Education Standing Committee of the RTM Special Meeting Materials (linked)
agenda center agenda
| Board/Commission | Representative Town Meeting (RTM) |
|---|---|
| Meeting Date | October 28, 2020 |
| Pages | 11 |
| File Size | 0.3 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Principals Charles C. Brown, P.E. James F. Norden, P.E. Amy Jagaczewski, P.E. Principal Emeritus Kenneth Gibble, P.E. Geotechnical Associate David L. Freed, P.E. Structural Associate Richard A. Centola, P.E. 1358 Boston Post Road P.O. Box 802 Old Saybrook, CT 06475 Tel 860.388.1224 lastname@gncbengineers.com gncbengineers.com September 30, 2020 Abby Y. Piersall, AICP Planning Director, Town of Waterford 15 Rope Ferry Road Waterford, CT, 06385 (860) 444-5813 apiersall@waterfordct.org Re: Nevins Cottage Structural Stabilization and Exterior Rehabilitation Opinion of Probable Cost Dear Ms. Piersall: The following presents the Opinion of Probable Cost for the work outlined in our September 30, 2020 Construction Documents for Grant Submissions. A breakdown of these costs can be found in Appendix A. Base Bid (Structural Stabilization and Exterior Rehabilitation) Location Summary Estimated Cost Rear Addition Removal $2,823 Porch Post dutchman, concrete slab, wood framing and decking $3,704 Basement Crushed stone, vapor retarder, footings, slab-on-grade, brick repointing $21,181 Sill Replacement Shoring, sheathing removal, replacement in kind with historic connections, sheathing reinstallation $23,050 1st Floor Structural reinforcement, new stairs, decking replacement $3,753 Town of Waterford Nevins Cottage Page 2 of 11 Mudroom New foundations and structural reinforcement $21,579 Low Roof (Kitchen) Structural reinforcement $7,163 Roof Removal of trim, removal of soffit, rafter reinforcing, trim and soffit reinstallation $3,776 Site Concrete cap + basement door; excavation and window wells at vents $2,646 Exterior Replace cladding, rehabilitate windows/doors, gutters $141,677 Glazing Allowance $600 Electrical Allowance $5,000 Lighting Allowance $2,400 Total Estimated Cost of Base Bid: $239,352 Total Estimated Cost of Base Bid (Including Labor, Materials, Permit, Other Fees, & Contingency)*: $376,978 Add Alternate No. 1 (Cut and Grind Holly Tree) Discipline Summary Estimated Cost Cut and Grind Holly Tree Cut and grind holly tree 2,040 Total Estimated Cost of Add Alternate No. 2 $2,040 Total Estimated Cost of Add Alternate No. 2 (Including Labor, Materials, Permit, Other Fees, & 15% Contingency)*: $3,270 Total Estimated Cost Base Bid and Add Alt. No. 1 (Including Labor, Materials, Permit, Other Fees, & 15% Contingency)*: $380,248 Please review this estimate and let us know if you have questions or comments. Very truly yours, Amy Jagaczewski, P.E./Principal Town of Waterford Nevins Cottage Page 3 of 11 Appendix A: ACE Cost Estimates Livingston Builders Nevins Tenant Cottage Page 1 Accurate Construction Estimates 9/24/2020 4:28 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount GENERAL REQUIREMENTS Personnel: Labor Working Carpenter Foreman 50/50 5.00 wk 1,200.00 6,000 - - - 1,200.00 /wk 6,000 Personnel: Labor 6,000 /wk 6,000 Temp: Construction Aids 7) Mudroom Temporary Shoring 2" x 6" @16" OC 18.00 lf 28.12 506 7.00 126 - 35.12 /lf 632 2) First Fl Temporary Shoring 2" x 6" @16" OC 18.00 lf 28.12 506 7.00 126 - 35.12 /lf 632 2) First Fl Temporary Shoring 2" x 4" @12" OC 72.00 lf 18.75 1,350 6.00 432 - 24.75 /lf 1,782 2) First Fl Temporary Shoring 2" x 4" @12" OC 10.00 lf 18.75 187 6.00 60 - 24.75 /lf 247 2) First Fl Temporary Shoring Lite 2" x 4" @16" OC 32.00 lf 14.06 450 5.00 160 - 19.06 /lf 610 2) First Fl 1st FloorTemporary "A" Frame Shoring 2" x 4" @16" OC 35.00 ea 116.38 4,073 22.50 788 - 138.88 /ea 4,861 Temp: Construction Aids 7,073 1,692 /ea 8,764 GENERAL REQUIREMENTS 13,073 1,692 /mo 14,764 DEMOLITION Demo: Dumpsters 1) Basement 30 yd Dumpster + 5 tons 4.00 ea - - - - 3,800 950.00 /ea 3,800 2) First Fl 30 yd Dumpster + 5 tons 1.00 ea - - - - 950 950.00 /ea 950 Demo: Dumpsters 4,750 /ea 4,750 Demo: General 2) First Fl Demo Rear Addition 1 story 100.00 sf 5.09 509 - - - 6.09 /sf 609 1) Basement MEP/ FP Debris Removal 2.00 day 813.76 1,628 - - - 849.76 /day 1,700 Demo: General 2,136 /sf 2,308 Demo: Concrete 1) Basement Remove Slab on Grade 600.00 sf 6.54 3,924 - - - 7.44 /sf 4,464 Demo: Concrete 3,924 /cy 4,464 Demo: Wood 1) Basement Remove Floor Joists Sub Floor Wd Flooring 12.00 sf 3.39 41 - - - 3.39 /sf 41 1) Basement Remove Existing Temp Shores 3.00 ea 30.01 90 - - - 30.01 /ea 90 7) Mudroom Remove Wood Framing For Re-Use 192.00 sf 2.03 391 - - - 2.03 /sf 391 7) Mudroom Remove Ceiling Framing For Re-Use 65.00 sf 1.02 66 - - - 1.02 /sf 66 5) Roof Remove Sheathing/ Roofing, Rafters Remain 260.00 sf 2.81 731 - - - 2.81 /sf 731 7) Mudroom Remove Roof Rafters/Sheathing/Shingles 100.00 sf 2.81 281 - - - 2.81 /sf 281 2) First Fl Remove Wood Deck & Decking 30.00 sf 3.00 90 - - - 3.00 /sf 90 2) First Fl Remove Wood Decking 45.00 sf 1.27 57 - - - 1.27 /sf 57 1) Basement Remove Flight Wood Stairs 1.00 ea 232.76 233 - - - 232.76 /ea 233 Demo: Wood 1,980 /sf 1,980 Demo: Insulation 2) First Fl Remove Batt Insulation 45.00 sf 0.20 9 - - - 0.20 /sf 9 Demo: Insulation 9 /sq 9 Demo: Doors & Windows 2) First Fl Remove Bilco Door 1.00 ea 101.72 102 - - - 101.72 /ea 102 Demo: Doors & Windows 102 /ea 102 Demo: Finishes, Ceilings 3) Second Fl Remove Plaster Ceiling For Rough Carp 164.00 sf 2.54 417 - - - 2.54 /sf 417 Demo: Finishes, Ceilings 417 /sf 417 Demo: Exterior Finishes 2) First Fl Remove Wood Clapboard Siding 130.00 sf 1.36 176 - - - 1.36 /sf 176 Demo: Exterior Finishes 176 /sf 176 Demo: Mechanical/Elect 1) Basement Remove/Dispose Oil Tank 1.00 ea 600.00 600 - - 0 600.00 /ea 600 1) Basement Remove/Dispose Furnace 1.00 ea 500.00 500 - - - 500.00 /ea 500 Demo: Mechanical/Elect 1,100 /sf 1,100 Demo: Elect 1) Basement Remove Dist Panel 1.00 ea - - - - 125 125.00 /ea 125 Demo: Elect 125 /sf 125 Livingston Builders Nevins Tenant Cottage Page 2 Accurate Construction Estimates 9/24/2020 4:28 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount DEMOLITION 9,844 4,875 15,431 SITEWORK Clear Site 8) Site Work Tree Remove 1.00 ea 160.00 160 - - - 1,120.00 /ea 1,120 8) Site Work Excavate Stump and Remove 1.00 ea 120.00 120 - - - 840.00 /ea 840 1) Basement Remove Misc. Rock/Earth Build up 5.00 cy 50.86 254 - - - 50.86 /cy 254 Clear Site 534 /ea 2,214 Earthwk: Cut & Fill Etc 1) Basement Dispose Spoils on Site 4.00 cy 6.12 24 - - - 14.62 /cy 58 1) Basement Dispose Surplus 22.00 cy 6.12 135 - - - 14.62 /cy 322 2) First Fl Dispose Surplus 2.00 cy 6.12 12 - - - 14.62 /cy 29 Earthwk: Cut & Fill Etc 171 /cy 409 Earthwk: Excavation All 1) Basement Excavate Footing By Hand 4.00 cy 67.81 271 - - - 67.81 /cy 271 1) Basement Excavate Basment SOG By Hand 20.00 cy 67.81 1,356 - - - 67.81 /cy 1,356 1) Basement Excavate For SOG 20.00 cy 4.08 82 - - - 9.74 /cy 195 2) First Fl Excavate For SOG 2.00 cy 4.08 8 - - - 9.75 /cy 19 7) Mudroom Excavate Footing By Machine 30.00 cy 4.08 122 - - - 9.74 /cy 292 7) Mudroom Shape & Grade Footing 96.00 sf 0.51 49 - - - 0.51 /sf 49 Earthwk: Excavation All 1,888 /cy 2,183 Earthwk: Grading 1) Basement Fine Grade 590.00 sf 0.76 450 - - - 0.76 /sf 450 Earthwk: Grading 450 /sy 450 Backfill: Foot Wall Misc 1) Basement Backfill, Spoils By Hand 1.00 cy 50.86 51 - - - 50.86 /cy 51 7) Mudroom Backfill Footings 26.27 cy 8.14 214 - - - 10.39 /cy 273 Backfill: Foot Wall Misc 265 /cy 324 Drainage: Drainage @ Slab 1) Basement Gravel At Slab 11.00 cy 10.00 110 50.63 557 - 64.83 /cy 713 2) First Fl Crusher Run At Slab 0.56 cy 10.00 6 25.99 14 - 40.20 /cy 22 Drainage: Drainage @ Slab 116 571 /cy 735 SITEWORK 3,424 571 6,316 CONCRETE Forms: Footings 1) Basement Footing Forms 160.00 sf 2.86 458 1.29 206 - 4.15 /sf 664 1) Basement Footing Forms 19.00 sf 2.86 54 1.29 24 - 4.15 /sf 79 7) Mudroom Footing Forms 52.00 sf 2.86 149 1.29 67 - 4.15 /sf 216 7) Mudroom Keyway In Footing 48.00 lf 0.86 41 0.93 45 - 1.79 /lf 86 Forms: Footings 703 342 /sf 1,045 Forms: Walls 7) Mudroom Wall Forms - Patent System 240.00 sf 2.15 516 1.03 247 - 3.18 /sf 763 Forms: Walls 516 247 /sf 763 Forms: Edgeform at Walks 2) First Fl EdgeForm 2x4 Random Length 60.00 lf 2.00 120 0.49 30 - 2.49 /lf 150 Forms: Edgeform at Walks 120 30 /lf 150 Forms: Blockouts 7) Mudroom Ledge Blockouts 72.00 sf 4.00 288 1.24 89 - 5.24 /sf 377 Forms: Blockouts 288 89 /sf 377 Forms: Screeds 1) Basement Screeds 590.00 sf 0.06 35 0.02 15 - 0.08 /sf 50 Forms: Screeds 35 15 /sq 50 Forms: Strip & Oil 7) Mudroom Strip/Oil Forms-Footings 52.00 sf 1.07 56 0.08 4 - 1.15 /sf 60 7) Mudroom Strip/Oil Forms-Walls 240.00 sf 0.27 64 0.08 19 - 0.35 /sf 83 7) Mudroom Strip/Oil Ledge Blockouts 72.00 sf 0.50 36 0.08 6 - 0.58 /sf 42 2) First Fl Strip/Oil Forms-EdgeForms 60.00 sf 0.72 43 - - - 0.72 /sf 43 Livingston Builders Nevins Tenant Cottage Page 3 Accurate Construction Estimates 9/24/2020 4:28 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount Forms: Strip & Oil 1) Basement Strip/Oil Forms-All other 160.00 sf 0.54 86 0.08 12 - 0.61 /sf 98 1) Basement Strip/Oil Forms-All other 19.00 sf 0.54 10 0.08 1 - 0.61 /sf 12 Forms: Strip & Oil 295 42 /sf 337 Forms: Snapties 7) Mudroom Snaptie 12 in. 52.00 ea - - 0.62 32 - 0.62 /ea 32 Forms: Snapties 32 /ea 32 Rebar: Footings 7) Mudroom Footing Rebar #3 12.00 lf 1.17 14 0.39 5 - 1.56 /lf 19 1) Basement Footing Rebar #4 160.00 lf 0.20 33 0.49 78 - 0.69 /lf 111 7) Mudroom Footing Rebar #5 72.00 lf 0.61 44 1.07 77 - 1.68 /lf 121 Rebar: Footings 91 160 /tn 251 Rebar: Wiremesh 1) Basement Wiremesh 6x6 6/6 649.00 sf 0.06 39 0.41 267 - 0.47 /sf 306 2) First Fl Wiremesh 6x6 10/10 33.00 sf 0.73 24 0.21 7 - 0.94 /sf 31 Rebar: Wiremesh 63 274 /sq 337 Conc: Pile Caps/Spread Ftgs 1) Basement Pile Cap Conc 3000 psi 3.00 cy 26.35 79 128.75 386 - 155.10 /cy 465 1) Basement Pile Cap Conc 3000 psi 0.56 cy 26.35 15 128.83 72 - 155.18 /cy 86 Conc: Pile Caps/Spread Ftgs 94 458 /cy 552 Conc: Footings 7) Mudroom Footing Conc 3000 psi 2.00 cy 42.16 84 128.75 258 - 170.91 /cy 342 Conc: Footings 84 258 /cy 342 Conc: Walls 7) Mudroom Wall Conc 3000 psi 3.56 cy 26.35 94 128.76 458 - 155.11 /cy 552 Conc: Walls 94 458 /cy 552 Conc: Slabs On Grade 1) Basement S.O.G. Conc 3000 psi 8.00 cy 97.13 777 128.75 1,030 - 225.88 /cy 1,807 Conc: Slabs On Grade 777 1,030 /cy 1,807 Conc: Walks 2) First Fl Walk Conc 3000 psi 0.37 cy 97.14 36 128.73 48 - 225.86 /cy 84 Conc: Walks 36 48 /cy 84 Finish: General 1) Basement Trowel Finish 590.00 sf 0.72 423 0.01 4 - 0.72 /sf 427 2) First Fl Broom/Float Finish 30.00 sf 1.43 43 0.01 0 - 1.44 /sf 43 1) Basement Rub, Cut, & Patch 160.00 sf 0.86 138 0.01 2 - 0.87 /sf 139 1) Basement Rub, Cut, & Patch 19.00 sf 0.86 16 0.01 0 - 0.87 /sf 17 7) Mudroom Rub, Cut, & Patch 240.00 sf 0.86 206 0.01 3 - 0.87 /sf 209 Finish: General 826 9 /sf 835 Finish: Protect & Cure 1) Basement CS 309 Curing Compound 590.00 sf 0.72 423 0.02 15 - 0.74 /sf 438 Finish: Protect & Cure 423 15 /sq 438 CONCRETE 4,445 3,505 /cy 7,950 MASONRY Stone Misc. 2) First Fl Remove Stone Treads for Re-use 10.00 sf 25.00 250 - 25.00 /sf 250 2) First Fl Re-install Stone Treads 10.00 sf 54.99 550 - 54.99 /sf 550 Stone Misc. 800 /lf 800 Stone Veneer 2) First Fl Salvage Stone for Re-use 152.00 sf 5.09 773 - - - 5.09 /sf 773 7) Mudroom Field Stone Veneer 4" (salvaged) 144.00 sf 30.02 4,322 21.00 3,024 - 51.02 /sf 7,346 Stone Veneer 5,095 3,024 /sf 8,119 Masonry Restoration 1) Basement Cut & Repoint Brick Chimney Bases 2 ea 128.00 sf 10.32 1,321 0.37 47 - 10.68 /sf 1,367 Masonry Restoration 1,321 47 /m 1,367 Livingston Builders Nevins Tenant Cottage Page 4 Accurate Construction Estimates 9/24/2020 4:28 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount MASONRY 7,216 3,071 10,287 WOOD & PLASTICS Division 6 Subcontractors 7) Mudroom Reassemble/ Reinstall Mudroom Ext. Wall 24.00 lf 93.74 2,250 - - - 93.74 /lf 2,250 7) Mudroom Reassemble/Reinstall Mudroom Roof 100.00 sf 22.50 2,250 - - - 22.50 /sf 2,250 Division 6 Subcontractors 4,499 /ea 4,499 Anchors 7) Mudroom Sill Anchor 1/2" D x 16" 6.00 ea 1.33 8 4.37 26 - 5.70 /ea 34 7) Mudroom Shot Anchors 12.00 ea 1.88 23 0.31 4 - 2.19 /ea 26 Anchors 31 30 /ea 60 Simpson Strong-Tie 2) First Fl LUS212 Joist Hangar 34.00 ea 2.34 80 1.04 35 - 3.38 /ea 115 2) First Fl A35 Clip 24.00 ea 7.27 175 1.83 44 - 9.10 /ea 219 Simpson Strong-Tie 254 79 /ea 334 Fasteners: Nails/Screws 7) Mudroom Nails - 16d common 0.03 box - - 62.00 2 - 62.00 /box 2 7) Mudroom Nails - 16d common 1.00 box - - 62.40 62 - 62.40 /box 62 7) Mudroom Sheetrock Nails 1-3/4 x 10 ga. 0.38 lb - - 6.22 2 - 6.22 /lb 2 Fasteners: Nails/Screws 67 /keg 67 Framing: Plates 7) Mudroom Top Plates 2x4 RL 48.00 lf 4.69 225 0.60 29 - 5.29 /lf 254 7) Mudroom Bottom Plate 2x4 RL 24.00 lf 2.08 50 0.60 14 - 2.68 /lf 64 Framing: Plates 275 43 /mbf 318 Framing: Plates PT 2) First Fl Remove Rotted Sill 130.00 lf 7.76 1,009 - - - 7.76 /lf 1,009 2) First Fl Plates PT 2x4x10 6/5' 3.00 ea 15.00 45 6.66 20 - 21.66 /ea 65 7) Mudroom Sill Plates PT 2x6 RL 24.00 lf 2.25 54 1.72 41 - 3.97 /lf 95 Framing: Plates PT 1,108 61 /mbf 1,169 Framing: Floor Joist 7) Mudroom Floor Joist 2x8 RL 14.00 lf 2.42 34 1.20 17 - 3.62 /lf 51 7) Mudroom Floor Joist 2x8x12 12/6' 72.00 ea 14.06 1,012 14.31 1,030 - 28.37 /ea 2,043 Framing: Floor Joist 1,046 1,047 /mbf 2,093 Framing: Studs/Posts 7) Mudroom Studs 2x4x 8 24.00 ea 6.70 161 4.79 115 - 11.49 /ea 276 2) First Fl Studs 2x4x 8 Sisters 130.00 ea 6.70 870 4.79 623 - 11.49 /ea 1,494 Framing: Studs/Posts 1,031 738 /mbf 1,769 Framing: Ceiling Joists 2) First Fl Modify Ceiling Joist to Rc've new Beam/Joist hngr 62.00 ea 9.70 601 0.01 0 - 9.71 /ea 602 Framing: Ceiling Joists 601 0 /mbf 602 Framing: Roof Rafters 5) Roof Rafters, Sister 2x4x 3" 44.00 ea 24.92 1,097 0.15 7 - 25.07 /ea 1,103 2) First Fl Rafters 2x4x 8 12.00 ea 60.22 723 4.78 57 - 64.99 /ea 780 2) First Fl Rafters 2x4x 8 12.00 ea 60.22 723 4.78 57 - 64.99 /ea 780 Framing: Roof Rafters 2,542 121 /mbf 2,663 Framing: Bridging Sets 7) Mudroom Bridging Sets (1 x 4) 11.00 ea 7.60 84 0.62 7 - 8.22 /ea 90 Framing: Bridging Sets 84 7 /ea 90 Framing: Beams & Headers 1) Basement Beams & Headers 2 2x6 2' 2ea 2 West Chimney 2.00 ea 25.00 50 10.00 20 - 35.00 /ea 70 1) Basement Beams & Headers 2 2x6 3' 2.00 ea 25.00 50 10.00 20 - 35.00 /ea 70 7) Mudroom Beams & Headers 2-2x8 3' Access Hatch 4.00 ea 56.24 225 4.77 19 - 61.01 /ea 244 2) First Fl Beams & Headers 3 -2x10 12' 1.00 ea 70.30 70 41.18 41 - 111.48 /ea 111 2) First Fl Beams & Headers 3- 2x10 16' 3.00 ea 70.30 211 54.91 165 - 125.22 /ea 376 Framing: Beams & Headers 606 265 /mbf 871 Framing: LVL's 2) First Fl LVL Sisters 1 3/4" x 5 1/2" LVL 2-6' 2-7' 28.00 lf 35.15 984 3.00 84 - 38.15 /lf 1,068 2) First Fl 1 3/4" x 5 1/2" LVL Sisyer Hips Low Roof 4/10' 40.00 lf 35.15 1,406 3.00 120 - 38.15 /lf 1,526 Livingston Builders Nevins Tenant Cottage Page 5 Accurate Construction Estimates 9/24/2020 4:28 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount Framing: LVL's 2) First Fl 1 3/4" x 5 1/2" LVL @ 4"x6" 2/18' 36.00 lf 35.15 1,265 3.00 108 - 38.15 /lf 1,373 Framing: LVL's 3,656 312 /mbf 3,968 Framing: Laminated Lumber 2) First Fl 5 1/4 " x 5 1/4 " PSL col PT Post Down 2/8' 16.00 lf 2.34 37 3.75 60 - 6.09 /lf 97 Framing: Laminated Lumber 37 60 /lf 97 Blocking: Misc. 2) First Fl Blocking 2 x 6 RL 2' Sisters 45 ea 90.00 lf 10.00 900 2.00 180 - 12.00 /lf 1,080 Blocking: Misc. 900 180 /mbf 1,080 Heavy Timber Construction 2) First Fl Sill Replacement PT 6"x6" Notch For Sister Studs 130.00 lf 55.00 7,150 2.81 365 - 57.81 /lf 7,515 Heavy Timber Construction 7,150 365 /mbf 7,515 Plywood: Subfloor 7) Mudroom Subfloor 3/4" CDX Plywood 3.00 ea 28.12 84 10.40 31 - 38.52 /ea 116 Plywood: Subfloor 84 31 /sf 116 Subfloor: All Types 2) First Fl Sub Flooring 1 x 6 T&G #2 Pine 70.00 sf 7.27 509 1.56 109 - 8.83 /sf 618 Subfloor: All Types 509 109 /sf 618 Plywood: Wall Sheathing 7) Mudroom Wall Sheath 1/2" CDX ea 6.00 ea 35.15 211 23.92 144 - 59.07 /ea 354 Plywood: Wall Sheathing 211 144 /sf 354 Plywood: Roof Sheathing 2) First Fl Roof Sheath 5/8" CDX ea Remove and Replace 6.00 ea 35.15 211 23.92 144 - 59.07 /ea 354 Plywood: Roof Sheathing 211 144 /sf 354 WOOD & PLASTICS 24,835 3,803 28,639 FINISH CARPENTRY Arch Wd Wrk: Decking 2) First Fl 5-/4" x 4" Vertical Grain Fir Decking 110.00 lf 1.16 128 1.25 137 - 2.41 /lf 265 Arch Wd Wrk: Decking 128 137 /sf 265 Arch Wd Wrk: Wood Columns 2) First Fl 5" x 5" x 8' Wood Turned Colonial Column 1.00 ea 290.95 291 130.00 130 - 420.95 /ea 421 Arch Wd Wrk: Wood Columns 291 130 /ea 421 Arch Wd Wrk: Wood Base 7) Mudroom Wood Base 1 Piece No Detail or Spec 48.00 lf 1.94 93 1.25 60 - 3.19 /lf 153 Arch Wd Wrk: Wood Base 93 60 /lf 153 Arch Wd Wrk: Rakes/Gables 5) Roof Remove & Replace Existing Soffit 164.00 sf 2.33 382 - - - 2.33 /sf 382 Arch Wd Wrk: Rakes/Gables 382 /lf 382 FINISH CARPENTRY 894 327 /sf 1,221 THERMAL & MOISTURE PROT Dampproofing: VaprBarrier 7) Mudroom Sill Sealer 4.00 lf 1.13 5 0.10 0 - 1.23 /lf 5 7) Mudroom Ty-Vek 96.00 sf 0.28 27 0.12 12 - 0.40 /sf 39 1) Basement Moistop Vapor Barrier 619.50 sf 0.15 95 0.05 29 - 0.20 /sf 125 Dampproofing: VaprBarrier 127 41 /sq 168 Insulation: Batt 7) Mudroom Batt Insulation R-13 Kraft 3.5" x 15½" Mudroom Roof 100.00 sf 0.38 38 0.36 36 - 0.73 /sf 73 Insulation: Batt 38 36 /sf 73 Roof Shingles Composition 7) Mudroom Ice Shield Felt 30 lb. 1.00 sq 28.05 28 36.05 36 - 64.10 /sq 64 2) First Fl Ice Shield Felt 30 lb. 2.00 sq 28.05 56 36.05 72 - 64.10 /sq 128 7) Mudroom Lifetme 3 Tab Roof Shingles 1.00 sq 224.40 224 113.30 113 - 337.70 /sq 338 2) First Fl Lifetme 3 Tab Roof Shingles 2.00 sq 224.40 449 113.30 227 - 337.70 /sq 675 Livingston Builders Nevins Tenant Cottage Page 6 Accurate Construction Estimates 9/24/2020 4:28 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount Roof Shingles Composition 757 448 /sq 1,205 Wood Siding: 2) First Fl Replace Removed (Original) ClapBoards 130.00 sf 2.91 378 0.00 0 - 2.91 /sf 378 Wood Siding: 378 /sf 378 Sheetmetal: Flashing 7) Mudroom Flashing Copper 16 oz x 12" 16.00 lf 5.62 90 6.90 110 - 12.53 /lf 200 2) First Fl Flashing Copper 16 oz x 12" 32.00 lf 5.62 180 6.90 221 - 12.53 /lf 401 7) Mudroom Flashing; Copper Starter Course 24.00 lf 5.62 135 2.06 49 - 7.68 /lf 184 2) First Fl Flashing; Copper Starter Course 36.00 lf 5.62 202 2.06 74 - 7.68 /lf 277 2) First Fl Hip Flashing Copper 16 oz x 12" 20.00 lf 5.28 106 6.39 128 - 11.67 /lf 233 Sheetmetal: Flashing 713 583 /lf 1,296 THERMAL & MOISTURE PROT 2,013 1,108 3,121 DOORS & WINDOWS Doors Bilco Steel 7) Mudroom Access Door 24 x24 1.00 ea 58.19 58 300.00 300 - 358.19 /ea 358 Doors Bilco Steel 58 300 /ea 358 DOORS & WINDOWS 58 300 358 GYP BD/METAL STUD GWB: Boards & Sheathing 7) Mudroom GWB 5/8" All Size Regular 192.00 sf 0.58 112 0.34 65 - 0.92 /sf 177 GWB: Boards & Sheathing 112 65 /sf 177 GWB: Finish Mud/Tape 7) Mudroom Labor GWB Finish All Steps 192.00 sf 0.55 105 0.10 19 - 0.65 /sf 124 GWB: Finish Mud/Tape 105 19 /sf 124 GYP BD/METAL STUD 216 84 301 STUCCO Lath/Plastr: Lath 3) Second Fl Plaster Patch and Repair (3 Coat System) 164.00 sf 9.46 1,552 - 9.46 /sf 1,552 2) First Fl Plaster Patch/Repair Clg @ Post Down 16.00 sf - - - - 144 9.00 /sf 144 Lath/Plastr: Lath 1,552 144 /sf 1,696 STUCCO 1,552 144 1,696 Estimate Totals Description Amount Totals Hours Rate Percent of Total Labor 67,572 1,268.041 hrs 48.10% Material 14,462 10.29% Subcontract 5,019 3.57% Equipment 3,032 36.580 hrs 2.16% Other 90,085 90,085 64.13% 64.13% General Conditions 11,711 13.000 % 8.34% 11,711 101,796 8.34% 72.46% Estimating Contingency 20,359 20.000 % 14.49% Contractors O/P 18,323 15.000 % 13.04% Total 140,478 GNCB Consulting Engineers Nevins Tenant Cottage- Architectural Page 1 Accurate Construction Estimates 9/28/2020 4:08 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Base Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount GENERAL REQUIREMENTS Utilities: Temporary All Temp Toilet 4.00 mo - - 110.00 440 - 110.00 /mo 440 Temp: Protection All Temp Floor Protection (Masonite) 1,324.00 sf 0.25 331 0.53 695 - 0.78 /sf 1,026 DEMOLITION Demo: Exterior Finishes 6) Exterior Remove Wood Clapboard Siding 1,560.00 sf 2.00 3,120 - - - 2.00 /sf 3,120 6) Exterior Remove Running Trims 414.00 lf 1.00 414 - - - 1.00 /lf 414 6) Exterior Remove Door/WindowTrims 315.00 lf 1.00 315 - - - 1.00 /lf 315 Demo: Mechanical/Elect 1) Basement Remove/Dispose Furnace 1.00 ea 400.00 400 - - - 400.00 /ea 400 SITEWORK Earthwk: Cut & Fill Etc 1) Basement Dispose Spoils on Site 2.00 cy 40.01 80 - - - 40.01 /cy 80 6) Exterior Dispose Surplus 2.00 cy 6.12 12 - - - 14.62 /cy 29 Earthwk: Excavation All 1) Basement Excavate Misc By Hand (Window Wells) 2.00 cy 76.29 153 - - - 76.29 /cy 153 6) Exterior Excavate Misc By Hand 2.00 cy 76.29 153 - - - 76.29 /cy 153 Earthwk: Grading 6) Exterior Rough Grade 50.00 sf 0.12 6 - - - 0.25 /sf 13 6) Exterior Fine Grade 509.00 sf 0.76 388 - - - 0.76 /sf 388 Backfill: Foot Wall Misc 6) Exterior Backfill, Rain Garden 1 1/2" Washed Stone 2.00 cy 16.29 33 30.00 60 - 50.79 /cy 102 1) Basement Backfill, 3/4" Washed Stone @ Areaway 0.50 cy 40.02 20 30.00 15 - 70.02 /cy 35 Drainage: Site Structures 1) Basement Galv Areaway Semi Circ 30"w 2.00 ea 125.00 250 225.00 450 - 350.00 /ea 700 CONCRETE Forms: Walls 1) Basement Wall Forms - Basement Stair 44.00 sf 2.15 95 1.03 45 - 3.18 /sf 140 Conc: Walls 1) Basement Mortar Curb Basement Stair 1.00 cy 26.35 26 128.75 129 - 155.10 /cy 155 Finish: General 1) Basement Rub, Cut, & Patch Basement Stair 44.00 sf 0.86 38 0.01 1 - 0.87 /sf 38 FINISH CARPENTRY Arch Wd Wrk: Wood Stairs 1) Basement Interior Stair Oak Tread Pine Riser F/I 10.00 ri 70.30 703 100.00 1,000 - 170.30 /ri 1,703 1) Basement Poplar Handrail & Brackets 2 ea/ 10' 20.00 lf 15.00 300 4.00 80 - 19.00 /lf 380 Arch Wd Wrk: Crown Mldg 6) Exterior Crown Moulding 4 5/8" Door B 6.00 lf 3.75 23 3.33 20 - 7.08 /lf 42 Arch Wd Wrk: Soffit/Eave 5) Roof Bead Board 5/8" Soffit Remove/Replace 32.00 lf 3.00 96 1.82 58 - 4.82 /lf 154 2) First Floor Bead Board 5/8" x 4' x 8' Porch Ceiling 32.00 sf 5.00 160 1.82 58 - 6.82 /sf 218 Arch Wd Wrk: Door/Window 8) Doors/Windows Repair/Restore/Door 3.00 ea 465.52 1,397 416.00 1,248 - 881.52 /ea 2,645 8) Doors/Windows Remove/Replace Door 3.00 ea 232.76 698 - - - 232.76 /ea 698 Arch Wd Wrk: Shutters 6) Exterior Shuttercraft Shutters Window A 12.00 ea 174.57 2,095 456.00 5,472 - 630.57 /ea 7,567 6) Exterior Shuttercraft Shutters Window B 1.00 ea 174.57 175 386.00 386 - 560.57 /ea 561 6) Exterior Shuttercraft Shutters Window C 5.00 ea 174.57 873 357.00 1,785 - 531.57 /ea 2,658 6) Exterior Shutter Hardware 1.00 ls - - 1,800.00 1,800 - 1,800.00 /ls 1,800 Arch Wd Wrk: Cedar 6) Exterior Cedar 2" x 2" Routed out Door Casing 66.00 lf 5.00 330 4.00 264 - 9.00 /lf 594 6) Exterior Cedar 5/4" x 4" Widow Ext Sill Casing Ripped to Size 60.00 lf 2.00 120 3.15 189 - 5.15 /lf 309 6) Exterior Cedar 5/4" x 6" Eave Rake Trims Remove/Replace 25% = 100.00 lf 3.00 300 3.25 325 - 6.25 /lf 625 6) Exterior Cedar 5/4" x 6" Door Crown 8.00 lf 4.00 32 3.25 26 - 7.25 /lf 58 6) Exterior Cedar 5/4" x 6" Routed Watertable 140.00 lf 5.00 700 3.25 455 - 8.25 /lf 1,155 6) Exterior Cedar 2" x 4" Routed out Window Casing 234.00 lf 5.00 1,170 4.00 936 - 9.00 /lf 2,106 THERMAL & MOISTURE PROT Dampproofing: VaprBarrier 6) Exterior 3/8" x 1 1/2" PT Lath 1,200.00 lf 0.78 931 0.05 62 - 0.83 /lf 993 6) Exterior Rainscreen B.Obdyke 1,536.00 sf 0.78 1,192 1.03 1,582 - 1.81 /sf 2,774 6) Exterior Ty-Vek 1,560.00 sf 0.28 439 0.12 190 - 0.40 /sf 629 6) Exterior Poly Vapor Barrier 6 mil 75.00 sf 0.07 5 0.04 3 - 0.10 /sf 8 Metal Roof/Siding 6) Exterior Copper Roof 16 oz 3 Locations (inc- removal) 50.00 sf 26.42 1,321 24.72 1,236 - 51.14 /sf 2,557 Wood Siding: 6) Exterior Cedar Clapboard Siding 1/2"x 6" 4" Exp. 1,560.00 sf 6.00 9,360 4.00 6,240 - 10.00 /sf 15,600 Sheetmetal: Flashing 6) Exterior Drip Cap Copper 16 oz x 6" 80.00 lf 2.00 160 6.18 494 - 8.18 /lf 654 GNCB Consulting Engineers Nevins Tenant Cottage- Architectural Page 2 Accurate Construction Estimates 9/28/2020 4:08 PM Location Description Takeoff Quantity Labor Cost/Unit Labor Base Amount Material Cost/Unit Material Amount Sub Amount Total Cost/Unit Total Amount Sheetmetal: Guttr DwnSpt 5) Roof Remove/Reinstall Existing Gutters 80.00 lf 20.00 1,600 - - - 20.00 /lf 1,600 Accessory Roof (General) 6) Exterior Ridge Vent B. Obdyke @ Watertable 140.00 lf 10.00 1,400 4.00 560 - 14.00 /lf 1,960 DOORS & WINDOWS Division 8 Subcontractors 8) Doors/Windows Remove & Replace Storm Windows 21.00 ea 75.00 1,575 500.00 10,500 - 575.00 /ea 12,075 8) Doors/Windows Remove/Replace Window Type A 16.00 ea 145.48 2,328 - 145.48 /ea 2,328 8) Doors/Windows Remove/Replace Window Type ,C,D 4.00 ea 116.01 464 2,400.00 9,600 - 2,516.01 /ea 10,064 8) Doors/Windows Restore/Repair Window Type A 15.00 ea 600.00 9,000 75.00 1,125 - 675.00 /ea 10,125 8) Doors/Windows Restore/Replace Windows B&E 3.00 ea 600.00 1,800 2,000.00 6,000 2,600.00 /ea 7,800 8) Doors/Windows Restore/Repair Doors 3.00 ea - - 2,500.00 7,500 2,500.00 /ea 7,500 Doors Bilco Steel 1) Basement Bilco Door Basement Door 1.00 ea 200.00 200 800.00 800 - 1,000.00 /ea 1,000 Marvin Windows WUDH 1) Basement Marvin Basement Window 2610 2.00 ea 116.38 233 450.00 900 - 566.38 /ea 1,133 8) Doors/Windows Marvin WUDH Basement 2610 2.00 ea 124.99 250 450.00 900 - 574.99 /ea 1,150 Marvin Doors 8) Doors/Windows Marvin WIFD 2668 WUDH 1.00 ea 931.04 931 4,500.00 4,500 - 5,431.04 /ea 5,431 Storm Windows All Storm Window F/I 1'8" x 2'6" 1.00 ea - - - - 150 150.00 /ea 150 All Storm Window F/I 2'4" x 2'0" 2.00 ea - - - - 350 175.00 /ea 350 All Storm Window F/I 2'4" x 4'0" 1.00 ea - - - - 300 300.00 /ea 300 All Storm Window F/I 2'4" x 4'6" 16.00 ea - - - - 6,400 400.00 /ea 6,400 PAINTING Painting: Commercial 8) Doors/Windows Scrape Sand Paint Wood Door 3.00 ea 429.74 1,289 6.25 19 - 435.99 /ea 1,308 8) Doors/Windows Scrape Sand Paint Wood Window Type A 16.00 ea 214.87 3,438 10.00 160 - 224.87 /ea 3,598 8) Doors/Windows Scrape Sand Paint Wood Window Type C,D 4.00 ea 107.44 430 8.00 32 - 115.44 /ea 462 Painting: Residential 8) Doors/Windows Paint Exterior Shingles/ Clapboard 1,536.00 sf 10.00 15,360 0.31 475 - 10.31 /sf 15,835 8) Doors/Windows Prep: Scrape, Sand Fas/Soffitt Rakes/Gables Corners 800.00 lf 5.37 4,297 0.64 515 - 6.02 /lf 4,812 ELECTRICAL Electrical Complete Allowance for Unforseen Electrical Circumstances 1.00 ls - - - - 5,000 5,000.00 /ls 5,000 ALLOWANCES Allowances 6) Exterior Cedar 5/4" x 6"Eave/Rakes Trims Remove/Replace 50%= 200.00 lf 5.00 1,000 3.25 650 - 8.25 /lf 1,650 8) Doors/Windows Glazing Allowance 15% 30.00 sf - - - - 600 20.00 /sf 600 All Electrical Lighting Fixture Allowance Item 18 24.00 ea 75.00 1,800 25.00 600 - 100.00 /ea 2,400 Estimate Totals GNCB Consulting Engineers Nevins Tenant Cottage- Architectural Page 2 Accurate Construction Estimates 9/28/2020 4:08 PM Description Amount Totals Rate Cost per Unit Percent of Total Labor 75,806 67.085 /sf 31.62% Material 70,580 62.460 /sf 29.44% Subcontract 12,800 11.327 /sf 5.34% Equipment 33 0.029 /sf 0.01% General Conditions 20,698 ##### % 18.317 /sf 8.63% Estimating Contingency 26,987 ##### % 23.883 /sf 11.26% Building Permit 1,592 1.000 % 1.409 /sf 0.66% Other 208,496 208,496 184.510 /sf 86.96% 86.96% Contractors O/P 31,274 ##### % 27.676 /sf 13.04% 31,274 239,770 212.186 /sf 13.04% 100.00% Total 239,770 212.186 /sf