Planning & Zoning Commission (linked)

agenda center agenda

Board/CommissionPlanning & Zoning Commission
Meeting DateSeptember 09, 2025
Pages6
File Size0.9 MB
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
The Williams School Tennis
New London, CT
Sales Representative: M.Mahoney   ·   Designed By: J. Danielson   ·   Design No.: 170539D   ·   June 26, 2025
Not to be reproduced in whole or part without the written consent of Musco Lighting. ©1981, 2025 Musco Sports Lighting, LLC.
Temple ISD, Temple, Texas, USA
Riverdale Ridge High School, Thornton, Colorado, USA
Indian Wells Tennis Garden, Indian Wells, California, USA
Mt. San Antonio College, Walnut, California, USA

PROJECT SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC.
©1981, 2025 Musco Sports LighƟng, LLC.
ENGINEERED DESIGN
By: J. Danielson  • File #170539D  • 26-Jun-25
The Williams School Tennis
New London, CT
LIGHTING SYSTEM
Structure/Fixture Summary
Structure ID
Structure Height
Fixt. Attachment Ht.
Fixture Qty
Fixture Type
Load
Circuit
P1
40'
40'
2
TLC-LED-550
1.08 kW
C
T1
50'
50'
2
TLC-LED-1200
2.34 kW
A
T2
50'
50'
2
TLC-LED-1200
2.34 kW
A
50'
2
TLC-LED-1200
2.34 kW
B
T3
50'
50'
2
TLC-LED-1200
2.34 kW
B
T4
50'
50'
2
TLC-LED-1200
2.34 kW
B
50'
2
TLC-LED-550
1.08 kW
C
T5
50'
50'
2
TLC-LED-1200
2.34 kW
A
50'
2
TLC-LED-1200
2.34 kW
B
T6
50'
50'
2
TLC-LED-1200
2.34 kW
A
7
20
20.88 kW
Circuit Summary
Circuit
Description
Load
Fixture Qty
A
Tennis 1-3
9.36 kW
8
B
Tennis 4-6
9.36 kW
8
C
Pickleball
2.16 kW
4
Fixture Type Summary
Type
Circuit
Source
Wattage
Lumens
L90
L80
L70
Quantity
TLC-LED-1200
A
LED 5700K - 75 CRI
1170W
150,000
>120,000
>120,000
>120,000
8
TLC-LED-1200
B
LED 5700K - 75 CRI
1170W
150,000
>120,000
>120,000
>120,000
8
TLC-LED-550
C
LED 5700K - 75 CRI
540W
67,000
>120,000
>120,000
>120,000
4
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage
208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
TLC-LED-1200
6.9
6.5
6.0
5.2
4.2
3.8
3.0
TLC-LED-550
3.2
3.0
2.8
2.4
1.9
1.8
1.4
Light Level Summary
Calculation Grid Summary
Grid Name
Calculation Metric
Illumination Ave
Circuits
Fixture Qty
Ave
Min
Max
Max/Min
Ave/Min
Pickleball
Horizontal Illuminance
17.79
11
26
2.50
1.68
C
4
Tennis 1-3
Horizontal Illuminance
57.31
49
65
1.35
1.18
A
8
Tennis 4-6
Horizontal Illuminance
56.73
48
64
1.34
1.18
B
8
Guaranteed Performance:
The ILLUMINATION described above
is guaranteed per your Musco Warranty document.
Field Measurements:
Individual field measurements may vary
from computer-calculated predictions.
Electrical System Requirements:
Refer to Amperage
Draw Chart and/or the
"Musco Control System Summary"
for electrical sizing.
Installation Requirements:
Results assume ± 3%
nominal voltage at line side of the driver and structures
located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC.
©1981, 2025 Musco Sports LighƟng, LLC.
ENGINEERED DESIGN
By: J. Danielson  • File #170539D  • 26-Jun-25
T1
58
57
57
53
53
61
61
64
56
55
62
61
56
57
58
58
58
53
58
57
49
52
50
56
52
55
59
54
59
57
59
64
57
58
57
61
64
65
55
55
60
59
61
56
53
T5
T2
50'
83'
60'
83'
60'
83'
50'
83'
T6
50'
Rear Setback
25'
Side Setback
SCALE IN FEET 1 : 50
0'
50'
100'
Equipment List For Areas Shown
Structure
Fixtures
QTY
STRUCTURE ID
SIZE
GRADE
ELEVATION
ABOVE FIELD
LEVEL
FIXTURE TYPE
QTY/POLE
THIS
GRID
OTHER
GRIDS
2
T1
T6
50'
-
50'
TLC-LED-1200
2
2
0
2
T2
T5
50'
-
50'
TLC-LED-1200
4
2
2
4
Totals
12
8
4
Above Field Level is height of fixtures above area shown
The Williams School Tennis
New London, CT
Grid Summary
Name: Tennis 1-3
Size: 3 Court - 12' Spacing
Spacing: 20.0' x 20.0'
Height: 3.0' above grade
Illumination Summary
MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average: 50
Scan Average: 57.31
Maximum:
65
Minimum:
49
Avg/Min: 1.18
Guaranteed Max/Min:
2
Max/Min: 1.35
UG (adjacent pts): 0.00
CU: 0.84
No. of Points: 45
FIXTURE INFORMATION
Applied Circuits: A
No. of Fixtures: 8
Total Load: 9.36 kW
Pole location(s)
dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:
The ILLUMINATION described above
is guaranteed per your Musco Warranty document.
Field Measurements:
Individual field measurements may vary
from computer-calculated predictions.
Electrical System Requirements:
Refer to Amperage
Draw Chart and/or the
"Musco Control System Summary"
for electrical sizing.
Installation Requirements:
Results assume ± 3%
nominal voltage at line side of the driver and structures
located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC.
©1981, 2025 Musco Sports LighƟng, LLC.
ENGINEERED DESIGN
By: J. Danielson  • File #170539D  • 26-Jun-25
54
52
51
48
53
58
58
63
63
60
63
56
58
62
62
64
57
54
59
58
59
53
48
55
52
62
52
52
61
59
61
50
55
64
62
54
53
61
63
63
50
48
51
52
57
50'
Rear Setback
T3
50'
83'
60'
83'
50'
83'
60'
83'
T5
T4
T2
SCALE IN FEET 1 : 50
0'
50'
100'
Equipment List For Areas Shown
Structure
Fixtures
QTY
STRUCTURE ID
SIZE
GRADE
ELEVATION
ABOVE FIELD
LEVEL
FIXTURE TYPE
QTY/POLE
THIS
GRID
OTHER
GRIDS
2
T2
T5
50'
-
50'
TLC-LED-1200
4
2
2
1
T3
50'
-
50'
TLC-LED-1200
2
2
0
1
T4
50'
-
50'
TLC-LED-1200
2
2
0
50'
TLC-LED-550
2
0
2
4
Totals
14
8
6
Above Field Level is height of fixtures above area shown
The Williams School Tennis
New London, CT
Grid Summary
Name: Tennis 4-6
Size: 3 Court - 12' Spacing
Spacing: 20.0' x 20.0'
Height: 3.0' above grade
Illumination Summary
MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average: 50
Scan Average: 56.73
Maximum:
64
Minimum:
48
Avg/Min: 1.18
Guaranteed Max/Min:
2
Max/Min: 1.34
UG (adjacent pts): 0.00
CU: 0.83
No. of Points: 45
FIXTURE INFORMATION
Applied Circuits: B
No. of Fixtures: 8
Total Load: 9.36 kW
Pole location(s)
dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:
The ILLUMINATION described above
is guaranteed per your Musco Warranty document.
Field Measurements:
Individual field measurements may vary
from computer-calculated predictions.
Electrical System Requirements:
Refer to Amperage
Draw Chart and/or the
"Musco Control System Summary"
for electrical sizing.
Installation Requirements:
Results assume ± 3%
nominal voltage at line side of the driver and structures
located within 3 feet (1m) of design locations.

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC.
©1981, 2025 Musco Sports LighƟng, LLC.
ENGINEERED DESIGN
By: J. Danielson  • File #170539D  • 26-Jun-25
50'
Rear Setback
11
16
20
20
21
24
15
21
23
23
24
24
15
19
24
25
22
22
12
17
21
21
21
25
11
15
17
19
23
26
11
12
15
18
21
21
11
12
13
16
17
17
11
13
14
16
15
14
14
16
17
17
15
13
17
20
20
18
15
12
21
22
22
18
14
12
21
22
22
19
15
12
P1
42'
100'
32'
65'
T4
SCALE IN FEET 1 : 50
0'
50'
100'
Equipment List For Areas Shown
Structure
Fixtures
QTY
STRUCTURE ID
SIZE
GRADE
ELEVATION
ABOVE FIELD
LEVEL
FIXTURE TYPE
QTY/POLE
THIS
GRID
OTHER
GRIDS
1
P1
40'
-
40'
TLC-LED-550
2
2
0
1
T4
50'
-
50'
TLC-LED-1200
2
0
2
50'
TLC-LED-550
2
2
0
2
Totals
6
4
2
Above Field Level is height of fixtures above area shown
The Williams School Tennis
New London, CT
Grid Summary
Name: Pickleball
Size: 117' x 64'
Spacing: 10.0' x 10.0'
Height: 3.0' above grade
Illumination Summary
MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 17.79
Maximum:
26
Minimum:
11
Avg/Min: 1.68
Max/Min: 2.50
UG (adjacent pts): 1.43
CU: 0.47
No. of Points: 72
FIXTURE INFORMATION
Applied Circuits: C
No. of Fixtures: 4
Total Load: 2.16 kW
Pole location(s)
dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:
The ILLUMINATION described above
is guaranteed per your Musco Warranty document.
Field Measurements:
Individual field measurements may vary
from computer-calculated predictions.
Electrical System Requirements:
Refer to Amperage
Draw Chart and/or the
"Musco Control System Summary"
for electrical sizing.
Installation Requirements:
Results assume ± 3%
nominal voltage at line side of the driver and structures
located within 3 feet (1m) of design locations.

EQUIPMENT LAYOUT
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC.
©1981, 2025 Musco Sports LighƟng, LLC.
ENGINEERED DESIGN
By: J. Danielson  • File #170539D  • 26-Jun-25
The Williams School Tennis
New London, CT
Tennis 1-3
3 Court - 12' Spacing
1
2
T1
13
16
14
15
T5
3
6
4
5
T2
9
12
10
11
T4
(-60.00', -0.00', 0.00')
Tennis 4-6
3 Court - 12' Spacing
50'
Rear Setback
25'
Side Setback
7
8
T3
17
18
T6
(60.00', 0.00', -0.02')
Pickleball
117' x 64'
19
20
P1
(152.43', 17.39', 0.00')
(0.00', 0.00', 0.00')
SCALE IN FEET 1 : 80
0'
80'
160'
Pole location(s)
dimensions are relative
to 0,0 reference point(s)
Equipment Layout
INCLUDES:
· Pickleball
· Tennis 1-3
· Tennis 4-6
Electrical System Requirements:
Refer to Amperage
Draw Chart and/or the
"Musco Control System Summary"
for electrical sizing.
Installation Requirements:
Results assume ± 3%
nominal voltage at line side of the driver and structures
located within 3 feet (1m) of design locations.
Equipment List For Areas Shown
Structure
Fixtures
QTY
STRUCTURE
ID
SIZE
GLOBAL
ELEVATION
ABOVE GLOBAL LEVEL
FIXTURE TYPE
QTY/POLE
1
P1
40'
-
40'
TLC-LED-550
2
3
T1
T3
T6
50'
-
50'
TLC-LED-1200
2
2
T2
T5
50'
-
50'
TLC-LED-1200
4
1
T4
50'
-
50'
50'
TLC-LED-1200
TLC-LED-550
2
2
7
Totals
20
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage
208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
TLC-LED-1200
6.9
6.5
6.0
5.2
4.2
3.8
3.0
TLC-LED-550
3.2
3.0
2.8
2.4
1.9
1.8
1.4
Above Global Level is height of fixtures above design (0,0,0)