Board of Selectmen Regular Budget Meeting Materials (linked)
agenda center agenda
| Board/Commission | Board of Selectmen |
|---|---|
| Meeting Date | February 10, 2021 |
| Pages | 22 |
| File Size | 6.8 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
TOWN OF WATERFORD CAPITAL IMPROVEMENT PLAN PROJECT CONSOLIDATION FORM-FY 2022-2026 DEPARTMENT/ AGENCY: TOWN IT COMMITTEE FUNDING | FISCAL YEAR | FISCAL YEAR | FISCAL YEAR | FISCAL YEAR | FISCAL YEAR DEPT SOURCE 2021-2022 2022-2023 2023-2024 2024-2025 2025-2026 PRIORITY PROJECT NAME TOTAL 3 SWITCHES 3 22,500.00 4 22,500.00 4 PHONE SYSTEM UY (software/hardware upgrades) 3 16,000.00 16,000.00 1 FIBER UPGRADE (Town Hall, to PD/YS/EOC, Community Center, 3 14,000.00 wv 14,000.00 Library 2 UPS uperades 12,500.00 v | 5 Cameras/Access securi 3 110,000.00 “| 77,000.00 282,000.00 0 95,000.00 yO Current fiber in this area is "multi-mode" which allows about 100 meg speed, would increase to 10 gig speed. INDEX TO FUNDING SOURCES, 1 ony A NM SW WN CURRENT YEAR CAPITAL IMPROVEMENTS UTILITY BUDGET/SEWER CAPITAL MAINTENANCE FUND TRANSFER TO CAPITAL & NONRECURRING. SHORT AND LONG TERM DEBT FINANCING LoCIP CNR UNDESIGNATED FUND BALANCE FEDERAL/STATE GRANTS OTHER FUNDING TOWN OF WATERFORD CAPITAL PROJECT REQUEST FORM DEPARTMENT/AGENCY CONTACT PERSON Waterford IT Committee Brett Mahoney PROJECT NAME DEPARTMENT PRIORITY Fiber Upgrade 1 t Fiber running between the Town Hall, Community Center, PD, EOC, Library and WYSB Fiber upgrade. Current fiber in this area is “multi-mode” which allows about 100 meg speed, would increase to 10 gig speed after bringing the fiber up to date. Allows for increased speed, data transfer, etc. This is the second year of this request, which would be installed this year. As the quote is three years old, a percentage has been added to ensure the request is adequate. Attached APPROVED FUNDING TO FUNDING SOURCE DATE FY2022 FY2023 FY2024 FY2025 FY2026 Current Year Capital Utility Budget/Sewer Cap Maint Fund Transfer to CNR 14,000 14,000 Short/Long-term Bonds LoCIP (detail in section 5 above) CNR Undesignated Fund Balance Federal/State Grants (detail in section 5) Ap Blo p N s Communications & Electrical LLC 896 Bear Hill Rd. Middletown, CT 06457 CT Lic # 184517 Phone (860) 343-9797 | Fax (860) 788-2635 www.northeastcne.com Town of Waterford Quote # B-17-0367 15 Rope Ferry Rd. Waterford, CT 06385 Attn.: Ed Crane Director of Information Technology (860) 625-5764 ecrane@waterfordschools.org Re: Single-mode (OS2) Optical Fiber Backbone (OSP) | “Budgetary” Price Quote Northeastern Communications & Electrical LLC is pleased to provide a quote for the above-mentioned project. SCOPE OF WORK Outside Plant: For the optical fiber plant, Northeastern Communications & Electrical LLC will supply and install the following: 11/9/2017 1 Initials -RESTRICTE D-PROPRIETARY INFORMATION- The information contained herein is for use by authorized employees of the parties hereto only and is not for general distribution within or outside their respective Companies 1: 24-strand Single-mode (OS2) ALTOS Loose Tube, Gel-Free, All--Dielectric optical fiber cable. This cable will be placed in an existing underground conduit and run: To: EOC From: Town Hall 3: 12-strand Single-mode (OS2) ALTOS Loose Tube, Gel-Free, All--Dielectric optical fiber cables. These cables will be placed in existing underground conduits and run: To: Library From: Town Hall To: Community Center From: Town Hall To: Police (PD) From: EOC 1: 6-strand Single-mode (OS2) ALTOS Loose Tube, Gel-Free, All--Dielectric optical fiber cable. This cable will be placed in an existing underground conduit and run: To: Youth Services Bureau (YSB) From: EOC Each strand of Single-mode fiber optic cable will terminate with an “LC” type connector and connect to its own fiber optic coupler. These couplers will be installed in an equipment rack mounted fiber optic patch panel at each end. All optical fiber cables and terminations will be labeled to identify their quantity, type, and the “to” and “from” locations. Labeling will be done in a professional manner with printed labels and fiber-optic yellow cable tags. A lifly-fool maintenance loop will be left and neatly stored al each end of the cable run. Included with the installation are: 2: 2U Fiber Optic Patch panel (Town Hall | EOC) 4: 1U Fiber Optic Patch Panels (Library | Com. Ctr. | PD | YSB) 10: 12-port OS2 “LC” Coupler Panels 2: 6-port OS2 “LC” Coupler Panels 11/9/2017 2 Initials -RESTRICTE D-PROPRIETARY INFORMATION- The information contained herein is for use by authorized employees of the parties hereto only and is not for general distribution within or outside their respective Companies Identification / Labeling: 1. Labeling will be done in a professional manner with (black on white, large font) printed labels. Testing: 1. All Single-mode optical fiber strands will be tested using a power meter in one direction at 1310nm & 1550nm. No loss will exceed the sum of .75db per mated connector plus .3db per splice plus the calculated cable length attenuation. Standards: 1. This Scope of Work provides for the described work to be done in compliance with NFPA-70 (National Electrical Code), unless otherwise directed or prohibited, all applicable Telecommunications Industry Standards, and specifications presented by the customer at the time of bid. Warranty: 1. A one-year warranty against defect with the described installation is included with the Northeastern Communications & Electrical LLC Structured Cabling Solution. Northeastern Communications & Electrical LLC warrants that for a period of one year from the system cut over date, the described work under normal use and service will be free from defects and faulty workmanship. CORNING OPTICAL COMMUNICATIONS 25-YEAR EXTENDED PRODUCT WARRANTY — Corning, together with its network of preferred installer members (NPI), commits to repair or provide replacement for nonconforming products free of charge during the 25 year extended warranty period, subject to the terms and conditions of Corning’s network of preferred installers program. “Budgetary” Price: Labor ..........0008 $17,160.00 Material.............. $8,356.28 Total .....ccsesee $25,516.28 (Plus 6.35% CT sales tax, if applicable) *The price provided in this Scope of Work is valid for a period of sixty (60) days* *The labor price is based on standard NON-PREVAILING wage rates.* Terms Net 30 Y% payment due upon bid acceptance Ye payment due upon project completion & test results 11/9/2017 3 Initials -RESTRICTE D-PROPRIETARY INFORMATION- The information contained herein is for use by authorized employees of the parties hereto only and is not for general distribution within or outside their respective Companies Assumptions / Qualifiers: 1. wn 10. The Northeastern Communications & Electrical LLC normal business hours are Monday through Friday 8:00 AM to 5:00 PM. This Scope of Work is based on all work being performed during normal business hours. The requiring of work to be preformed outside of this schedule or a shorter installation interval, causing work to be performed on “over-time” will be an additional cost to the customer and requires prior approval. This Scope of Work does not include the cost of pulling a permit, if applicable. Northeastern Communications & Electrical LLC assumes there are no abnormal environmental or hazardous conditions on the customer's premise which would require extraordinary safety and/or regulatory functions, activities, permits or certifications for Northeastern Communications & Electrical LLC to perform the required work. This Scope of Work assumes that the customer will provide free and ready access to all work locations. Including, but not limited to, rooms, floors, ceiling spaces, and manholes. All required moving of furniture, file cabinets, desks, and equipment will be the responsibility of others. This Scope of Work assumes that the installation of all plywood backboards will be the responsibility of others and are not included in this proposal. Northeastern Communications & Electrical LLC assumes no delays. Inaccessibility to the work areas may require additional man-hours charged to the customer. This Scope of Work assumes that the installation of all cable tray, conduits, sleeves, Tele/power poles, and core boring not before mentioned, will be the responsibility of others and are not included in this proposal. It also assumes that they will be of sufficient size and design to accommodate all cables to be installed and properly fire- safed. This Scope of Work assumes that prior to the start of work all conduits will have pull strings installed by others and are not included with this proposal. Alterations or deviations, if any, from the above scope of work, or any delays or postponements of the work by the Customer or its agents which result in additional materials or labor costs, will become an extra charge which will be billed as an addition to this proposal amount. Any extra move on or off the job site due to circumstances beyond our control will be billed as an extra at hourly labor and equipment rates in effect at the time. 11/9/2017 4 Initials -RESTRICTED-PROPRIETARY INFORMATION- The information contained herein is for use by authorized employees of the parties hereto only and is not for general distribution within or outside their respective Companies TOWN OF WATERFORD CAPITAL PROJECT REQUEST FORM DEPARTMENT/AGENCY CONTACT PERSON Waterford IT Committee Brett Mahoney PROJECT NAME DEPARTMENT PRIORITY UPS upgrades 2 ON (describe pur nticip complishm he Numerous Uninterrupted Power Supplies (UPS) need to be changed. These are mounted UPS for the various data racks in buildings throughout town. Before the units are relaced, IT attempts to replace the batteries for cost savings, but there are too many that have failed or are end of life. Locations of UPS units - SMT3000 Units: (2) Town hall server room Basement. (1) Town Hall data room 2nd floor. SRT2200 Units: (1) Youth center, (1) Community center, (1) 2nd floor Town Hall switch closet, (1) EOC server rack. Most town departments Attached APPROVED FUNDING TO FUNDING SOURCE DATE FY2022 FY2023 FY2024 FY2025 FY2026 Current Year Capital 14,560 Utility Budget/Sewer Cap Maint Fund Transfer to CNR. Short/Long-term Bonds LoCIP (detail in section 5 above) CNR Undesignated Fund Balance ST HAlap Blom p— Federal/State Grants (detail in section 5) Other Fundi SALVLS GALINN geld cettate gge90 LO GYOINALVM “ed SALVLS GALINN th GVOuw AYYsSs 3AdON SL ‘OWEN CGYO4YALVM 4O NMOL CGYOIYALVM 40 NMOL -aumeuBig Oj dius OL jlg souej}deooy Jawojsn5g “@SIMUAU}O JO Bulsojo Ay9e} 0} aNp ydia0eJ 410) UBIs 0} jauUOSJad JaLUO}SNo JO aunjiey Aue Bulpueysyjimjou paianljap patweep aq jm s}onpod pue SUOHONJJSU! O}-diys USHUM SJeWO}SNd YM BdUePsOIIE UI AJ@AIJEP JO} sjonpoid diys |IM snjge ‘suoHeziuebio Auew Jo} suoejedo pajdnusip sey o1wepued jeqoj6 au yey} BulziuBooey “ad!0Au! au} 0} pappe 8 [NIM }I ‘XBL Sajeg Woy }dwexe si Auedwod 0] -IJ1G SSajUF “Sd1OAU! 84} 0} pappe aq |IIM YBIEN ‘018Z S| JO ‘payedipul si JuNoWe jYBiey ssejUp ‘JUatUsoR|d Japso 0} Jo Buloud WuyU0D aSes|q ‘OAOGe pa}ayel sep uoHesIdxS ay} B10JEq UBA2 ‘8dI}0U JNnoYyM aBHueYo 0} JOeIqns si a}onb SIU} YNsed & SV “}O1]UCD ,sNiqe Puofeq puke ‘sd}0U OU JO aI] YIM ‘s}onpoid 1; Auew JO} saseaioul said Busnes aie syodul uleyiso UO syue} JAOB Sp JUso@y “Aunbul NOK Jo} NOK yueYL “spun Jo Uoleldosdde-uou 0} anp ayeulw9} 0} me] Aq pasinbas siawioysno 10}9as oIgnd Aq }deoxe uoseas Aue JO} S1de|e9ued-UOU ae s[eMeusl OeWO}Ne pue sjuswjsnipe AWUenb ‘suo-ppe ‘seaj uoNduunsuoo ‘sebesero pawinoul-Jewo}sno yy Buoje ‘sBuuayo oyl0eds 10} suonebijgo yuewAed oipoiied Auy “suJ9} uolduosqns Jo s}juaweebe Jasn pua Jaysigndeinjoeynuew 0} Joalqns si snjqa Aq pjosei sjonpoid Jeujo Jo sadiAias uonduosgns ‘aemyos Jo asq “SUa} Od pajuldeid Aue JO soue}deo0e patuseap aq jou jJeys eoueWOjed ,sniqe pue ‘Ajdde |jeys Japio aseyoind e UI SU} Ale1]U09 JO JeUOIIPpe ON “UBAOH Wod'snjgqa’MmM je pe}e90] S8dIAJaS JO/pue s}onpolg 10} SUOHIPUCD PUB SUE] JEWO}sND 8y} JUsWaelHeE YONs OU Ss! 919} J! JOeNUOD J0}9as oIIGnd ajqeoldde Jo sige UM JUaWebe peubis S,uoleziuebio InoA Aq pausJaaob ae siapio jv 96'EvE‘ZL (asn) [e301 00°0 :(asn) puHsdys aiqeouddy 3! Gat (asp) xeL ‘Bupjoed 96'eve'ZL (GSN) 1e}01 ans :Buiddiys 96 Eve ZL veere ct (Gsnyieioi-qns 91}98]5 Jopisuyss ZL LES L 82°788'b v GYVO MYOMLAN AZ} WY VA00ZZ LYS SdN-LYVWS OdV YAGISNHOS ON-VIXNNO0ZZLYS z00 qdyvo v8 ZLe'y 82'709'L S MYOMLAN HLIM A0ZL NZ WY GO1 VAOONE SdN LYVWS OdVv Y3SGISNHOS ONNZNMOOOELWS 400 89d }Xq 89d Wun ALO S9JON OUlT/UOndoseq SAIN JOquINN Hed “ON Our] woo'snjde®ejuelds :ewy eaynoexy Junosoy Side CCEL-GLO-L8Z :8UOYd SANNIExy JuNODDy OZOZ/LL/LL -8}eq UOHeJONH SUL] BAI}JS :@AINIEXy JuNODIY ouj9|q Jeplauyos OZOZLL/ZL :9xeq uoHeudxy woo'snide®piemoye :jwewy yoddng sajes - SLVWILSS ANVLa9CNg :eweN aj0nD [ON J2p19 ZLSE-E9Z-E09 :euoYyd HOddnsg sees €8608SZz :ON e}onD ah :ON Od Jawo}snp pueMoH PJ :39e}U0D yoddng sejes CGYOSYALVM JO NMOL :aweN saW0j}snp b 40 | obeq TOWN OF WATERFORD CAPITAL PROJECT REQUEST FORM DEPARTMENT/AGENCY CONTACT PERSON Waterford IT Committee Brett Mahoney, IT Chair PROJECT NAME DEPARTMENT PRIORITY Switches 3 10 pu ac en he General purpose switches that connect to end users, phones, and other user support switches. These are 48 port switches, we intend to purchase four of them. These are replacements for very old items that need to be upgraded. All Town Departments are impacted OV FUNDING TO FUNDING SOURCE DATE FY2020 FY2021 FY2022 FY2023 FY2024 Current Year Capital 26,000 Utility Budget/Sewer Cap Maint Fund Transfer to CNR Short/Long-term Bonds LoCIP (detail in section 5 above) CNR Undesignated Fund Balance Federal/State Grants (detail in section 5) STA] Poly pl Other Funding (detail in section 5 above JOJ SUOIIPUOD pue SUE] JaWO}SND ey} JUaLUseIBe YONs OU S| 2194} J! ‘J9eIJUOD 10}DeS SIGnd sjqeoldde 10 snjqe YIM jugweeibe poubis s,uojeziueBio unof Aq pouiaaob ale sispio IV 00°0 (asn) puHgdus aiqeoddy 3! Gal (asn) xeL :Buryoed os'zsr'zz :(asn) 1201 ans ‘buyddiys oscsyec (aSn) feyoL-qns SOUSIMS WOMEN 00°0 00°0 v HONOL-OYSZ YO4 LOANNOO AV 1d-N-9N 1d MHOMLAN Oosid Ol1-dNd-MHOMLAN LLO 00°0 000 v A1EV9O ONIMDVLS 7 AdAL WO0S OosId W90S-4L-AOVLS O10 00°0 00°0 8 FINGOW HOVLS 0026 LSAIVLVD oosid MOVLS-00269 600 ve L8L'% LeS69 v AINGOW AOVLS 10026 LSATIVLVD OOSID oosid LD-XOVLS-100269 800 ZLele'z ev c6sS v WHAL YV3A € ‘LYOd-8r ‘STVILNASSS VNG OOSID 100269 oosiod A€-87-S-VNG-100269 200 00°0 00°0 v ASN3OM WHAL LYOd-8r ‘STIVILNASSA VNG OOSID 100269 oosiod 8b-S3-VNG-100269 900 00°0 00°0 y MNV1d AlddNS YAMOd S DISNOO OosId NV 18-S0-YMd S00 00°0 00°0 v A1gV9 YSAMOd V AdAL OV VOINSINV HLYON oosid VN-VL-EV9 yoo 00°0 00°0 v ASNAOM LYOd-8¢7 ‘STVILNASSA MHOMLAN 100269 OosIo 87-S-MN-100269 €00 87'628'1 78697 v X v ‘450d LNOd-8r 10026 LSATVLVD GENXSX8 dNS YNLYd OOSID Xv¥100Z69-LNSd-NOO Z00 9G'8Ly'SL pO'ySs'e v MYOMLAN ‘DOL X # ‘+5Od LYOd Br 10026 LSATVLVO oosid a-Xb¢-d8¥-100269 400 89d 1X9 89d JUN ALO Sd8JON SuljuoHndusseq SIN Jaquinn Wed “ON 9Ul] woo'snide®ejuelds :prewy sayndexy yunosoy snida CZEL-GLO-L8Z -@UOUd SAI}NIEXy JUNOIIYV OZOZ/ZL/L) :9}eq uoHe}ONH JUL] DAZJS 79AINIEXy JUNOIDY SOYOUMS YOMION OZOZ/LL/ZL :0}eq UOHeuIdxXy woo'snjde®piemoya :ewy yoddnsg sees - ALVWILSS AYVLAOGNA ‘owen ajonH :ON J8P19 ZLGE-E9T-E09 :auoYyd Hoddng sajesg 08608922 :ON 8}0NDH + :ON Od J9wWo}snO psemoH py :9eJUOD Woddns sees CYOSYALVM JO NMOL ‘owen Jeu0jsng Page 2 of 2 Products and/or Services located at www.ePlus.com govern. No additional or contrary terms in'a purchase order shall apply, and ePlus' performance shall not be deemed acceptance of any preprinted PO terms. Use: of software, subscription services or other products resold.by ePlus is subject to manufacturer/publisher end user agreements or subscription terms. Any periodic payment obligations for specific offerings, along. with customer-incurred. overages, consumption:fees,. add-ons, quantity adjustments: and automatic renewals are non-cancelable for any reason except by public sector. customers required by law'to terminate due to non-appropriation of funds. Thank you for your inquiry. Recent US govt tariffs on certain imports are causing price increases for many IT products, with little or no notice, ard beyond ePlus' control. As a result, this quote is subject to change without notice, even before the expiration date reflected above. Please confirm pricing prior to order placement. Unless freight amount is indicated, or is zero, freight will be added to the invoice. Uniess Bill-To company is exempt from Sales Tax, it will be added to the invoice. Recognizing that the global pandemic has disrupted operations for many organizations, ePlus will ship products for delivery in accordance with customer's written ship-to instructions and products will be deemed delivered notwithstanding any failure of customer personnel to sign for receipt due to facility closing or otherwise. Customer Acceptanc Bill To - Ship To Signature: ___ —____ | TOWN OF WATERFORD . TOWN OF WATERFORD Name: 45 ROPE FERRY ROAD wy bs | 15 ROPE FERRY ROAD Title: : WATERFORD CT 06385 Date: WATERFORD. CT 06385 UNITED STATES Customer PO #: UNITED STATES . ED CRANE ED CRANE TOWN OF WATERFORD CAPITAL PROJECT REQUEST FORM DEPARTMENT/AGENCY CONTACT PERSON Waterford IT Committee Brett Mahoney PROJECT NAME DEPARTMENT PRIORITY Phone system 4 Ba ac its The VOIP phone system is split between the Town and BOE - 2 servers BOE, one server town. The servers are all end of life this budget year, and need to be replaced to keep the hardware viable. Attached APPROVED LoCIP (detail in section 5 above) CNR Undesignated Fund Balance Federal/State Grants (detail in section 5) FUNDING TO FUNDING SOURCE DATE FY2022 FY2023 FY2024 FY2025 FY2026 1 |Current Year Capital 16,250 2 |Utility Budget/Sewer Cap Maint Fund 3 |Transfer to CNR 4 |Short/Long-term Bonds 5 6 7 8 |Other Fundi ajqejeoued-uou aie sjemouel deWO Ne pue sjusWSNipe AjUeNb ‘suO-ppe ‘see} UOHdWNSUOD ‘seBe1aAo palNoUl-JatWO}sNd YM Huge ‘sHuayo oiyl9ads 10) suonebijgo juewAed dIpoiied Au ‘swa} uoldiuosgns Jo sjuawaeibe Jeasn pua Jaysiqndjeimoesynuew 0} yoalgns si snjqe Aq pjosel sjonpoid Jeyjo Jo seolAles uoNdUosgns ‘alemyos JO asp “SWJS} Od pejuudeid Aue JO souejdac0e paweseap aq jou |Jeus eoUeUWOEd ,snjige pue ‘Ajdde jJeys Japio aseyond e ul SWS} AejU0D Jo [JEUOHIPPe ON “WAH WOd'sn| qo MMM Je Ps}ed0] SSdIAIBS JO/pue s}ONPod JO} SUONIPUOD pUue SUA] JEWO}SND eu} jUsWeeJBe UONs OU Ss] o19U} JI JoeRIJUCD JOJOaS oIJGnd ajqeal|dde Jo snjqe YIM JUaWaelBe peubis s,uoeziuebo InoA Aq peuserob aie siapio |IV| giqeoddy 3! dal (Asn) xeL ‘Bupjoed ze‘0ze‘Sh “(asn) 1e}01 ans bods O0G000L (GSN) ieol-qns uoHeIbiyy ddy 9 speiBdn MAH JeAles On 00°000'0! re ee NOLLVYOIN ddV 8 SGVYOdN MH YSANSS ON snida SAOINNAS IWNOISSSIONd SNA Ge0ces (asp) ieioi-qns epeibdn ieAjes suoud (NdO-z) X’9 00°0 00°0 L SM1d YOSIANAdAH “LIA ON OOSID ‘ASNSOM Gaqqsaawa oosio 6-S dd AH-9SA-MNA oLo 00°0 00°0 L HLYON ‘SM 1d S}-S VAN VEL OWAGZI ‘GHOO Y3MOd oosio YN-VZ16-8V9 600 00°0 00°0 ( ZHWO0¢Z PUCC/SHOVO SWSZ'E1/D0L MS8/Pb Ly ZHO 2°% oosio Ndo-y93a 300 00°0 00°0 € ATONIS/00€12-Od/WWIGY ZHW-9992-rHaG A991 oosio Wvu-93 200 00°0 00°0 L ONILLAS S Give STaVNA oosio SGIVe-XXZY 900 00'0 00°0 9 CGH 44S Wdd yO} SVS DZ} GO00e oosio ysiq-1938 00 00°0 00°0 L FHOVO 89Z HLIM YATIONLNOO GIVY VINGOW OZ! OOSIO oosio UTYLOGIVe-y93d 00 00°0 00°0 L USAYAS NOWY NOS AlddN$ YAMOd OV MOLL SON ODSIO oosio NSd-y9354 €00 8667 81 66r L WO0009 NOILIGS SSANISNE ODSID *XLXbZ SSd ddNsS SON oosio 6YSWW938-ErSd-NOO Z00 MS YLS3y BI XZ 39d HUN ALO S9}JON SUulT/UOHdLOSseq SIN JIQuUINN Hed ‘ON 9Ul] woo'snide®@ejuejds :ewy aAljndexy Juno.y side ON J9pP19, OZOZ/LL/ZL :e3eq UOesIdxy ZZEL-SLO-18Z :2UoYd aAHNIeXy JuNoDDy OZOZ/LL/L) :83eq UOHe}ONH apeibdn Javies au0yd 6L608922 :ON 8}0NH aL QYOSYALVM AO NMOL :8WeN JaW0}sND z 40 | a6eq ANVYD da SSLVLS GSLINA S8E90 1D GYyOsAYSaLVM GVO ANY3S AdOw Sb GHOSYALVM 40 NMOL O1 dius SINVYO Ga SSLVLS G3LINN 48690 LO GYOJYALWM QVOuw AdYas 3d0u'Sh GHOSMALYM 4O NMOL O1Ila :9yeq -SRLL -Ginjaubie souejdao0y Jewojsng JO aunjiey Aue Bujpueysyyajou paiaayjap pewesp aq || sjonpoid pue suonons)sul 0} “ASIMJEUO JO Bursojo Ajiioey 0} anp }dieoed 10) UBis 0} jouUosied JaWoysno dIUS USWUM SJewoysno UM souepsoooe Ul AJOAEP JO} sJonpoud diys jm snjga ‘suoneziuebio Auew Jo, suoyesedo pajdnisip sey olwepued jeqoj6 ayy yeu} BulziuBooey “eoloaui ey) 0} pappe aq jim y ‘xe! sajeg Wo. }dwexe s} AUedWwOd O]-I11g SSA]UN “Sd!OAL! By) 0} Pappe eq WIM WUBIOY ‘0182 S| JO ‘payed|pul si JUNOWe jYyBiey ssajuN “jUsWede|d Japso 0} JolNd Buloud WuyUCS asee|q ‘aAcge peyayal ayep uol}esdxe ay} a10J9q USA ‘sd}OU JNOYYM eBueyo 0o} yoelgns si sjonb SIU} YNSal B Sy "]OuJUOD ,snid@ puofsg pue ‘sd}ou OU JO ANI] YM ‘s}onpod 1] AUeW JO} saseesou! Bold Bulsneo aie sHodul ujeya9 uo sye} OB Sp yusdey “AuNbul INOA JO) NOA yueUL, “spuny so uoyelidoidde-uou 0} enp sjeulWa} 0} mel Aq pauinbsr siawojsno io}9es o11qnd Aq jdeoxe uosee: Aue JO} Nae TOWN OF WATERFORD CAPITAL PROJECT REQUEST FORM DEPARTMENT/AGENCY CONTACT PERSON Waterford IT Committee Brett Mahoney PROJECT NAME DEPARTMENT PRIORITY Camera/Access Security 5 d Cameras and access control systems work together, and help agencies plan during incidents. First Selectman, BOE, PW and EM Youth/Senior Services can monitor conditions for school cancelation, plow routes, etc. Emergency Services can monitor traffic and criminal items, and replay traffic crashes. EM can monitor storm damage, flooding and wires down live via phone, and videos can be saved for potential litigation issues. The plan is for a multi-year buildout of camera and access sites, all using Milestone and S2 software already purchased through the Public Works building project. Four quotes included - Town Hall cameras Town Hall access, and Eugene O'Neill mansion cameras and wiring. APPROVED nT FUNDING TO FUNDING SOURCE DATE FY2022 FY2023 FY2024 FY2025 FY2026 Current Year Capital 110,000 Utility Budget/Sewer Cap Maint Fund Transfer to CNR Short/Long-term Bonds LoCIP (detail in section 5 above) CNR Undesignated Fund Balance STW pur poplmpe Federal/State Grants (detail in section 5) Othe nding (detail in section 5 above) Quote by Stephanie Seymour O: 203-287-1306 C: 203-974-9070 To: Chief Brett Mahoney Waterford Police Department Town of Waterford bmahoney@waterfordct.org Project Video Coverage Town Hall Town of Waterford Quote # 2011-36 Date: 11/20/2020 Expires: 12/20/2020 Qty. | Description | PartNumber | Each | Extended |. MILESTONE SOFTWARE: 24 XProtect Pro+ Device Device Licenses XPPPLUSDL $131.82 $3,163.68 24 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $24.18 $580.32 Il. CAMERAS - A. Exterior Cameras: 1 Axis P3719-PLE Outdoor Fixed Dome Camera Multi-sensor 01500-001 $1,517.43 $1,517.43 IP Camera. 1 Axis T91A64 Corner Bracket 5017-641 $74.97 $74.97 4 Axis T91D61 Camera Wall Mount Bracket 5504-821 $79.72 $79.72 4 Axis T94N01D Pendant Kit w/ 01513-001 $84.46 $84.46 2 Axis P1448-LE Outdoor Ready Network Bullet Camera with 01055-001 $900.58 $1,801.15 2 Axis P3375-LVE Outdoor Fixed Dome IP Camera 01063-001 $948.03 $1,896.05 B. Interior Camera: 5 Axis M3058-PLVE Fixed Dome Camera 2992x2992 (12MP) 01178-001 $805.68 $4,028.38 11 Axis M4206-V Fixed Dome Camera 2048zx1536 (3MP) 1240-001 $397.63 $4,373.94 C. Street Cameras: 3 Axis Q6125-LE Outdoor PTZ Camera 1920x1080, laser focus 01234-004 $3,898.70 $11,696.10 30x optical zoom 12x digital zoom. 3 Axis T94A01D PTZ Camera Pendant Kit 5505-081 $46.80 $140.40 3 Axis A91G61 Wall Mount Kit 5506-951 $174.30 $522.90 3 Axis T91B57 Axis Pole Mount Bracket for Camera 01470-001 $156.00 $468.00 3 Axis T8123 30 watt POE+ Power Supply for PTZ Camera 5030-234 $298.80 $896.40 3 Axis T98A57 Axis Surveillance Cabinet Kit Outdoor 5900-151 $322.80 $968.40 Ill. NETWORK: 3 Cambium AC Power Photo Cell Adapters Kit 5871325H01 $226.80 $680.40 6 PTP450i Cambium 5 GHz Subscriber Modules 580210 $635.54 $3,813.26 6 PMP 30W, 56V Power Supply 581592 $21.60 $129.60 6 1' AC Line cord for PTP450 544082 $4.32 $25.92 6 Canopy Surge Suppressor 489338 $30.24 $181.44 6 Canopy Universal Mounting Bracket 427337 $46.80 $280.80 6 Tilt Bracket Assembly 590213 $34.80 $208.80 120 Wubperior Armored Cat 5e Outdoor Ethernet Cable 315167 $1.14 $136.80 4000 Cat6 Nework Cable $0.35 $1,392.00 84 EX-RJ45 Cat6 Connectors 100010C $0.81 $68.04 IV. SERVER: 4 Windows Server 2019 STD, 1x Xeon 4210 2.2GHz 10 C CPU, D54M30TB2R-1610 $8,562.50 $8,562.50 16GB RAM, 2x 480GB SSD OS R1. 4x 300GB 15K 8TB SATA R5 (RAW) Archive, 2x 1Gb NIC, KB/M, 2x 750W PS, Rails, 3 YR Dell Warranty. V. INSTALLATIONS COSTS: 4 YR Warranty $2,200.00 $2,200.00 1 Misc. Parts $1,000.00 $1,000.00 1 Project Management and Engineering $1,200.00 $1,200.00 4 Installation of Equpment,Setup of Cameras, Camera Views and Install $16,000.00 $16,000.00 Milestone Set-up. Cost of Equipment and Labor: $68,171.85 Customer to provide: 1. Traffic Officer. 2. Network Connectivity 3. Routing done by IT Department 4. Supply A/C Power Poles Continuous 5. Agreement w/ power company to use Light Pole on street 6. IT Hardware Equipment Quote # 2007-35 Quote by Stephanie Seymour Date: 7/15/2020 O: 203-287-1306 C: 203-974-9070 To: Chief Brett Mahoney Waterford Police Department 860-442-9451 bmahoney@waterfordct.org Expires: 8/15/2020 Waterford Beach Park Qty. Description Part Number Each Extended I]. MANSION: 2 XProtect Pro+ Device Device Licenses XPPPLUSDL $122.00 $244.00 2 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $22.35 $44.70 2 Axis Q6125-LE PTZ Network Camera 01234-004 $2,846.05 $5,692.10 2 Axis T94N01D Pendant Mount for Camera 5505-871 $84.46 $168.92 2 Axis Midspan T8154 60 Watt 5901-004 $188.81 $377.62 600 Cat6 Plenum Cabling 849231 $0.35 $208.80 1 Misc. Equipment Local $100.00 $100.00 4 EX-RJ45 Cat6 Connectors 100010C $0.72 $2.88 1 Installation of Equipment - conduit down side of building. $3,120.00 $3,120.00 |. Sub-total Mansion: $9,959.03 ll. POLE at Pavilon: 2 XProtect Prot Device Device Licenses XPPPLUSDL $122.00 $244.00 2 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $22.35 $44.70 2 Axis P1448-LE Outdoor Ready Network Bullet Camera 01055-001 $900.60 $1,801.20 2 Axis T91B47 Pole Mount 01165-001 $71.18 $142.35 50 Cat6 Plenum Cabling 849231 $0.35 $17.40 4 EX-RJ45 Cat6 Connectors 100010C $0.72 $2.88 1 Axis T98A15-VE Surviellance Outdoor Cabinet $900-151 $235.64 $235.64 1 Axis T91A57 Pole Mount Bracket Outdoor Cabinet 5507-341 $100.74 $100.74 1 DIN Rails SDRR $12.00 $12.00 1 DDIN-Rail Power Supply SDR-120-48 $61.14 $61.14 1 TRENDnet 6-port Hardened Unmanaged Gigbit TI-PG62 $228.08 $228.08 1 Misc. Equipment Local $100.00 $100.00 1 Milestone Set-up of software and camera views. $125.00 $125.00 1 Installation of Equipment $2,080.00 $2,080.00 ll. Sub-total Pole: $5,195.14 lll. STAGE: 2 XProtect Pro+ Device Device Licenses XPPPLUSDL $122.00 $244.00 2 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $22.35 $44.70 2 Axis P1448-LE Outdoor Ready Network Bullet Camera 01055-001 $900.60 $1,801.20 2 Axis T91B47 Pole Mount 01165-001 $71.18 $142.35 50 Cat6 Plenum Cabling 849231 $0.35 $17.40 4 EX-RJ45 Cat6 Connectors 100010C $0.72 $2.88 1 Axis T98A15-VE Surviellance Outdoor Cabinet $900-151 $235.64 $235.64 1. Axis T91A57 Pole Mount Bracket Outdoor Cabinet 5507-341 $100.74 $100.74 Continue on Next Page Waterford Beach Park Page 2 Qty. Description Part Number Each Extended 1 DIN Rails SDRR $12.00 $12.00 1. DDIN-Rail Power Supply SDR-120-48 $61.14 $61.14 1 TRENDnet 6-port Hardened Unmanaged Gigbit TI-PG62 $228.08 $228.08 1 Misc. Equipment Local $100.00 $100.00 1 Milestone Set-up of software and camera views. $125.00 $125.00 1 Installation of Equipment $2,080.00 $2,080.00 lll. Sub-total Stage: $5,195.14 VI. PARKING LOT: 4 XProtect Prot Device Device Licenses XPPPLUSDL $122.00 $488.00 4 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $22.35 $89.40 4 Axis P1448-LE Outdoor Ready Network Bullet Camera 01055-001 $900.60 $3,602.40 4 Axis T91B47 Pole Mount 01165-001 $71.18 $284.70 100 Cat6 Plenum Cabling 849231 $0.35 $34.80 8 EX-RJ45 Cat6 Connectors 100010C $0.72 $5.76 2 Axis T98A15-VE Surviellance Outdoor Cabinet $900-151 $235.64 $471.29 2 Axis T91A57 Pole Mount Bracket Outdoor Cabinet 5507-341 $100.74 $201.48 2 DIN Rails SDRR $12.00 $24.00 2 DDIN-Rail Power Supply SDR-120-48 $61.14 $122.28 2 TRENDnet 6-port Hardened Unmanaged Gigbit TI-PG62 $228.08 $456.17 1 Misc. Equipment Local $100.00 $100.00 1. Milestone Set-up of software and camera views. $125.00 $125.00 1 Installation of Equipment $3,000.00 $3,000.00 IV. Sub-total Parking Lot: $9,005.28 V. RESTROOM: 1 XProtect Prot Device Device Licenses XPPPLUSDL $122.00 $122.00 1 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $22.35 $22.35 1 Axis P1448-LE Outdoor Ready Network Bullet Camera 01055-001 $900.60 $900.60 150 Cat6 Plenum Cabling 849231 $0.35 $52.20 2 EX-RJ45 Cat6 Connectors 100010C $0.72 $1.44 1 Axis T98A15-VE Surviellance Outdoor Cabinet $900-151 $235.64 $235.64 1 DIN Rails SDRR $12.00 $12.00 1 DDIN-Rail Power Supply SDR-120-48 $61.14 $61.14 1 Misc. Equipment Local $100.00 $100.00 1 Milestone Set-up of software and camera views. $125.00 $125.00 1 Installation of Equipment $1,680.00 $1,680.00 V. Sub-total Restroom: $3,312.38 VI. BEACH SHACK: 1 XProtect Pro+ Device Device Licenses XPPPLUSDL $122.00 $122.00 1 One Year Care Plus Support SUP Device Licenses YXPPPIUSDL $22.35 $22.35 1 Axis P3719-PLE Fixed Dome Camera 01500-001 $1,517.45 $1,517.45 1 Axis T91B67 Pole Mount 01473-001 $90.16 $90.16 Continue on Next Page ( Page 3 Coblrucanons INC. Waterford Beach Park Qty. escription art Number ac xtende 30 Cat6 Plenum Cabling 849231 $0.35 $10.44 2 EX-RJ45 Cat6 Connectors 100010C $0.72 $1.44 2 DB365W 29248 $74.77 $149.54 1 3"x 10' Antenna Mast 581979 $253.20 $253.20 1 Milestone Set-up of software and camera views. $125.00 $125.00 1 Installation of Equipment $1,680.00 $1,680.00 VI. Sub-total Beach Shack: $3,971.58 Vil. SERVER: 1 Dell Windows Server 2019 STD 4208 x.1GHZ 8C CPU D54M30TB2R-168 $7,995.60 $7,995.60 16GB ECC RAM PERC H730P RAID controller, 2x 480GB SSD R1 OS 4x 600GB 15K SAS R10 LIVE, 2x 10TB SATA R85 Archive, 2x GbE NIC, Archive, 2x GbE NIC, 2x 750W PS, Keyboard/Mouse 3YR Dell Hardware Warranty. Sub-total Server: $7,995.60 I. Sub-total Mansion: $9,959.03 ll. Sub-total Pole: $5,195.14 lll. Sub-total Stage: $5,195.14 IV. Sub-total Parking Lot: $9,005.28 V. Sub-total Restroom: $3,312.38 Vi. Sub-total Beach Shack: $3,971.58 Total Cost of Equipment and Labor: ~~ $44,634.14] Customer to Suppy: 1. Supply and install poles w/ power to box at designated location. 2. Supply Fiber/Network Connectivity to light poles and /or camera poles. 3. Supply Fiber/Network Connectivity at Mansion, stage area, Beach Parking lot, Beach Restroom and Beach Shack. 4. Supply A/C Power to locations. 5. Town supply conduit from Tree to Restroom. 6. Supplying routing information. Thank you D/E/F Services Group, Ltd 1171 Voluntown Rd., Griswold, CT 06351 (860) 376 — 4896, Fax (860) 376 — 1213 (AA/EOE) “The Value of One” August 25, 2020 Low Voltage SUBJECT: Waterford Beach Fiber Project D/E/F Services Group, Ltd is proud to present the following proposal to the Town Of Waterford to supply labor and material to install single mode fiber and Cat 6 cable to the Waterford Beach for to be used for a camera system. Project Scope e D/E/F will install a 6 strand fiber from the barn to the Attic in the Mansion that will make use of newly installed 44” strand mounted on poles. e D/E/F will provide a bucket truck for the installation of the pole hardware. e Terminations will be LC fusion spliced connections. Each of the above locations will make use of stanchions that will be used to mount Hubbell NEMA boxes used to contain Switches (provided by others). All boxes to be properly grounded. e All poles will be mounted on bases. These pole bases and associated conduit runs are provided by others. Cat 6 cable will be runs will be added to the front corners of the mansion to be used for future cameras. e All drops will be: o Runusing Cat 6 Plenum rated cables o Supported every 4-6 feet where necessary o Make use of proper penetrations where necessary o Certified with test reports available upon request Total Price: $7,445.00 Statement of Clarifications and Exclusions: e 120 Volt power is excluded Bid Bond, Performance and Payment Bonds are excluded Installation of additional grounding methods/means is excluded Any and all utility fees and/or usage charges for power is excluded Dumpster, trash / debris removal from site is excluded Saw-cut slab and Patch to Match is excluded Any and all site work outside of scope is excluded Overtime / additional time caused by delays due to other trades or schedule acceleralion is excluded Additional work requested by customer will be performed on a Time & Material basis with labor at current service rate ($85.00/hour) and material at cost plus 20% with all applicable taxes and fees. e This proposal is contingent upon a complete scope review between the authorized personnel and D/E/F Services to ensure over-all project intent. ercial Clari ions: 1. For projects with an estimated completion time of forty-five (45) days or less, a down payment of 1/3 of the contract total is due upon contract signing. Another payment of 1/3 of the contract total is due upon completion of rough-in inspection. The remainder of the contract is to be paid out upon completion of work. 2. For projects with an estimated completion time over forty-five (45) days, project billing will be monthly or as a project section or unit is completed and payment is required no more than net thirty (30) days. 3. Paid when paid will not be an acceptable contract option. Retention will not be more than 30 days / 90 days upon project substantial completion @ 7.5% This proposal is valid for a period of thirty (30) days. State of Connecticut sales tax is excluded in this proposal Fee for required permits has been excluded All work to be performed 7:00 AM to 3:30 PM Monday through Friday, excluding holidays and overtime. ON OOS arran All work is warranted for a period of one year from substantial completion. Schedule: D/E/F Services Group could be on site and prepared to start installation within (15) days after receipt of a purchase order or notice to proceed. If you have any questions regarding this proposal, please do not hesitate to call us. Piease sign and return this proposal (below) if this proposal is acceptable and you would like begin coordination to proceed. Regards, David Hatch Low Voltage Project Manager DHatch@DEFWiring.com Direct # (860) 213-0081 D/E/F SERVICES GROUP: CUSTOMER: By: _ By: Name: Name: Title: Title: Date: Date: Purchase order: To initiate order please 1. Fax back to 860.376-1213, or 2. Email copy to dhtach@defwiring.com Page 2 of 2 Quoted by Stephanie D. Seymour QUOTE # 2007-30 920 SHERMAN AVENUE HAMDEN, CT 06514 Rev 1 (203) 287-1306 FAX (203)248-9167 11/16/2020 ATTN: Dave Garside Municipal Facilities Manager Expires: Town of Waterford 12/16/2020 860-235-9783 dgarside@waterfordct.org Waterford S2 Access Control - Budge Estimate Town Hall QTY. DESCRIPTION PER UNIT | EXTENDED 4 $2-SL2 Expansion 16 Portal to 32 Portal for existing system. $1,677.00 $1,677.00 2 $2-NN-E2R-WM S2 Network Node wall mount with 1 ACM blade $2,015.00 $4,030.00 1 $2-ACM Access Control Blades - 2 doors per blade. $577.20 $577.20 1 - front double, 2 First Selectman's exterior door, 3 existing back parking lot HID reader door, 4 double door adjacent to reader needs door "schedule" not reader, 5 roof door and 6 Auditorium. 4 RP15 HID Access Reader Proximity Multiclass $198.65 $794.61 1 - Front double door, 2 = First Selectman's Exterior, 3 = roof access and 4 Auditorium. 2 HES 5000C ASSA Abloy Electric Strike - 1st Selectman's exterior $128.70 $257.40 and roof access. 1 M56AF Motor Assembly Sargeant 80 Series push bars needed for $623.86 $623.86 the Auditorium Door. 2 HES 9500-630 ASSA Abloy Surface Mount Door Hardware - Front $334.88 $669.76 double door - both sides. 6 |AMS-39B Potter Standard Surface Mount Contact $13.00 $78.00 100 4849231 General cable CAT6 Plenum $0.35 $35.00 600 4342T Control Cable $1.25 $748.80 3. |AX-600ULPD8 Power Supply $296.40 $889.20 5 JUA12V6A Altronix 12 VDC 7Ah battery for battery back up $27.30 $136.50 1 Misc Equipment $100.00 $100.00 1 Project Managerment $500.00 $500.00 1 Install S2 equipment, pull cable, add electric door locks and HID $5,280.00 $5,280.00 access readers. Cost of S2 Access System: $16,397.33 THANK YOU Note 1. Customer must supply Networking to S2 Controller 2. Customer must complete Network routing.