Planning & Zoning Commission (linked)
agenda center agenda
| Board/Commission | Planning & Zoning Commission |
|---|---|
| Meeting Date | May 13, 2025 |
| Pages | 82 |
| File Size | 0.8 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
259 Noank Ledyard Road Page | 1 Mystic, CT 06355 150 BUTLERTOWN ROAD SUBDIVISION APPLICATION STORM WATER MANAGEMENT REPORT March 11, 2025 The 150 Butlertown Road Subdivision project involves an existing 33.52 acre parcel – Parcel Map/Lot 37- 1278 – located on the southwestern side of Butlertown Road in the northwest section of Waterford, Connecticut. The parcel is proposed to be partially developed as a subdivision under the Town of Waterford Zoning and Subdivision Regulations taking the existing lot and creating a new building lot (Lot A) 5.67 acres in area. The remainder of the parcel will remain as it is presently with woodlands, wetlands and the existing single-family residential structure – 150 Butlertown Road. As part of the Final Subdivision Plan Application requirements listed in Section 25.6 of the Waterford Zoning Regulations and Section 5.5 of the Waterford Subdivision Regulations, this Storm Water Management Report establishes the means for mitigating the increase in storm water runoff and provides treatment capacity consistent with the Connecticut Storm Water Management Plan and other pertinent regulations and best management practices. The 150 Butlertown Road Subdivision parcel is located within the Oil Mill Brook subregional drainage basin which drains directly to the Niantic River, Niantic Bay and Long Island Sound. The delineation of the subregional basin is shown in Figure 1. The total area of the subregional basin is 5.2 mi2; The 150 Butlertown Road Subdivision parcel accounts for 33.52 acres of the basin. Excluding the Open Space area of the 150 Butlertown Road Subdivision the development impacts 5.67 acres of the Oil Mill Brook basin; approximately 0.17% of the total basin. The basin consists primarily of residential lots of varying size, roadways (including Interstates 395 and 95), agricultural land, a racetrack, limited commercial and municipal uses, open space and woodlands. 259 Noank Ledyard Road Page | 2 Mystic, CT 06355 The 150 Butlertown Road Subdivision parcel and the development area consists of one primary drainage area. The wetlands (Poly Brook) at the eastern end of the parcel drain directly to Oil Mill Brook downstream of Lake Konomoc. Currently, the 150 Butlertown Road parcel is primarily woodlands and wetlands with only 1.40 acres in the central portion developed with a single-family home. The proposed subdivision would consist of the development of another single-family residential lot on the western side of the wetlands impacting a 5.52 acre drainage basin. These conditions, along with the land survey data from the subdivision site plan set were used to develop a HydroCAD model representing the existing conditions and project storm water runoff flows for various storm events using the USDA Natural Resources Conservation Service (NRCS) TR-20 method. The results of the model are summarized in Figure 2. The full HydroCAD report is attached for reference as Attachment A. Summary of Storm Water Runoff Flow Rates (ft3/s) 150 Butlertown Road Subdivision Existing Conditions Source: HydroCAD Storm Event Total 1 year Storm 0.07 2 year Storm 0.21 10 year Storm 0.78 25 year Storm 1.11 100 year Storm 1.89 The 150 Butlertown Road parcel was then modeled under the land use conditions proposed within the developed area as depicted in the Final Subdivision Application package and site plan set, again, using HydroCAD and the TR-20 methodology. The proposed development consists of adding one single-unit residential building lot (Lot A), 5.67 acres in size, with an extended gravel driveway that connects with the existing driveway for 150 Butlertown Road and utilizes the existing wetland crossing/bridge. Three small detention basins (#1A, #1B and #1C) are proposed flanking the proposed Lot A driveway to intercept runoff from the up-gradient woodland area and the proposed development for treatment and peak runoff flow mitigation. Each basin is sized and configured per the site plan set and includes a catch basin overflow and discharge pipe to the down- gradient woodland area. Discharges are further protected with riprap aprons for energy dissipation. Two cross-culverts are proposed to convey runoff through the driveway discharging to detention basins #1B and #1C. Total stormwater detention or storage volume is 26,748 ft3 – Detention Basin #1A – 13,488 ft3; Detention Basin #1B – 7,140 ft3; and Detention Basin #1C – 6,120 ft3. Each of the drainage basin areas for each detention basin under proposed conditions is delineated on the Erosion & Sediment Control and Storm Water Management Plan sheet within the Final Subdivision Application site plan set. A Figure 2: Storm Water Runoff Flow Rates – Existing Conditions 259 Noank Ledyard Road Page | 3 Mystic, CT 06355 summary of the storm water runoff flow rates under the proposed developed condition is presented in Figure 3. The storm water runoff flow rates under the proposed conditions represent a zero net increase compared to existing conditions. A comparison of the existing and proposed storm water runoff flow rates for all storms is presented in Figure 4. Attachment B provides all the HydroCAD data reports for the proposed conditions model. The increase in storm water runoff flow rates due to the introduction of impervious surfaces and lawn/landscaped areas within the developed portion of the parcel are mitigated by the detention basin storage and treatment capacity. From a storm water treatment perspective, the Water Quality Volume was calculated for the 150 Butlertown Road Subdivision under proposed conditions and included as part of the Erosion & Sediment Control and Storm Water Management Plan sheet and the Final Subdivision Application package. The Water Quality Volume was calculated per the 2024 Connecticut Stormwater Quality Manual for the development area and determined to be a total of 3,118 ft3. The proposed stormwater detention basin Figure 3: Storm Water Runoff Flow Rates – Proposed Conditions Figure 4: Storm Water Runoff Flow Rates Comparison 259 Noank Ledyard Road Page | 4 Mystic, CT 06355 provides 26,748 ft3 of treatment capacity exceeding and effectively treating the calculated Water Quality Volume. The three stormwater detention basins are designed to accept and direct the stormwater flows from the developed area and Lot A and under extreme storm events discharge their overflow to the down-gradient woodlands at flow rates less than existing conditions. Peak flows will be treated, mitigated and delayed eliminating any adverse impact to the greater watershed, wetland area and watercourses downstream. In conclusion, the impact of the 150 Butlertown Road Subdivision demonstrates a zero net increase in storm water flow rates while introducing storm water treatment with the implementation of strategically placed stormwater detention basins. Further, the detention basins are designed to target the impervious surfaces introduced with the proposed subdivision and provide direct flow mitigation and water treatment. These actions will mitigate the potential adverse impacts of the proposed subdivision on the remainder of the parcel dedicated to open space, the wetland and watercourses downstream of the development and all neighboring properties. Respectfully submitted, David L. Cooley, P.E. DLC Engineering Services, LLC Attachments Attachment A – HydroCAD Report – Existing Conditions Attachment B – HydroCAD Report – Proposed Conditions 259 Noank Ledyard Road Page | 5 Mystic, CT 06355 ATTACHMENT A HydroCAD Report – Existing Conditions Table of Contents Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Rainfall Events Listing 2 Area Listing (selected nodes) 3 Ground Covers (selected nodes) 1-yr Event 4 Subcat 1S: Drainage Area #1 2-yr Event 5 Subcat 1S: Drainage Area #1 10-yr Event 6 Subcat 1S: Drainage Area #1 25-yr Event 7 Subcat 1S: Drainage Area #1 100-yr Event 8 Subcat 1S: Drainage Area #1 Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 1 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Rainfall Events Listing Event# Event Name Storm Type Curve Mode Duration (hours) B/B Depth (inches) AMC 1 1-yr Type III 24-hr Default 24.00 1 2.70 2 2 2-yr Type III 24-hr Default 24.00 1 3.40 2 3 10-yr Type III 24-hr Default 24.00 1 5.00 2 4 25-yr Type III 24-hr Default 24.00 1 5.70 2 5 100-yr Type III 24-hr Default 24.00 1 7.10 2 Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 2 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Area Listing (selected nodes) Area (acres) CN Description (subcatchment-numbers) 5.524 55 Woods, Good, HSG B (1S) 5.524 55 TOTAL AREA Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 3 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Ground Covers (selected nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 5.524 0.000 0.000 0.000 5.524 Woods, Good 1S 0.000 5.524 0.000 0.000 0.000 5.524 TOTAL AREA Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 4 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Drainage Area #1 Runoff = 0.07 cfs @ 17.80 hrs, Volume= 0.056 af, Depth> 0.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type III 24-hr 1-yr Rainfall=2.70" Area (sf) CN Description 240,645 55 Woods, Good, HSG B 240,645 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 253.4 100 0.0400 0.01 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 0.04" 5.0 588 0.1563 1.98 Shallow Concentrated Flow, Shallow Conc Flow Woodland Kv= 5.0 fps 258.4 688 Total Subcatchment 1S: Drainage Area #1 Runoff Hydrograph Time (hours) 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Flow (cfs) 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type III 24-hr 1-yr Rainfall=2.70" Runoff Area=240,645 sf Runoff Volume=0.056 af Runoff Depth>0.12" Flow Length=688' Tc=258.4 min CN=55 0.07 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 5 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Drainage Area #1 Runoff = 0.21 cfs @ 16.66 hrs, Volume= 0.144 af, Depth> 0.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type III 24-hr 2-yr Rainfall=3.40" Area (sf) CN Description 240,645 55 Woods, Good, HSG B 240,645 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 253.4 100 0.0400 0.01 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 0.04" 5.0 588 0.1563 1.98 Shallow Concentrated Flow, Shallow Conc Flow Woodland Kv= 5.0 fps 258.4 688 Total Subcatchment 1S: Drainage Area #1 Runoff Hydrograph Time (hours) 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Flow (cfs) 0.23 0.22 0.21 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Type III 24-hr 2-yr Rainfall=3.40" Runoff Area=240,645 sf Runoff Volume=0.144 af Runoff Depth>0.31" Flow Length=688' Tc=258.4 min CN=55 0.21 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 6 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Drainage Area #1 Runoff = 0.78 cfs @ 16.08 hrs, Volume= 0.451 af, Depth> 0.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type III 24-hr 10-yr Rainfall=5.00" Area (sf) CN Description 240,645 55 Woods, Good, HSG B 240,645 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 253.4 100 0.0400 0.01 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 0.04" 5.0 588 0.1563 1.98 Shallow Concentrated Flow, Shallow Conc Flow Woodland Kv= 5.0 fps 258.4 688 Total Subcatchment 1S: Drainage Area #1 Runoff Hydrograph Time (hours) 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Flow (cfs) 0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type III 24-hr 10-yr Rainfall=5.00" Runoff Area=240,645 sf Runoff Volume=0.451 af Runoff Depth>0.98" Flow Length=688' Tc=258.4 min CN=55 0.78 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 7 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Drainage Area #1 Runoff = 1.11 cfs @ 15.80 hrs, Volume= 0.621 af, Depth> 1.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type III 24-hr 25-yr Rainfall=5.70" Area (sf) CN Description 240,645 55 Woods, Good, HSG B 240,645 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 253.4 100 0.0400 0.01 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 0.04" 5.0 588 0.1563 1.98 Shallow Concentrated Flow, Shallow Conc Flow Woodland Kv= 5.0 fps 258.4 688 Total Subcatchment 1S: Drainage Area #1 Runoff Hydrograph Time (hours) 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Flow (cfs) 1 0 Type III 24-hr 25-yr Rainfall=5.70" Runoff Area=240,645 sf Runoff Volume=0.621 af Runoff Depth>1.35" Flow Length=688' Tc=258.4 min CN=55 1.11 cfs Type III 24-hr 100-yr Rainfall=7.10" Butlertown Road.Existing Conditions.6.14.2024 Printed 8/23/2024 Prepared by DLC Engineering Services, LLC Page 8 HydroCAD® 10.20-5a s/n 11668 © 2023 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: Drainage Area #1 Runoff = 1.89 cfs @ 15.79 hrs, Volume= 1.007 af, Depth> 2.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type III 24-hr 100-yr Rainfall=7.10" Area (sf) CN Description 240,645 55 Woods, Good, HSG B 240,645 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 253.4 100 0.0400 0.01 Sheet Flow, Sheet Flow Woods: Dense underbrush n= 0.800 P2= 0.04" 5.0 588 0.1563 1.98 Shallow Concentrated Flow, Shallow Conc Flow Woodland Kv= 5.0 fps 258.4 688 Total Subcatchment 1S: Drainage Area #1 Runoff Hydrograph Time (hours) 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Flow (cfs) 2 1 0 Type III 24-hr 100-yr Rainfall=7.10" Runoff Area=240,645 sf Runoff Volume=1.007 af Runoff Depth>2.19" Flow Length=688' Tc=258.4 min CN=55 1.89 cfs 259 Noank Ledyard Road Page | 6 Mystic, CT 06355 ATTACHMENT B HydroCAD Report – Proposed Conditions Table of Contents Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing 3 Area Listing (all nodes) 4 Soil Listing (all nodes) 5 Ground Covers (all nodes) 6 Pipe Listing (all nodes) 1-yr Event 7 Node Listing 8 Subcat 1S: Drainage Area #1C 9 Subcat 3S: Drainage Area #1A 10 Subcat 5S: Drainage Area #1B 11 Reach 7R: Basin #1A Discharge 12 Reach 8R: Basin #1B Discharge 13 Reach 9R: Basin #1C Discharge 14 Pond 2P: Detention Basin #1C 15 Pond 4P: Detention Basin #1A 16 Pond 6P: Detention Basin #1B 2-yr Event 17 Node Listing 18 Subcat 1S: Drainage Area #1C 19 Subcat 3S: Drainage Area #1A 20 Subcat 5S: Drainage Area #1B 21 Reach 7R: Basin #1A Discharge 22 Reach 8R: Basin #1B Discharge 23 Reach 9R: Basin #1C Discharge 24 Pond 2P: Detention Basin #1C 25 Pond 4P: Detention Basin #1A 26 Pond 6P: Detention Basin #1B 10-yr Event 27 Node Listing 28 Subcat 1S: Drainage Area #1C 29 Subcat 3S: Drainage Area #1A 30 Subcat 5S: Drainage Area #1B 31 Reach 7R: Basin #1A Discharge 32 Reach 8R: Basin #1B Discharge 33 Reach 9R: Basin #1C Discharge 34 Pond 2P: Detention Basin #1C 35 Pond 4P: Detention Basin #1A 36 Pond 6P: Detention Basin #1B 25-yr Event 37 Node Listing 38 Subcat 1S: Drainage Area #1C 39 Subcat 3S: Drainage Area #1A 40 Subcat 5S: Drainage Area #1B 41 Reach 7R: Basin #1A Discharge 42 Reach 8R: Basin #1B Discharge Table of Contents Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC 43 Reach 9R: Basin #1C Discharge 44 Pond 2P: Detention Basin #1C 45 Pond 4P: Detention Basin #1A 46 Pond 6P: Detention Basin #1B 100-yr Event 47 Node Listing 48 Subcat 1S: Drainage Area #1C 49 Subcat 3S: Drainage Area #1A 50 Subcat 5S: Drainage Area #1B 51 Reach 7R: Basin #1A Discharge 52 Reach 8R: Basin #1B Discharge 53 Reach 9R: Basin #1C Discharge 54 Pond 2P: Detention Basin #1C 55 Pond 4P: Detention Basin #1A 56 Pond 6P: Detention Basin #1B Multi-Event Tables 57 Subcat 1S: Drainage Area #1C 58 Subcat 3S: Drainage Area #1A 59 Subcat 5S: Drainage Area #1B 60 Reach 7R: Basin #1A Discharge 61 Reach 8R: Basin #1B Discharge 62 Reach 9R: Basin #1C Discharge 63 Pond 2P: Detention Basin #1C 64 Pond 4P: Detention Basin #1A 65 Pond 6P: Detention Basin #1B 1S Drainage Area #1C 3S Drainage Area #1A 5S Drainage Area #1B 7R Basin #1A Discharge 8R Basin #1B Discharge 9R Basin #1C Discharge 2P Detention Basin #1C 4P Detention Basin #1A 6P Detention Basin #1B Routing Diagram for Butlertown Road.Proposed Conditions.11.23.2024 Prepared by DLC Engineering Services, LLC, Printed 12/19/2024 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcat Reach Pond Link Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 2 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Rainfall Events Listing Event# Event Name Storm Type Curve Mode Duration (hours) B/B Depth (inches) AMC 1 1-yr Type III 24-hr Default 24.00 1 2.70 2 2 2-yr Type III 24-hr Default 24.00 1 3.40 2 3 10-yr Type III 24-hr Default 24.00 1 5.00 2 4 25-yr Type III 24-hr Default 24.00 1 5.70 2 5 100-yr Type III 24-hr Default 24.00 1 7.10 2 Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 3 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 1.184 61 >75% Grass cover, Good, HSG B (1S, 3S, 5S) 0.444 96 Gravel surface, HSG B (1S, 3S, 5S) 0.056 98 Unconnected roofs, HSG B (3S) 3.808 55 Woods, Good, HSG B (1S, 3S, 5S) 5.492 60 TOTAL AREA Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 4 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 5.492 HSG B 1S, 3S, 5S 0.000 HSG C 0.000 HSG D 0.000 Other 5.492 TOTAL AREA Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 5 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 1.184 0.000 0.000 0.000 1.184 >75% Grass cover, Good 1S, 3S, 5S 0.000 0.444 0.000 0.000 0.000 0.444 Gravel surface 1S, 3S, 5S 0.000 0.056 0.000 0.000 0.000 0.056 Unconnected roofs 3S 0.000 3.808 0.000 0.000 0.000 3.808 Woods, Good 1S, 3S, 5S 0.000 5.492 0.000 0.000 0.000 5.492 TOTAL AREA Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 6 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Width (inches) Diam/Height (inches) Inside-Fill (inches) Node Name 1 1S 0.00 0.00 25.0 0.0800 0.020 0.0 24.0 0.0 2 7R 356.00 355.00 111.0 0.0090 0.020 0.0 18.0 0.0 3 8R 320.00 319.00 28.0 0.0357 0.020 0.0 18.0 0.0 4 9R 302.00 301.00 27.0 0.0370 0.020 0.0 18.0 0.0 Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 7 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=84,877 sf 0.00% Impervious Runoff Depth=0.16" Subcatchment 1S: Drainage Area #1C Flow Length=621' Tc=257.8 min CN=57 Runoff=0.04 cfs 0.026 af Runoff Area=99,965 sf 2.45% Impervious Runoff Depth=0.26" Subcatchment 3S: Drainage Area #1A Flow Length=424' Tc=234.9 min CN=61 Runoff=0.08 cfs 0.049 af Runoff Area=54,385 sf 0.00% Impervious Runoff Depth=0.29" Subcatchment 5S: Drainage Area #1B Flow Length=509' Tc=219.2 min CN=62 Runoff=0.05 cfs 0.030 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 7R: Basin #1A Discharge 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs Outflow=0.00 cfs 0.000 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 8R: Basin #1B Discharge 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs Outflow=0.00 cfs 0.000 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 9R: Basin #1C Discharge 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs Outflow=0.00 cfs 0.000 af Peak Elev=307.55' Storage=1,149 cf Inflow=0.04 cfs 0.026 af Pond 2P: Detention Basin #1C Outflow=0.00 cfs 0.000 af Peak Elev=361.25' Storage=2,153 cf Inflow=0.08 cfs 0.049 af Pond 4P: Detention Basin #1A Outflow=0.00 cfs 0.000 af Peak Elev=325.46' Storage=1,295 cf Inflow=0.05 cfs 0.030 af Pond 6P: Detention Basin #1B Outflow=0.00 cfs 0.000 af Total Runoff Area = 5.492 ac Runoff Volume = 0.106 af Average Runoff Depth = 0.23" 98.98% Pervious = 5.436 ac 1.02% Impervious = 0.056 ac Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 8 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 1S: Drainage Area #1C Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.04 0.038 0.036 0.034 0.032 0.03 0.028 0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Type III 24-hr 1-yr Rainfall=2.70" Runoff Area=84,877 sf Runoff Volume=0.026 af Runoff Depth=0.16" Flow Length=621' Tc=257.8 min CN=57 0.04 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 9 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 3S: Drainage Area #1A Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type III 24-hr 1-yr Rainfall=2.70" Runoff Area=99,965 sf Runoff Volume=0.049 af Runoff Depth=0.26" Flow Length=424' Tc=234.9 min CN=61 0.08 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 10 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 5S: Drainage Area #1B Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type III 24-hr 1-yr Rainfall=2.70" Runoff Area=54,385 sf Runoff Volume=0.030 af Runoff Depth=0.29" Flow Length=509' Tc=219.2 min CN=62 0.05 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 11 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 7R: Basin #1A Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=2.295 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs 0.00 cfs 0.00 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 12 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 8R: Basin #1B Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=1.249 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs 0.00 cfs 0.00 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 13 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 9R: Basin #1C Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=1.949 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs 0.00 cfs 0.00 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 14 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 2P: Detention Basin #1C Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.04 0.038 0.036 0.034 0.032 0.03 0.028 0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 Inflow Area=1.949 ac Peak Elev=307.55' Storage=1,149 cf 0.04 cfs 0.00 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 15 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 4P: Detention Basin #1A Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Inflow Area=2.295 ac Peak Elev=361.25' Storage=2,153 cf 0.08 cfs 0.00 cfs Type III 24-hr 1-yr Rainfall=2.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 16 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 6P: Detention Basin #1B Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Inflow Area=1.249 ac Peak Elev=325.46' Storage=1,295 cf 0.05 cfs 0.00 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 17 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=84,877 sf 0.00% Impervious Runoff Depth=0.38" Subcatchment 1S: Drainage Area #1C Flow Length=621' Tc=257.8 min CN=57 Runoff=0.10 cfs 0.062 af Runoff Area=99,965 sf 2.45% Impervious Runoff Depth=0.53" Subcatchment 3S: Drainage Area #1A Flow Length=424' Tc=234.9 min CN=61 Runoff=0.18 cfs 0.101 af Runoff Area=54,385 sf 0.00% Impervious Runoff Depth=0.57" Subcatchment 5S: Drainage Area #1B Flow Length=509' Tc=219.2 min CN=62 Runoff=0.11 cfs 0.059 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 7R: Basin #1A Discharge 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs Outflow=0.00 cfs 0.000 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 8R: Basin #1B Discharge 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs Outflow=0.00 cfs 0.000 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 9R: Basin #1C Discharge 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs Outflow=0.00 cfs 0.000 af Peak Elev=309.19' Storage=2,681 cf Inflow=0.10 cfs 0.062 af Pond 2P: Detention Basin #1C Outflow=0.00 cfs 0.000 af Peak Elev=362.38' Storage=4,402 cf Inflow=0.18 cfs 0.101 af Pond 4P: Detention Basin #1A Outflow=0.00 cfs 0.000 af Peak Elev=326.68' Storage=2,580 cf Inflow=0.11 cfs 0.059 af Pond 6P: Detention Basin #1B Outflow=0.00 cfs 0.000 af Total Runoff Area = 5.492 ac Runoff Volume = 0.222 af Average Runoff Depth = 0.48" 98.98% Pervious = 5.436 ac 1.02% Impervious = 0.056 ac Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 18 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 1S: Drainage Area #1C Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type III 24-hr 2-yr Rainfall=3.40" Runoff Area=84,877 sf Runoff Volume=0.062 af Runoff Depth=0.38" Flow Length=621' Tc=257.8 min CN=57 0.10 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 19 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 3S: Drainage Area #1A Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Type III 24-hr 2-yr Rainfall=3.40" Runoff Area=99,965 sf Runoff Volume=0.101 af Runoff Depth=0.53" Flow Length=424' Tc=234.9 min CN=61 0.18 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 20 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 5S: Drainage Area #1B Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.12 0.115 0.11 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type III 24-hr 2-yr Rainfall=3.40" Runoff Area=54,385 sf Runoff Volume=0.059 af Runoff Depth=0.57" Flow Length=509' Tc=219.2 min CN=62 0.11 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 21 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 7R: Basin #1A Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=2.295 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs 0.00 cfs 0.00 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 22 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 8R: Basin #1B Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=1.249 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs 0.00 cfs 0.00 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 23 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 9R: Basin #1C Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=1.949 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs 0.00 cfs 0.00 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 24 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 2P: Detention Basin #1C Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Inflow Area=1.949 ac Peak Elev=309.19' Storage=2,681 cf 0.10 cfs 0.00 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 25 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 4P: Detention Basin #1A Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Inflow Area=2.295 ac Peak Elev=362.38' Storage=4,402 cf 0.18 cfs 0.00 cfs Type III 24-hr 2-yr Rainfall=3.40" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 26 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 6P: Detention Basin #1B Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.12 0.115 0.11 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Inflow Area=1.249 ac Peak Elev=326.68' Storage=2,580 cf 0.11 cfs 0.00 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 27 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=84,877 sf 0.00% Impervious Runoff Depth=1.10" Subcatchment 1S: Drainage Area #1C Flow Length=621' Tc=257.8 min CN=57 Runoff=0.32 cfs 0.179 af Runoff Area=99,965 sf 2.45% Impervious Runoff Depth=1.37" Subcatchment 3S: Drainage Area #1A Flow Length=424' Tc=234.9 min CN=61 Runoff=0.52 cfs 0.262 af Runoff Area=54,385 sf 0.00% Impervious Runoff Depth=1.44" Subcatchment 5S: Drainage Area #1B Flow Length=509' Tc=219.2 min CN=62 Runoff=0.31 cfs 0.150 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 7R: Basin #1A Discharge 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs Outflow=0.00 cfs 0.000 af Avg. Flow Depth=0.00' Max Vel=0.00 fps Inflow=0.00 cfs 0.000 af Reach 8R: Basin #1B Discharge 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs Outflow=0.00 cfs 0.000 af Avg. Flow Depth=0.10' Max Vel=2.26 fps Inflow=0.11 cfs 0.039 af Reach 9R: Basin #1C Discharge 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs Outflow=0.11 cfs 0.039 af Peak Elev=312.00' Storage=6,120 cf Inflow=0.32 cfs 0.179 af Pond 2P: Detention Basin #1C Outflow=0.11 cfs 0.039 af Peak Elev=365.27' Storage=11,405 cf Inflow=0.52 cfs 0.262 af Pond 4P: Detention Basin #1A Outflow=0.00 cfs 0.000 af Peak Elev=329.61' Storage=6,519 cf Inflow=0.31 cfs 0.150 af Pond 6P: Detention Basin #1B Outflow=0.00 cfs 0.000 af Total Runoff Area = 5.492 ac Runoff Volume = 0.591 af Average Runoff Depth = 1.29" 98.98% Pervious = 5.436 ac 1.02% Impervious = 0.056 ac Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 28 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 1S: Drainage Area #1C Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type III 24-hr 10-yr Rainfall=5.00" Runoff Area=84,877 sf Runoff Volume=0.179 af Runoff Depth=1.10" Flow Length=621' Tc=257.8 min CN=57 0.32 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 29 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 3S: Drainage Area #1A Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type III 24-hr 10-yr Rainfall=5.00" Runoff Area=99,965 sf Runoff Volume=0.262 af Runoff Depth=1.37" Flow Length=424' Tc=234.9 min CN=61 0.52 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 30 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 5S: Drainage Area #1B Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type III 24-hr 10-yr Rainfall=5.00" Runoff Area=54,385 sf Runoff Volume=0.150 af Runoff Depth=1.44" Flow Length=509' Tc=219.2 min CN=62 0.31 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 31 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 7R: Basin #1A Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=2.295 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs 0.00 cfs 0.00 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 32 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 8R: Basin #1B Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 1 0 Inflow Area=1.249 ac Avg. Flow Depth=0.00' Max Vel=0.00 fps 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs 0.00 cfs 0.00 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 33 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 9R: Basin #1C Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.12 0.115 0.11 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Inflow Area=1.949 ac Avg. Flow Depth=0.10' Max Vel=2.26 fps 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs 0.11 cfs 0.11 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 34 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 2P: Detention Basin #1C Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Inflow Area=1.949 ac Peak Elev=312.00' Storage=6,120 cf 0.32 cfs 0.11 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 35 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 4P: Detention Basin #1A Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=2.295 ac Peak Elev=365.27' Storage=11,405 cf 0.52 cfs 0.00 cfs Type III 24-hr 10-yr Rainfall=5.00" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 36 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 6P: Detention Basin #1B Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Inflow Area=1.249 ac Peak Elev=329.61' Storage=6,519 cf 0.31 cfs 0.00 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 37 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=84,877 sf 0.00% Impervious Runoff Depth=1.50" Subcatchment 1S: Drainage Area #1C Flow Length=621' Tc=257.8 min CN=57 Runoff=0.45 cfs 0.243 af Runoff Area=99,965 sf 2.45% Impervious Runoff Depth=1.81" Subcatchment 3S: Drainage Area #1A Flow Length=424' Tc=234.9 min CN=61 Runoff=0.70 cfs 0.346 af Runoff Area=54,385 sf 0.00% Impervious Runoff Depth=1.89" Subcatchment 5S: Drainage Area #1B Flow Length=509' Tc=219.2 min CN=62 Runoff=0.42 cfs 0.196 af Avg. Flow Depth=0.14' Max Vel=1.43 fps Inflow=0.13 cfs 0.036 af Reach 7R: Basin #1A Discharge 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs Outflow=0.12 cfs 0.036 af Avg. Flow Depth=0.09' Max Vel=2.13 fps Inflow=0.09 cfs 0.033 af Reach 8R: Basin #1B Discharge 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs Outflow=0.09 cfs 0.033 af Avg. Flow Depth=0.15' Max Vel=3.02 fps Inflow=0.29 cfs 0.103 af Reach 9R: Basin #1C Discharge 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs Outflow=0.29 cfs 0.103 af Peak Elev=312.00' Storage=6,120 cf Inflow=0.45 cfs 0.243 af Pond 2P: Detention Basin #1C Outflow=0.29 cfs 0.103 af Peak Elev=366.00' Storage=13,488 cf Inflow=0.70 cfs 0.346 af Pond 4P: Detention Basin #1A Outflow=0.13 cfs 0.036 af Peak Elev=330.00' Storage=7,140 cf Inflow=0.42 cfs 0.196 af Pond 6P: Detention Basin #1B Outflow=0.09 cfs 0.033 af Total Runoff Area = 5.492 ac Runoff Volume = 0.785 af Average Runoff Depth = 1.72" 98.98% Pervious = 5.436 ac 1.02% Impervious = 0.056 ac Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 38 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 1S: Drainage Area #1C Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.48 0.46 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type III 24-hr 25-yr Rainfall=5.70" Runoff Area=84,877 sf Runoff Volume=0.243 af Runoff Depth=1.50" Flow Length=621' Tc=257.8 min CN=57 0.45 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 39 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 3S: Drainage Area #1A Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type III 24-hr 25-yr Rainfall=5.70" Runoff Area=99,965 sf Runoff Volume=0.346 af Runoff Depth=1.81" Flow Length=424' Tc=234.9 min CN=61 0.70 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 40 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Subcatchment 5S: Drainage Area #1B Runoff Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.46 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type III 24-hr 25-yr Rainfall=5.70" Runoff Area=54,385 sf Runoff Volume=0.196 af Runoff Depth=1.89" Flow Length=509' Tc=219.2 min CN=62 0.42 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 41 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 7R: Basin #1A Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Inflow Area=2.295 ac Avg. Flow Depth=0.14' Max Vel=1.43 fps 18.0" Round Pipe n=0.020 L=111.0' S=0.0090 '/' Capacity=6.48 cfs 0.13 cfs 0.12 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 42 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 8R: Basin #1B Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Inflow Area=1.249 ac Avg. Flow Depth=0.09' Max Vel=2.13 fps 18.0" Round Pipe n=0.020 L=28.0' S=0.0357 '/' Capacity=12.90 cfs 0.09 cfs 0.09 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 43 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Reach 9R: Basin #1C Discharge Inflow Outflow Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Inflow Area=1.949 ac Avg. Flow Depth=0.15' Max Vel=3.02 fps 18.0" Round Pipe n=0.020 L=27.0' S=0.0370 '/' Capacity=13.14 cfs 0.29 cfs 0.29 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 44 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 2P: Detention Basin #1C Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.48 0.46 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Inflow Area=1.949 ac Peak Elev=312.00' Storage=6,120 cf 0.45 cfs 0.29 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 45 HydroCAD® 10.20-5c s/n 11668 © 2023 HydroCAD Software Solutions LLC Pond 4P: Detention Basin #1A Inflow Primary Hydrograph Time (hours) 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Flow (cfs) 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Inflow Area=2.295 ac Peak Elev=366.00' Storage=13,488 cf 0.70 cfs 0.13 cfs Type III 24-hr 25-yr Rainfall=5.70" Butlertown Road.Proposed Conditions.11.23.2024 Printed 12/19/2024 Prepared by DLC Engineering Services, LLC Page 46 HydroCAD® 10.20-5c s/n 11668 © 20