FIFTEEN ROPE FERRY ROAD 
WATERFORD, CT 06385-2886
Date: 
June 17, 2025
To: 
Waterford Planning & Zoning Commission
RE: 
Report of Conservation Commission Action:
Inland Wetland Permit #C-25-06 — 51 Daniels Avenue
Commissioners,
The Waterford Conservation Commission granted inland wetland permit #C-25-06 for regulated inland
wetland activities associated with the construction of a new school facility on land located at 51 Daniels
Avenue, Waterford, CT. The permit was granted with conditions on June 12, 2025. A copy of the permit
is attached.
Authorized regulated activities include:
* 
Construction of an 87,500 sq. ft. school facility with associated access driveway and parking
areas upland of inland wetland resources.
= 
Disturbance of 1,000 sq. ft. of upland review area for construction of a sidewalk west of the off-
site wetland area #2.
e 
Discharge of treated stormwater run-off to inland wetlands and watercourses.
The activities are shown on site plans entitled; “LEARN — Early Childhood School, 51 Daniels Avenue,
Waterford, Connecticut” dated 05/01/2025, prepared by Langan Engineering & Environmental Services,
Inc.
A condition of permit approval requires the final plan set to incorporate the revised plan sheets CG101,
CG102 and CE101 as presented to the Conservation Commission on 5/22/2025. These plan changes
reflect the relocation of the southwest stormwater discharge outlet to reduce the potential for soil erosion
and sediment impacts to the off-site receiving wetland area, and revised grading at the spillway outlet for
the stormwater basin.
Respectfully;
Maureen FitzGerald
Environmental Planner
Attachment:
ce: 
Waterford Conservation Commission

FIFTEEN ROPE PERRY ROAD:
WATERFORD, CT 06385-2886
PHONE: 860"442-0553
www.waterfordétorg
OT VALID
Nfl SIGNED
51 Daniels Avenue, }
The Wateetoed Conservation: re 
ini their capacity at the Town’ 8 Inland Wetland
oT; ‘which are subject to jurisdiction 3th apeotdance
vit CT’ ‘Genewal. statutes, Secdon: 
5, inclusive, as:amended, and the:
Waterford Inland Wetlands and ae 
segulations.
This permit is a-gtant of approval to conduct the following regulated activities:
* 
Construction 
of an 87,500:sq, ft. school facility with associated access driveway-and
parking areas upland of inlarid wetland resources.
a 
Disturbance of 1,000 sq.ft. of iplaiid review ated for coxistructioti of a sidewalk’ west of
the off-site Wetland atea #2,
« 
Discharge of treated stormwater ruit-off from the developed site uppradient of the off-site
‘wetland atea #3,
These-re culated activities are associated withthe construction of anew regional school facility
ott 15.36 acies of land located at,51 Daniels Avenue, Waterford, Connecticut. The proposed
activities are. detailed on site plans-entitled; “LEARN 
— Early Childhood School, 5f Daniels
Avenue, Waterford, Connecticut” dated. 05/0: 1/2025, prepared by ‘Langan Engineering &
Environmental Services, Inc.
The Consetvation Commission. authorizes the regulated activity with the following coriditions 6f
approval to-minimize impacts associated with the proposed'regulated activity. and protect the
inland wetlands and watercoutses:
SPECIAL CONDITIONS:
1. The:fitial plan get shall incorporate the tevised plan sheets CG101, CG102 and CE101 as
‘preserited to the Conservation Commission on 5/22/2025,
2. The approved limits of clearing and disturbance shall be marked in the field 
and approved by
the Commission’s agent prior to the-start of site work.
3, The vernal:pool protection plan shall be: implemented : ag detailed in the wetland. assessment
réport-prepared by All-Points Technology. Corporation submitted: with the applica
Repoits docutneititig completion of contractor awareness training and inspection of wildlife
restrictive batriers shall be submitted tothe: Gommission’s:agent at:the:start of construction.

Waterford Conservation’ Commission
Talarid’ Wetland Petinit:#C-25-06
51 Daniels;Avenué:~Page:2:of 
3°
4, At all tines duritig site construction, temporary diversion swales and sediment traps shall’ be
installed and.maintained to. control, construction run-off arid prevent sediniént discharge to
wetlands.
5; Ptiot to:issuance of a certificate. of permit compliaiee; att as-built plan.and. written inspection:
téport from the design engiréer shall be-submitted to-the Commission’s 
agent to document
that the stormwater detention / treatment components and outfalls were: constructed:in
accordance:with:the approved plans,
6... Ax opetation arid. maintenance plan that identifies thé frequency: and type of inspection:and.
maintenance:actions tequired for cadhelemeitt of the stormwater treatment system shall be
prepared by ‘the project engineer and submitted:to the Commissiori’s agent. The plat shall be:
kept on-site and the stormwater system shall be maintained in: accordance with the plan,
f. The Conservation Cormmission’s agent shall be notified at least 
48 hours prior ta
‘commencement 
of any regulated activity:
2. Final stabilization. of disturbed soil ateas, including all temp
disturbatices, shall bé stabilized with the application of loam
control measures.
1, seed and ‘appropriate erosion
3. Atall times: during site-work and until.soil areas are stabilized, the applicant'shall install and
wnaintaiii erosion and sediment control meastires such as “fabtic filter fence, staked: hay bales
or other theasures deemed necessary by the Commissions agent to pievént etosion and
‘sedimentation. impaets:to” wetlands and watercoutses.
4, Erosion control and soil stabilization-measures'shall.comply with the.approved plans‘and'the
guidelines as established in: the Connecticut Guidelines:for Soil Etosion and Sediment
Contrél, 2002,‘ CTDEEP Billetin 34.
5, Upon direction of the Commission's agent, erosion and sediment control measures shall be
removed by the applicant following stabilization: 
of the site.
Adi work and all iegulated. aétivities. conducted pursuant to this authorization shall be:consistent
with the. terms-and cotiditions of this permit, Any-structures, excavation, deposition of fill,
abistiuctions of flow, encroachments or other regulated activities not specifically identified and
authorized 
herein shall constitute a violation of this permit and-may result in permit
modification, suspension or revocation.
Ia the event. that. any additional wetland: or watercourse regulated activities. aré required.as:a
result of ather agency permitting to support the proposed activity, 
‘aterford Conservation
Cammission reserves the right to-reconsider the proposed regulated activity and may require
modifications to minimize:the impact to wetland.xesources,

Waterford Conservation Commission
Inland Wetland Permit #C-25-06
51 Daniels Avenue - Page 3 of 3
In evaluating this application, the Commission has relied on information provided by the
applicant. If such information subsequently proves to be false, incomplete and/or inaccurate, this
permit may be modified, suspended or revoked.
This.permit shall be valid for a period of 5 years.. Permit extensions may be authorized in
accordance with CT General Statutes § 22a-36 through 22a-45 inclusive,. If the regulated
activity is not completed within this time frame, the permit may be held to be invalid by the
Conservation Commission or the applicant may be required to petition the: Commission for an
extension or te-issuance of the permit. The Commission may require the applicant to furnish
additional information at that time.
The Conservation Commission renders this Summary Ruling in accordance with the Waterford
Inland, Wetlands and Watercourses Regulations based on the following considerations:
A. The proposed activity does not involve direct impacts to wetlands or watercourses
and maintains vegetated uplands upgradient of wetland resoutces.
B. The activity has been found to not affect the capacity of the wetland resources to
support wildlife habitat, perform groundwater discharge/recharge functions, and
to support sediment/toxicant/nutrient removal functions.
C.. Short-term potential impacts to wetlands are minimized through implementation
of a detailed erosion and sediment control plan. Potential long-term impacts to
wetlands are mitigated with a stormwater detention/infiltration system to control
water quality impacts, maintain groundwater recharge and detain peak flows.
This permit will be’strictly enforced. If the Conservation Commission finds that the applicant
has not complied with the permit conditions or has exceeded the scope of this permit as set forth
herein, or, if the intended use of the general site is not as represented by the application or the
plan of record, the Commission may suspend of revoke this permit, direct the Environmental
Officer to issue a cease and desist order, require the applicant to modify, extend or revise the site
work, or tequire the applicant to restore the area to its original condition.
Date Issued: 
June 12, 2025
NOT VALID
Issued By: 
| IN | ie are
Waterford Conservation 
Commission
Effective Date: