Planning & Zoning Commission (linked)
agenda center agenda
| Board/Commission | Planning & Zoning Commission |
|---|---|
| Meeting Date | March 14, 2023 |
| Pages | 1 |
| File Size | 0.9 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
30±FT EXISTING SEAWALL 6±FT RETURN NEW 20±FT SECTION APPROXIMATE PROPERTY BOUNDARY SHED STEPS LANDING APPROXIMATE SHORELINE WOODEN UPPER DECK SANDY BOTTOM EXTENDED APPROXIMATE PROPERTY LINE 19 Oswegatchie Road N/F William B Pepin EXISTING STEPS NEW STONE SCOUR/RETAINING WALL 30±CY OVER 150±SF - TOP EL 5.8±FT AT AND WATERWARD OF HTL AND CJL (SEE EROSION & SEDIMENT CONTROL NOTES THIS SHEET) EXTENDED APPROXIMATE PROPERTY LINE EXISTING SOUTH STONE SCOUR WALL TO BE RETAINED TOP EL 5.8±FT UNDER DEEP PERMIT# 202015003-COP APPROXIMATE PROPERTY BOUNDARY RETURN TOP ELEVATION TO RISE TO 8±FT TO MATCH BLUFF GRADE SINGLE Baccharis halimifolia (SEA MYRTLE) TRANSPLANTED 23 Oswegatchie Road N/F Barbara H. Eberle TEMPORARY TURBIDITY CURTAIN IF REQUIRED MULTI-STORY FRAME RESIDENCE PROPOSED SECTION C-C SEE DETAIL BELOW APPROXIMATE FEMA 100-YR FLOOD LIMIT ACCESS WAY TO WORK AREA STORAGE/STAGING AREA FOR FILTER and GEOTEXTILE FABRIC and STONE C C HTL and CJL ALONG FACE OF SCOUR/RETAINING WALL NOTE: WORK LIMIT TO BE STAKED by JAMES BERNARDO LAND SURVEYING LLC 50±FT REAR YARD SETBACK 20-FT SIDEYARD SETBACK 20-FT SIDEYARD SETBACK TEMPORARY HAY BALES or WATTLE ON DRIVEWAY IF SOIL PRODUCTS ARE STORED IN THIS AREA FENCE GATE TO BE SECURED CLOSED DURING WORK ACTIVITIES REBUILD COMPLETE STAIRS OVER STONE WALL TO BEACH FUTURE DOCK FACILITY DEEP PERMITS 202015003-COP & 202015007-LISGP APPROXIMATE EXISTING GRADE PROFILE MHW 2.6 HTL/CJL 3.7 MLW 0.0 BOTTOM SEDIMENTS: SAND and GRAVEL BRUSH and TREE COVERED BANK SLOPE APPROXIMATELY 1 : 1 DO NOT DISTURB EXISTING VEGETATION CJL SINGLE Baccharis halimifolia (SEA MYRTLE) TO BE REPLANTED - CAREFULLY DIG OUT ROOT BALL, TEMPORARILY PLACE IN BUCKET, SPRINKLE WITH RIVER WATER APPROXIMATE EXCAVATION LIMIT LINE FOR NEW STONE SCOUR WALL, TO BE EXCAVATED BY HAND NAVD 1.6 WORK STAGES : 1) DAILY EXCAVATION LIMIT 2) PLACE GEOTEXTILE FABRIC 3) BEGIN STONE PLACEMENT AS GEOTEXTILE IS PLACED TEMPORARY FLOATING TURBIDITY CURTAIN WITH WEIGHTED SKIRT 26±LF OF NEW STONE SCOUR/RETAINING WALL 30±CY OVER 150±SF - TO BE RETAINED TOP EL 5.8±FT TO MATCH ELEVATION OF SOUTHERLY WALL. RETURN TOP ELEVATION TO MATCH GRADE OF BLUFF REGRADE TO MATCH EXISTING GRADE PROFILE SOUTH OF STAIRWAY MHW 2.6 HTL/CJL 3.7 BRUSH and TREE COVERED BANK, DO NOT DISTURB - REMOVE DEAD OR DYING TREES MLW 0.0 BOTTOM SEDIMENTS: SAND and GRAVEL 2±FT CJL SINGLE Baccharis halimifolia (SEA MYRTLE) TO BE REPLANTED WITH ROOT BALL AT HIGH TIDE ELEVATION APPROXIMATE TEMPORARY EXCAVATION LIMIT NEW GEOTECH FABRIC BENEATH STONE AND UP BACKSIDE OF NEW STONE SCOUR WALL NAVD 1.6 TEMPORARY FLOATING TURBIDITY CURTAIN CONSOLIDATED BACKFILL SLOPE/GRADIENT 1 : 5 or 33% STAKED GEOTEXTILE FABRIC UTILIZED AS TEMPORARY EROSION and SEDIMENT CONTROL DURING CONSTRUCTION THEN PLACED ALONG BACK OF NEW WALL ROCK WEIGHTS ALONG BOTTOM OF CURTAIN PREPARED BY: DOCKO, INC. KEITH B. NEILSON, P.E. PO BOX 421 MYSTIC,CT 06355 860 572-8939 APPROVED DATE DWG 19-07-3045 SHEET Keith B. Neilson, Docko Inc. 2/1/2023 7:54 AM Spery_CSP-2-C_.dwg PROPERTY OF COASTAL SITE PLAN NEW STONE SCOUR WALL NIANTIC RIVER JANUARY 3, 2023 MARK SPERY & ANABEL S. FRISH 21 OSWEGATCHIE ROAD - WATERFORD, CT 2 OF 2 RIVER NIANTIC FLOOD EBB GRAPHIC SCALE 1 " = 5 ' 5 4 0 5 PLAN VIEW W S E N EMAIL: office@docko.com 3 2 1 GRAPHIC SCALE 1 " = 5 ' 5 4 0 5 EXISTING SECTION C-C 3 2 1 GRAPHIC SCALE 1 " = 5 ' 5 4 0 5 PROPOSED SECTION C-C 3 2 1 EROSION & SEDIMENT CONTROL NOTES 1. AGREED UPON EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED PRIOR TO ANY DISTURBANCE OF THE SITE. 2. LAND DISTURBANCE WILL BE KEPT TO A MINIMUM; ROUGH GRADING OR DEPOSITED FILL & RE-STABILIZATION WILL BE SCHEDULED AS SOON AS PRACTICAL, FOLLOWING THE DELIVERY AND PLACEMENT OF THE GRAVEL AT THE SITE RIGHT UP TO THE POINT WHEN CONSTRUCTION EQUIPMENT OR ACCESS TO THE AFFECTED AREA IS COMPLETE. 3. INSTALLED EROSION AND SEDIMENT CONTROL MEASURES AND DEVICES SHALL BE MAINTAINED AS INSTALLED THROUGHOUT THE COURSE OF THE PROJECT. 4. REFERENCE IS MADE TO THE STATE OF CONNECTICUT GUIDELINES FOR SOIL AND EROSION SEDIMENT CONTROL HAND BOOK, LATEST EDITION.