Planning & Zoning Commission (linked)
agenda center agenda
| Board/Commission | Planning & Zoning Commission |
|---|---|
| Meeting Date | September 09, 2025 |
| Pages | 3 |
| File Size | 0.2 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
System Requirements: Control System Summary Preliminary Plans: Confirm all details - see Note 1 Project Name: The Williams School Tennis | Project #: 170539 Control System ID: 1 of 1 Distribution Panel Location/ID: Service one Project Information Control System Control System ID: 1 of 1 Control System Type: Control-Link ® Control and Monitoring System Communication Type: PowerLine-ST Power Requirements Control cabinet(s): Control voltage (phase to neutral) 120/60 VA loading - Inrush 3023.0 VA loading - Sealed 336.0 Lighting Circuits: Voltage/Hertz/Phase 480/60/3 Project Notes: Equipment Listing Description Qty Size (in) Control and monitoring cabinet - primary 1 24 X 72 Contactors, 30 amperes 10 - Off/On/Auto switches 3 - Important Notes: 1. Please confirm that the lighting circuit voltage listed above is accurate for this facility. This is the voltage/phase being connected and utilized at each lighting pole's electrical components enclosure disconnect. Inaccurate voltage/phase can result in additional costs and delays. Contact your Musco sales representative to confirm this item. 2. In a 3 phase design, all 3 phases are to be run to each pole location. Musco's single phase luminaires come pre-wired to utilize all 3 phases across the entire facility. 3. One contactor is required for each circuit at each pole location. Contactors are 3 pole and 100% rated for the published continuous load. 4. If the lighting system will be fed from more than one distribution location, additional equipment may be required. Contact your Musco sales representative. 5. Size overcurrent devices using the full load amps column of the Circuit Summary by Switch chart (Minimum power factor is 0.9). Size conduit per code unless otherwise specified as larger to allow for harness connectors. 6. Avoid use of in-ground junction/pull boxes when possible. If used, the following best practices must be followed: • Underground handholes (pull boxes) must be supported to prevent settling. Boxes buried directly in soil, without support, are not allowed. • Use polymer concrete lids marked with ELECTRIC for underground handholes. Steel lids are not allowed. • Avoid underground connections when possible. If used, all wire connectors must be UL listed for Wet Locations to prevent leakage current. 7. Control power wiring must be in separate conduit from line or load power wiring. Communication cables must be in separate conduit from any power wiring. 8. Test wire per ANSI/NETA ATS-2021. Wires with insulation resistance less than 100 MOhms, in water-filled conduit, must be replaced. 9. Refer to Installation Instructions for more details on equipment information and the installation requirements. Sales Representative: Mike Mahoney | Project Engineer: Joe Danielson | Scan: 170539D | Document ID: 170539P1V2C2-0626130811 www.musco.com | lighting@musco.com Page 1 of 3 -- 26-June-2025 System Requirements: Control System Summary Project Name: The Williams School Tennis | Project #: 170539 Control System ID: 1 of 1 Distribution Panel Location/ID: Service one Equipment Layout and Connection Details Connection Details ID Description 1a Line power to contactors, and equipment grounding conductor. Requires one circuit per contactor, size wiring per load and voltage drop. 1b Load power from contactors, and equipment grounding conductor. Requires one circuit per contactor, size wiring per load and voltage drop. 2a Control power with equipment ground to control cabinet. Requires dedicated 20 A circuit. Provide transformer if control voltage not present. Equipment ID Description 1 Control and monitoring cabinet - primary Sales Representative: Mike Mahoney | Project Engineer: Joe Danielson | Scan: 170539D | Document ID: 170539P1V2C2-0626130811 www.musco.com | lighting@musco.com Page 2 of 3 -- 26-June-2025 System Requirements: Control System Summary Project Name: The Williams School Tennis | Project #: 170539 Control System ID: 1 of 1 Distribution Panel Location/ID: Service one Circuit Summary Switching Schedule Field/Switch Description Switches Tennis 1-3 1 Tennis 4-6 2 Pickleball 3 Control Module ID: 1 Lighting Circuit Voltage: 480/60/3 Circuit Summary by Switch Switch Zone Description Pole ID Qty of Fixtures Full load amperes Contactor Size (Amps) Cabinet # Contactor ID 1 Tennis 1-3 T1 2 5.2 30 1 C1 Tennis 1-3 T2 2 5.2 30 1 C2 Tennis 1-3 T5 2 5.2 30 1 C3 Tennis 1-3 T6 2 5.2 30 1 C4 2 Tennis 4-6 T2 2 5.2 30 1 C5 Tennis 4-6 T3 2 5.2 30 1 C6 Tennis 4-6 T4 2 5.2 30 1 C7 Tennis 4-6 T5 2 5.2 30 1 C8 3 Pickleball P1 2 2.41 30 1 C9 Pickleball T4 2 2.41 30 1 C10 Sales Representative: Mike Mahoney | Project Engineer: Joe Danielson | Scan: 170539D | Document ID: 170539P1V2C2-0626130811 www.musco.com | lighting@musco.com Page 3 of 3 -- 26-June-2025