Utility Commission Regular Meeting Materials (linked)
agenda center agenda
| Board/Commission | Utility Commission |
|---|---|
| Meeting Date | August 18, 2020 |
| Pages | 21 |
| File Size | 4.1 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
WATERFORD UTILITY COMMISSION REGULAR MEETING AGENDA *** ZOOM REMOTE ACCESS ONLY *** DATE: Tuesday, August 18, 2020 PLACE: 1000 Harford Tpke., Waterford, CT TIME: 6:00 pm ZOOM Remote Access Only Neftali Soto is inviting you to a scheduled Zoom meeting. Topic: Waterford Utility Commission Regular Meeing Time: Aug 18, 2020 06:00 PM Eastern Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/89608837515 Meeting ID: 896 0883 7515 One tap mobile +13017158592,,89608837515# US (Germantown) +13126266799,,89608837515# US (Chicago) Dial by your location +1 301 715 8592 US (Germantown) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 669 900 9128 US (San Jose) Meeting ID: 896 0883 7515 Find your local number: https://us02web.zoom.us/u/kbHcaZcbA 1. Citizens Session – 2. Secretary’s Report – Approval of July 21, 2020 Regular Meeting minutes. 3. Accounts Adjustments – As per list 4. Expenditures – Approval of Bill List REGULAR MEETING AGENDA PAGE 2 DATE: TUESDAY, AUGUST 18, 2020 PLACE: 1000 HARTFORD TPKE., WATERFORD, CT TIME: 6:00 PM ZOOM REMOTE ACESS ONLY 5. Old Business – Reports and Updates Financials - WW Fund Revenues / Expenditures Report, and Collections Municipal Complex Rehab – Status Update Waterford/East Lyme/New London Wastewater Agreement & Wtfd/EL Sewer Agreement 6. Unfinished Business - 7. Executive Session (if necessary) – Pending claim by New London regarding termination of Tri- town agreement and requirement for Waterford to seek alternate treatment solution. 8. New Business - None WATER – Veolia Report 9. Correspondence – As noted on correspondence list. 10. Plans Review – 11. Personnel – Update 12. Other – 13. Adjournment All requests for items to be considered by the Utility Commission must be received at least seven (7) days in advanced. Neftali Soto, P.E. – Chief Engineer ( ( WATERFORD UTILITY COMMISSION REGULA.R MEETING MINUTES DATE: July 21, 2020 PLACE: Waterford Municipal Complex; 1000 Hartford Turnpike ZOOM ACCESS ONLY PRESIDING: Chairman Peter Green MEMBERS PRESENT: Steve Negri, Raymond Valentini, and Ken Kirkman ALSO PRESENT: Staff: Neftali Soto-Chief Engineer, Jim Bartelli-Assistant Director and Attorney Nick Kepple Chairman Green called the meeting to order at 6:01 PM CITIZEN SESSION None SECRETARY'S REPORT MOTION VOTE MOTION VOTE BILLING ADJUSTMENTS Made by Mr. Valentini to approve the Minutes of the June 16, 2020 meeting, Mr. Negri seconded. The motion passed Made by Mr. Kirkman to approve the Minutes of the July 15, 2020 Special meeting, Mr. Negri seconded. The motion passed The Commission reviewed the June Adjustments. The adjustment report will be kept in the office for review. EXPENDITURES MOTION VOTE made by Mr. Negri to approve end of year FY20 and July 2020 bill list, Mr. Valentini seconded. The motion passed unanimously. ( ( ( Waterford Utility Commission July 21, 2020 OLD BUSINESS - REPORTS & UPDATES • FINANCIALS -WW FUND REVENUES/EXPENDITURES REPORT The financial were reviewed. Mr. Soto reported that we ended FY20 under budget but it was tight. • MUNICIPAL COMPLEX REHAB -STATUS UPDATE The building committee had a tour this week of the new office building and the mechanics' area . . The foundation for the new garage is currently being worked on. • COLLECTIONS-UPDATE Attorney Kepple gave a report that collections are going well. He stated that they had some good size payoffs this past month. • TRI TOWN AGREEMENT Attorney Kepple received a letter from the New London's Town Attorney. It addressed six areas that New London would like changed or added to the new Tri-Town agreement. Attorney Kepple will draft a response letter to be approved by the commission as well as a letter to East Lyme. The Sub Committee for the Tri Town agreement met on July 15th via Zoom. They went page by page and discussed areas that should be updated . . UNFINISHED BUSINESS • FLOOD INSURANCE ON PUMP STATIONS Mr. Soto contacted our contact person at the insurance agency. She informed Mr. Soto that she had been working with the former finance director regarding the evaluation of the pump stations. She will be in touch in a couple of weeks with a full report. • Policy No. 3014 Well and Secondary Meters Mr. Soto explained how the new policy would work and if approved would send letter to residents to let them know of the change in policy. MOTION VOTE 21Pa g e made by Mr. Negri to accept the new Policy No. 3014 regarding Well and Secondary Meters, Mr. Kirkman seconded. The motion passed unanimously. ( ( ( Waterford Utility Commission July 21, 2020 NEW BUSINESS • Extension on Evoqua Contract Mr. Bartelli has been in contact with our sales representative for Evoqua that provide chemicals for odor control. Evoqua is willing to extend our contract and keep our current pricing for an additional year. MOTION made by Mr. Kirkman to extend the current Evoqua contract for an additional year, seconded by Mr. Valentini. VOTE Passed WATER-VEOLIA REPORT Report was not ready but will be e-mailed to Commission when available. CORRESPONDENCE None PLANS REVIEW None PERSONNEL • There are three candidates being interviewed this week for the Sewer Tech I position. • Mr. Soto is working with Human Resources for the advertisement of the Operator position. OTHER ADJOURNMENT With no further business before the Commission, the meeting adjourned at 6:49 p.m. MOTION VOTE Respectfully submitted, Amy L. Windle Recording Secretary 3jPa ge made by Mr. Valentini to adjourn. Mr. Kirkman seconded. The motion passed unanimously. - -- ---- --- - - - - - - - Waterford Utility Commission From 07/21/2020 through 08/18/2020 Sorted by Location No Transaction List Account No Location No Customer Name Trans. Date Trans. Type Amount Reason Batch 06-0007083 00426300 08/14/2020 Adjustment -5.85 SEWER USE Interest -5.85 06-0004504 0073200 08/11/2020 Adjustment ADJUST INT -7.40 SEWER USE Interest -7.40 06-0005683 0081687 08/12/2020 Adjustment -13.28 SEWER USE -13.28 06-0002765 0130600 08/12/2020 Adjustment -17.67 SEWER USE -17.67 06-0005643 0271200 07/22/2020 Adjustment -8.51 SEWER USE Interest -8.51 06-0002194 0467600 07/30/2020 Adjustment NL ADJUST -207.17 SEWER USE -207.17 06-0001141 0492500 08/11/2020 Adjustment -11.05 SEWER USE Interest -11.05 06-0000680 0534100 07/22/2020 Adjustment -88.66 SEWER USE Interest -88.66 06-0005500 0554100 07/30/2020 Adjustment NL ADJUST 45.50 SEWER USE 45.50 06-0005500 0554100 07/30/2020 Adjustment RE ADJUST -91.00 SEWER USE -91.00 06-0001379 0620200 08/12/2020 Adjustment -15.83 SEWER USE -15.83 06-0005099 0681800 08/12/2020 Adjustment -8.20 SEWER USE -8.20 06-0003153 0705400 08/06/2020 Adjustment NL ADJUST -217.00 SEWER USE -217.00 06-0060149 0706000 08/11/2020 Adjustment -2.00 SEWER USE Interest -2.00 06-0003082 0708400 07/22/2020 Adjustment -7.67 SEWER USE Interest 08/17/2020 12:07:19 PM Page Number: 1 Transaction List Account No Location No Customer Name Trans. Date Trans. Type Amount Reason Batch -7.67 06-0002527 0718600 08/12/2020 Adjustment -12.63 SEWER USE -12.63 Grand Totals Adjustment -537.28 SEWER USE -131.14 SEWER USE Interest -668.42 08/17/2020 12:07:19 PM Page Number: 2 Transaction List Date PAID DATE Department # ACCT # INVOICE # JOB VENDOR DESCRIPTION AMOUNT 8/18/2020 9/4/2020 21131 52030 69304 210108 Lenard Engineering Consulting on Town Wide Lead and Copper 3,602.50 $ 60131 52040 81020 Atlantic Broadband Cable for Maintenance Building 110.88 $ 60131 54170 163101 Bahr Sales Camera Truck Parts 444.33 $ 60131 52730 712020 City of New London Bond Payment for FY21 30,640.58 $ 60131 54170 23171 Critical Signs Name Magnets 73.00 $ 60131 52040 158626 200366 EST Associates East Lyme Flow Monitoring 4,354.28 $ 60131 52040 158625 200357 EST Associates Flow Monitoring for 5 locations for 4weeks 14,735.00 $ 60131 52080 80920 Frontier Communications Pump Stations-Telephone 144.55 $ 60131 54170 67893933 FW Webb 58.60 $ 60131 54170 67900667 FW Webb ARC Pipe 153.28 $ 60131 54170 68023669 FW Webb 67.87 $ 60131 54170 67987679 FW Webb Cross Roads 18.04 $ 60131 52030 80920 Hartford HealthCare Employee Services 57.00 $ 60131 54170 72820 Home Depot Shop Supplies 590.56 $ 60131 53070 73120 NAPA Auto Supplies 337.73 $ 60131 54170 S041402460 NorthEast Electrical Grider Cord 143.97 $ 60131 54170 S041428720 NorthEast Electrical Cross Roads 171.25 $ 60131 54170 70389 Rapid Lock & Door Service Sectional Key 15.15 $ 60131 54170 80471 Rapid Lock & Door Service Sectional Key 23.75 $ 60131 54170 S128379799 Rexel Cross Road 28.20 $ 60131 53020 54850 Superior Industrial Products Corp Shop Supplies 454.28 $ 60131 53020 54854 Superior Industrial Products Corp Gloves and Tyvek Coveralls 905.54 $ 60131 54170 54891 Superior Industrial Products Corp Shop Supplies 373.02 $ 60131 54170 S2926390 Superior Products Distributors Cross Road 173.64 $ 60131 54170 S020409524 Teledyne Instruments Flow Meter 367.23 $ TOTAL 58,044.23 $ ALREADY SENT TO FINANCE 7/29/2020 8/7/2020 60131 52040 71020 Atlantic Broadband Cable for Maintanence Building 110.88 $ 60131 52080 71520 Frontier Communications Fax Line 241.66 $ 60131 52030 71020 Hartford HealthCare Dulin, Patrick 57.00 $ 60131 52040 7390964 TIAA Bank Plotter Lease Fee 185.00 $ 60131 52080 985881048 Verizon Cell Phones 823.24 $ 8/14/2020 9/4/2020 60131 52040 9972473394 Airgas Cylinder Rentals 53.69 $ 60131 52100 Eversouce Electric 12,410.36 $ 60131 52110 City of New London Water 208.51 $ 60131 52040 10809752 Vanco Electronic Checks Processing Fee 313.60 $ TOTAL 14,403.94 $ GRAND TOTAL 72,448.17 $ Payroll 68,073.90 $ Month Ending Revenues FY 20 Expenditures FY 20 Actual Collections FY 20 Rev FY 19 Exp FY 19 7/31/19 $23,981 $110,914 $695,689 $35,191 $116,618 8/31/19 $40,299 $291,616 $834,268 $48,322 $288,871 9/30/19 $27,971 $1,015,091 $874,785 $60,904 $402,928 10/31/19 $999,673 $1,168,315 $1,636,562 $1,251,548 $1,032,499 11/30/19 $1,013,082 $1,365,066 $1,777,971 $1,122,326 $1,196,006 12/31/19 $1,027,038 $1,730,566 $1,819,750 $1,095,751 $1,623,009 1/31/20 $1,950,795 $1,945,572 $2,530,327 $2,006,367 $1,785,621 2/29/20 $1,972,295 $2,072,289 $2,760,028 $2,032,486 $1,968,801 3/31/20 $1,984,582 $2,228,364 $2,820,744 $2,047,489 $2,131,401 4/30/20 $2,832,631 $3,194,895 $3,528,312 $2,917,195 $2,849,448 5/31/20 $2,851,292 $3,315,415 $3,628,128 $2,933,359 $3,008,809 6/30/20 $3,757,519 $3,503,869 $3,676,533 $3,828,644 $3,241,761 Final Wastewater Enterprise Fund FY 2020 - Performance - Cummulative Aug. 18 - 2020 Regular ZOOM Meeting $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 $4,500,000 Dollars Month Ending Final Performance to Wastewater Enterprise Budget FY 2020 Revenues FY 20 Expenditures FY 20 Actual Collections FY 20 Rev FY 19 Exp FY 19 Aug. 18 - 2020 Regular ZOOM Meeting $320,321 $62,631 $1,018,250 $68,178 $121,970 $17,518 $79,554 $19,381 $951,198 $304,005 $71,626 $25,723 $10,651 $295,500 $63,000 $1,200,000 $100,000 $125,000 $20,000 $70,000 $20,000 $1,093,077 $310,000 $87,204 $46,843 $20,000 $299,849 $74,926 $1,465,725 $103,820 $133,459 $13,634 $98,764 $19,475 $822,460 $242,689 $61,211 $24,648 $1,528 $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 $1,600,000 Final FY 2020 Utility Commission Major Expenditure Items FY 2019 Actual FY20 Budget Final 6/30/2020 $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 51000 - Salaries and Benefits 52000 - Services 53000 - Materials and Supplies 54000 - Equipment and Parts Dollars Series and Description Final Expenditures by Series FY20 FY 20 Budget Final To June 30-2020 Month Ending Revenues FY 21 Expenditures FY 21 Actual Collections FY 21 Actual Collections FY 20 Rev FY 20 Exp FY 20 7/31/20 $19,414 $72,336 $658,113 $695,689 $23,981 $110,914 8/31/20 $834,268 $40,299 $291,616 9/30/20 $874,785 $27,971 $1,015,091 10/31/20 $1,636,562 $999,673 $1,168,315 11/30/20 $1,777,971 $1,013,082 $1,365,066 12/31/20 $1,819,750 $1,027,038 $1,730,566 1/31/21 $2,530,327 $1,950,795 $1,945,572 2/29/21 $2,760,028 $1,972,295 $2,072,289 3/31/21 $2,820,744 $1,984,582 $2,228,364 4/30/21 $3,528,312 $2,832,631 $3,194,895 5/31/21 $3,628,128 $2,851,292 $3,315,415 6/30/21 $3,676,533 $3,757,519 $3,503,869 Wastewater Enterprise Fund FY 2021 - Performance Progress - Cummulative August 18 - 2020 Regular ZOOM Meeting Sewer Use Collections Status as of August 14, 2020 939 Files referred for collections with a current total of $613,888.33 To Date: 789 Paid/Closed 49 Payment Plans-$175,213.31 16 Town Real Estate Tax Foreclosures -$93,524.82 17 Other entity foreclosures/bankruptcy/military -$69,292.67 Activities over next 60-90 Days: 38 Filed or Filing lawsuits for non-payment -$101,029.50 20 Town Sewer Use Foreclosures -$137,991.91 10 Miscellaneous follow-up, on hold, bank owned, new referrals -$36,836.12 Delinquent Sewer Use Collections Summary through August 14, 2020: Fiscal Total Use Collections from July 1, 2011 to August 14, 2020 Fiscal Year Use Collections YTD Fiscal Year Attorney Fees and Costs Expended * Fiscal Year Attorney Fees and Costs Recovered *Does not include July bill $2,034,181.52 $ 13,204.73 $ $ 9,891.40 SUMMARY FOR PREVIOUS FISCAL YEAR COLLECTIONS 2000 THROUGH 2017 UTILITY COMMISSION FILES TOTAL: TAX COLLECTOR FILES TOTAL: UTILITY COMMISSION LEGAL REIMBURSMENT MISC. COLLECTION FILES TOTAL: FISCAL YEAR 2018 UTILITY COMMISSION FILES TOTAL: TAX COLLECTOR FILES TOTAL: UTILITY COMMISSION LEGAL REIMBURSEMENT TAX & WUC LEGAL REIMBURSEMENT: TOTAL FISCAL YEAR 2019 UTILITY COMMISSION FILES TOTAL: TAX COLLECTOR FILES TOTAL: UTILITY COMMISSION LEGAL REIMBURSEMENT TAX & WUC LEGAL REIMBURSEMENT: TOTAL FISCAL YEAR 2020 $1,921,603.90 $ 5,205,748.53 $ 180,116.83 $ 743,672.87 $ 8,051,142.13 $ 250,573.49 $ 700,752.17 $ 47,979.70 $ 26,266.71 $ 1,025,572.07 $ 215,330.67 $ 794,921.89 $ 54,793.23 $ 45,981.33 $ 1,111,027.12 UTILITY COMMISSION FILES TOTAL: $ 175,514.89 482,767.88 46,696.76 36,184.35 741,163.88 TAX COLLECTOR FILES TOTAL: $ UTILITY COMMISSION LEGAL REIMBURSEMENT $ TAX & WUC LEGAL REIMBURSEMENT: $ TOTAL $ FISCAL YEAR TO DATE 2021 (JULY 1, 2020 TO AUGUST 13, 2020} UTILITY COMMISSION FILES TOTAL: $ 13,204.73 TAX COLLECTOR FILES TOTAL: $ 53,648.95 UTILITY COMMISSION LEGAL REIMBURSEMENT $ 9,891.40 TAX & WUC LEGAL REIMBURSEMENT: __ $ __ 4-'-"'-.0 _____ 02 ___ .9_2 TOTAL $ 80,748.00 GRAND TOTAL COLLECTED SINCE APPOINTMENT AS TOWN ATTORNEY: $11,009,653.20 \ 7-1 3-;;1.o (i)veouA WATER Monthly Operating Report New London, Ct. June 2020 The report covers the period from June 1, 2020 to June 30, 2020 New Business a. Operations -All Water and wastewater operations were within permit compliance throughout this monitoring period. b. All work continues throughout the Covid outbreak. As of June 151 we have begun entering homes and businesses to perform meter exchanges, cross connection inspections and backflow testing. A building entry plan has been established along CDC guidelines, an all involved employees have been trained. To-date no employees have tested positive in New London. c. Storm water work continues with 77 Catch Basins cleaned during this month leaving 395 cleaned since January 1, 2020. In total the New London Storm Water system contains around 1,700 catch basins. d. The water main replacement work on Elm Street is completed and all sections have been opened up for service. This area now has a complete grid connecting all streets on all four directions. At the same time 3 fire hydrants have been added to the area. The crew has now begun replacing the 24" diameter Stormwater pipe on Lincoln Ave. The pipe being removed is beyond deteriorated and in most cases comes out of the ground in small rust pieces. This pipe was half filled with dirt and rocks that were not only inhibiting flow but creating sink holes all along Lincoln Ave. This project will alleviate significant flooding between Lincoln Ave and Cedar Grove. e. Work continues at the Shaw's Cove Storm Water pump station. The first two Pumps have been installed, aligned and started up. Removal of the 3rd pump will take place on July 15th. This pump will be ready to run by the 1 ih with the exception of the right angle drive anti rotation repair. Parts are on order for this but will not arrive until the 2nd week of August. In preparation for the potential July 11 th tropical storm, the first two pumps were test run and they really move a lot of water quick. f. Fire Hydrant flushing is complete in Waterford and New London, the crews are now moving over to valve excursing. g. Maintenance crews at the WWTF are completing the rebuild of Primary Effluent Pump No. 1. This pump has been completely rebuilt including epoxy coating of all wetted surfaces, new seals, bearings, and a new double shaft seal and recalculated city water lubrication system. This is the first of these seal-water systems we are installing on large pumps. The goal is to reduce dependency on recalculated plant water for equipment lubrication. Monthly summary for accounts paid by credit card was up quite a bit to 32%. The amount in legal was about the same as last month at $838,000 % Accounts by Via Website 2. Water Ac:coUI\Uln legal Oalanc 1. Lake Konomoc is at 83% of capacity at months end. The entire reservoir system is at 78% at months end 11. Finished water flows for the month averaged 6.39 MOD u1. All analysis and sampling are in full complied with Drinking Water Standards 3. Wastewater tv. Monthly Flow Averaged 5.24 MOD v. TSS Average - 5.0 mg/L- 98 % removal vt. BOD Average- 3.0 mg/L - 99 % removal vu. Total Nitrogen 268.6 lbs/day - 82% 4. New London Utilities Road Crew Work June 2020 New London Hydrant Maintenance O Hydrant Flushing 611 Pipe Repair 1 Valve Maintenance 0 Waterford Hydrant Maintenance 0 Hydrant Flushing 0 Pipe Repair 4 Valve Maintenance 0 Leaks and Main Breaks DATE Location Town TYPE 6/1/2020 46 Lamphere Road WF Service 6/2/2020 271 Crystal Avenue NL Service 6/9/2020 24 North Road (NYLL) WF Service 6/14/2020 19 Laurel Street WF Service 6/23/2020 27 Scotch Cap Road WF Service Deliverables: CCTV 5341.95' Pipe Cleaning Valve Turning Hydrant Flushing 611 Sewer Work: Date Location Town Work Type Service Installations: Date Location Town 5 Maintenance as of June 30, 2020 all preventive maintenance scheduled have been completed with no backlog Water - Corrective maintenance - 6, Preventative Maintenance - 21 Wastewater - Corrective Maintenance, - l l, Preventative Maintenance - 22 Monthly Total - Corrective - 17, Preventative - 43 6 Billing and Collections 1. 53 backflow devices were tested this month by Veolia personnel. 11. 445 cross connection inspections were completed this month by Veolia 111. 18 water meters were replaced during this month Total of205 meter related service orders were completed 7 Number of employees a. Veolia currently employees 45 full time employees vs. our contract requirement of 43 Correspondence with Contract Administration • June 2020 Construction Crew Calendar • June 2020 Storm Water Crew Calendar • Notice of payment for performance bond elimination • Invoice for operational fee August 2020 • Invoice for Electrical reimbursement for August 2020 • Invoice for Underground Material June 2019