Representative Town Meeting (RTM) - 244 (05/06/2021)
agenda center attachment
| Board/Commission | Representative Town Meeting (RTM) |
|---|---|
| Meeting Date | May 06, 2021 |
| Pages | 4 |
| File Size | 3.9 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
GENERAL
FUR.
.
.
2022
-
2026
CAPITAL
IMPROVEMENT
PLAN
(CIP)
CURRENT
YEAR
CAPITAL
IMPROVEMENTS
128/21
Revisions
S5738
SS
FLEET
MANAGEMENT
PLAN
,000,
900,000
800,000
|___
900,000
55805
HARDWARE
REFRESH
22,233
0
55862
PURE
ARRAY
74,000
74,000
FD
NETWORKED
COMPUTER,
55845
PHONE,
WIFI
95,976
55864
BODY
CAMERAS
98,250
110,100
55837
INFRARED
CAMERAS
IN
CARS
14,812
14,350
55858
ACCIDENT
INVESTIGATION
13,391
55846
POLICY
DIRECTIVE
REVAMP
30,000
NEW
CYBER
CRIME
TAKS
FORCE
EQUIPMENT
11,000
11,000
NEW
TRAFFIC
MESSAGEBOARDS
28,000
28,000
0
0
0
0
NEW
IMPOUND
YARD
IMPROVEMENTS
28,500
28,500
0
0
0
0
NEW
MARINE
OUTBOARD
MOTORS
38,500
38,500
0
0
0
0
NEW
LICENSE
PLATE
READERS
27,120
27,120
0
0
0
0
TOWN OF WATER’ 3D
GENERAL FUR
2022 - 2026 CAPITAL IMPROVEMENT PLAN (CIP)
10138 _
CURRENT bees CSET AL, IMPR
|
|
Revisions
NEW
EQUIPMENT REPLACEMENT PLAN
75,000
75,000
75,000
75,000
NEW
JORDAN - WINDOW REPLACEMENT
50,000
50,000
QUAKER HILL - EMERGENCY
NEW
GENERATOR
50,000
NEW
QUAKER HILL - REAR PARKING LOT
50,000
NEW
QUAKER HILL ROOF PROJECT
100,000
NEW
GOSHEN BUNKROOM RENOVATIONS
50,000
NEW
GOSHEN APPARATUS FLOOR DRAINAGE
25,000
NEW
OSWEGATCHIE CASCADE SYSTEM
80,000
GOSHEN - AIR CONDITIONING SYSTEM
NEW
REPLACEMENT
25,000
25,000
25,000
NEW
COHANZIE EMERGENCY GENERATOR
50,000
55847
COHANZIE - ROOF REPLACEMENT
0
60,000
60,000
55865
GOSHEN- HALL FLOOR REPLACEMENT
15,000
NEW
I
CULVER
fi
i
:
27,500
Bloomingdale Ra/Hunts Brook
Cross Rd/Jordan Brook
Chapman/Brandee Lake
NEW
Marmran Concnets Panels
80,100
80,100
William Street/Concrete Sidewalk
42,300
42,300
Summer Street/Concrete Sidewalk
33,420
33,420
David Street/Concrete Sidewalk
43,680
43,680
Cross Road/Asphalt
69,800
69,800
Rope Ferry Road (Federal Grant Funds)
304,000
304,000
NEW
ROAD RESURFACING/PAVING __
Daniels (Reclaim)
0
0
451,462
Niantic River #194-Rt. 1 (Reclaim)
319,840
Quarry-Leary-Shore (Reclaim)
332,685
Goshen-Spinmaker-C Club (Reclaim)
396,765
Oil Mill (Reclaim)
487,285
TOWN OF WATER” 3D
{
f
GENERAL FUN.
'
2022 - 2026 CAPITAL IMPROVEMENT PLAN (CIP)
DET UAGCENGY:
_
_
10138
_ CURRENT ea CAPITAL IMPROVEMENTS
Section A, ‘Area (P) - See Note A
334,473
334,473
Section A, Area 1(P) & Areas 2 - See Note
B
239,096
Section B, Area 8 - See Note C
192,645
Section B, Area 6 - See Note D
161,705
Section C, Area 1 - See Note E
493,475
Gardiner Wood Road
3,000,000
Eversource Affected - See Note F
215,813
215,813
NEW
MISCELLANEOUS
_
MS4 Retro Fits and DCIA
Sea Level Rise
Traffic Signal Replacement
Guild Rail Replacement
Retaining Walls
Transfer Station (Scale & Scale House)
106,548
106,548
55866
BLOOMINGDALE SOUTH-MILL
&PAVE
131,300
NEW
MILLSTONE EAST NEIGHBORHOOD
oO
oO
55868
GALLOWS LANE- Reclaim/Pave
134,080
55867
REMOVE UNDERGROUND UST-
Cohanzie Fire
299,000
VAUXHALL ST. (Hunts Brook Mill &
55851
ADA IMPROVEMENTS YSB/PD
80,700
80,700
0
0
55852
TOWN HALL BATHROOMS
25,000
25,000
0
0
57857
CIVIC TRIANGLE UPGRADES
150,000
150,000
0
0
0
0
NEW
UNDERGROUND TANK REPLACMENT
250,000
250,000
0
0
0
0
AC UNIT REPLACEMENT AT EMERGENCY
NEW
RADIO SITES
60,500
60,500
0
0
0
0
EUGENE O'NEILL MANSION ROOF
REPLACEMENT (co-funded with Eugene
NEW
O'Neill)
35,000
35,000
0
0
106,000
“mm,
TOWN
OF
WATEF
~RD
{
GENERAL
FU:
.
2022
- 2026
CAPITAL
IMPROVEMENT
PLAN
(CIP)
Pe
DEPT/AGENCY:
10138
Secbee
SE
Sa
a)
a
~
2,216,680
FY21
Approved
FY22
Requested
2,599,754
$
Difference
383,074
% Difference
17.28%
(36,000)
CURRENT
YEAR
CAPITAL
IMPROVEMENTS
1/28/21
Revisions
NEW
CCTV
Camera
& Lateral
Launching
System
120,000
120,000
CONTROL
PANEL
RETRO-FIT
(GORMAN-
NEW
RUPP
STATION)
30,000
30,000
30,000
30,000
30,000
NEW
ROOF
& SIDING
REPLACEMENT
50,000
50,000
50,000
50,000
25,000
55871
EVERGREEN
PUMP
STATION
375,000
375,000
0
0
IN-LINE
WASTEWATER
SOLIDS
85,000}
85,000}
85,000}
85,000]
NEW
VETERAN'S
FIELD
LIGHT
REPLACEMENT
0
341,000
NEW
EQUIPMENT
STORAGE
PLAN
21,000
21,000
NEW
VETERAN'S
GARAGE
ADDITION
PLAN
0
0
NEW
MAGO
POINT
LIGHT
REPLACEMENT
25,990
55822
LEARY
PARK
IRRIGATION
0
0
CHILDREN'S
PLAYGROUND
EQUIP.
55838
(GRANT
& CNR
FUNDS)
0
0
50,200
0
0
55856
DOG
PARK
FENCE
REPLACEMENT
16,200
0
0
HIGH
SCHOOL
FIELD
ENHANCEMENTS
0
0
FEDERAL/STATE
GRANTS
0
0
0
Rope
Ferry
Road
Sidewalk
(304,000)
(304,000)
EUGENE
O'NEIL
MANSON
ROOF
CO-
FUNDING
(25,000)
(25,000)
CONTRIBUTED
GIFT
GRANT
(REC
&
PARK)
CHILDREN'S
PLAYGROUND