Oswegatchie Fire Station Building Committee - Minutes - 04/16/2026
agenda center minutes
| Board/Commission | Oswegatchie Fire Station Building Committee |
|---|---|
| Meeting Date | April 16, 2026 |
| Pages | 14 |
| File Size | 1.1 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD. WATERFORD, CT 06335-2886 April 16, 2026 Pledge of Allegiance Meeting called to order at 6:30 pm Robert Tuneski, Rocco Bracciale, Ursula Moreshead, Richard Muckle, Kathleen Elbaum, Wayne Matthew Blankenship, Timothy Sullivan, Paul Rafuse Steve Smith, Eric Cantar, Tim McCarthy (Solli Engineering), Christopher Haley, Kimberly Allen None Opening Remarks: None FOR: Unanimous R. Tuneski introduced the new member on the committee, Ursula Moreshead. MOTION by R. Muckle, second K. Elbaum to approve the 3/19/26 meeting minutes. FOR: Unanimous MOTION by R. Bracciale, second K. Elbaum to approve the payment of $5,250.00 to US Bank, invoice #8108820 dated 3/9/26. MOTION by R. Muckle, second U. Moreshead to approve the payment of SPA, invoice MOTION by K. Elbaum, second R. Muckle to approve the payment ofN. Kepple Law, LLC, invoice #82 dated 4/6/26 in the amount of $1,611.50. MOTION by K. Elbaum, second W. Gilpin to approve Munistat, referencing PO# Traffic signal ~ Solli Engineering presented the options and relative costs under new b. DOT Permit - Contractor (Secondino) is responsible for filing for encroachment C. Haley recommended “Station 4 Oswegatchie) as the name of new firehouse via d. Meaning of RCRA8 TCLP ~ email from S. Smith explaining the meaning. 1. S. Smith stated the contract between the contractor, (Secondino), and the Town has been executed. The building department is currently reviewing the plans and b. Review and action on station traffic light or traffic signs Tim McCarthy explained the existing set up being an emergency signal plus signs displaying a fire truck indicating a Fire Station is ahead. Options presented and explained: a. New light would require new span pole assemblies f. 10-14 months construction due to equipment lead time 2. Signs displaying a fire truck with yellow flashing beacons a. Estimated cost - $75,000.00 to $100,000.00 peo The biggest difference between the two options is the signal is regulatory ~ the law requires vehicles to stop for the red light. The flashing signs are a warning device which the law does not require a vehicle to stop. Another difference is the signs are able to be solar powered or hard wired. The Local Traffic Authority would authorize or deny the option brought before them. The DOT Director Haley asked if the LED lights embedded around the sign is a choice. The DOT would make the final decision on this type of sign. _E. Cantar and T. McCarthy will look into this. U. Moreshead asked if the current concem with the control of traffic now. If not is the traffic signal warranted? R. Tuneski believes Chief Balestracci stated the current traffic does not warrant a light. U. Moreshead asked which power option is more sustainable and is there a life expectancy to where they would need replacement? T. McCarthy ~ cost is comparable for solar or wired. R. Muckle stated due to cloudiness and snow in the winter, in his opinion, solar is not W. Gilpin stated the firefighters voted for an overhead light. Therefore does not believe there is R. Tuneski stated the committee could vote on referring the overhead light to the Local Traffic MOTION by R. Muckle, second W. Gilpin to refer to the LTA the option of an overhead VOTE: MOTION by R. Bracciale, second R. Muckle to table the sign option until the next FOR: R. Tuneski, R. Muckle, R. Bracciale, K. Elbaum, W. Gilpin New Business: a. Ground Breaking Plans: b. Change Order Process: S. Smith suggested a sub-committee be formed to meet with Downes during the R. Bracciale stated the Town’s bus trips usually pick up their passengers in the Oswegatchie The next meeting date is May 7, 2026. MOTION to adjourn by W. Gilpin, second U. Moreshead Meeting adjourned 7:56pm Linda Finnegan, Recording Secretary x» eat , . ee Invoice Number 8108820 03/09/2026 St Pou MN SE107 ‘Town of Waterford, Connecticut General Obligation ‘CURRENT CHARGES SUMMARIZED FOR ENTIRE RELATIONSHIP Detail of Current Charges Volume. Rate Portion of Year Total Fees 01010 Acceptance Fee 250.00 1.00 $250.00 Subtotal Acceptance Fees $260.00 04125 Pay int, One Time 5,000.00 1.00 $5,000.00 Covers: 03/162086 03/1/2026 ‘Subtotal Miscelaneous $5,000.00 TOTAL AMOUNT DUE $5,250.00 Page 2012 (Sbank. : Invoice Numbor: 8108820 erect ‘Account Number. ‘S9928U0NS Ons ave Invoice Date: 03/09/2026 Town of Waterford, Connecticut General Obligation Bonds, Issue of 2026, Dated 32.10.2026, Que _ Te foloring is statement ol Yanssetons perwnna yur eecount. Fr futher intormaton please review ne steches . TOTAL AMOUNT DUE $5,250.00 All invoices are due upon receipt Man dae ‘ rH POH KMS’ FY_Dle CLOSE PO Y. N ACCOUNTE, ve 3IS- DET AMOUNT. PIB. SIGN. DATE, Please delach at perforation andrea bonom porion othe statement with your check payable to US. Bank Town of Waterford, Connecticut General Obligation invoice N a Bonds lave of 2026, Dated 810.2026, Due St 2006 ecead Nettes: sogo0uons ‘Current Dua 35,250.00 « USS. Bank 3 St. Paul, MN 55170-9690 ~ A SILVER PETRUCELLI + ASSOCIATES 3190 WHITNEY AVENUE HAMDEN CT 06518 311 STATE STREET NEW LONDON CT 06320 203 230 9007 silverpetruceli.com ‘Town of Waterford, 15 Rope Ferry Road Waterford, CT 06385-28686 Professional services through March 31, 2026. Date Project 23.352 Waterford - Oswegatchie Fire Contract Percent Total Prior Current Description ‘Amount_Complete Billed Billed Billed ‘Schematic Design Phase 66,200.00 100.00 66,200.00 66,200.00 0.00 Design Development 110,344.00 100.00 110,344.00 110,344.00 0.00 G802#1 Construction Document Phase 286,000.00 100.00 286,000.00 286,000.00 0.00 Bid Phase 22,000.00 100.00 22,000.00 22,000.00 0.00 Construction Admi 132,000.00 1.00 4,320.00 0.00 1,320.00 42,500.00 1456 6,187.00 4,687.00 1,500.00 35,000.00 36.71 12,500.00 12,500.00 0.00 25,000.00 0.00 0.00 0.00 0.00 = Boundary Survey & Wetland 15,000.00 100.00 15,000.00 18,000.00 0.00 Allowances - High Performance Buildings 25,000.00 0.00 0.00 0.00 0.00 G802H3 Add. Engineering Services 3,250.00 100.00 3,250.00 0.00 3,250.00 Total __ 762,294.00 68.58 522,801.00 516,731.00 6,070.00 Invoice total 6,070.00) “Town of Waterford Tnvoice number 26-505, Tawoee date 04/01/2026 Page tol? Projecl_23.352 Waterford -Oxwogatehie Fite Station ae osro1r2026 Invoice Summary Contract Total Prior Current 6802#1 Construction Document Phase 286,000.00 286,000.00 286,000.00 0.00 Bid Phase 22,000.00 22,000.00 22,000.00 0.00 Construction Administration 132,000.00 1,320.00 0.00 1,320.00 Allowances - Geotechnical Borings 35,000.00 12,500.00 12,500.00 0.00 Allowances - Boundary Survey & Wetland Delineation 15,000.00 15,000.00 18,000.00 0.00 Allowances - High Performance Buildings 25,000.00 0.00 0.00 0.00 (G802#3 Add. Engineering Services 3,250.00 3,250.00 0.00 3,250.00 Invoice Number __lavoice Date_Outstanding Gurrent___ Over 30_Over 60 Over 90__Over 120 ‘Approved by: N Kepple Law, LLC INVOICE 20 South Anguilla Road, PO Box 1445 Invoice # 82 Pawcatuck, CT 08379 Date: 04/08/2028 United States Due Upon Receipt Oswegatchie Bldg Comm. 2023 (BFC-23-223-001) ‘Type Date ae Notes. Quantity Rate (USD) Total (USD) Service 03/00/2026 NK Review Stein and Callahan emails, 040 $200.00 $80.00 Service 03/14/2028 NK Review D Stein email and contract 0.70 $200.00 $140.00 ‘amendment Service 03/14/2026 NK Prep for and attend Bidg Committee 260 $200.00 $520.00 Service 03/18/2028 NK Prep for and attend Zoom mig w 0.80 $200.00 $160.00 ‘Shea D, D Stain, Steve S, review AIA ‘contract Service 03/17/2026 NK ‘TOW S Davy re Contract, ofc w Eric 0.40 $200.00 $80.00 C. review emalis. Service 03/19/2028 NK Prep for and attend Blég Committee 180 $200.00 $300.00 Service 09/20/2026 NK ‘TCwS Davy re contract status, tc w 0.80 $200.00 $160.00 RT, TC w Atty McNamara, review SD Service 09/31/2026 LP Complete OP-296 and deed 030 © $105.00 $31.50 ‘acknowledgments. Service 03/31/2026 NK ‘TC w RB re Construction Contract w 0.70 $200.00 $140.00 ‘Secondino, TC w Atty Anderson re Gardner property abutting Fire Station Total $1,611.50 USD Please make all amounts payable to: N Kepple Law, LLC Munistat Services, Inc. . 129 Samson Rock Drive, Suite A Moneatcteae Munistat 115 Rope Ferry Road Madison, CT 06443 2026 Bond Issuance $13,000.00 Hf you have any questions concerning this invoice, use the following contact informs APPROVED VENDOR#. Susan Caron olen 429 Samson Rock Drive, Suite A POHMDSEE FY. _— Madison, CT 06443 CLOSE PO Y. AMOUNT. ‘Thank you for your business! SIGN. DATE. Attachment 1 From: Steve Smith <smith@downesco.com> Subject: ‘Oswegatchie Fire Station - Soils testing meaning of report 1 CAUTION: This email originated from outside of the organization. I Ted, Thope your retirement from the Building Committee is going well. You will be missed as a resourceful member for the project. I wanted to close an item on the open items list. Mystic Air performed soils testing at the new building site and provided a report of the findings. In its review, you asked what the terms RCRA and TCLP Mercury, Selenium, and Silver—regulated by the EPA under the Resource Conservation and Recovery ‘Act (RCRA) due to their environmental and human health hazards. They are strictly monitored for toxicity and DOWNES CONSTRUCTION Connecticut | Rhode ‘Sheet Revisions: Rev.# Date Attachment 2 ‘Sheet Information: Project: ‘Sheet Title: ony oso?*| Oswegatchie Fire Station Existing Approved By: MFB 441 Boston Post Road Conditions Map Project #: 26104101 Waterford, Connecticut Estimated Cost Timeline Cost: $75,000-$100,000 Timeline: Design 2-3 weeks Bidding: 3-5 weeks Construction: 4-6 Months ALTERNATE FLASHING SIGNAL DIAGRAM BA maton ensins PAVEMENT MARIN MATCH EXSIING PAVEMENT MABE INOCATORS 10 HAVE LED LAMPS 88 - £ OOURLE YELOW DOMED EXTENTION LE NOTES commen 1 FRVAR PAVEMENT MARKINGS SHALL BE EPOXY RESIS AND SHALL OF ‘ACCORDANCE WH SIANOARD SHE Cs = cae aaa tT OSWEGATCHIE FIRE STATION | WATERFORD. SIGNING AND PAVEMENT 0102-0210 fare a E TECHNICAL NOTES sean OmCEBECOND = DOT Review & Approval: 2-4 Months Construction: 10-14 Months TRAFFIC CONTROL warenrono EC Sot 0102-0210