FIFTEEN ROPE FERRY ROAD 
WATERFORD, CT 06385-2886
PLANNING & DEVELOPMENT
Date: 
May 26, 2021
To: 
Waterford Conservation Commission
From: 
Maureen FitzGerald, Environmental Planner
Re: 
Inland Wetland Application #C 21-04
198 Shore Road: Stream Channel Stabilization
Application Review Comments
Proposed Activity:
Placement of 6-8 inch diameter rip-rap along the toe of the stream embankments at 198 Shore Road for
the purpose of erosion control and bank stabilization. Approximately 240 linear feet of stream channel
embankment on the north side of the intermittent stream is proposed to be lined with between 5 - 8 feet
width of rip-rap and 180 linear feet of stream channel embankment on the south side of the stream is
proposed to be lined with a 5-8 feet width of rip-rap at the toe. Refer to the attached site plan.
A portion of the rip rap-rap, approximately 200 sq. ft., is proposed within the flagged wetland areas
bordering the northern stream channel between wetland flags #3 and #6, and the embankment above this
area re-graded. Approximately 860 sq. ft. of wetland along the southern channel toe is proposed to be
altered with rip-rap.
The plan proposes to remove the existing vegetation from the southern channel embankment and replant a
20 ft. wide area with a mix of trees, shrubs and herbaceous species. Existing vegetation will also be
removed from 130 linear feet of the northern channel embankment and replanted.
The location of the property is shown on the attached aerial map.
Application Review Comments:
1. 
Information of the total cubic yardage of rip-rap, and the typical depth and extent of rip-rap to be
placed at the toe of embankment should be provided. Cross sections indicating this detail should
be provided in locations along both the northern and southern embankments.
2. 
An explanation of how the material will be placed at the toe of embankment, e.g. the type of
machinery used, amount of slope disturbance, and any temporary stream crossings, is requested in
order to understand the extent and duration of the regulated activities.
3. 
The plan proposes the alteration of 1060 square feet of riparian wetland /stream corridor with rip-
rap to stabilize the toe of bank and support areas of embankment regrading. The application
should discuss alternatives considered to reduce the total area of wetland and stream impacts,
including vegetative solutions, reduced rip-rap extent or use of larger stone in areas to minimize
direct impacts to the stream channel. 
;
4. 
The extent of tidal influence in the stream channel needs to be identified. Rip-rap placement in
tidally influenced waters is regulated by the State DEEP.

5. 
The channel stabilization work should be conducted during low flow summer dry conditions
when the stream cross section is at its minimum.
6. A line of silt fence or other sediment control measure should be installed between the exposed
slope soils and the newly placed rip-rap to control potential sedimentation impacts until such time
that the slopes have become well-vegetated.
7. 
Methods for temporary stabilization of the grubbed and re-graded steep slopes within the riparian
corridor are recommended to prevent soil eroding into the stream channel.
8. 
The plan should identify whether any existing canopy trees in or along the stream will be
removed.
Maureen FitzGerald
Environmental Planner
attachments (2)

0}0Ud 
|EWSV 
9107
VY 09=,1 
+9789
S
Solf
e

ison 
Projectit21-002 Jahn L 
lands. dug
PRT GEARS. THE MPAESSICH PE SEAL 220. ROWAL UvE SAI
‘MIOSE: MALE: AX REGSTRAMON HUVEER APPR
I
‘cnibe tortok asta) 
1 
ig
STACY A QUINN &
PAMELA G QUINN 
—_
200 SHORE: ROAD 
: 
\ 
¢ 
ial
¢
a 
ah 
og
et 
oSTM 
org
AV 
40,308" SO FT
i
Le
\
AS 
\
x 
i
AON
yO
Vee
¥ 
1
VAS
ry,
\ 
\
1% 
Z
\
/\
ef
,
Na
N/F 
:
JOHN B LUCEY & 
eer]
KIM C_FRENZEL 
|
W9BR SHORE ROAD
w
. 
a 
¢
S, 
f
t 
TM 
7
‘ 
‘, 
/ 
gO
. 
H 
aaT 
fi
\ 
vemionae]-—
} 
7 |anmmasenonestons 
|
4 
7 
Menaysuyt | —
4 
,
/ ri
fx
avn 
i
a 
f,
iv 
re 
ge
V7
.
4 
s
1 
/ 
y
| 
\ 
( 
1 
] 
7 & EES, _,,| 
aeRamanmsor 
mm suey 
4
JORD AN 
‘ \ 
g 
—
x 
Ly 
%
COVE 
Vlog VOR 
PAMELA W BERRY 
&
ACen 
4 
i 
of ( 
496 SHORE ROAD
Sy \tE ON
Lif 
VPS 
NN
VEN 
PLP 
4
Wolk ddt 
\
yp
sue A
aN
ws 
AS,
feet 
mn Wale 
SSS 
ON-SITE INLAND WETLANDSAREA= 
4,200 SQUARE FEET
if 
UstE 
loo 
se 
Bik bs 
.
arr 
-ayrueious 
SA 
SPARTA ALTERHARORA 
SN 
es 
, 
,
sigh Wnaas Cinna Watiming! 
«=k MEAD 
¥ 
INLAND WETLANDS AGTIVITY= 
1,060 SQUARE FEET
oe ere 
Peer aner 
5 
400' UPLAND REVIEW AREAACTIVITY= 
16,250 SQUARE FEET
08 
cismmsivige 
box 
BR" sex eee esr LocanoH 
*,
json 
PE 
ECEIVED
vr 
MunszO MAST. 
TREE 
Ls
e oe mee 
QQ
Gin) wet 
SAAAALYY excanie 
inet Une 
—
MA, 
MORE 
0 LESS 
AAA 
piste TALLINE
A/F 
HOW DR FoRUBALY 
----1S8---- "DOSTG CONTOUR, 
Blane? 47 sevelopment
Ceomie 
she 
nit 
Town 
of Waterford, CF
Bax 
S207 ELEVATION 
woe ‘STORM-DRAM PIPE 
-
= 
sae rt 
cocemmerees guebul
Biel 
i 
bani ei
w 
‘wart
F
|
102A 
SPITHEAD 
ROAD
JAMES 
BERNARDO
LAND 
SURVEYING, 
LLC
WATERFORD,.CONNECTICUT 
0638
(860) 
447-0236
WWW.JBSURVEY.COM
SHALL 
ROWAN 
THE 
PROPERTY|
OF 
THE 
SURVEYOR:
ANITA AVENUE
{ prverr )
1 inh 
= 
2001
&
MAY 1 12021 
———
O THE BEST OF MY KNOWLEDGE AND BEUEF THIS-HAP 1S
‘SUBSTANTIALLY CORRECT AS NOTED HEREON.
i 
, 
:
fdas. trnror.do 
5-4-2021
TRIES BERNAROO” 
LICENSE #70IZV
DATE
ue] 
dEscrienon 
| GATE
REVISIONS
COMPILATION 
PLAN
PROPERTY:OF
FOR 
PROPERTY 
LOCATED 
AT
198 
SHORE 
ROAD
‘TOWN 
OF 
WATERFORD 
- COUNTY 
OF 
NEW 
LONDON 
- 
CONNECTICUT
JOHN 
LOMBARDI, 
JR
Sheet No.
S-01
SHEET 1 OF 1
Scole:
Tl =e0!
Date
MARCH 
(17,, 2021
Project No. 
‘
‘WETLANDS