Conservation Commission - 654 (11/09/2023)
agenda center attachment
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | November 09, 2023 |
| Pages | 4 |
| File Size | 0.1 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Town of Waterford, Connecticut Conservation Commission Application for Inland Wetland/Watercourse Permit Application of Congregation Beth-El, Inc. 33 Kenyon Road Assessors Map 92 – Lot 3715 Attachment A Property Owners Adjoining the Subject Land Parcel 23-20 Congregation Beth-EL, Inc. Page 1 of 1 9-1-23 List of Property Owners Adjoining the Subject Land Parcel Assessors Map-Block-Lot Record Owner Property Address Mailing Address 92-3712 Andrea J. Page 27 Kenyon Road 27 Kenyon Road Waterford, Connecticut 06385 92-3716 Keith T. Steamer 35 Kenyon Road 35 Kenyon Road Waterford, Connecticut 06385 64-8669 Steven P. David 666 Vauxhall Street Extension 666 Vauxhall Street Extension Waterford, Connecticut 06385 84-8659 Town of Waterford 644 Vauxhall Street Extension 15 Rope Ferry Road Waterford, Connecticut 06385 Town of Waterford, Connecticut Conservation Commission Application for Inland Wetland/Watercourse Permit Application of Congregation Beth-El, Inc. 33 Kenyon Road Assessors Map 92 – Lot 3715 Attachment B Description of Proposed Activity 23-20 Congregation Beth-EL, Inc. Page 1 of 1 9-1-23 Description of Proposed Activity Congregation Beth-EL, Inc. has submitted an application to the Town of Waterford Conservation Commission requesting approval to conduct regulated activities within an inland wetland and within 100-feet of an inland wetland associated with the construction of a new synagogue. The planned improvements consist of a 3,760 square foot footprint synagogue and 180 square foot footprint storage building, and associated driveway, parking area, sidewalk, waste and recyclables receptacle enclosure, building utility services, stormwater management facility, exterior lighting, signage, and landscape improvements. The buildings will be served by the Town of Waterford municipal water and sanitary sewer systems and public communication, and electric utilities located within the Kenyon Road right-of-way. All utilities will be installed underground. The site work associated with the project includes erosion and sediment control, site preparation, clearing and grubbing, mass earthwork, building foundation, trenching, backfilling, grading, sanitary sewer, water, communication and electric utility, exterior lighting, sidewalk, paving, pavement markings, signage, landscape and turf establishment construction. Earth fill is proposed to be placed within approximately 450 square feet of an inland wetland associated with the construction of a stormwater infiltration area and the improvements within the 100-foot inland wetland upland review area include buildings, parking area, sidewalk, waste and recyclables receptacle enclosure, building utility services, stormwater infiltration area, exterior lighting, and placement of fill and grading.