Conservation Commission Regular Meeting Materials (linked)
agenda center agenda
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | June 09, 2022 |
| Pages | 3 |
| File Size | 1.0 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
DRAFT DRAFT DRAFT Inland Wetlands & Watercourses Permit #C-22-05 Footbridge Crossing, 861 Vauxhall Street Extension Waterford Recreation & Parks Dept. The Waterford Conservation Commission, acting in its capacity of the Inland Wetlands & Watercourses regulatory agency, hereby authorizes the applicant to conduct regulated activities in designated areas at 861 Vauxhall Street Extension (Old Barry Farm), Waterford, CT which are subject to jurisdiction in accordance with CT General Statutes Section 22a-36 through 22a-45 inclusive, as amended, and the Town of Waterford Inland Wetlands and Watercourses regulations. This permit is a grant of approval to conduct the following activities: 1. Installation of a 45 ft. length x 5 ft. width wooden boardwalk supported by stone block footings within an existing trail crossing of a perennial stream and adjacent wetland. 2. Crossing a 16 ft. wide stream channel with 2 8 ft. x 5 ft. wide boardwalk sections supported by 6 stone blocks (1 ft. x 0.5 ft) placed at the edge of channel and within the stream channel on existing boulders. 3. Placement of 8 stone block supports (1 ft. x 0.5 ft.) within the existing wetland trail to support the boardwalk through the adjoining wetland. Total wetlands and stream channel impact from the support block placement is <10 sq. ft. These regulated activities are associated with the proposed installation of a 45 foot length footbridge in an existing trail crossing inland wetlands and a watercourse at Old Barry Farm, 861 Vauxhall Street Extension, Waterford, CT. The location of the activity is shown on the attached map. All work and all regulated activities conducted pursuant to this authorization shall be consistent with the terms and conditions of this permit. Any structures, excavation, fill, obstructions, encroachments or regulated activities not specifically identified and authorized herein shall constitute a violation of this permit and may result in permit modification, suspension or revocation. In the event that any additional wetland or watercourse regulated activities are required as a result of other agency permitting to support the proposed facility, the Waterford Conservation Commission reserves the right to reconsider development of this site and may require design modifications to minimize the impact to regulated resources. In evaluating this application, the Commission has relied on information provided by the applicant. If such information subsequently proves to be false, incomplete and/or inaccurate, this permit shall be modified, suspended or revoked. Inland Wetland Permit #C-22-05: 861 Vauxhall Street Extension Footbridge Crossing - page 2 of 2 This permit shall be valid for a period of 5 years and subject to renewal or extension in accordance with the Inland Wetlands and Watercourses regulations. If the regulated activity is not completed within this time frame, the permit may be held to be invalid by the Commission and the applicant may be required to petition the Commission for an extension or re-issuance of the permit. The Commission may require the applicant to furnish additional information at that time. The Conservation Commission renders this Summary Ruling in accordance with the Waterford Inland Wetlands and Watercourses Regulations based on the following considerations: A. The activity involves minimal impact to the wetland or watercourse, B. The activity will reduce erosion of an existing recreational trail and reduce disturbance to the steam channel. C. Direct and indirect wetland impacts are minimized by the installation of the footbridge. This permit will be strictly enforced. If the Conservation Commission finds that the applicant has not complied with the permit conditions or has exceeded the scope of this permit as set forth herein, or, if the intended use of the general site is not as represented by the application or the plan of record, the Commission may suspend or revoke this permit, direct the Environmental Officer to issue a cease and desist order, require the applicant to modify, extend or revise the site work, or require the applicant to restore the area to its original condition. Dated: June 9, 2022 Issued By: Chairman, Richard F. Muckle Waterford Conservation Commission See ae Eg. Footbridge Installed ;