Planning & Zoning Commission - 1108 (07/22/2025)
agenda center attachment
| Board/Commission | Planning & Zoning Commission |
|---|---|
| Meeting Date | July 22, 2025 |
| Pages | 4 |
| File Size | 1.2 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886 Date: June 17, 2025 To: Waterford Planning & Zoning Commission RE: Report of Conservation Commission Action: Inland Wetland Permit #C-25-06 — 51 Daniels Avenue Commissioners, The Waterford Conservation Commission granted inland wetland permit #C-25-06 for regulated inland wetland activities associated with the construction of a new school facility on land located at 51 Daniels Avenue, Waterford, CT. The permit was granted with conditions on June 12, 2025. A copy of the permit is attached. Authorized regulated activities include: * Construction of an 87,500 sq. ft. school facility with associated access driveway and parking areas upland of inland wetland resources. = Disturbance of 1,000 sq. ft. of upland review area for construction of a sidewalk west of the off- site wetland area #2. e Discharge of treated stormwater run-off to inland wetlands and watercourses. The activities are shown on site plans entitled; “LEARN — Early Childhood School, 51 Daniels Avenue, Waterford, Connecticut” dated 05/01/2025, prepared by Langan Engineering & Environmental Services, Inc. A condition of permit approval requires the final plan set to incorporate the revised plan sheets CG101, CG102 and CE101 as presented to the Conservation Commission on 5/22/2025. These plan changes reflect the relocation of the southwest stormwater discharge outlet to reduce the potential for soil erosion and sediment impacts to the off-site receiving wetland area, and revised grading at the spillway outlet for the stormwater basin. Respectfully; Maureen FitzGerald Environmental Planner Attachment: ce: Waterford Conservation Commission FIFTEEN ROPE PERRY ROAD: WATERFORD, CT 06385-2886 PHONE: 860"442-0553 www.waterfordétorg OT VALID Nfl SIGNED 51 Daniels Avenue, } The Wateetoed Conservation: re ini their capacity at the Town’ 8 Inland Wetland oT; ‘which are subject to jurisdiction 3th apeotdance vit CT’ ‘Genewal. statutes, Secdon: 5, inclusive, as:amended, and the: Waterford Inland Wetlands and ae segulations. This permit is a-gtant of approval to conduct the following regulated activities: * Construction of an 87,500:sq, ft. school facility with associated access driveway-and parking areas upland of inlarid wetland resources. a Disturbance of 1,000 sq.ft. of iplaiid review ated for coxistructioti of a sidewalk’ west of the off-site Wetland atea #2, « Discharge of treated stormwater ruit-off from the developed site uppradient of the off-site ‘wetland atea #3, These-re culated activities are associated withthe construction of anew regional school facility ott 15.36 acies of land located at,51 Daniels Avenue, Waterford, Connecticut. The proposed activities are. detailed on site plans-entitled; “LEARN — Early Childhood School, 5f Daniels Avenue, Waterford, Connecticut” dated. 05/0: 1/2025, prepared by ‘Langan Engineering & Environmental Services, Inc. The Consetvation Commission. authorizes the regulated activity with the following coriditions 6f approval to-minimize impacts associated with the proposed'regulated activity. and protect the inland wetlands and watercoutses: SPECIAL CONDITIONS: 1. The:fitial plan get shall incorporate the tevised plan sheets CG101, CG102 and CE101 as ‘preserited to the Conservation Commission on 5/22/2025, 2. The approved limits of clearing and disturbance shall be marked in the field and approved by the Commission’s agent prior to the-start of site work. 3, The vernal:pool protection plan shall be: implemented : ag detailed in the wetland. assessment réport-prepared by All-Points Technology. Corporation submitted: with the applica Repoits docutneititig completion of contractor awareness training and inspection of wildlife restrictive batriers shall be submitted tothe: Gommission’s:agent at:the:start of construction. Waterford Conservation’ Commission Talarid’ Wetland Petinit:#C-25-06 51 Daniels;Avenué:~Page:2:of 3° 4, At all tines duritig site construction, temporary diversion swales and sediment traps shall’ be installed and.maintained to. control, construction run-off arid prevent sediniént discharge to wetlands. 5; Ptiot to:issuance of a certificate. of permit compliaiee; att as-built plan.and. written inspection: téport from the design engiréer shall be-submitted to-the Commission’s agent to document that the stormwater detention / treatment components and outfalls were: constructed:in accordance:with:the approved plans, 6... Ax opetation arid. maintenance plan that identifies thé frequency: and type of inspection:and. maintenance:actions tequired for cadhelemeitt of the stormwater treatment system shall be prepared by ‘the project engineer and submitted:to the Commissiori’s agent. The plat shall be: kept on-site and the stormwater system shall be maintained in: accordance with the plan, f. The Conservation Cormmission’s agent shall be notified at least 48 hours prior ta ‘commencement of any regulated activity: 2. Final stabilization. of disturbed soil ateas, including all temp disturbatices, shall bé stabilized with the application of loam control measures. 1, seed and ‘appropriate erosion 3. Atall times: during site-work and until.soil areas are stabilized, the applicant'shall install and wnaintaiii erosion and sediment control meastires such as “fabtic filter fence, staked: hay bales or other theasures deemed necessary by the Commissions agent to pievént etosion and ‘sedimentation. impaets:to” wetlands and watercoutses. 4, Erosion control and soil stabilization-measures'shall.comply with the.approved plans‘and'the guidelines as established in: the Connecticut Guidelines:for Soil Etosion and Sediment Contrél, 2002,‘ CTDEEP Billetin 34. 5, Upon direction of the Commission's agent, erosion and sediment control measures shall be removed by the applicant following stabilization: of the site. Adi work and all iegulated. aétivities. conducted pursuant to this authorization shall be:consistent with the. terms-and cotiditions of this permit, Any-structures, excavation, deposition of fill, abistiuctions of flow, encroachments or other regulated activities not specifically identified and authorized herein shall constitute a violation of this permit and-may result in permit modification, suspension or revocation. Ia the event. that. any additional wetland: or watercourse regulated activities. aré required.as:a result of ather agency permitting to support the proposed activity, ‘aterford Conservation Cammission reserves the right to-reconsider the proposed regulated activity and may require modifications to minimize:the impact to wetland.xesources, Waterford Conservation Commission Inland Wetland Permit #C-25-06 51 Daniels Avenue - Page 3 of 3 In evaluating this application, the Commission has relied on information provided by the applicant. If such information subsequently proves to be false, incomplete and/or inaccurate, this permit may be modified, suspended or revoked. This.permit shall be valid for a period of 5 years.. Permit extensions may be authorized in accordance with CT General Statutes § 22a-36 through 22a-45 inclusive,. If the regulated activity is not completed within this time frame, the permit may be held to be invalid by the Conservation Commission or the applicant may be required to petition the: Commission for an extension or te-issuance of the permit. The Commission may require the applicant to furnish additional information at that time. The Conservation Commission renders this Summary Ruling in accordance with the Waterford Inland, Wetlands and Watercourses Regulations based on the following considerations: A. The proposed activity does not involve direct impacts to wetlands or watercourses and maintains vegetated uplands upgradient of wetland resoutces. B. The activity has been found to not affect the capacity of the wetland resources to support wildlife habitat, perform groundwater discharge/recharge functions, and to support sediment/toxicant/nutrient removal functions. C.. Short-term potential impacts to wetlands are minimized through implementation of a detailed erosion and sediment control plan. Potential long-term impacts to wetlands are mitigated with a stormwater detention/infiltration system to control water quality impacts, maintain groundwater recharge and detain peak flows. This permit will be’strictly enforced. If the Conservation Commission finds that the applicant has not complied with the permit conditions or has exceeded the scope of this permit as set forth herein, or, if the intended use of the general site is not as represented by the application or the plan of record, the Commission may suspend of revoke this permit, direct the Environmental Officer to issue a cease and desist order, require the applicant to modify, extend or revise the site work, or tequire the applicant to restore the area to its original condition. Date Issued: June 12, 2025 NOT VALID Issued By: | IN | ie are Waterford Conservation Commission Effective Date: