Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886 DEPARTMENT OF PLANNING AND DEVELOPMENT MEMORANDUM TO: Rob Brule, First Selectman FROM: Abby Y. Piersall, AICP, Director of Planning and Development DATE: November 23, 2021 TITLE: Waterford Community Park The Town Center Ad Hoc Committee voted on November 10, 2021 to recommend that the Board of Selectmen adopt the Master Plan for the Waterford Community Park dated October, 2021, and that the Board authorize the First Selectman to enter into a contract modification with Kent + Frost, LLC to continue design work in support of implementation. Kent + Frost, LLC was contracted in July of 2021 to develop a master plan and opinion of probable costs for an accessible and connected system of trails and park amenities in the Town Center. Planning work concluded on November 10, 2021 and the project is progressing to design and permitting work. The project has been divided into 6 phases. The first three phases would potentially take place during FY23, and the final three phases would potentially take place in FY24, depending on funding requested through the Town’s Capital budget. Phases 1-3 include the necessary restoration for the pond, which involves dredging and installing a water quality pump and filtration system. Construction of an accessible path and boardwalk circling the pond and connecting the Community Center, playground, and restrooms to the pond loop are included in the FY23 request. The FY 23 request also includes design work for all phases to ensure that the Town is prepared to apply for future grants with "shovel-ready" projects. Phases 4-6 include improvements to the playground, Library Parking lot, and an outdoor plaza at the Library that overlooks the park. Work shown on the master plan in the area of the softball fields and Recreation and Parks facility are intended for future years. A total of $167,180 remains of the original $200,000 appropriated in Capital funds for this project. $17,820 remains in line 20511-57857 and $150,000 remains in line 31122-57857. Attachments 1. Waterford Community Park Master Plan, October 2021 2. Phasing Plan 3. Project Renderings 4. Opinion of Probable Cost and Capital Funding Request Summary 5. Minutes of the November 10, 2021 Town Center Ad Hoc Committee SOUd+INAX [z0¢ 199020 ~ UD] f A8ISOIN a[suely WALD : -uivd ALINAININOD CuO MALY: ‘SHOUYOIGOHR SNDNB= -spasTieuliod= - gma a UNO SONMRH IVD ALINNIMAVDD 380. Lc smiy 31OH08e 01 SLAEEADEANL as RE SNL SAI SAVd WIONVREE DS Waterford Civic Triangle Opinion of Probable Costs - All Phases Kent + Frost Landscape Architecture 41/4/2021 Phase “Section: SEeCost Design Fee Construction Costs 1 Dredging $246,209 $26,957 $219,252 2 Pond Loop $1,394,934 $151,624 $1,243,310 3 Rope Ferry Streetscape $504,556 $54,843 $449,713 4 Playground $361,946 $39,342 $322,604 5 Library Parking Lot Expansion $597,831 $64,515 $533,316 6 Library Civic Plaza $348,603 $38,169 $310,434 Project Total $3,454,078 $375,450 $3,078,623 Alternate | Section.’ o oe Cost ee 1 Library Parking Lot Replacement $984,529 $106,245 $878,284 Capital Request Summary Cost of Dredge, All r Design Work for phases 1-6 $594,702 ‘Balance of Current Civic Triangle Funds (Appropriated) _ $167,820 _ FY23 Current Year Capital FY23 CNR FY24 CNR ~ Cost of Dredge, All current funding Design Work for phases 1-6; less Pond Loop and Rope. Ferry Streetscape Construction $426,882 $1,693,023 Playground, Library - Parking Lot Expansion, and Library Civic Plaza Note: The Library Lot could be expanded OR fully reconstructed, The FY24 Request includes the expansion. Should full reconstruction be supported, the proposed F¥24 CNR request would increase to cover additional design costs and construction estimates $1,166,353 associated with full reconstruction, MINUTES ERFERD TOWN CENTER DEVELOPMENT 202) nov neat AD-HOC COMMITTEE . : November 10, 2021 6:00 PM Remote Access Members.Present: Miriam Furey-Wagner, Library Board of Trustees; Traci Santos, Recreation and Parks Commission; Jennifer Bracciale, Representative Town Meeting Members Absent: Melissa Chiappone, Recreation and Parks Commission Staff Present: Abby Piersall, Planning Director; Others Present: Chad Frost, Architectural Consultant Kent+Frost; CALL TO ORDER The meeting commenced at 6:00. 2. . REVIEW OF AND RECOMMENDTION TO ADOPT FINAL MASTER PLAN Chad Frost reviewed updates and changes that have been made to the master plan. a. Recommendation to Board of Selectmen. MOTION: Motion made by T, Santos, seconded by J. Bracciale, to approve the plan as currently submitted and forward it to the Board of Selectmen for their December 7, 2021 meeting, VOTE: 3-0 b. Recommendation to Planning and Zoning Commission MOTION: Motion made by M. Furey-Wagner, seconded by J, Bracciale, to recommend that the Planning & Zoning Commission adopt the Master Plan as a component of Waterford’s Plan of Conservation and Development, and that the Commission recommend implementation of the plan relative to Connecticut General Statute Section 8-24 for Municipal Improvement. VOTE: 3-0 3. RECOMMENDATION TO PROCEED TO DESIGN AND PERMITTING Committee members discussed the design and permitting process. A. Piersall stated that - the committee can recommend that the Board of Selectmen authorize the first Selectinan to enter into contract negotiations for the scope of work for funds in hand now, and include the rest in the Capital Plan. 4, ADJOURNMENT MOTION: Motion made by T, Santos, seconded by M. Furey- Wagner, to adjourn the meeting at 6:11. VOTE: 3-0