Representative Town Meeting Regular Meeting Materials (linked)
agenda center agenda
| Board/Commission | Representative Town Meeting (RTM) |
|---|---|
| Meeting Date | June 06, 2022 |
| Pages | 2 |
| File Size | 0.3 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Page 1 of 2 2/14/2018 4:37 PM UST Compliance Inspection Checklist Connecticut Department of Energy and Environmental Protection Storage Tank and PCB Enforcement Unit 79 Elm Street, Hartford, CT 06106 860-424-3374 GENERAL: Inspection Date: 2/14/2018 Site ID: 152-3068 Inspector Gary Bellmar Site Name SOUTHWEST SCHOOL Reason Compliance Site Address DANIELS AVE. Waterford, CT 06385 Inspection Type Full Inspection Contacts Contact Type Contact Information Owner TOWN OF WATERFORD, 15 ROPE FERRY RD WATERFORD, CT 06385, Phone: (203) 444- 5801- Registrant TOWN OF WATERFORD, 15 ROPE FERRY RD WATERFORD, CT 06385 Tank ID: SW1R1 - Currently In Use (10000 gallons) – Installed: 11/1/1988 Construction Coated & Cathodically Protected Steel (sti-P3) Life Expectancy 30 years Construction Notes Tank Options Corrosion Protection Type: Galvanic (Sacrificial Anode) Impressed Current System Structure to soil voltage Compartment: a - Heating Oil(on-site consumption) (10000 gallons) Spill Prevention Spill Containment Overfill Prevention Ball Float Device Product Notes Spill Prevention Note Release Detection No release detection required Piping – Installed: 11/1/1988 Construction Other (Specify) Corrosion Protection Type Not Required Construction Notes Piping material: B Piping Installed: 11/88 Piping Options Single Walled, Containment Sumps @ Tanks, Metallic fittings isolated from soil and water Piping Release Detection Pump Type American Suction (Check Valve is at Tank) Line Leak Detector Primary Method Precision LTT Every 3 years Tank ID: SW2R1 - Currently In Use (2000 gallons) – Installed: 11/1/1988 Construction Coated & Cathodically Protected Steel (sti-P3) Life Expectancy 30 years Construction Notes Tank Options Double Walled Corrosion Protection Type: Galvanic (Sacrificial Anode) Impressed Current System Structure to soil voltage Compartment: a - Heating Oil(on-site consumption) (2000 gallons) Spill Prevention Spill Containment Overfill Prevention Ball Float Device Product Notes Spill Prevention Note Release Detection No release detection required Piping – Installed: 11/1/1988 Page 2 of 2 2/14/2018 4:37 PM Construction Other (Specify) Corrosion Protection Type Not Required Construction Notes Piping material: B Piping Installed: 11/88 Piping Options Single Walled, Containment Sumps @ Tanks, Metallic fittings isolated from soil and water Piping Release Detection Pump Type American Suction (Check Valve is at Tank) Line Leak Detector Primary Method Precision LTT Every 3 years Narrative Comments 02/14/2018 Inspector: Gary Bellmar - Site has two steel UST’s , one 10K and one 2K. Both UST’s need to have annual cathodic protection testing done. Notice of Violation issued. Annual Tank Notification needs to be updated on-line via EZFile to CT DEEP. Written Warning issued. Potential Violations Regulation: CT state regulation (d)-1(d) Violation Reason: A review of DEP records indicates that we do not have a registration form with current information. Required Action: Please provide a completed registration through EZ-File for the facility and all unregistered UST systems. Regulation: CT state regulation (d)-1(e)(1)(E) Violation Reason: Cathodic protection systems require annual testing to ensure that a structure to soil test voltage reading of at least minus 0.85 volts is maintained. Required Action: The UST system owner or operator must have the requisite CP test performed on the tank and/or piping. Applies To: TANK SW1R1 (Containing Heating Oil(on-site consumption) with Capacity of 10000 gallons) Applies To: TANK SW2R1 (Containing Heating Oil(on-site consumption) with Capacity of 2000 gallons) Inspector Signature Recipient Signature TOWN OF WATERFORD Recipient Printed Name Facility Owner Position/Title