Design Review Board
January 23, 2024
Page 1 of 2
DESIGN REVIEW BOARD
MEETING MINUTES
Design Review Board
Remote Access
Members Present: 
Chairman -John O’Neill, Robert Nye, Edward Pellegri
Members Absent: 
Joy Merrill
Staff Present: 
Jonathan Mullen, AICP, Planning Director
Mark Wujtewicz, Planner
ITEM #1 
CALL TO ORDER AND APPOINTMENT OF ALTERNATES
Chairman, John O’Neill called the meeting to order at 4:00 p.m.
ITEM #2 
PLAN REVIEWS
#PL-23-16 — Request of Mondays, LLC, owner, 16-18 Boston Post Road Associates, LLC,
owner and 7Hills Hospitality Group, LLC, applicant for a Site Plan/Special Permit approval
for New Hotel at 16 & 18 Boston Post Road and 295 & 313 Willetts Avenue, C-G zone, in
accordance with Sections 8.2.6 and 23 of the Zoning Regulations and as shown on plans
entitled "Woodspring Suites, 295 & 313 Willetts Avenue, 16 & 18 Boston Post Road
Waterford, CT December 5, 2023".
Atty William Sweeney TCORS representing the applicant along with Ellen Bartlet, PE of
CLA Engineers, Culin Thompson and Ashley Florez of BRR Architecture, Renita Somers of
7 Hills Hospitality were present for the application.
Atty Sweeney introduced the project to the Board with a brief overview of the site.
E. Bartlett described the layout of the site. She went through the landscape design and
stormwater drainage system. She stated that all existing buildings will be demolished as part
of the development. The proposed landscaping is designed to enhance the visual appeal of
the property from Boston Post Road and Willetts Avenue Ext. The landscaping is also
designed to provide adequate vegetative buffering to the adjacent properties. Several
pollinator garden areas have been located throughout the site to add color enhancement
overall,
Atty Sweeney presented the building elevation renderings to the Board. He described the
elements used in the building design. The exterior products will be fiber cement in order to
provide for long term low maintenance.
C. Thompson of BRR Architecture described the various features of the building. He stated
the design represents a Northeastern New England Coastal style utilizing various design
elements including shake siding, faux shutter and dormers.

Design Review Board
January 23, 2024
Page 2 of 2
E. Pellegri inquired as to the note on the plan located under the planting list. E, Bartlett
responded that if there is a discrepancy in the number of plants as appears on the plant list,
the landscape plans submitted as part of the site plan would take precedence in determining
the correct number of individual species.
E. Pellegri inquired as to the location of the proposed sign on Boston Post Road. E. Bartlett
responded that the sign will be located on the property in accordance with Zoning
Regulations. She also stated that there will not be a sign on Willetts Avenue Extension in
order to maintain the secondary access nature of that entrance.
B. Nye inquired as to whether a permit will be required to demolish the existing buildings on
the property. Atty Sweeney confirmed that demolition permits will be applied for.
MOTION: 
Motion made by R. Nye, seconded by E. Pellegri to submit a positive
recommendation to the Planning and Zoning Commission
VOTE: 
3-0
ITEM #3 
APPROVAL OF THE October 10, 2023 MEETING MINUTES
MOTION: 
Motion made by R. Nye, seconded by E. Pellegri, to approve the October 10,
2023 meeting minutes as written.
VOTE: 
3-0
ITEM #4 
ADJOURNMENT
MOTION: 
Motion made by R. Nye, seconded by E. Pellegri, to adjourn the meeting at
4:38 pm.
VOTE: 
3-0
ark ives
Planner