DEPARTMENT OF PLANNING AND DEVELOPMENT 
 
 
MEMORANDUM 
 
TO:  
 
Planning and Zoning Commission 
 
FROM:  
Mark Wujtewicz, Planning Director 
 
DATE:  
March 10, 2026 
 
TITLE:  
Staff Report:  Crystal Mall Adaptive Reuse 
 
 
 
 
Electric Boat Corporation 
Professional Office/Research & Development 
 
 
 
 
850 Hartford Turnpike  
 
 
 
 
Site Plan / Special Permit  
Application PL-26-4 
 
 
 
EXECUTIVE SUMMARY 
The project as proposed is to repurpose the existing Crystal Mall property from a retail shopping 
center to a business/professional office with a private educational use in addition to private 
ancillary uses such as medical, food and financial services. The property is owned by the Electric 
Boat Corporation and is located at 850 Hartford Turnpike (Rte 85). It consists of 83.2 acres 
which includes approximately 54.6 developed acres. The Crystal Mall building contains 
approximately 935,361 square feet (sf) on two levels. The property is located within the Regional 
Commercial (C-R) and General Commercial (C-G) Zone Districts. The existing Crystal Mall 
Building and associated parking are located within the Regional Commercial (C-R) Zone District 
while the existing Longhorn Restaurant is located within the General Commercial (C-G) Zone 
District. There are no changes proposed to the Olive Garden and Longhorn Restaurants on the 
property. All the proposed uses are permitted within the Regional Commercial (C-R) Zone 
District.  
This application is a request for a modified site plan and a new special permit approval which 
were originally granted by the Planning and Zoning Commission (the Commission) on 
November 26, 1979. The proposed changes to the site which include parking, landscaping and 
modification to the stormwater drainage system require a modified site plan review and approval 
by the Commission. The change in uses that are proposed, while permitted in the Regional 
Commercial (C-R) Zone District, require that a new special permit be granted for the change in 
use of the original special permit granted in 1979.  
 
FIFTEEN ROPE FERRY ROAD 
WATERFORD, CT 06385-2886 

C:\Users\mwujtewicz\Box\TOW_PZBD\Departments\In_Process\Planning\Hartford Turnpike, 850 Electric Boat 
PL-26-4\Staff Report_DRAFT.docx 
There are no improvements or development proposed outside of the existing developed area of 
the property.  
 
 
BACKGROUND 
 
Pertinent Regulations 
CGS 8-3(g) 
Section 9 – Regional Commercial District (C-R)  
Section 9.1.3 – Business Offices and Professional Buildings 
Section 9.1.13 – Laboratories, research and development and educational facilities 
 
 
Section 22 – Site Plans 
Section 22b – Design Review of Site and Building Requirements 
Section 23 – Special Permits with Design Review 
 
This application was received by the Commission on January 27, 2026. 
The Public Hearing was advertised in The Day on February 24 and March 3, 2026. 
The Public Hearing was opened on March 10, 2026. 
 
DISCUSSION 
The Crystal Mall use as a regional shopping center was approved by the Planning and Zoning 
Commission on November 26, 1979 as a Subdivision (# 79-08), Site Plan (#79-13) and Special 
Permit (#79-02). Subsequent approvals granted by the Planning and Zoning Commission include 
a Special Permit/Site Plan (#PZ2003-062) on July 23, 2003 for the Olive Garden Restaurant, a 
modified Site Plan approval (#PZ2007-015) for the repurpose of the Filene’s Store to Bed Bath 
Beyond and Christmas Tree Shop on July 23, 2007, and a Special Permit/Site Plan approval 
(#PZ-2008-015) for the construction of the Longhorn Restaurant on September 8, 2008.  
In order for the Commission to approve a site plan and special permit it must find that the uses as 
proposed in the application are consistent with the findings listed in Section 23.5 of the Zoning 
Regulations. As required, the applicant has submitted into the record a “Statement Regarding 
Compliance with Section 23.5 of the Zoning Regulations” (Exhibit 6) which describes the 
proposed project’s consistency with the findings contained in Section 23.5 of the Zoning 
Regulations. The Commission may require additional conditions or stipulations to the Special 
Permit which must be supported by the record. It must also find that the site plan is compliant 
with the Zoning Regulations or it may approve a plan with modifications that are required to be 
implemented on the plan prior to filing on the land records.  
In addition to the business and professional office use proposed, the applicant is also proposing 
classroom/training/workforce development as private education uses including 50 classrooms. 
The workforce development includes “hands-on” training in the various construction trades for 
the Electric Boat workforce. The materials, equipment, byproducts used to support the training 
must be stored in such a way as not to be visible from public view in accordance with Section 
22.5(b) of the Zoning Regulations. These areas should be identified on the site plan. 
The applicant has submitted a Stormwater Management Report into the record (Exhibit 2). The 
report provides an analysis of the existing stormwater system and analyzes the proposed 

C:\Users\mwujtewicz\Box\TOW_PZBD\Departments\In_Process\Planning\Hartford Turnpike, 850 Electric Boat 
PL-26-4\Staff Report_DRAFT.docx 
improvements to the existing system as well as incorporating new measures into the design in 
order to mitigate any adverse impacts from the development of the project as proposed. The 
amount of impervious area currently existing on the site including buildings and paved surface is 
approximately 54.6 acres. The redesign of the paved parking areas which includes the addition of 
landscape islands at the end of parking aisles and the elimination of additional paved surfaces 
contributes to an overall decrease of approximately 1.2 acres of impervious surface. While the 
existing stormwater infrastructure will remain in place, various elements in the existing system 
will be replaced and upgraded. Additional stormwater infrastructure will be installed that will 
supplement the existing system. Upgrading the drainage structures within the existing 
stormwater system, installing hydrodynamic separators, reducing the amount of impervious 
surface and increasing the amount of vegetation on the site, all contribute to reducing the impacts 
of stormwater run-off volume and quality in accordance with Section 25.6 of the Zoning 
Regulations.   
The applicant submitted a Traffic Impact Study (the Study) into the record (Exhibit 7). The 
Study evaluated traffic impacts from scenarios considering full occupancy of the mall as a retail 
center and the repurpose of the property into professional offices with an anticipated workforce 
of approximately 4,500 to 5,000 employees. The Study evaluated the existing road network in 
proximity to the site and established a study area with key intersections that would be impacted 
by the project. The Study concluded that while there will be an overall increase in traffic 
volumes and delays at intersections, the implementation of onsite and offsite traffic 
improvements and other mitigation measures are expected to adequately mitigate the impacts to 
the traffic operations within the study area. The proposed offsite improvements to Rte. 85 and 
the northbound on-ramps and off-ramps to and from I-95 will require review and approval by the 
Connecticut Office of the State Traffic Authority since the State of Connecticut has jurisdiction 
over those roadways. The Town of Waterford’s Chief of Police and its Traffic Officer submitted 
comments into the record (Exhibit 8) which will be included during the State’s permit review 
process.  
 
RECOMMENDED ACTION 
 
Based on the information provided, staff recommends the Planning and Zoning Commission find 
that:  
 
Findings: 
1.  
The property is located within the Regional Commercial (C-R) and General 
Commercial (C-G) Zone Districts. 
2. 
The property is subject to an existing Special Permit #79-02 that was granted by the 
Commission on November 26, 1979.  
3. 
The change in use of the property and buildings require a new special permit in 
accordance with Section 23.9.1 of the Zoning Regulations.  
4. 
The uses that are proposed by the applicant are permitted in accordance with Sections 
9.1.3 and 9.1.13 of the Zoning Regulations. 

C:\Users\mwujtewicz\Box\TOW_PZBD\Departments\In_Process\Planning\Hartford Turnpike, 850 Electric Boat 
PL-26-4\Staff Report_DRAFT.docx 
5. 
The “Statement Regarding Compliance with Section 23.5 of the Zoning Regulations” 
(Exhibit 6) provided by the applicant in accordance with Section 23.5 of the Zoning 
Regulations identify that the findings and the proposed uses are consistent with 
sections 23.5.1 through 23.5.9. 
6. 
The property is subject to the original Site Plan #79-13 and a subsequent modification 
approval #PZ-2008-015 granted by the Commission on September 8, 2008 
7.  
The application meets the criteria for a modified site plan approval, pursuant to 
Section 22 of the Waterford Zoning Regulations, subject to condition 1. 
8. 
This application has been reviewed by the Town of Waterford Design Review Board 
in accordance with Section 22b of the Waterford Zoning Regulations and which 
Board submits a positive report to the Planning and Zoning Commission. 
 
and that the Commission approve the proposal (with the following conditions):  
 
1. 
An annual Maintenance and Inspection Report for the Stormwater management 
system shall be provided to the Town of Waterford Planning and Development 
Department. This report shall be required to be submitted in order to verify that the 
stormwater management system is maintained and continues to operate as originally 
designed. 
2. 
All outside storage of materials used in conjunction with the workforce training 
programs shall be shielded from public view through the use of screening. These 
areas shall be identified on the plan prior to filing on the site plan on the land records. 
 
 
Proposed Motion 
 
To approve with conditions the Site Plan and Special Permit for the Crystal Mall Adaptive 
Reuse by Electric Boat Corporation application #PL-26-4 located at 850 Hartford 
Turnpike with conditions 1 and 2 and to adopt the findings 1 through 8 of the staff report 
dated March 10, 2026.