TO: Mr. Robert J. Brule - First Selectman
FROM: Jill N Stevens - Director of Utilities
DATE: November 15, 2024
RE: Utility Commission - Capital Improvements Plan FY 26-30
Dear First Selectman Brule,
In summary, the major funding requests for FY 26 from CYC and Transfers to CNR
are as follows:
Cross-Country Sewer Mains Access Project.
Sewer mains collect wastewater from our Town’s parcels and convey this
wastewater to downstream pumping stations via a vast network of piping and
pumping stations to a point terminating at the Main pumping station, which then
conveys the wastewater to the regional treatment facility in New London. Of the
Town’s 150 miles of sewer piping, approximately 15.6 miles lie within cross-country
easement areas, which are outside of roadways. Many of these sewer mains traverse
through heavily wooded cross-country easement areas, which are becoming more
challenging to access. Accessibility is crucial in order to conduct a full assessment
evaluation and to provide timely access to conduct immediate or corrective repairs
to the sewer main or structures. The goal of this project is to recreate the original
easement access area or create alternate access points.
Contract #1 was the Town's very first sewer construction project, which began in
1970. This project entailed the installation of approximately 13,000 linier feet of
sewer main. A Special Appropriation in the amount of $250,000 for engineering
services was appropriated for the Contract #1 Sewer Main Access project in 2023.
Survey work to identify the Contract #1 easement area, manholes, intersecting
property lines, and other utilities within the easement area commenced in October
of 2023 and was completed in the spring of 2024. Preliminary design is complete,
and approval for the final design package (drawings and specifications) to be used
for contractor bid solicitation and construction for Phase One of the restoration
project was granted by the Utility Commission at the November 2024 meeting.
Phase one will encompass the southern section of the interceptor beginning at the
intersection of Great Neck Road and Rope Ferry Road to the end of the interceptor
at Evergreen Avenue Pump Station. Phase two which encompasses the northern
section of the interceptor from Boston Post Road to Great Neck Road requires the
acquisition of additional easements to gain access to the interceptor during
Many of the Town’s easement area will require surveys to delineate boundaries,
identify wetland soils and engineering services to design access travel surfaces
based upon the survey findings. It is the intent of the Utility Commission to establish
a multi-year request necessary to fund the survey, engineering and reconstruction
of each of the Town’s cross-country sewer main easement areas.
$500,000/Yr from Current Year Capital (CYC)
Plastic Water Service Replacement Program
There are approximately 7900 water services in Town, many of which are plastic
and have exceeded their useful life resulting in unaccounted for water loss and
degradation to the Town roads. The goal of this program is to replace the aging
plastic water services with copper line prior to DPW paving the roads.
To date through a cooperative WUC/DPW effort, we have replaced 162 water
service lines, totaling 3,416 linear feet. In FY26 the DPW has identified several roads
scheduled to be repaved, within these roads lie approximately 280 water services,
of those approximately 122 may need to be replaced. Service line replacement costs
are on average $4100 each depending upon the service line length and location.
It is our intent to continue to replace these water services prior to DPW paving the
roads in doing so we are requesting a multi-year funding schedule and program for
the replacement of plastic water services. This will be in conjunction with the DPW
roads improvement program. Based upon the aforementioned number of services
that may need to be replaced less current available funding the Utility Commission
requests $275,000 from Transfers to Capital & Nonrecurring (CNR)
Route 85 Wastewater Pumping Station Power Conversion.
Since the Rt 85 wastewater pumping station was constructed, the station’s electric
power and stand by power has been provided by the Crystal Mall. It is the intent of
the Commission to be responsible for the commercial and standby power to this
pumping station in order to assure reliable service from the electrical components
and proper maintenance of the emergency standby power source. To achieve this we
will have to install our own emergency generator and commercial power service
components. An evaluation was conducted in 2007, which identified two alternatives
ranging in costs from $432K to $602K. Utilizing the Engineering News Record’s
Construction Costs Index inflation factor of 1.69 from 11/2007 to 11/2024, a
representative value range is $730,080 to $1,017,380
$508,690/Yr from Current Year Capital
necessary to preserve the Town’s significant investment in its infrastructure and to
extend the life of its asset; if routine maintenance of infrastructure is ignored, it turns
into an emergency capital investment and typically costs three times that of routine
maintenance. If this tank had not undergone the recent rehabilitation, the structural
integrity of the tank would have eventually failed, requiring that the tank be replaced
at a significant cost to the Town.
Many municipalities do not realize the financial investment they have in their water
storage tanks. These key municipal water distribution system components often
receive the least attention and yet, they can potentially experience serious issues
without proper tank asset management. Contamination from animals or debris,
corrosion and other issues can trigger customer complaints, municipal regulatory
compliance violations and costly water distribution service disruptions. A Water
Tank Management Program for these valuable assets would preserve the significant
investment the Town has made in water storage tanks by guaranteeing routine
inspections and maintenance of the water storage tanks does not fall behind, thus
improving the reliability of the system. A sustainable water tank management
solution also makes budgeting easier as initial repair costs can be spread out over a
few years if necessary and all future interior and exterior renovation costs are
included.
Our request is to initiate a funding schedule that would enroll the three water storage
tanks in a Tank Asset Management program progressively, beginning with Fargo
Road in FY26, this tank will not require any Upfront Renovation (UR) costs to enroll
in the program, only annual Maintenance plan (MP) costs. The Vauxhall Tank does
require UR costs, prior to enrollment, those costs have been requested under a
separate CIP Project with a Department Priority of 4, upon completion of the UR work,
if approved, the tank could be enrolled in the program in FY 28. The Rogers Hill Tank
requires UR work as well, again these costs have been requested under a separate CIP
Project with a Department Priority of 10, upon completion of the UR work, if
approved, the tank could be enrolled in the program in FY31.
$46,222 in FY26, $47,272 in FY27, $95,520 in FY28 from Current Year Capital
Bartlett Corners Water Booster Station Decommissioning.
In 2006, the Town constructed water system improvements that enhanced water
pressures and fire flows to the Quaker Hill area of Waterford. Included in this project
were a new 2500 gpm capacity water booster pumping station near the intersection
of Old Colchester and Old Norwich Roads, and a 1.5 million gallon pre-cast, pre-
stressed concrete water storage tank constructed on Rogers Hill. From 1977 up to
prepared which identified costs of $105,000 to properly decommission the station.
This project has been identified within previous CIPs. Utilizing the Engineering News
Record’s Construction Costs Index inflation factor of 1.59 from 11/2009 to 11/2024,
the current decommissioning costs estimate is $166,950
$166,950 from Transfers to Capital & Nonrecurring (CNR)
Respectfully Submitted,
Jill N Stevens
Director of Utilities.
Cc. Utility Commission
Kimberly Allen - Finance Director
ONIGNNA YSHLO
SLNVYD SLVLS/1V¥IdG34
JONVIVE GNNA GALVNOISAGNN YND
dID°1
ONIDNVNIA Ldad Waal SNOT GNV LYOHS
“ONIMYNIAYNON 8 IWLIidVO OL YAASNVYLL
GNN4 JONVNALNIVIA TV.LIdVD Y4M]S/1L39GN ALMLLA
SLNAWSAAOYdWI TW LIdV3 YVaA LNAYYND
Nom sonore ©
T
“SADUNOS ONIGNNA OL XAGNI
O0°ZT8‘SZz‘2 |oO'E90‘TzT‘e |oo'soo‘oZe’e [oo'sse'ZEE'z STVLOL
OSZ'TvS OSz‘TvS OSZ‘TPS € s}UaWaAOIdU| auNssaidg Jae ajepsulwoojg TT
O0S‘TTE OOS‘TTE € JUaWYsIqinjay Yue] 1932 |IIH Siadoy OT
0890 008‘90 00890 € juawase|day uleyj 4932 yoeag aunseajd 6
S6‘99T 0S699T € Ja}soog Ja}eM S19u1OD WoajUeg 8
0ST 000‘0S 000‘0S 000‘0S T sJUdWaAOIduUY| J0119}xq Salyoe4 l
9¢‘90T 02S‘S6 CLe‘Lv 77790 T jUaWaseue] Jassy Yue] Jae 9
00‘09S 000095 000095 000‘09S € suoljeis Jo~alZ py ulj|AJeIAl °g 1D Sawa Ss
269 €66‘0€Z €66‘0€Z €66‘0EZ T qeyay Yue] Jazeny Joos jjeyxner v
‘ZTO'T 069‘80S 069‘80S T JaMod uol}e}S dung Ja}emayseM GB 1y €
00‘0SZ 000‘SZZ 000‘SZZ 000‘SZZ € juawade|day SadiAsas Ja3eM\ ISI d Z
00‘00€ 000‘00¥ 000005 000‘00S T ssaoVy ule] Jamas AsjUNOD sso) T
6207-8202 87Z07-LZ0Z £202-9Z0Z 9z0¢-SzOz_ | 304NOS JINVN LDafoud ALIMOIYd
UWAATWISIA | YWSATWISIA | YVIATWISIA | YWaATVDSIA | ONIGNNS 1dia
“AINIDV /LNAWLYVd3d
O€07-9202 Ad WOS NOILVGIMOSNOD 193fOud
NV1d LNIINAAOUdWI TVLidv>
QuOseAILVM JO NMOL
1 [DESCRIPTION AND JUSTIFICATION (describe the type, purpose & anticipated accomplishments of the project)
The goal of this project is to obtain readily available access to all cross-country sewer mains. Accessibility is crucial in
order to conduct a full assessment evaluation and to provide timely access to conduct immediate or corrective repairs to
the sewer main or structures. The goal of this project is to recreate the original easement access area or create alternate
access points to all areas that are not within paved roadway areas. Funds were granted for the Contract #1 easement
area in 2023, this request is to continue the access program to the remaining cross country easement areas.
2 |PROJECT STATUS IF IN PROGRESS
Preliminary design is complete for Contract 1, and the final design package work for Phase One of the restoration project
will begin in December. A probable cost for restoration is in the range of $250,000 - 350,000
LIST OTHER PROJECTS WITHIN YOUR DEPARTMENT OR ANOTHER DEPARTMENT THAT WILL BE IMPACTED BY THIS
3 |REQUEST
Accessibility will allow pipeline evaluation crew to conduct our sewer system evaluation survey and create the ability to
access the pipeline and manholes in the event of an emergency
4 |DESCRIBE THE IMPACT ON DEPARTMENT OPERATING BUDGET (include cost estimate if applicable)
Minimal impact on operational budget, however, accessibility will allow staff to conduct routine and emergency repairs
in a timely manner, in lieu of creating access on a emergency basis which will be far more costly and greatly reduce the
potential of adverse environmental impact.
GRANT FUNDING/OTHER FUNDING, if applicable (detailed explanation of grant/other funding, including the amount,
5 |source of funding, status, town match, if any. Attach award letter if available)
ATTACH PLAN ESTIMATE, SERVICE AREA MAP AND/OR OTHER SUPPORTING DOCUMENTATION (if none, simply state that
6 |in the area below)
See backup material
7 COST/FUNDING SOURCE
APPROVED
FUNDING TO
FUNDING SOURCE DATE FY2026 FY2027 FY2028 FY2029 FY2030
1 |Current Year Capital 250,000 500,000 500,000 400,000 300,000 300,000
2 |Utility Budget/Sewer Cap Maint Fund
3 |Transfer to CNR
4 |Short/Long-term Bonds
5 |LoCIP (detail in section 5 above)
6 |CNR Undesignated Fund Balance
Federal/State Grants (detail in section
7 {5)
Other Funding (detail in section 5
8 |above)
TOTALS 250,000 500,000 500,000 400,000 300,000 300,000
sewer mains traverse through heavily wooded cross-country easement areas, which are
becoming more challenging to access. Accessibility is crucial in order to conduct a full assessment
evaluation and to provide timely access to conduct immediate or corrective repairs to the sewer
main or structures. The goal of this project is to recreate the original easement access area or
create alternate access points.
Contract #1 was the Town's very first sewer construction project, which began in 1970. This
project entailed the installation of approximately 13,000 linier feet of sewer main. A Special
Appropriation in the amount of $250,000 for engineering services was appropriated for the
Contract #1 Sewer Main Access project in 2023. Survey work to identify the Contract #1 easement
area, manholes, intersecting property lines, and other utilities within the easement area
commenced in October of 2023 and was completed in the spring of 2024. Preliminary design is
complete, and approval for the final design package (drawings and specifications) to be used for
contractor bid solicitation and construction for Phase One of the restoration project was granted
by the Utility Commission at the November 2024 meeting.
Phase one will encompass the southern section of the interceptor beginning at the intersection
of Great Neck Road and Rope Ferry Road to the end of the interceptor at Evergreen Avenue Pump
Station. Phase two which encompasses the northern section of the interceptor from Boston Post
Road to Great Neck Road requires the acquisition of additional easements to gain access to the
interceptor during restoration and for the Utility Commission staff in the future. Splitting the
project into two Phases allows restoration work to begin while easements are procured, so that
once Phase one is complete easements will be in place and Phase two can begin shortly
thereafter. Our engineering firm estimates construction costs up to $350,000 for Contract One
Restoration. A detailed construction costs estimate for Phase One will be provided with the final
design package.
Many of the Town’s easement area will require surveys to delineate boundaries, identify wetland
soils and engineering services to design access travel surfaces based upon the survey findings. It
is the intent of the Utility Commission to establish a multi-year request necessary to fund the
survey, engineering and reconstruction of each of the Town’s cross-country sewer main
easement areas.
Upon completion of the Contract #1 restoration, our goal is to continue to other major cross-
country easement areas, Contract # 2 and 3, which possess many of the same land characteristics
as Contract #1. A map depicting all of our cross-country areas is attached.
_
HRIARWOOD DR. P.S Ne i a
we eat Ay
ca tel NS 4 :
J : contract 16
CONTRACT 69 T
vo CONTRACT 93-7” A —— - RICHARDS GOVE
NTRACT 15: x
“Ss CONTRACT ISA CONTRACT 15
%
~ \ N «
« 0
‘ \ 2
\ CONTRACT 50 \ ONTRA
NGi ONTRA 8 :
CONTRACT 324 '
. GNTERCEPTOR? CONTRACT 32 | ‘i
CONTRACT 164 CRTERCEPTERD iy CONTRACT 7 a (eee é at
FACILITY MATHT. BLOG —— i Cle HORVICH Rp. Ps. A REL
\ CONTRACT 75 f t
m CONTRACT i S
a W CONTRACT 45 (FORCE HAIN) a, ft te
it . : 4
nN ;
N J ean
vA \. c=) \conreact_s
\, a LE8 : (GRAVITY)
i
y , SONTRACT_7
HARRISON LANDING. P.S
CONTRACT 38
CONTRACT
CHTEREEPTORD
wr of z
cRrsta
j HALL BS 7 mn
a ad = con eact 18. CONTRACT 46
“A. CONTRACT 44 oe INTERCEPTOR) : CONTRACT 4B
HL MILL AD, PS. .SL CONTRACT 48 ‘
a L/ “ aoe \ contract 49
Roe. CONTRACT 6 .
EC an 3 BCUE HILLS FS. io pnd
§ \} CONTRACT 14
‘, semcs s /72 CONTRACT 2
\ ae ue
CONTRACT 44 CI TRACT 14€
OSWEGATCHIE BD. P.S
CINTERCEP TORY ‘ EON :
¥ | oO
CONTRACT 42 aN u i
CONTRACT 138 aN o
—E A 2
CONTRACT 17
o
oO
a
y 2
CONTRACT 74 ao
CONTRACT it
~
CONTRA 4
NIANTIC RIVER RD P.S
CONTRACT 7t
a \
eA = il
2 , =
i
NIANTIC |
i
RIVER
m CONTRACT at
CONTRACT 5
CONTRACT 59 TANTS
AVITYS
ws ne, ‘i : CONTRACT 1
CONTRACT 19 crore Ha CONTRACT 2 aint
iN 4 é
: EQLONTAL De, PS, SS ' CONTRACT 63
CONTRACT 22 toa EM “ary a \g CONTRACT 58
HaGO POIAT Bo-e . SS
, q CONTRACT 57
oo GRANITE VILLE PS!
My . if
CONTRACT 25 i
Yy) CONTRACT 24 cake ~\goueacr 2s. “CONTRACT 55
GARDINER WOOD RD Po \ Cs NS
GRAPHIC SCALE 4 “\ CONTRACT 238
. 1: em aa — ' ‘
at a
a } QS
KEY
GRAVITY SEWER
2 ee FORCE MAIN
PRIVATE INSTALLATION
LAST UPEATER OCTOBER oma
CONTRACT 73. Fi
Se CD CAMP HARKNESS
ag CONTRACT 54
Wy CONTRACT 24 £
We ocK RB. PS :
C% CONTRACT 23
CONTRACT 55 CONTRACT S2
¢ SHORE DR. PS
CONTRACT 68
0 ee CONTRACT 26 e
CONTRACT 24
SEASIDE PS.
TUWN UF WATERFORD
WATER POLLUTION CONTROL ALITHORITY
i
>,
_
a
&
om
-
o,
~~
Py
et q
ae
A ANL AG
NKas VTY
DI S3ELITLLIN
LOVHINGO SUL
39 YO Ly St
s LLIBS La
VASIINE 183
NOLLYOOT SHE
SN138
BGHA 2
81 51
SHI JD
BESTT ¢
NWININ, &
IC SNIMOT IOS
Y NEV JOUOS
95d SY
GADCOM
ANSIN YO
smOigwana
Wied
4 @ 36 TYHS
LY Slid 1S3L
SNEAIISC 38
LWM SNLISIXG
ROTIG ISMURL
3 HLL XSI
Od SSU3AVEL
GD 30 WIEN
O SNOLIVONT
Y SNOIVATI
iT
oo
o
v
£
z
wwas
bags
eS Sis lei it
bg
*
19
State
ies 1
~ 21g eg)
2596791
=
Lae
n
STS Ser K-
gle
Sel
“Tre y
Fess
5 350's2l
Q
1
0
gt
tu
a)
¢
?
4
z
i)
Oo}
&
g
L
9
‘ADIAMSS
JO
Hudsd
NOWISNNOD
SSTOH
want
33UL ONLISIXS
NIWN-M21U8 NO INVUOAH ONIUSIXS
HIVN UBLVB NG BATYA 31VO ONTISIXE
3NIT ALUBdOud
Tyebuynd SNLASTXS
AACN
JU3HM
LNNJAWd
dOAMOVIG
URCNT
INGGAYd
SL3YINDD
30
3903
SNLISIXG
SNORSTIAL
CANCEDUBONN
ONLIS
1X3
ONOTTI
CNNRUBINN
ONL
S1XE
NIVW
¥alvA
SNHSOE
NIVHG
PHOLS
ONI1S1X3
NOWVATTT
TUS
SLVOIGNE
SFUMDId
MBKOT
-
3SNOH
SNTISHXG
did Isat
W3SMYT
YO
{PZ
HAMS
ANVLINYS
C3S0d0ud
UATIWAS
YO
81
HENES
AMWLINYS
CaSOd0ud
BEMES
CE
(RENE
doris,
aes
NY¥
Id
AaX
SENN va pupiny sheaf onorl 4 |
a
= CKAKN
S
~
wou
kava \
\
¢
OD
OD HE oF
HLO ‘
N FH a
Ay St
TIVES
1 AuIS
OT SHI
I 1S3@
q
3ou04 £
L Ag
SIN} 3
HS
ES3L sg
D HL
Z0 38
SM op
Y 135
AVUL €
LYIOT 2
VAITZ 1
LIUALYE g
Z My g
“G3LON BSIMYBHLO SSaINA S3HoM
2 3A WHS SIWAAIN? SNILSINA YO SFLLITILO ONIGIxa anv
TNIVW UBiVM d3¢0d0ud N3IN13G JONVUVAID WOLYBA NOKIA -o
NOMI S NOD
DNTENG BIABAS JO S607 ANY BbYiva LNBABYE OL S371KURS
GNY SNIVW 40 NOLVION LOVKS ane ANIWG3LAd OL GAAIOAN
SBINVdIWOD ALM BHL HIM BLYNIG2003 WHS AOLIVALNOD Bnd
“NMOS LON Buy SNOLDaNNo? BDAWIS AGNOH GNV ALVWlyOuddy
GI GNW1d 363rL NO NMOHS SNIVW ALIMLLG 40 NOivICT BAL Ss
“SSIMUSHLO GION
SETINN SNONIWNMIIG YO WVAVIVA dOLNOVIG ary SLNANBAVA TY ‘p
“RIVA 2m
HIM NOISNAIYa ANI 1338%IS UVINDANAadyad AO SLNIOd
SNLISUSLN AV d21V901 34 OL NOILASHALNI 199%15 Iv SSATWA €
“4332uL5 bru SalLaadoud LNBIVGdv 4O 3NI1 Aluadoud ,
WVINFINAdUad AW UO WANBOD ABIALS LV A3.1LVIO1 3G OLGLNVUGAH 2
“8947 39 VIVHS S3d1d B3IAO UBAO? HIwVa WON “1
WBINM wos Salon WWuanay
TW Swi ONI8OG JL LY SNINOS Ly WAT Maya ONNOYD a
SNIMOd WOS fe]
AARNS INV] JS¥G ND INIOd 35uaAWUL Vv
FGML SNLISIX ®
TiOd ONL1S1X3 .
NEVE UBL NO LNYUOUH SNS _—
NIV ULVK NO SATYA 31¥9 SNIISHG —— Oe
NIS¥S HOLYO SNLIS IG ac
STIOMNYR ONLISIXS wel
INIT ALHad0ud
HAQLNGD GNNOUD ONIAS1X3
(938 JNQLS) TIN SNLISHXa
SONGS ONTES EXT
TIVEGYRS SNTISG eee $e + cts + me
NON “FUZHM INGNBAYd ¢OLWOVIE EBON INSPBAYd 3L3HONCO 40 3903 SNiisa
ANGMBAYd 40 3903 ON ISIX3
ANDHATTSL ONAGUOY3ONN SNES1G
S1MLIT73 ONNOUSHSONN SNLISTa
NIWA WALA SNUIS IX
NIVEO FYOLS SNLSHXS
NES AUVLINYS SNLSHG [a5 ---—
| Heth l
NOUVATTE THS SLYOIGNI SzuNOIs NaNOT - asnOH SNS Foie
+
Lid isa. Ty a
SAHIN] 9 - NOILI3NND9 SNIGTING YO 3SNOH O3s0d0ud - a
JTOHNYR OaSOdeud =»
UIDNY) HO S3HINI p2 URAIS AYWLINYS O3SOdOud a
M3TIVAS UO S3HIN] Bt BIMIS ANWLINYS GASOdoHd pe: EV -or- eel
GNU
%
=
ia
is
i
RS
SS
3 SENG \ ss)
. ; "1 Vou B4 As
UE
UN.
5)
LORS
yave
(Gun
(& a
-
Ke
w
ek —~a
2%
~~
PO oe eS
57
equ
ULON Twaahiad } [s— SuyNiays
:
.
.
QOb!
=,1
91u9s
mies
7
:
oe
lp2LLOOOELL
[OSbLBI0008
|
921
-
2bS-65+.L8
fooo'sor2h
jooosez6sel|
SZ!
.
:
OAYH HI ‘V RH _
WOO-7G-,G01
frets
BoLetL|
esza
ieee!|
H2t
|
|
\
ee
.
O'°0O-,00-,0
[szdv6ISz1L
[asee's1661|
£21
-
i|
|
—
PSO-AE-M4
|
ILECITLSALL|
S22
LILGSI|
Weer
\
|
j\
3
AO : \ af *
sV60-,E0>.%
OOSPALEZLL
[O00SS2964!
|
Zezt
\
af
i
¢
: ‘ & \
MIS AUBeA Gel PBIUNSELE | OBIe LESS! | 121 \ ie 1
-6%0-10+S38
lowezrr2l
lolee
zie!|
o@!
|
L
an
ad
aa
=
ot
sBSOo-LD-.¥!
O*deGL22LL
loezsLOOG6!|
Vol
|
|
:
:
A
NA
&
e »SPS-22-.\b | OLA eIZLL |mo6i'4l6s6l} 6it \ AG nN Co
BBS=,68
-2L
aesovo2L.
[azo
0PLV4I]
Bi
{a
=
5
aN
\
ats ¥3 a \
wLtna2-.tb
[ssplaci2ie
foar@oiegel|)
11
\2
eo
|
.
\
Ett
w212-9EIL
|
olasbi2l.
lovLase7eél|
Fit
\
3
SPINS 1G.8! jesersarir lowe gest} pit
P
ves-62-18
ARbLAESILL
GhiSrtsel
cu
«G5-,08-2
[z>eeez2ILL
|osio'ae26él|
2!t
-2E2-G¥-S2
[BIW
WEGLL
|
GSOICOTAEI)
1
I
BOWS
ANG-~oE
[VIPS
ISLOLL
|
SiH
@ovsst)
Olt
dues
We
2YV2-
69-412
[IAIVOLIOLL
|
LObZ95%66!
|
SO!
a
q
z
.
Ss
$3
»LSP-
25-8
[42evO0S0Li
|
Liarsig@esi!
B01
w&BO-BS
-O
PATLSooLL|
6
Vib
Level)
Loi
[
ogt-06-.18
boar
iineal|
reiscenest|
soi
(6
L2-¥S-.a0
Ole
eev6al
lossecenssl|
£01
JING
St-
Sl
bry
S9569L
|
OCIS
2bzZ661
Zor
LBG-GO-nG8
[Lb
>bS6IL
jObzO'1b4BSI}
lol|
99.2068
Hroe
Seer.
jORO'SALB4l
|
OO!
.L2$-L2-,26
|]
SItMIObE%L
|
Leb
+Lysal,
96
DBb-70-<be
|FOESILZOIL
[SHOP
IOZES!
|
LE
= TIO-NG-E% [ZL SISAL | ISS OTELAL| 26 7 SY Ny See, 3\\ | Y ~ -
2-2-9
Por
sSiOeIl
|sbroriailel}
sé
|
.
.
=e
‘ees
oF
suoynry
SS
Boi
@i-.68
acer
2p049L
|asvO'6eGLEI
|
76
ve
3
a
~~
= yf
L9G-O8-,06
HPSarpseorh|
eas
ieglél|
6
Rec
SS
\
(0
me
OE
-B2E-
EP“
|LOBPOKOSAL
j2BES‘ObZLEI|
26
pears]
on
eee
=
L
;
6
IS
Nee
eee
Coos
Loe7L
[Coos
EMEMEt|
16
ese
Ne
oe
>
nousssasd
IS
Hast
fet
HN)
—
“
.
;
SAL
MGHOOD
BION
NAW S¥M SNIGDS SWELL AY SNINOG L¥ T3A11 dauye ONTO
=
ONISHa 1105 @
TIY AQAIS BNI ASWE A lW'Od SCUBA ‘9
!
ANYANCO nel ®
O FHL 01 TW ONIISIX3 ®
2S1RYIHLO SOMM RGILWM NO LeAUTAH StU SIX —
SLON 6 NIV AWM NO SATIVA LVS SNTLSTA 7_—_
‘ NISWH HOLWO SNI1S1Xa a0
STUAE UNTISHG wn] See
3NIT ALU3d0Md _—
UNOINOD GMD GNIS |
UY .
alet (7923 JNDLS) TIVE SNLISHG —— senecmcomunecncoaeme
ONIIS113 SONBS SNLISEXS mete $$ p anrrntnn
9 en
0 ee ne _
40 seurey
a RMON SUBHN JMOMT Ve dOUKIVTG USOND INSAGAWd 3L340NOO 4D 3903 SNLLSIXG —_
& ANaAG!
SNIMOTIO4 Nid 20 3908 SASH
300d £ NOHAST3A ONNOHETESGNT SNILS KS m1 a
t 4 uae on wrens >
S WIM 9 NUVI SLY NTIS 1X3 “a
TNS NUD WUDLS SHULSIX3 me eee emo pe se ene
S31 5 WEARS AMVLINYS ONLISIXE 0 Sp
D 3Ht ae
LI 38 NOLIVATIA THS BIVIIGNT SFaMOtd WITT - SNH INILSEXR oie
MUHL > did isa = ==
135 “
RANUL & S3HON} 9 ~ NOIJO3NNOD SNIQTINA YO 3ISNOH G3sodoud mo
LGGNN, DOHA G3stdetd
VOOT” 2 MJOUYT HO S3HONI $2 UINRS AYYLINYS GaSodoud
VARTA 1 4311S 40 SHONI 81 Y3K3S ABVIINYS G3S00Us ——sgggeee—
Rs
TER
TREE,
~
WWeaN39 oNzov1
From: Barry Parfitt, PE
Subject: Preliminary Design for the Waterford Contract 1 Sewer Interceptor Easement Restoration
Introduction
The Waterford Utility Commission (WUC) is responsible for the operation and maintenance of an extensive
wastewater collection system, including approximately 145 miles of gravity sewers and force mains. This collection
system was constructed during the 1970s and 1980s, and the majority of the collection system is now between 40
to 50 years old.
The Contract 1 interceptor is a vital artery of this
system. Constructed around 1977, this 42 and 48-
inch diameter interceptor receives flows from the
Town’s wastewater collection system as well as from
New London, East Lyme and Point of Woods in Old
Lyme. This interceptor is approximately 2.3 miles
long, starting at Jordan Cemetery on the Boston Post
Road and terminating at the Evergreen Pump Station
on the southeastern side of Waterford. It is the
largest interceptor in the Town of Waterford’s
collection system.
MH 17 @ Miner Lane and
All wastewater collection systems require routine
maintenance and repairs to provide safe, efficient, and reliable service. Systems that are not properly maintained
can result in sanitary sewer overflows (SSOs) due to sewer blockages, sewer pipe failures and/or pump station
failures. Aging systems eventually require capital repairs and upgrades that are beyond typical routine maintenance
and repairs. If collection systems are not properly maintained and repaired, they can be subject to catastrophic
failures, SSOs and/or damage to property, which can result in costly emergency repairs.
Project Need
Access to the Contract 1 interceptor has become increasingly difficult since its original construction. The sewer is
located mostly through cross-country areas and over time these areas have become difficult to access due to plant
overgrowth and increased ponding and wet areas that have spread over sections of the interceptor. Many of the
manhole frames are raised above grade to prevent infiltration. However, maintenance staff are not able to access
many manholes in order to properly inspect the condition of the sewer line and address any maintenance needs.
with local, state, and federal regulations. In addition, the WUC will need to confirm there are sufficient entry points
into the easement to allow equipment and vehicles to enter. Some entry or access points may be outside of the
current sewer easement. These new access points would require additional easements and possible additional
clearing.
Existing Conditions
For the purpose of this project, Contract 1
Interceptor is divided into three segments
defined by major roads where the =
interceptor crosses. The Northern Section Cacia) “foaty
(Section 1) begins at the Jordan Cemetery sit oN
located at 240 Boston Post Road, and flows |
southward, adjacent to Nevins Brook. The
2,omen,
ER
sewer crosses a marshy area at the m ‘ 5
confluence of Nevins Brook and Jordan ew nn 7
Brook and then crosses Rope Ferry Road at é S
Jordan Brook. Ss . (Geciion2§
The Central Section (Section 2) begins at the cal
intersection of Rope Ferry Road and Great
Neck Road, and flows southward, adjacent to Great Neck Road until turning eastward. The interceptor continues
eastward past the Rope Ferry Commons and Waterford High School until reaching Miner Lane.
ApBDONETID
The Southern Section (Section 3) begins at Miner Lane, just north of the railroad tracks. The interceptor flows
eastward parallel to the railroad tracks, crosses beneath the tracks and continues eastward to the Evergreen Pump
Station.
Sewer Easement
A 30-foot-wide easement in favor of the Town of Waterford was established during the original construction of the
Contract 1 Interceptor. Original construction drawings from 1977 and easement maps were provided by WUC for
our review. To understand where the current sewer and easement boundaries exist, a subconsultant was
contracted to perform a boundary survey and install flags to designate the 30-foot-wide easement. The survey
drawing is included in Appendix A and accurately depicts the existing sewer location, the easement boundary, and
boundaries of intersecting and abutting properties. The survey drawing also identifies the interceptor manhole
locations, trees/shrubs larger than 12” in diameter, utilities, culverts, roadways, etc. We were able to verify that
the entire length of the Contract 1 interceptor is located within the 30-foot easement except for one 85-ft segment
that crosses outside the easement between the High School and Miner Lane. However, this encroaching segment is
located on the Town of Waterford property. The survey also verified that the sewer is not centered within the
easement in all cases.
WriGHT-PIERCE == 2 of 10
Engineering a Better Environment
The Central Section of the interceptor crosses in and out of the 500-year floodplain, which is defined as an area
with a 0.2% annual chance of flood hazard. The Southern Section crosses in an out of the 100-year floodplain,
which is defined as an area with a 1% annual chance of flood hazard. The Town of Waterford does not permit fill
within the 100-year floodplain.
Wetlands & Watercourses
Local Jurisdiction
The Contract 1 Interceptor passes through wetlands and watercourses for much of its length. Although wetlands
were not delineated as part of this preliminary study, the Town of Waterford Wetlands and Watercourses map was
reviewed, along with National Wetlands Inventory map, managed by the U.S. Fish and Wildlife Service. Additionally,
previous wetlands delineation maps of various intersecting properties were reviewed. These resources provided a
clear indication that a substantial length of the interceptor crosses through wetlands. This was also confirmed from
a site walk performed with Waterford staff.
Wetlands come under the jurisdiction of the Waterford Conservation Commission. Due to the extent of wetlands
that cross-country sewers pass through and the need to maintain a collection system that protects the
environment, the Commission has approved a general permit for maintenance activities within the wetlands. The
current permit expires in 2028.
This permit authorizes the cutting of vegetation that are located on wetlands and adjacent upland areas within the
sewer easement areas. Cutting is limited to 20-feet in width to allow for vehicle access. The permit allows for
temporary vehicle access and placement of temporary crossings to minimize disturbance to inland wetlands and
watercourses. The permit does not authorize obstructing, diverting, or adding fill in the wetlands. A copy of this
permit is included in Appendix C.
State & Federal Jurisdiction
The Army Corps of Engineers (ACOE) and Connecticut Department of Energy & Environmental Protection (CT DEEP)
also have jurisdiction over activities that could create a disturbance within wetlands. For a tree and vegetation
clearing project, a disturbance could be created when soils are disturbed by performing work below grade (i.e.
removal of tree roots or soils) or adding fill. Removal and/or grinding of stumps down to grade is not considered a
disturbance of the wetlands, and would not require an ACOE permit. We have consulted with Julie Bjorkman, an
environmental permitting consultant, and her report is included in Appendix D.
In summary, removal of tree roots within wetlands would require an ACOE permit. The area disturbed by this work
dictates the level of permitting (and overall time and effort) required. An area totaling 5,000 square feet (sf) or less
may be permitted under General Permit #6 (Self-Verification). An area greater than 5,000-sf but less than 0.5 acres
also may be permitted under General Permit #6, but with a Pre-Construction Notification (PCN). This also
necessitates a PCN concurrence from the CT DEEP. Disturbance greater than 0.5 acres requires an Individual Permit
WriGHtT-PleERCcE =<
Engineering a Better Environment 3 of ] 0
The Southern Section of the interceptor runs parallel to the railroad tracks owned by Amtrak. At one point, the
interceptor crosses underneath (perpendicular to) the railroad tracks and then continues running parallel along the
south side of the railroad tracks. Based on the survey field work, we have confirmed that no clearing work would
be performed within the Amtrak property line. However, some work would be performed adjacent to the Amtrak
property line. An Amtrak representative was contacted to discuss the project. Based on email correspondence, we
understand that a Permit to Enter application may be required by the contractor prior to beginning clearing work
adjacent to the Amtrak property. The permit application is available online. Discussion with Amtrak should be
continued during the design phase to confirm specific Amtrak requirements prior to issuing bidding documents.
Conclusions and Summary
Construction Approach
Based on the information collected during preliminary design and subsequent discussions with Waterford staff, a
reasonable approach to construction of this project would include the following. This work is illustrated on the
conceptual plans in Appendix E. The conceptual plans include the information obtained from the survey and
topography obtained from online sources.
« Cut trees and woody vegetation to a 20-ft width within the sewer easement.
» Remove/grind stumps within the 20-ft easement to near grade to improve accessibility.
e Selectively remove tree roots within wetlands to keep total soil disturbance under 5,000 sf.
« Smooth the grade and reseed to establish a grassed accessway.
e Clear trees and vegetation as required for permanent entry points to the interceptor. at Jordan Cemetery, 79
Rope Ferry Road, High School, and Evergreen Pump Station.
Many sections of the sewer easement will be difficult to traverse due to the wet conditions. Although the work will
be planned for the dry season, it is expected that construction access mats will be used by the contractor to access
the wet sections. Additionally, there are at least three small stream crossings along the path of the sewer.
Permanent crossings, or crossings that disturb the wetlands will not be permitted. The contractor will be required
to utilize temporary stream crossings. Sediment and erosion control measures will be implemented to the extent
practical based on the current 2023 CT DEEP Guidelines for Soil Erosion & Sediment Control.
Final Design
The preliminary design should be used as a basis for further discussion with WUC prior to preparing a final design
package. The final design package, including drawings and specifications, will be used in solicitating contractor bids
for construction of the project.
During the final design and prior to soliciting bids, we recommend the following:
» Discuss with WUC staff to confirm the approach outlined above and make changes as necessary.
e Establish entry/access points to ensure vehicular access to all points along the interceptor.
WRIGHT-PIERCE = 4 of 10
Engineering a Better Environment
to the ACOE for wetland disturbance.
e Apply for the ACOE General Permit 6 (Self-Verification).
« Notify the Town Conservation Commission of the scope of work and provide drawings to demonstrate permit
compliance.
¢ Coordinate with Amtrak for pre-construction planning and preparation for required construction permits.
« Notify all affected property owners of the planned work.
Additional Considerations
In addition, the WUC should consider the following options which could impact the final design and contractor
scope of work.
1. The WUC may be able to self-perform some of the restoration work including the removal of smaller trees
and vegetation. Performing some work in house would reduce the contractor cost and potentially reduce
the overall construction cost.
2. The WUC may want to consider repairing culverts located within the easement and likely contributing to
drainage issues and increased ponding along the interceptor. One culvert is located at Great Neck Road,
just south of the intersection with Rope Ferry Road. A second culvert crosses Miner Lane. This work could
be included as part of the restoration project or in a separate project.
3. The WUC may want to consider combining CCTV inspection of the interceptor in conjunction with the
contractor work.
4. Depending on budget requirements, the construction may be split into phases or separate projects. For
example, we identified three major sections of the interceptor and each section could represent its own
phase or project.
Consiruction Cost Estimate
A preliminary opinion of probable cost for the proposed construction work is in the range of $250,000-350,000. The
construction cost will be revisited with a higher degree of accuracy once the final design is completed, and
contractor scope is finalized.
WRIGHT-PIERCE =~
Engineering a Better Environment 5 of ] 0
WRIGHT-PIERCE == 6 of 10
Engineering a Better Environment
WRIGHT-PIERCE =
Engineering a Better Environment 7 of ] 0
WRIGHT-PIERCE = 8 of 10
Engineering a Better Environment
WrRIGHT-PIERCE =
Engineering a Better Environment 9 of ] 0
WRIGHT-PIERCE = 10 of 10
Engineering a Better Environment
WrRiIGHT-PIERCE =
Enginevring a Better Environment 6 of 1 0
vy
Thm SNOLS:
SNF ALa3dOtd
TWA ONIN =
vis}
_
.
morn
:
BLVO BBIVM “BvD Svo
“ue
Zz
re uve oN Ld
AJOLNS
eGIWA
oo
IN3ANNOR
SNP
SWUTITA
QVIHEIAD
:
'
Bed
NO’
Nid
NOut
wig 3aui snonon3a .
: e ANd AEYONNOE
“
SNOLS
ONNOND W3GNN on TVA OME ~
- XBVGARUOI YO MON 4/n SONGS XNT1-NWHD
Od
auuA
tet
SN
ALU3d0ud
em
CNOA)
wid
STON, GMS :
MOS SusveL
Sens ay, Ore. SIS ones a SVD EAIVM “AIvD SvO
s % a” be
: a, 4 id ° auyriog inanewon ,
4 a SJOLNMS 2G1VN Ses NOW ‘tet NOB
4, ‘s INN SLIT OVBHY3AO 1NOd awvONnOS 7
O'1 | snonan30 TVA NOLS seein Bane
— tJ “ Sn TWH OMB -
o0e: Y30NN 7 oe
one) stone . #0 AON 4 ys me en ueee _
TAID
wOd ATA
wiI9 GNSS 1
enner ttm 2 CTT
ee manta HEPES
li =z] l
a ay 8 2 ye se ee | SECO | et | em | amy , : j ‘ r
“eae — — a v _— — SS = Sar Tae on) ae = oa ~~ —_+—.
a , ‘=
a ——— —e Er eS ising FF —_—_— 7
i li
ed ee
— Bfisce a
° zen 1 iam §
ma Dee et
cr ann OR
vy
ZIOHNWN 2GNGS :
HOREIVM anus ~ IVD RGIVM "BIV9 Sv9
O1LdS0HEILN auyriog ¥ 1NGAAWOR
0, AJOLIRS 8IVA
OVHLNOO. oo ‘Scie! NOW ‘Nid NOU
ara ANT OLIGTA GYBHE3A0 cp
POUCEUGECE¢noeuacereaanencasanenstuanacectaneaeenentnity
ILE
TEOUOAEOSUETE ogaecnt tenuate utageaneztunsenatatenecemnanAMEN
fru
UU TEU if
TNE
@ moss
TUT TEED
—TTecan
Raa te
CULE ETT TE
Rat
ST
Wwe,
*
ites
ot cn 3
__Al
vy
*SvOL# “SV “SUSAIHO ‘f NWAM
a
“NO3U3H TILId3Id YO GILON Sy 15aHNOD BG8-2 [ONMAVEG ‘098.1 SFIVOS ‘2251 HOWYN [31¥0 ‘ZAONYT “3 ANOHINY
ATWUNVISENS SI NWid SIKL -3°138 ONY 3O07IMONM AW 01 2A CGEVd38d .3OVED WF 3ONOID “LYNWM INBMGSY3 ALN3dOUd UGMIS CXOIHRIVM 30 NMOL, ‘ZZ
1£83 % O89 ‘6ZR-3 “104-3 “ONMAYUO “Ov=.5 STTWOS ‘O65
AVAL =2IN0 “DARD “T TGVHOW “A O38¥ded JST] INSAGSV3 8GKGS GUOJUILVM 30 NMOL, “LZ
409-3 (ONWAYEO “Ov|=,) SOS ‘8461 AYN G1V0 “SUMVD ‘f T3VHOIN
TAR OSUWU 30 GIVISI “SINE “ISON INSAGSV] AIN3dOed BGM2S CYOJHRLWA JO NMOL, “OZ
wig 89 W ZQ9~3 COMMAVED “Oh. S1VOS “OLB AYN TRIVO ‘3uUVO “x TWO
1AG OBYVd38d .SOWLVSE “TVHINSSON INGASSV3 ALW3d0Hd USNGS CXORGLVA 30 NMOL, 6t
089~3 “ONUAVEX] “O9".5 [3TVIS “9261 AVA <31v0 “SAdYD
“PT TAVHOWN [AB CUvdStid 23 GUVHOY "RMON ININISVG ALN3dOUd U3NGS GHOJUGIWM JO NMOL. “Bt
ZIGL ANVGMOD GVOH TH GHOJLEVH ONY NGAVH AGN "SHO, AGN 3HL AD CRIWEadO “ANYAROD
QVOSTVE GHOALEWH ONY "NGAVH GN “MOA AGN GH ‘CVE OWE ONY AVA JO LHOR, 2
GEO % BS0-3 SNWWHO Oe, 1 TFWOS 9261 Wid¥ saivd Sued
TTAVHOWN “AS CBiivdB¥d ,AHNSH ‘HNIOUVD INH: mIGY? AUSUOHS NIMS CAOAGIVA IO NAGL, “Bt
999-3 ONIMVHO .OP=.1 [3S 9261 HOMWY “31V0 JiABWO T T3VHIIN
AB GGevd3dd .V 3H00VS! "NHOD LNGAISW3 ALU3dO¥d N3NSS OUOJURIVM 30 NMOL, “SI
999 2B SO~3 ONMVEO OF=,| TFNIS OL6L AVA UIVO SAMYD
T DVM AE OG 3dd .UBISOS ‘3UVISIS ININISVI ALU3d0Ud U3NGS CUORAIVA JO NMOL, “bt
SVS % Zv9 “199-3 ONMVEO ,OV=,1 SSIS 9Z5L ANYONYT 221V0 JAMO ‘f T3VHOIN
AG GRUVdRd —_.ITVED °F 304030 “LVNVM INGA3SVA ALU3IdOHd H3NOS CHOJEGLVM 40 NMOL, “St
ES9~-3 ONUIVEO .OP8,1 “VIS S261 H3GNS030 -31vO BAe
(Ove. STIS 6661 T TVHON AG) GSuvd3td JOOSVD F HSVD LNGAISV3 ALN3dOKd SNES ONORGIVM 40 NOL, 'Z1
St AINE Ziv ,OO'vE+9% “VIS C1 O0+0 “VIS MONI CUORAIYM JO NMOL SL Ni OvON OZL~VET ONMVEO .OP=.b “SIVIS 90/7/90 aIvO OEWAQIS
DOIN IVSHD 30 NOUQMEUSNOD BOI NVId UAGRLUIVESC AVIHOH GUVIS LMOWIGNNOD. “CY “O GRADS TAG CSYV3Sd VEZ LOVING) ALEIOHIMY JOLINOD NOUN TION AGIVM CROSGIVM
SVL-H-L coMaYEO “Ope.L SIVOS “zz61 4O NMOL SHL CON CTIVH SOUNGBd MONS COMNOOY 3G OL INGNASVA UIM3S INGNYAId, “61
“NYP <1VO ‘ONKGUYH 29 AGQAWH 149 CBUVE3He 4} LOVUINOD NYHOOUE NOUDNUISNOD G29 % GL9-3 ONE OPH.1 ZIWOS O61 AWN RIVO BAuVD *T
SORIOM 3OWNGS Guasave SQNGS ONY UGIVM, “zy TRVHOWN 740 OFNvdad ONE TWHJOUNGYd INGAISV ALWSd0¥d WINGS CYOIGIVM JO NMOL, ‘OL
BOAZAUNS ONY 26¥i-96-TD “ON 1O3MGME 16/61/11
ALUS ONOWOS =A8 CauUYd3td 6461 "380120 SAINT *.0Z".1 SZIVIS "HNOD "GYOIAGIVR TORSIARS 9661 “Wid 731¥0 “ONI ‘SEGSMONG VID “AS Ciuvd3Hd .INIUDINNOD ‘CHOIUIIVA VOR
-OVOU MUI 3G0U SINSAGSYA C2S0d0Ud ONY SNLISIG ONY NOTSUGY SNIT AavONnOd | 3O3N AV3HD ¥ OVDY ABTA 3uOH FZ “OMI TWH JOUNGd JO ALMadOUd AGAMNS ALNWONNOG, “6
G3S0d0td DNMOHS “ONT | "ON OD SNION3 3H CHOSUTIWM 3H JO AINGdOUd, “by
82 7 SR90-3 “ONMVYO LOF=,) “JWOS OLBL AWA DIVO ZIAD “fT TSVHOIN
SO51 ‘Ok AVA <2iv0 "NMOHS “31VOS .ISDHS SZINGIOS :
COMSINLE/AV Id US “NNGS “GHOSE TROUVOG) a1 ance TORO kanas cee AS CSewetRd ,AMILINID TWAT NYCYOM INGNISV3 ALUZGOd INES OVOAUZIVM JO NMOL @
“ONION ANVGINOD 3NRON3 BYU GUO.RGIVM HOI SNOLIVOLEOON ONY SNOLWGLTV. “OF 0") SWOS ¥e8I
2GONGIIG 1BIVT GUVNGLS "0 ONVMCS 2AS O3UVdGad .ONOZRIVM JO NMOL 3HL OL GBASANCO
£261 “O2d 221V0 .Ov=,1 SF1V9S NIT “1 ATNWS
5
AB CEAVAERd .CVOU XO3N AVRO NOUVIMOGSHYEL 90 “MiG Shu NOUE NoLIoaLONS 3d 01 AGIINGD “WU NYGHOr 40 ONY] 30 WOUMOd ONIMOHS GAOJUGIVM JO NMOL 3H, “2
WINGANGHANG JO “1d30 01 CSMRGYSNVEL ONVT SNIMOHS YN GUOSURIVM JO NMOL, “6C 1401 °ON IHS
ecoi-3 001.1 :3IVOS 8/21/90 RLV SHIVIOSSY CNV ONRGENION] ATWO! <XG CaUVETHG ANAUINGD
TONWYEC BL61 “HVE =RIVO OP SIVIS ST/Fd GUNGLS “O GUY “AB GOuVd32d TRINA NYGHOF QL INOWPOY SGUN3AOHd ONY SORNGNADE ALNGE0%d ONWOHS JUYAGHOS, “9
sVHLIVIN “BNSvidS NOB GOYINOOV 36 OL LNGNISVA UGM3S CUOIEGIVA 40 NMOL SHI. “eo t 40 1 ON JSGHS Shi-Z5t [U30RNN NE ZaND! FWIS 000Z/r0/ZD [atwo BITTEN B NGSNG”
_— a0 9961 230 ive “35070 AB O3UVdRd .MOONE SNUGN B3A0 1 “RIN ST) SOSTD ‘ON 300W8 30 NOUVITEWHaH
Ep NOLVLSOdSNVEL 30 INGFILEN30 LTOU3NNOD JO BIVIS SHI AB “ON ‘NOLYOOSSY
vee) SWOS SV/Fa GUWMGLS "CO GUYMOR 51S COUVEGEd .CUOIURIVM 30 NMOL 3HL A2BISAGD TWOUNN NVGYOP 3H1 ROW ORANOOV INSRGSY OMMOKS ch CHORIZIVM 40 NMOL “C
Gi GHGANOD 3d OL SNDEISG “8 LEOTW’ 40 GNVT DMAONS GUaAgiIve JO NAGI SL “Z¢
@ 30 | "ON LA3HS ¥~60-7G) 2GRYWIN 1961 ‘Z SNNP <31v0 .991
<BANIII CAESAR 661 “eZ HIGOIID “FLV *.Ov=,.b JIWIS LNGUSINNOD ‘GUORELVA =:
NV] 2QNDV 2? COR 150d NOJSOG UINKMWD AGH JO LUNB0ONd ONINOHS NYId, “9¢ AGN-SUNWIN OBOJEGLVR JO NADL GV AVM JO 141M INQULMWSO AVMHKH GIVIS LYOLSSNNOI, 7
Ove,.b TWIS ‘LI-Zi~w “TIVO WANWIACD
B3MOd % LHOM INDUDANNOD BOs “OF 3SIAN3S SBLIMLIN ISVGHLYON LNDULD3NNGD
“BHOSEBIVM NVId 2S SINQNBAQUENE SNS O350d08d UEIN39 SOARS NOONG? AGN, “SC
€ 40 £ “ON L3GHS LO~ZS1 UREN Ove SIVIS ECS “IE AVM “BIO .951
BANGY GVON 180d NOLSOB OL ARIISV] TOOHIS 12RUSIO HUNNO4 JHL MOUs QVOH NOONOT
“DUNVIN CHORGLWM JO NMOL CW AVM 30 1HOR INDAULSYESO AVA 3Ivis DOUDINNOD, “EC
Z 40 ZW 1 “ON 1398 0-261 UIGAAN OFH,1
ONY OMYINONG TAD ISMON VAG OWNED Oreet STWOS LEN AOGROION ponrNS, OBE "IS HOW “BIW ,LZI4 O0G'Y ANOEY SUOHINOS GVON BUOHS BAL MOLLE CvOH
SIne TROLIBNNGD CUOIRINM vee aod TAL geabeed HOE he oe IGHD CUORGLVN 40 NACL GVA AVA JO LEO INIAVESO AVMHEAH SIVIS IMOUIGNNOD, “Z
be
Og et HOW SUvO .L ‘SN GINOY 3ovIg id aS0u GWe OL AMGISYS YOU TAN SOE Su nous avo
: ‘ace, . : en Hi
i395 oe rch 9 aiva Twonsnuns oe Oe 10 Ae Oe oe JS0d NOSOG GHOREIVK 20 NMOL d¥V AVM JO HORE INGRIEVE30 AYMHDM GIVIS INOUIBNNGO, “t
‘ASTHNO! “NOS “66h We SAID “ATTN ® NGSNST “SOU 440) CanveGus WOO SFONSHSISH dVN
SNVQN UGAO | “RIN "S'. $0510 ‘ON 30018 JO NOUYITRRYH3H NOUVINGISHYAL
30. INGALUYd30 LMOUIGNNOD 40 BIVIS SHI AB “SN “NOUWIDOSSY AN2i3A39
CWNLOW NVOHOP 3HL NOMS O38INCOY ONY) DNIMOHS VN "OHOZEGIVM 30 NMOL, “25
1 JO 6 ISHS ‘Ove.i "OS “ZZ ¥ SNAP 22LY0 “SASANNS NODINV Ag
O38VEId CLNLIINNOD ‘OUOSEGLWA SNNGAY MOOR WIS “ON JO AGAHIS ALMGdOHd. “IE
HOAR/AUTS BHI 40
NTHODN 001TM 1 STIVOS “6261 6 LIT BUNUIVHONS JAM ONY 1V3S 3HL SNWINGD Uf SS3INN ONVA 1ON SI d¥M SIHL JO UYLAN BO INQid ¥ “DI
SOBSAGH "A961 BZ _Y3G0190 TIVO ‘SUIINONG UGATNd @ UGTONVHD 18 COUYUIid
eANOUDSNNOD “QUOSUSIVA | ON ZINGY UINIDNVD AYNSH 40 ALN32eOdd JO NVkl, OC COZ “Ss ismony ONV ChOz “Ss USNOMW “L6Oz ‘G1 ATO SatwO 3AN939429 PEDGOD1106D ONY MPaPCDI OBO
“OZBYOD1 1080 SUIGAIN aM 955 30 £05 ONY ‘vey ‘Zay STZN¥d SNOUQOSRINT TY INOUDINNOT “ALNNOD
+ 20 | J93HS ‘601-D0ld “ONMMVAD “.0%=.1 SIS NOONO? AGN Sdv¥t Give SONVENSNE QOO1U MOUS NIXVL SHIM CRiIdIO SINT NOUYATG GOL YIN’ “6
"000% “TIVO “YOAZABNS ONYT ALIS °3 NYG AS O34¥d3ed 15 ‘ONORGIYE SANT i NO car
ABBAY OF 9-9 BNOZ ASO SIMGYS JGAYSWY 30 ONY! AGNUTS AIVONNOG/ALGAORd, “62 SIMOd NIBALIG SALRVINORUA 3AM AYP SBRWONNOG SY NHOHS SISNET HOA STN SHOES “@
“1="S ONAWUO “0C*,1 SSIVOS £0/9/9 ‘OISASH ‘ZD0Z OF LSNONW “BIVd “HLMOJNYO “330138 ONY NOUVRIOSN “JOCEIMON® UISHL JO 1535 BHL D1 HOAGANNS ONY] SHL 30
NnWOLWA *D UGHdOISRIHD FAB OIUVdIYd NVid NOISIAKIENS “SNYT AMGAY 9Z Dvd @ SIO, “BZ NONI 3HL 40 Nw 38 01 St ASUHSO. ORO BH “L
6 40 1 LOKS 21NO S2S0cUNd “TYNOUYYOJN YO2 NMOHS SI ONY AINUNS C194 ¥ 40 INS3y
*h=n5 SONMMYAR 4OF=.1 “TIOS “20/9/21 “a3SUGU “2002 $ AINE =lvG "HL SHL NB ONAYH S¥ CAMSNOD 38 G1 LON JV SSUNGdOUd ONNOOY JO S3NTT AYWONAOG “9
“D UHdOISRAD 3AG ORWVGIHd CNVIa SNM ALGdO'd NY] AAGAY #Z Dad “8 SINOO, “ZZ “SNOLLVAN2SAO Sd CTAU NO G3SVE 89 AYN SI FUVG “TYOUNSA “S
Z+L SIQ3BHS *0G~.1 “21VOS “NNBISAS UIVNIQRIOO) CROWN 1D 3H OL SMML ONY “OND DUG0039 01 OTGH Juv SSONVISO Ok
*OZOZ “TL ISNONY =31V0 “SASAUNS NIDINVES °AG OFUVdaed .'IMOUI3NNOD “OYOJUGIVA “SONRIV3G “SRIYNIGHOOD “SNOUWAH3SEO SdD GTS NO O3SVG CQCVN 19 S) NOLIVIN3WO TWINOZRIOH ‘fC
0 SATHOLYN NOSN2IX3 SONGAY SLIITEM YEE ONY PEC “SON JO AGANTS DHCVEOOGOL 3% ALI, “Vz
£262 43ONI030 “VOM OTA ISGIV] 40 3IV0 “=
=) {O¥=,1 (FWIS ‘SL6b AWN? <21Nd ‘Ou One
8 “Aas “UNION 8 EMERY -1TDUASNNGD “QUORILLYM GVO 150d NOISOG 30 “1 ONOW
se 3QS HINOS ‘SSNY ‘dc YNYK ONY SSNY °d BVOOI AD CUNO 3d OL ONY] 30 NY¥id, “SZ ‘SGUNIV3s INVATTSE / SSIOHNYA ONY “MOH BOIdSORINI 1 LOVEINOD, BHI 1idG0 01 TLNZINE “CD
wi V/NTANUNOOY DiHeEDOGOL
SNITHOLN TFWOS ‘SOOZ OL BAENGLIS “BVO *1N3y WITHA 8 Z~A VADWUNIOY WouN3A
: awe ifousaNeD uaaaivia God HNO > ONY TVOH Jad 2008 101 ® sive Note ee
% mem ons 6B 10D v ADNGM 8 ‘v AN0D3N9D Ol SNDNOTIE ALdOUd dwt LNO~SwiS ANYONNOG, “PZ Porters NouvNeel? ng v
ZR ee % LGHS ‘7-95 ONE
obe.1 77was ‘t0/s/9 *a3SiAR! "ZOO G Aint sauvd Suna “S USUeISES SN Suosauuns ow 30
9 Of. \ NORLWIOSSY 1AOUINNOD BHI AG C3SHOONT SY .LNOUIINNOD JO GLVIS 3Hi NI SdWN ONY
2 3A GRUVdTYd CNVId SNOWONOD ONUSIG “SAY ARGAY ¥Z JMV3d “A SINOG, “EZ SQAUNS UD4 SONMONVIS, SIDNSDY ZIVIS HOT SNOAYWOSM Sti IO DE-A00L oe rion
$“S00T-OZ NOWLISS HLA JONYOHOOOY NI OGadaad NGGE SVH dW ONY AGAMMS SIH ‘1
O00S=5 -FIWOS CANNLLNOSD SSONSYSS3" dvVW SHLON ASAYNS
dV¥W
ASM
TIVE3A0
WriGHt-Pierce ==
Engineering a Better Environment 7 of 1 0
Es? CSE o i FSS n1G
omer i DOO Y BRULEE po Ey
7 OST BAST OT BT WRT POOL UTR Baay GueTwH Good weed PS
ee
cover
BIPPW
S55
SET]
10
SWIHW
HSHLO
e907
ays
——o_- =
ue y
eT
RUT
aunan|
STNWd orl
(OU 2 MEDS FEO UBY) Fee po oro NM
— —-. aPeupep jas 40 HG cua weiduy = hamid punos
inane UubSuleg Cay poor Paes .
omg Buo
— 2 . esqena, fpedad Mie O
TT SUELO YIO UF USSiSs! IU eos Pur
er
OOL
oh Seuerddy
s Auewues
WRIGHT-PIERCE =
Engineering a Better Environment 8 of 1 0
INLAND WETLANDS & WATERCOURSES PERMIT #23-03
Vegetation Clearing, Inspection & Maintenance
of Municipal Sewer Utilities within Easements
Issued to the Waterford Utility Commission
The Waterford Conservation Commission, in their capacity as the Town’s Inland Wetland Agency,
hereby authorizes the Waterford Utility Commission to conduct regulated activities in designated wetland
areas of existing sewer utility easements subject to jurisdiction in accordance with CT General Statutes,
Section 22a-36 through 22a-45, inclusive, as amended, and the Waterford Inland Wetlands and
Watercourses regulations.
Regulated activities authorized include:
1. Cutting of vegetation in wetlands and adjacent upland areas within sewer easement areas
to clear a 20 foot wide vehicle access for purposes of inspection and maintenance of the
existing municipal sewer. Vegetation to be cut by machine-mounted mowers or
manually where flooded conditions do not allow machinery access.
2. Temporary machinery access through and over inland wetlands and watercourses within
municipal sewer easement areas to access sewer manholes for inspection and repair.
3. Placement of temporary crossings including temporary plates, timbers, slash, corduroy or
mats to minimize disturbance to inland wetlands and watercourses.
4, Minor repair of sewer manholes and utility lines to prevent infiltration of ground and
surface water and correct system failures detected during the inspection. Minor repair
work includes excavation of soils, installation of temporary erosion and sediment controls
and de-watering basins, temporary discharge of sediment-free de-watering waters, and
restoration of wetland substrate conditions.
These regulated activities are associated with maintenance practices and repairs for the Town of
Waterford municipal sewer system as described in the application dated June 20, 2023. The
Conservation Commission attaches the following conditions to minimize impacts to inland
wetlands and watercourses associated with the proposed inspection and maintenance activities:
SPECIAL CONDITIONS:
1) All maintenance and repair activities conducted under this authorization shall be reported
no later than 7 days prior to the planned initiation of the activity to the Conservation
Commission’s agent for a determination of consistency with the terms of this permit.
Limits of disturbance shall be identified and marked in the field. Erosion and sediment
control and de-watering measures, and measures to restore wetland soils, grades and
3)
4)
5)
6)
7)
watercourse resources is not herein authorized.
In areas of flooded or saturated soil conditions, the use of machinery shall be restricted
and vegetation removal conducted manually to protect wetland and surface flow patterns.
Where temporary disturbance from machinery access occurs in wetlands or watercourses,
the wetland substrate and surface flows are to be restored to pre-existing conditions upon
completion of the maintenance activity.
The crossing of wetlands and watercourses with machinery shall be temporary and
accomplished with minimal disturbance to wetlands and streambed substrates. Use of
best management practices for temporary stream crossings, wetland protection and
erosion control shall be incorporated into the inspection and maintenance program.
These practices shall comply with the State of Connecticut Forest Practices Regulations.
Upon completion of machinery access and required repairs to the utility, all temporary
wetland and watercourse crossing devices shall be removed, and the wetland and
watercourse substrate and surface flows shall be restored to pre-existing grades. The
permanent obstruction, diversion or alteration of wetlands and watercourse resources is
not herein authorized.
A representative of the Utility Commission shall schedule a site inspection with the
Commission’s agent following completion of the maintenance activity within each sewer
easement area to review wetlands and water