 00°0 00°299'T SuTvé3¥ ONY 1NOD 3DIAWaS ovozs sPtoT 0070. 00°000°s¢ ‘S334 ‘TNOISS340¥d ogozs spToT 00"0 00°896 BOvLSOd oz0zs sprot 00"0 00°00" ONTSTLNBAQY + otozs sptot 00"0 00"0z6'Tt eS 00°s6z'8t 00" p8z"€9 TWOINKSL ONY TWwOTWITD otzrs svrot DEA 00°0 00°sz0'26 NOTAVALSININOY OTTTS sptot LYOd3u 1390NE 3LVG-OL-NV3A LO ‘p1oyiazeM JO UMOL 2 abea 55:40 meoe/n wa"09 60" 26E, 00°0 16" 409 00°000'T 00°0 00°000'T SBTidans waHLo oz0Es stot ‘SERENE xoroot £6" 00°0 cort'2 00° zet'z 90°0 00° 2et'2 wrupous SDNVASISSY 33A01AN3) o4szs setot Pood soavistsse 30nd Wc7 x6"09—00°99K'2 00°0 00° vE8"E 00"008*9 00°0 00°00€'9 BeoLivONGs 2 ONINITEL ODEO] RO'LoT —8S°LE~ weer ev-ory 00"s6P 00° 00°s6y xOTOE —TOELT. 00"0 66°92 00"0sz 00° 00"0sz ESasN3axi siawssngntys OL0og) xo"00T 00° 00°0 00°ss¥ 00's 00°9. 00"ss¥ notavonag ® $32Ng¥asNOD' sand LuOday L390NE ALVG-OL-NV3SA LO ‘psopiezeM JO UMOL we VaLLY K(s9qu}x Aq pares9UE9 ~ 1¥OETY 40 ONE +e 1uOd3ay LIOGNE 3LVG-OL-NVSA LO ‘PsojsezeM JO UMOL Human Resources TOWN OF WATERFORD TRANSFER REQUEST FORM In Series (Over $1000) DEPARTMENT APPROVED CURRENT Budget Budget REVISED. Budget Available Transfer__—Transfer_— Available. Line No. Org. Code Object Code. Object Description Amount Budget__WINGREASEW DECREASE! Budget 4 10145 51110 __|Administration S$ 92025|$ 12.406] 1,689.00 S$ 14,095 2 10145 51210__|Clorical & Technical $__82s79|5__ 10.656 (1,689.00)|$ 8,967 3 $ 4 $ 5 $ 6 $ z $ a $ TOTAL 1,688.00 —(7,68800) Explanation: ‘Transfer needed from Clerical & Technical to cover end of year: overs Administration due to non-union 1 wage increase that was. after the FY24 budget was finalized, Chez Aunt) = A “Bos Director of Finance First Selectman ‘Tommission/Board Approval slizloy - OUB/04 Dato Date revised 9/9/20 1 bes 60°28 " oes SE" v6r'T y 29° 00°0 00°29%'T est ts S¥IVdIY ONY LNOD 3DIA¥3S Ov0zS SPTOT 6°96 TSTTSE'Z 8°29 LE S9°S8T'SE 00°000'sz 0070, 00°000"S2 ‘S334 “TWNOISS340Nd ogozs sPtoT [5334 TwNOISS 3404 OFOcg} NS'6E —66"S8S 00°0 To'zee 00"896 00"0 00°896 RezE 66" VOL*Z 00° To"sez't 00°000'# 00"0 00°000'» SNTSTLNBAGY otozs sptot Duis ince ule x8"¥6 ——pO"BTO 00°0 96°T0E "Tr 00°026"TT 00"0 00"oz6'Tt eS xCLe ——_26°S59°OT 00°0 80°Ez6'TL 00°625'28 00°s6z ‘st o0"vee"e9 WwoIMOaL ONY Worea7D orets spot DyotviO31 ony 03) OL) xS'982L"S0R'zT 00°0 82°619°6L 00°S20'26 00°0 900°sz0'z6 NOLLWaASINTWaY OTITS svtoT | LuOday 1390NE 3LVd-OL-NWSA LO ‘psopiazeM JO UMOL 2 bed x9709«60°26E. 00°0 16°209 (00°000'T 00°0 00°000'T sarians uso ‘Oz0ES SPtOT xorooT «£670 00°0 cortt'z 00°zt'2 90°0 oo'zet'z wvupoud SDNVASTSSY 33A07dN3 ouszs svtot Pow SONS Sse 3A did Der x6°09 00" 99'2 00°0 00'vE8'€ 00° 0089 00°0 00°008'9 EES xovcot8S°LE~ Wet avotr 00"s6y 00°0 00°s6» Bxo123 13 03075) xeroe = TOELT. 00°0 66°92 00°02 00:0 00"0sz SaSNaxa 378VSUNEHISY 0202s svtot Es3cnaax3 snavsuniaul 3s 02009 x0"00T —00°0 00°0 00"sse 00"ssy 00°0 00's NotLvonaa ® $32Nz¥BINOD'SaNd osozs sprot LuOd3y LIDGNE ALVG-OL-WAA LO ‘psopiazeM JO UMOL € bed ss0 ‘ex UBLLY Alsaqayn Aq pares9u99 - 1NOdTY JO ONE ae 14YOd3y LIOGN 3LVG-OL-NVSA LO ‘psojiezeM JO UMOL TOWN OF WATERFORD TRANSFER REQUEST FORM Out of Series Transfer Request Planning & Zoning APPROVED CURRENT ACCOUNT ACCOUNT ~—REVISED. Budget Avaliable | INCREASE DECREASE) Available LinoNo. _Orp.Code__ Object Code Object Description Amount Budget Budget 10110] '51120]inspection 282,411.00 | _ $5,223.00 2,100.00 57,323.00 10110] 52040| Service Cont & Repair 15,781.00 | _ 10,268.00 (2,100.00}] 8,168.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jo fom a feo foo fo 10 TOTAL 210000 (2,100.00) Explanation ‘Additional funds needed inthe inspection line to accommodate contractual salary requirements, ‘Director of Finance Dae First Selectman Date je, Tommission/Board Approval Date revised 9/9/20 t NSLL ete xL92 eee x98 bed o"6se's ea't2'2z 96°CHL'T 00"0 00°0 00° 00° 00°tt* zz 00°000'T, 00°00" ONISTLWaAGY otozs ottot Beis isan DOC) 00°0 oo'ee'ey word ozsrs ottot REA 00°0, o0"ee8's ‘SLIS3NE 3ONTUS ot6ts ortot 00° 00"vat'9 000. 00"¥¢9'z9T aWoINWDaL ON WoIWST> orzts ottot 00° 00°Ttv'zez NOILDadSNI oztts ottot 00°0 00°€82‘TTT 140d 1LA90NE SLVG-OL-NVAA LO ‘plojsayeA JO UMOL zebra sv:et p0e/B6/50 :posnseuns astase xS'6y 0°60" 00°0 46°00¥ 00°0T8. 00°0 00°0r8 SINVOT¥EN GNY S73NS 060¢5 OTTOT BS ine Srygn) GNe S130 0605) xorse—20°889°T 00°0 96°190'T 00" 0s2'2 00°0. 00"0se'z xo" 00°002 00°0 00° 00°002 90070 00°00z ‘S3SN3X3 FTaVSUNAHIIY REE OG *OTE. 00"0 ot'6eT 00"0s» 00°0 00"0s» Nore O2*0SZ 00°0 0g" 022'E oortes'€ 00°0. o0'tzs'€ avonaa ® 532N3¥aINOD'S3NG osozs ortot Bs3x0) S300 os02) xt T2"9€t"6 82'9E2'T 1s"90%'S 00° T82'st 00° oo't92'st ESyted3s Ove INO> 27035 Orbe) x0"00T ~—00°0 To"z9¥'8 66°2ES'0T 00°000'6t 00°000'T- 00°000*02 $5534 TeNOISS340ud 06025) xe'ov 6992, 00°0 19°€8T 00"0s» 00°0 00°0s¥ 1NOday L39GNE ALVG-OL-NVAA LO ‘PIopayeM JO UMOL £ = SPiZE 7202/90/50 spanesauas 10dey ‘es VOLLY ALsBqUEN Aq pa3esDUIH - LOKI JO ON ve | x 66°cEv'T 00"0 0'z 00°ove'T 00° 00" ory" INaNdTNDB 391440 0900S OTTOT LNOdae LA90NE 3LVG-OL-YV3A LO ‘psojsayeM JO UMOL Planning and Zoning Commission April 30, 2024 p.lofé PLANNING AND ZONING COMMISSIONECEIVED FOR RECORD MEETING MINUTES WATERFORD. CT Planning & Zoning Commission TH HAY -bFP 34? AB Town Hall 630 PM arrest: Bind £2 Members Present: Chairman Greg Massad, Karen Barnett, Tim Bleasdt Conderino Members Absent: Victor Ebersole Alternates Present: Bertrand Chenard Alternates Absent: Doris Crum, Joseph DiBuono Staff Present: Jonathan Mallen, Planning Director, Mark Wujtewicz, Planner, Katrina Kotfer, Recording Secretary 1, CALL TO ORDER AND APPOINTMENT OF ALTERNATES G. Massad called the meeting to order at 6:30 PM. B. Chenard was seated for V. Ebersole. 2. APPROVAL OF MINUTES MOTION: Motion made by B. Chenard, seconded by T. Conderino, to approve the March 26, 2024 meeting minutes. VOTE: 3-0 (K. Barnett and T. Bleasdale abstained) 3. PLEDGE OF ALLEGIANCE 4, APPLICATION RECEIPT #PL-24-6 — Request of Adams Builders, LLC, owner and applicant, for a modification to the Master Design Plan for PDD-2 (Planned Design District 2), 48 Great Neck Road in accordance with Section 19.1.2 and 19.2.2 of the Waterford Zoning Regulations. APPLICATION WAS RECEIVED: 4/15/24 PUBLIC HEARING REQUIRED BY: 6/20/24 Chairman Massad noted that application PL-24-6 was submitted for receipt at the April 15, 2024 Planning & Zoning Commission meeting. The April 15, 2024 meeting was cancelled, however the application was still officially received in accordance with State Statute and that it was scheduled for a public hearing within the required statutory period. 5. PUBLIC HEARING #PL-24-5 — Request of East Lyme Tree Service, owner & applicant for a Site Plan/Special Permit approval for Storage of Trucks & Equipment at 1122 & 1124 Hartford Tumpie, [P-3 zone, in accordance with Sections 15.2.1, 22 and 23 of the Zoning Regulations and as shown on plans entitled "East Lyme Tree Services, 1122 & 1124 Hartford Tumpike, Waterford, CT Rev. March 6, 2024 ". PUBLIC HEARING REQUIRED BY: 5/16/2024 Chairman Massad opened the public hearing at 6:33 p.m. Planning and Zoning Commission ‘April 30, 2024 p.20f6 Ellen Bartlett, PE., CLA Engineers, was present for the application. M. Wujtewicz read the exhibit list, items 1-7 into the record. E. Bartlett reviewed the 3.2 acre site with the Commission and noted that because the property is located in the IP-3 zone all uses require a Special Permit. She noted the applicant plans to renovate the existing home, relocate the existing chicken coop on site and use the barn for vehicle storage. Timber and wood chips may be temporarily stored on site but will not be processed on site. There will be no vehicle maintenance or fueling on site. E. Bartlett reviewed the water quality and water treatment proposed. She noted there will be a slight decrease in peak flows. T. Bleasdale asked how long the wood chips will be kept on the property. E. Bartlett stated the applicant uses them on job sites and he also donates them. The chips shouldn’t be there for more than six months. K. Barnett asked what the hours of operation will be. E. Bartlett stated that they would be 8:00 am 5:00 pm Monday through Friday and some Saturday morning hours. G, Massad asked three times if anyone from the public would like to speak regarding the application. No one from the public spoke. MOTION: —_ Motion made by T. Bleasdale, seconded by T. Conderino, to close the public hearing for PL-24-5. VOTE: 50 The public hearing closed at 6:46 pm. 6. APPLICATION REVIEW #PL-24-5 ~ Request of East Lyme Tree Service, owner & applicant for a Site Plan/Special Permit approval for Storage of Trucks & Equipment at 1122 & 1124 Hartford Turnpike, IP-3 zone, in accordance with Sections 15.2.1, 22 and 23 of the Zoning Regulations and as shown on plans entitled "East Lyme Tree Services, 1122 & 1124 Hartford Turnpike, Waterford, CT Rev. March 6, 2024 ". G. Massad asked staff if there are any outstanding zoning enforcement issues. Staff responded yes, and this application will resolve the zoning matter. M. Wujtewicz reviewed the staff report with the Commission. The Commission made the following findings: 1. The application is for a use subject to a Special Permit approval, pursuant to Section 15.2.1 of the Waterford Zoning Regulations. 2. The existing single family and accessory apartment residential use on the property is a pre-existing non-conforming use and may continue. The continuation of the residential use shall be govemed in accordance with Section 24 of the Town of Waterford Zoning Regulations pertaining to non-conforming uses and structures. 3. The statement of use contained in Exhibit 1b provided by the applicant in accordance with Section 23.5 of the Zoning Regulations identifies the findings and that the proposed Planning and Zoning Commission April 30, 2024 p.30f6 use as presented is consistent with the findings listed in Sections 23.5.1 through 23.5.9. 4. The Waterford Conservation Commission issued Inland Wetland Permit# C-23-12 for regulated inland wetland activities. 5. The Waterford Conservation Commission has submitted to the Planning and Zoning Commission a final report in accordance with CGS 8-3(g). 6. The application meets the criteria for site plan approval, pursuant to Section 22 of the Waterford Zoning Regulations, subject to condition 1. The Commission discussed the following conditions: 5. 5 The deed description for the merger of 1122 and 1124 Hartford Turnpike shall be submitted and filed on the land records at the time the final plans are filed. An annual Maintenance and Inspection Report for the Stormwater management system. shall be provided to the Town of Waterford Planning and Development Department. This report shall be required to be submitted in order to verify that the stormwater management system is maintained and continues to operate as originally designed. All conditions of approval for Inland Wetland Permit #C-23-12 shall be incorporated into this decision as if fully set forth herein. MOTION: Motion made by T. Conderino, seconded by K. Barnett, to approve the Site Plan / Special Permit for a Business Office application #PL-24-5 at 1122 & 1124 Hartford Turnpike with conditions 1 thru 3 and to adopt the findings 1 thru 6 of the staff report. VOTE: 5-0 PUBLIC HEARING #PL-24-6 — Request of Adams Builders, LLC, owner and applicant, for a modification to the Master Design Plan for PDD-2 (Planned Design District 2), 48 Great Neck Road in accordance with Section 19.1.2 and 19.2.2 of the Waterford Zoning Regulations. PUBLIC HEARING REQUIRED BY: 6/20/24 T. Conderino recused himself from the public hearing and review of this application. The public hearing was opened at 6:50 pm. Gordy Adams, Skip Adams and Brian Florek, LS, were present for the application. B. Florek explained to the Commission that the applicants are a change in the Master Design Plan that would create building development areas for each building in order to allow for flexibility in the footprint locations. B. Florek stated that the building envelopes will be staked out, foundations will be located by a surveyor and foundation location certificates will be provided for each building. Planning and Zoning Commission ‘April 30, 2024 p.40f6 6 T. Bleasdale asked if the mix of unit types has changed. B. Florek stated the overall amount of units has stayed the same, but there will now be 32 free standing single family units and 4 duplex units. The original layout had 20 free standing single family units and 10 duplex units. K. Bamett expressed concem with the reduction in the number of duplex units. She questioned whether the potential reduction in length of the driveways would affect the amount of parking available for the project. B. Florek stated the intention is for one car to be parked in the garage and one parking space available in the driveway. The plan identifies additional off street parking not associated with the buildings. All parking designated on the plan conforms with the parking requirements for the PDD-2 Zone District. G. Massad asked three times if anyone from the public would like to speak regarding the application, No one from the public spoke. MOTION: Motion made by B. Chenard, seconded by T. Bleasdale, to close the public hearing for PL-24-4. VOTE: 40 ‘The public hearing closed at 7:06 pm. APPLICATION REVIEW #PL-24-6 — Request of Adams Builders, LLC, owner and applicant, for a modification to the Master Design Plan for PDD-2 (Planned Design District 2), 48 Great Neck Road in accordance with Section 19.1.2 and 19.2.2 of the Waterford Zoning Regulations. ‘The Commission discussed the application. T. Bleasdale asked if all buildings comply with zoning setbacks. Staff responded that they do comply. B. Chenard asked if any house is too close to the wetlands. Staff replied that the proposed and existing locations are consistent with the Inland Wetland permit and the Environmental Planner is working with the applicants on the design and location of the retention basin. K. Bamett asked if all houses are the same size. Staff responded that the houses will vary in size and design. B. Chenard noted that the proposed building envelopes allow the developer some flexibility with building placement. G. Massad questioned if there were still affordable units. Staff replied that the affordable units are still included in the revised Master Design Plan. The requirement that of 10% of the units be affordable is still in place and that the affordable housing plan filed for the original approval applies to this application. The Commission made the following findings: 1. Application PL-24-6 is submitted in accordance with Sections 19.1.2 and 19.2.2 of the Zoning Regulations as a result of substantial and material changes in the field as determined by the Planning and Zoning Commission on March 26, 2024. 2. The Master Design Plan submitted through application PL-24-6 is consistent with the Planning and Zoning Commission April 30, 2024 p.Sof6 purpose of PDD-2 in that it provides for flexibility in building placement and design while providing protection to the adjoining neighborhoods. 3. The Master Design Plan is consistent with the stated goals of the Natural Resources Policy of the 2012 Plan of Conservation and Development amended to June 11, 2015 (The Plan”) by providing for further flexibility of design and placement of buildings and maintaining the existing open space and conservation easement areas through the “smart growth” design. 4, The Master Design Plan is consistent with the Residential Development policy of The Plan in that it maintains the multifamily use originally approved by providing a housing option that will meet the needs of residents of the Waterford. The MDP also will maintain the minimum 10% of the housing units as affordable meeting current affordability guidelines and requirements. MOTION: Motion by T. Bleasdale, seconded by G. Massad to approve Application PL- 24-6 for a new Master Design Plan for the existing PDD-2 Zone District located at 48 Great Neck Road by adopting the findings 1 thra 4 of the Staff Report with an effective date of May 17, 2024. The Commission discussed the motion on the table. B. Chenard asked if the proposed houses need sprinklers due to their close locations. Staff responded that the buildings would need to meet current building codes. Discussion ensued regarding establishing minimum separation distances between buildings. G. Massad offered to require the buildings to be at least 15 feet apart. T. Bleasdale noted that could potentially effect driveways. AMMENDMENT: Motion by T. Bleasdale, second by B. Chenard to add a condition requiring at least 15 feet between units to be constructed, excluding units that have already been constructed specifically units 1 - 5 and 18 - 25. The 15 feet of separation between units must be accomplished within the proposed building envelopes. VOTE: 4-0 to the Motion as amended. 7. ADMINISTRATIVE REVIEW No review was discussed. 8. CORRESPONDENCE No correspondence was received. 9. COMMISSION BUSINESS MOTION: —_ Motion made by K. Bamett, seconded by B. Chenard to approve an In-Series Transfer of $4,000 from: 10110-51810 (Overtime) to: 10110-51120 (lspection) and Out-of-Series Transfer of $2,100 from: 10110-52040 (Service Contracts & Repair) to: 10110-51120 (Inspection). Planning and Zoning Commission ‘April 30, 2024 P.60f6 VOTE: 5-0 10. ADJOURNMENT MOTION: Motion made by K. Barnett, seconded by T. Bleasdale to adjourn at 7:56 pm. VOTE: 5-0 fully Submitted, KOA ‘atria Kotfer Recording Secretary TOWN OF WATERFORD TRANSFER REQUEST FORM In Series (Over $1000) Plaanin ge DEPARTMENT APPROVED CURRENT Budget Budget REVISED. Budget Available Transfer_—_Transfer_— Available Line No. Org.Code Object Code, Object Description Amount Budget Budget 4 10110 51120 _|Inspection s 262411] 55.223] 4,000.00 $59,223 2 40110 51810__|Overtime $s 6te4}$ 4,646 (4.000.00)] 46 3 s 4 s 5 $ 6 $ 7 $ 8 s TOTAL 4000.00 (4,000.00) Explanation: Additional amount needed in the Inspection line to accommodate contractual sal Yen Eula whey Director of Finance Date First Selectman Date petty tte chee) sommission/Board Approval Date revised 99720 sorte SLL eee e792 we"e8 xv98 xorte bed OT's¥8"06 o0"8¢8"s 00°v9t'9 00"¥e9'29T CK) Tourstivanav Co OtOzS OTTOT 00°0 oo" e2b' ty Poors od oor. oo-eee's 'sL14anae 30NTs orets ortor awxaK0 orets ortor TS Brora e avs os OL 00°0 00° TTr*zez Norso34snr ozrts otto oro ooreee'ttr 140d3e L390NE ALVG-OL-NVSA z xs'6r Mee 0°00 a6ed €0°60¥ 00° 00°0 00°0 ot'6et 1S°908'S 66°ZeS‘oT o0'osz'z 00°002 00°0s» 00°000'6t 00"0s¥ 00°0 00°08 siNvoT¥EN ONY S73Nd 06085 OTTOT PS axwotua nn Ny S303 Gus 5) 00°09. 00"0se'2 ‘sartsans 391440 OtOES OttOT 90070 00"002 00°0 00° 0s 00°0, 00'tzs'€ 00° o0"t82"st ‘SELLE 00°000'~ 00°000"02 00°0S» 1uOd3y LA9GNE ALVG-OL-NV3A 19 ‘psopazeM JO UMOL sven woe/90550 spoxesov8 ai0dse es VBLLY ALs9qUEy Aq pares24yE9 - 1Y0dIY 40 GNI +e x” 66"2en'T 00"0 0'z 00°orm'T 00°0. 00" ort ‘Inawarnda 391440 090%5 ortoT 1N0d3e 1L390NS 3LVG-OL-NVSA Planning and Zoning Commission ‘April 30,2024 p. 1ofé PLANNING AND ZONING COMMISSIONECEIVED FOR RECORD MEETING MINUTES WATERFORD. CT Planning & Zoning Commission TM HAY ~ bP} AB Town Hall 630 PM arrest: Good £2 Members Present: Chairman Greg Massad, Karen Bamett, Tim Bleasdite! Conderino Members Absent: Victor Ebersole Alternates Present: Bertrand Chenard Alternates Absent: Doris Crum, Joseph DiBuono Staff Present: Jonathan Mullen, Planning Director, Mark Wujtewicz, Planner, Katrina Kotfer, Recording Secretary 1, CALL TO ORDER AND APPOINTMENT OF ALTERNATES G. Massad called the meeting to order at 6:30 PM. B. Chenard was seated for V. Ebersole. 2. APPROVAL OF MINUTES MOTION: Motion made by B. Chenard, seconded by T. Conderino, to approve the March 26, 2024 meeting minutes. VOTE: 3-0 (K. Bamett and T. Bleasdale abstained) 3. PLEDGE OF ALLEGIANCE 4, APPLICATION RECEIPT #PL-24-6 - Request of Adams Builders, LLC, owner and applicant, for a modification to the Master Design Plan for PDD-2 (Planned Design District 2), 48 Great Neck Road in accordance with Section 19.1.2 and 19.2.2 of the Waterford Zoning Regulations. APPLICATION WAS RECEIVED: 4/15/24 PUBLIC HEARING REQUIRED BY: 6/20/24 Chairman Massad noted that application PL-24-6 was submitted for receipt at the April 15, 2024 Planning & Zoning Commission meeting. The April 15, 2024 meeting was cancelled, however the application was still officially received in accordance with State Statute and that it was scheduled for a public hearing within the required statutory period. 5. PUBLIC HEARING #PL-24-5~ Request of East Lyme Tree Service, owner & applicant for a Site Plan/Special Permit approval for Storage of Trucks & Equipment at 1122 & 1124 Hartford Turnpike, IP-3 zone, in accordance with Sections 15.2.1, 22 and 23 of the Zoning Regulations and as shown on plans entitled "East Lyme Tree Services, 1122 & 1124 Hartford Turnpike, Waterford, CT Rev. March 6, 2024 ". PUBLIC HEARING REQUIRED BY: 5/16/2024 Chairman Massad opened the public hearing at 6:33 p.m. Planning and Zoning Commission April 30, 2024 p.20f6 Ellen Bartlett, PE., CLA Engineers, was present for the application. M. Wujtewicz read the exhibit list, items 1-7 into the record. E. Bartlett reviewed the 3.2 acre site with the Commission and noted that because the property is located in the IP-3 zone all uses require a Special Permit. She noted the applicant plans to renovate the existing home, relocate the existing chicken coop on site and use the bam for vehicle storage. Timber and wood chips may be temporarily stored on site but will not be processed on site. There will be no vehicle maintenance ot fueling on site. E, Bartlett reviewed the water quality and water treatment proposed. She noted there will be a slight decrease in peak flows. T. Bleasdale asked how long the wood chips will be kept on the property. E. Bartlett stated the applicant uses them on job sites and he also donates them. The chips shouldn't be there for more than six months. K, Bamett asked what the hours of operation will be. E. Bartlett stated that they would be 8:00 am ~ 5:00 pm Monday through Friday and some Saturday morning hours. G. Massad asked three times if anyone from the public would like to speak regarding the application. No one from the public spoke. MOTION: Motion made by T. Bleasdale, seconded by T. Conderino, to close the public hearing for PL-24-5. VOTE: 5-0 The public hearing closed at 6:46 pm. 6. APPLICATION REVIEW #PL-24-5 — Request of East Lyme Tree Service, owner & applicant for a Site Plan/Special Permit approval for Storage of Trucks & Equipment at 1122 & 1124 Hartford Turnpike, IP-3 zone, in accordance with Sections 15.2.1, 22 and 23 of the Zoning Regulations and as shown on plans catiled "East Lyme Tree Services, 1122 & 1124 Hartford Tumpike, Waterford, CT Rev. March 6, 2024 ". G. Massad asked staff if there are any outstanding zoning enforcement issues. Staff responded yes, and this application will resolve the zoning matter. M. Wujtewicz reviewed the staff report with the Commission. The Commission made the following findings: 1, The application is for a use subject to a Special Permit approval, pursuant to Section 15.2.1 of the Waterford Zoning Regulations. 2. The existing single family and accessory apartment residential use on the property is a pre-existing non-conforming use and may continue. The continuation of the residential use shall be governed in accordance with Section 24 of the Town of Waterford Zoning Regulations pertaining to non-conforming uses and structures. 3. The statement of use contained in Exhibit 1b provided by the applicant in accordance with Section 23.5 of the Zoning Regulations identifies the findings and that the proposed Planning and Zoning Commission Apri 30, 2026 p.30f6 use as presented is consistent with the findings listed in Sections 23.5.1 through 23.5.9. 4. The Waterford Conservation Commission issued Inland Wetland Permit# C-23-12 for regulated inland wetland activities. us The Waterford Conservation Commission has submitted to the Planning and Zoning Commission a final report in accordance with CGS 8-3(g). 6. The application meets the criteria for site plan approval, pursuant to Section 22 of the Waterford Zoning Regulations, subject to condition 1. The Commission discussed the following conditions: 5. 1E The deed description for the merger of 1122 and 1124 Hartford Turnpike shall be submitted and filed on the land records at the time the final plans are filed. 2. Amannual Maintenance and Inspection Report for the Stormwater management system shall be provided to the Town of Waterford Planning and Development Department. This report shall be required to be submitted in order to verify that the stormwater management system is maintained and continues to operate as originally designed. 3. All conditions of approval for Inland Wetland Permit #C-23-12 shall be incorporated into this decision as if fully set forth herein. MOTION: Motion made by T. Conderino, seconded by K. Barnett, to approve the Site Plan / Special Permit for a Business Office application #PL-24-5 at 1122 & 1124 Hartford Tupike with conditions 1 thru 3 and to adopt the findings 1 thru 6 of the staff report. VOTE: 5-0 PUBLIC HEARING #PL-24-6 — Request of Adams Builders, LLC, owner and applicant, for a modification to the Master Design Plan for PDD-2 (Planned Design District 2), 48 Great Neck Road in accordance with Section 19.1.2 and 19.2.2 of the Waterford Zoning Reg