Planning & Zoning Commission - 1037 (03/25/2025)
agenda center attachment
| Board/Commission | Planning & Zoning Commission |
|---|---|
| Meeting Date | March 25, 2025 |
| Pages | 8 |
| File Size | 0.2 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Town of Waterford
Building, Conservation, Planning and Zoning
www.waterfordct.org
a. This form must be submitted in conjunction with PZC Form 1: Planning and Zoning Application or, in the case of
minor activities and if permitted by the Zoning Enforcement Officer, Zoning Compliance Permit.
b. This form does not supersede or take the place of any state or federal permits. The applicant shall consult with the
necessary agencies to review the possibility of additional permits, including general or individual permits that may be
required for specific activities.
Consistent with Connecticut General Statues ,Chapter 444, Secs. 22a-90 to 22a-113j, Waterford’s Planning and Zoning
Commission, acting in the capacity of the Town’s Zoning Commission, regulates certain activities upon properties which
lie completely or partially within the coastal area as defined by CGS §22a-94(b). Specifically, the Commission’s is
authorized, cited in part, by the following:
Sec. 22a-105. Coastal site plan reviews. (a) Coastal municipalities shall undertake coastal site plan reviews in
accordance with the requirements of this chapter.
(b) The following site plans, plans and applications for activities or projects to be located fully or partially within the
coastal boundary and landward of the mean high water mark shall be defined as “coastal site plans” and shall be subject to
the requirements of this chapter: (1) Site plans submitted to a zoning commission in accordance with section 22a-109; (2)
plans submitted to a planning commission for subdivision or resubdivision in accordance with section 8-25 or with any
special act; (3) applications for a special exception or special permit submitted to a planning commission, zoning
commission or zoning board of appeals in accordance with section 8-2 or with any special act; (4) applications for a
variance submitted to a zoning board of appeals in accordance with subdivision (3) of section 8-6 or with any special act,
and (5) a referral of a proposed municipal project to a planning commission in accordance with section 8-24 or with any
special act.
PZC Form 2:
Application for Coastal Area Management Site Plan Permit
Property Address:
Office Use Only
Date Submitted:
Processed By:
App. No.:
Rev: 07/24/14
2.
Authority
1.
General
441 & 439 Boston Post Road, Waterford, CT
a. By placing a check mark in the appropriate box(es), identify the coastal resources and their policies for each that is
located on and adjacent to the property or that may be influenced by the activities associated with the application.
Note: A resources may be located on site, adjacent and be off-site but influenced by the activities. Refer to CGS §22a-
92(a) for General Coastal Resource Policy, CGS§221-92(b)(2) and CGS §22a-93(7) for definitions of each
corresponding policy’s coastal resource.
Coastal Resource
On-site
Adjacent
Off-site but
within
Influence
General Coastal Resources
Beaches and Dunes
Bluffs & Escarpments
Coastal Hazard Area
Coastal Waters, Estuarine Embayments,
Nearshore Waters, Offshore Waters
Development Shorefront
Freshwater Wetlands and Watercourses
Intertidal Flats
Islands
Rocky Shorefront
Shellfish Concentration Area
Shorelands
Coastal Hazard Area ID Type (i.e. VE, A, etc.)
NA
NA
Base Flood Elevation
NA
NA
Tidal Wetlands
b. Consistency with Coastal Resources and Policies.
Attached a typed and briefly statement of how the resources checked are consistent or inconsistent with coastal
resource policies.
3.
Coastal Resources and Policies
X
X
X
c. Identification of Potential Adverse Impacts on Coastal Resources
Please complete this section for all projects. Identify the adverse impact categories below that apply to the
proposed project or activity. The applicable column must be checked if the proposed activity has the potential to
generate any adverse impacts as defined in CGS Section 22a-93(15). If an adverse impact may result from the
proposed project or activity, please use Part VIII to describe what project design features may be used to
eliminate, minimize, or mitigate the potential for adverse impacts.
Mitigation
Potential Adverse Impacts on Coastal Resources
Applicable Not Applicable
Proposed
i.
Degrading tidal wetlands, beaches and dunes,
rocky shorefronts, and bluffs and escarpments
through significant alteration of their natural
characteristics or functions
ii. Increasing the hazard of coastal flooding through
significant alteration of shoreline configurations or
bathymetry, particularly within high velocity
flood zones - CGS Section 22a-93(15)(E)
iii. Degrading existing circulation patterns of coastal
water through the significant alteration of patterns
of tidal exchange or flushing rates, freshwater input,
or existing basin characteristics and channel contours
iv. Degrading natural or existing drainage patterns
through the significant alteration of groundwater
flow and recharge and volume of runoff
v. Degrading natural erosion patterns through the
significant alteration of littoral transport of sediments
in terms of deposition or source reduction
vi. Degrading visual quality through significant alteration
of the natural features of vistas and view points
vii. Degrading water quality through the significant
introduction into either coastal waters or groundwater
supplies of suspended solids, nutrients, toxics, heavy
metals or pathogens, or through the significant alteration
of temperature, pH, dissolved oxygen or salinity
viii. Degrading or destroying essential wildlife, finfish, or
shellfish habitat through significant alteration of the
composition, migration patterns, distribution, breeding
or other population characteristics of the natural species
or significant alterations of the natural components of
the habitat
X
X
X
X
X
X
X
X
a.
Identify all coastal policies and standards in or referenced by CGS Section 22a-92 applicable to the proposed
project or activity:
General Development
Sewer and Water Lines
Water-Dependent Uses
Energy Facilities
Ports and Harbors
Fuel, Chemicals and Hazardous Materials
Coastal Structures and Filling
Transportation
Dredging and Navigation
Solid Waste
Boating
Dams, Dikes and Reservoirs
Fisheries
Cultural Resources
Coastal Recreation and Access
Open Space and Agricultural Lands
b.
Consistency With Applicable Coastal Use Policies And Standards
Attach an explanation of how the proposed activity or use is consistent with all of the applicable coastal use and
activity policies and standards identified in Part V. For projects proposed at waterfront sites (including those with
tidal wetlands frontage), particular emphasis should be placed on the evaluation of the project’s consistency with
the water-dependent use policies and standards contained in CGS Sections 22a-92(a)(3) and 22a-92(b)(1)(A)
also see adverse impacts assessment in Part VII.B below:
Attach a summary addressing each of the following:
a.
Describe the methods proposed to mitigate any adverse impacts.
b.
Explain why adverse impacts are not being mitigated, if applicable.
c.
Summarize why the project as proposed is consistent with the Connecticut Coastal Management Act
4.
Coastal Use and Activities Policies and Standards
5.
Mitigation of Adverse Impacts and Overall Consistency (all applications)
a. Identification of existing and/or proposed Water-dependent Uses: Attach a description of the features or
characteristics of the proposed activity or project that qualify as water-dependent uses as defined in CGS Section
22a-93(16). If general public access to coastal waters is provided, please identify the legal mechanisms used to
ensure public access in perpetuity, and describe any provisions for parking or other access to the site and proposed
amenities associated with the access (e.g., boardwalk, benches, trash receptacles, interpretative signage, etc.)*:
b. Identify the adverse impact categories below that apply to the proposed project or activity. The applicable column
must be checked if the proposed activity has the potential to generate any adverse impacts as defined in CGS
Section 22a-93(17). If an adverse impact may result from the proposed project or activity, use Part VIII to
describe what project design features may be used to eliminate, minimize, or mitigate the potential for adverse
impacts.
Potential Adverse Impacts on Future Water-dependent
Mitigation
Development Opportunities and Activities
Applicable Not Applicable
Proposed
i.
Locating a non-water-dependent use at a
site physically suited for or planned for location of a
water-dependent use
ii.
Replacing an existing water-dependent use
with a non-water dependent use
iii.
Siting a non-water-dependent use which
would substantially reduce or inhibit existing public
access to marine or tidal waters
Application Content
The undersigned herby acknowledges that this application and statements submitted herewith are true to the best of my
knowledge and approval of the application is contingent upon compliance with all requirements of said regulations.
Signature
Printed Name
Date
_________
_________
Applicant
_________
_________
Agent
_________
_________
Land Owner
_________
_________
Land Owner
6.
Potential Adverse Impacts on Water-dependent Uses (for project or activity is proposed at a waterfront site)
7.
Acknowledgements; All applications
X
X
X
SIGN
Memorandum
555 Long Wharf Drive New Haven, CT 06511 T: 203.562.5771 F: 203.789.6142
To:
Mark Wujtewicz | Waterford Planning & Development
From:
Brian Phillips, P.E.
Chris Cardany, P.E.
Date:
07 February 2025
Re:
Coastal Site Plan Application
Oswegatchie Fire Station
441 & 439 Boston Post Rd.
Waterford, Connecticut
Langan Project No.: 140286501
Project Description
This Coastal Site Plan Application memorandum has been prepared in support of the proposed
Oswegatchie Fire Station project at 441 Boston Post Road. The project includes the phased
demolition of the existing fire station building and the construction of a new fire station along
with associated site improvements including parking, utilities, landscaping, and lighting.
Coastal and Other Resources
Portions of the property lie within the Connecticut Coastal Boundary line, however only about
half of the proposed development will fall within this boundary. Following review of the State
Coastal Resources Maps (Niantic), the coastal resources on site include only shorelands. The
only other identified natural features of the development site are shorelands and inland
freshwater wetlands both on the parcel and offsite to the north. No significant historical or cultural
resources have been identified within the limit of development The property also contains no
floodplain.
Coastal Resource and Activities Policies (CT Coastal Management Manual)
•
•
Shorelands (42) – To regulate shoreland use and development in a manner with minimizes
adverse impacts upon adjacent coastal systems and resources.
•
•
MEMO
Coastal Site Plan Application
441 & 439 Boston Post Rd.
Waterford, Connecticut
Langan Project No.: 140286501
07 February 2025- Page 2 of 3
use without significantly disrupting either the natural environment or sound economic
growth.
Consistency with Coastal Resource and Activities Policies
In accordance with the policies noted above, the proposed development includes erosion
controls throughout construction, stormwater quality and quantity improvements, and a limited
development area so as not to encroach on any inland freshwater wetlands and watercourses.
The proposed development will be designed in accordance with the CT Stormwater Quality
Manual and CT Guidelines for Soil Erosion and Sediment Control. Controls to be implemented
throughout construction include anti-track pad construction entrances, silt fences backed by hay
bales, and temporary sediment traps. These controls will help minimize the passage of sediment
and pollutants from the limit of development.
Stormwater quality and quantity improvements include catch basins with deep sumps, a rain
garden to promote infiltration, riprap scour pads and level spreaders at stormwater outfalls, and
vegetated swales with check dams. These proposed improvements are designed to attenuate
stormwater peak flows for all storm events up to and including the 100-year storm event.
Additionally, per the 2024 CT Stormwater Quality Manual requirements, peak stormwater runoff
from each individual onsite watershed where site development is proposed will be reduced by
50% for the 2-year storm event. These measures will be implemented to reduce stormwater
peak flows, promote infiltration of stormwater and groundwater recharge, improve water quality,
and minimize the passage of pollutants to the onsite wetlands, offsite drainage networks and the
adjacent coastal resources noted in this memorandum.
The extent of site development is proposed within the 100-foot upland review area of both inland
freshwater wetland areas, however no further encroachments are proposed beyond the existing
site disturbances. The project has submitted a wetlands application to the Waterford
Conservation Commission and was approved at their January 23, 2025 meeting.
Evaluation of Potential Benefits and Adverse Impacts of the Project
The potential adverse impacts of the project to the applicable coastal resources include erosion
during construction and stormwater runoff following construction. Additionally, the project
proposes to maintain the undeveloped wooded and wetland area to the north of the site. Other
benefits include the implementation of stormwater infrastructure to reduce stormwater runoff,
promote infiltration, and improve water quality.
In order to mitigate the potential adverse impacts, the project proposes the previously mentioned
sediment and erosion control measures to minimize the passage of sediment and other
pollutants from the site during construction. The permanent stormwater infrastructure is
designed to reduce stormwater peak flows from the development for all storms up to and
including the 100-year storm event and promote onsite infiltration and groundwater recharge.
MEMO
Coastal Site Plan Application
441 & 439 Boston Post Rd.
Waterford, Connecticut
Langan Project No.: 140286501
07 February 2025- Page 3 of 3
Evaluation of Impacts or Effects the Project Will Have on Future Water-Dependent Uses
The site is not on a waterfront location and therefore has very little or no potential for water-
depended uses or water-dependent development. As such, there are no impacts proposed by
the development and no mitigation measures required.
If there are any questions or comments, please feel free to contact our office.
Sincerely,
Langan CT, Inc.
Brian Phillips, P.E.
Senior Project Manager
Christopher Cardany, P.E., LEED AP
Principal/Vice President
\\langan.com\data\nhv\data5\140286501\project data\_discipline\site civil\permit apps\coastal site plan application\2025-02-07 oswegatchie fire station-cam narrative.docx