Conservation Commission Agenda (linked)
agenda center agenda
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | October 10, 2024 |
| Pages | 8 |
| File Size | 1.7 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886 DRAFT PHONE: 860-442-0553 www.waterfordct.org CONSERVATION COMMISSION FISCAL YEAR July 1, 2023 — June 30, 2024 ANNUAL REPORT I. Commission Overview The Waterford Conservation Commission functions as the Town’s Inland Wetlands & Watercourses Agency, authorizing and enforcing activities affecting inland wetlands and watercourses in accordance with the Waterford Inland Wetlands and Watercourses regulations and the CT General Statutes 22a-36 through 22a-45. The Conservation Commission is also responsible for maintaining an inventory of open space lands and natural resource areas, and providing recommendations regarding the management and preservation of open space and natural resource areas. The Conservation Commission held 18 regular meetings and | special meeting during FY 23/24 and rendered decisions on 13 applications to conduct activities in or adjacent to inland wetland and watercourse. IL. Inland Wetland Agency Tasks The Commission approved 13 authorizations to conduct activities regulated under the Waterford Inland Wetlands & Watercourses Regulations. Residential Permits - 9 Approvals were issued for 2 new residential dwellings and activities including retaining wall construction, stream channel restoration, modification of wetland buffer limits for property maintenance and timber harvesting. Commercial Development - 4 Four commercial development approvals were issued for activities associated with construction of facilities adjacent to inland wetland resources and a modification of an existing permit regarding stormwater reporting requirements. New commercial development authorized included a hotel, a facility for tree service equipment storage and an athletics facility building. Inland wetland permits issued in FY 2023/24 authorized the permanent disturbance of 0.018 acres of wetland, and temporary disturbance of 0.002 acre of wetland. Mitigation for permanent impacts involved in a commercial development proposal required creation of 0.039 acres of wetland area on the site. Fees received from permit applications during FY 2023/2024 totaled $ 1,050.00. Violations - 7 The Commission issued 7 notices of violation for unauthorized activities or violations of existing permits during FY 2023/2024. All unauthorized activities were remediated and the violations were closed. Ii. Conservation Tasks A. Town-Wide Stream Water Quality Monitoring Stream water quality sampling was conducted by Town staff in November 2023 and June 2024. Samples were collected at 27 locations on watercourses including Jordan Brook, Nevins Brook, Fenger Brook, Hunts Brook, Stony Brook, Oil Mill Brook, Millstone (Beebe) Brook, Green Swamp Brook and a tributary stream to Goshen Cove. The water quality parameters analyzed by MicroBac Laboratories, Dayville, CT were total coliform, e. coli and enterococcus, nitrate, nitrite, organic nitrogen, ammonia and phosphorus. The laboratory analytical cost for sample analysis of the November 2023 and June 2024 monitoring totaled $ 6,817.25. The laboratory analytical costs were less than previous years because the samples are no longer analyzed by the laboratory for suspended solids, pH, chloride and chemical oxygen demand. A map of the monitoring locations and long-term data graphs are attached. Monitored nitrogen levels within Stony Brook, Jordan Brook, Oil Mill Brook and Hunts Brook indicate the waters continue to meet Class A water quality criteria and are not eutrophic. Relatively higher nitrogen levels in Stony Brook are still being detected at the Rte 1 culvert downstream of I-95 and Parkway South, correlated to wet weather events and believed to be attributable to stormwater run-off. Phosphorus levels remain low and within water quality criteria standards. Stony Brook and Oil Mill Brook are tributaries of the Niantic River. The Niantic River Watershed Protection Plan, (in which Waterford, East Lyme, Montville and Salem are participating municipalities), recommends reducing bacteria and nutrient loading from stormwater outfalls and run-off, and establishing a long-term water quality monitoring program for the watershed. The stream monitoring data help to identify changes to surface water quality entering the Niantic River. Jordan Brook, Nevins Brook, Stony Brook and Oil Mill Brook support native trout. Habitat requirements for these fisheries include cool, oxygenated waters with suitable substrate conditions to provide food and aquatic habitat. Alterations and loss of vegetative cover, soil erosion, flow alterations and stormwater discharges can adversely impact the biological conditions of these watercourses. With the monitoring program analytical results, the Commission has established a long-term database used to evaluate potential impacts of land use and development on stream health, to determine measures required to protect water quality, and to allow long-term tracking of water quality. The Commission continues to support regular monitoring and assessment of the Town’s water resources to measure potential pollutant loads and detect changes in surface water quality. The Commission’s goal is to improve or maintain existing water quality that flows into Long Island Sound and the shoreline resources of Niantic River and Bay, Thames River, and Jordan Cove. IV. PROFESSIONAL SERVICES The Commission did not require specialized technical assistance this fiscal year for review of permit applications or legal assistance. No expenditures were made from this line item. V. CONFERENCES / EDUCATION Commissioners and staff attended educational conferences regarding inland wetland regulation, stormwater management and pollution reduction techniques, and resource conservation hosted by the CT Association of Inland Wetland & Conservation Commissions, the Connecticut Association of Wetland Scientists and the New England Interstate Water Pollution Control Commission. The Commission satisfies the required training for inland wetlands agencies with members having completed the Inland Wetland Agency Comprehensive Training program provided by CT DEEP. Conference fees totaled $295.00. COMMISSION MEMBERS Richard Muckle - Chair Tali Maidelis — Secretary David Lersch Geneva Renegar Wade Thomas Matthew Keatley Keith Kriet Ivy Plis — Alternate Matthew Shea - Alternate Commission Staff: Maureen FitzGerald, Environmental Planner Kim Powell — Recording Secretary Respectfully Submitted: Waterford Conservation Commission Date Town of Waterford Stream Monitoring Sites (Bi =Sample Point Stony Brook NO3-N ( mg/l) =—@—SB-1A —@=— SB-1B —@—SB-1 —@=—SB-2 —@—SB-3 hy €Z AON €z unt 7Z AON zz unt TZ AON Tz unt 07 AON oz unt 61 AON 6T unt 8T AON tT unt LT AON ZT unt 9T AON 9T unt > STO ST unt vT-PO pr-une €T-PO €T-une z1-PO zr-unt TT-PO | Tp-unge » 01-?0 ot-unt 60-P0 60-unp 80-P0 g0-unf £0-P0 zo-unt 90-20 go-unr 0-0 so-unr 70-P0 vo-unt €0-PO €0-unr 70-~O zo-unr T0-PO To-unt 00-20 o0-unr 66-PO | 66-unr 1.2 ©: i} (1/3) N-EON 0.8 Sample Date Oil Mill Brook NO3-N (mg/l) =—@—0M-1 =—@=0M-2 =—®—OM-2t —®=0M-3 14 ~ © o i=) (1/3) N-EON 0.4 0.2 €7 AON €¢ une 77 AON e une TZ AON Td une 0@ AON o¢ unr 6T AON 6T unt 8T AON 8T une LT AON ZT une 9T AON OT unt sT Po ST ung bT-~o pt-unt €T-Po et-unf @t-Po er-une TT-PO Tr-une OT-PO ot-unr 60-90 60-unf 80-PO go-unr 40-0. Zo-unr 90-0 go-unr S0-9O so-unr p0-PO po-unr €0-PO €0-unr 70-0 co-unp T0-PO To-unf 00-20 oo-unr 66-90 66-unt Sample Date Jordan Brook NO3 (mg/l) =—@—JB-2 —@—JB-3 —G—JB-4 —@—JB-5 —G—JB-6 —@—JB-8 EZ-AON ev-unt ZZ-00N ze-unr TZ-AON Te-unr 07-AON oz-unr 6T-AON er-unr 8T-AON gt-unr LT-AON ct-unr QT-AON gt-unr sT-P0 st-unr PT-AON pr-unr ET-Y0 er-unr Z1-%0 zr-un TT-P0 Tr-unr ot-»0 or-unr 60-20 6o-unr 80-20 go-un 10-20 zo-unt 90-20 go-unr 50-20 so-unr 0-¥0 vo-unr £0-20 if” eo-unr =z — ae x 20-0 co-uny 12 0.8 0.2 (\/3W) N-EON Sample Date Hunts Brook NO3-N (mg/l) —=@—HB-1 =—@=—HB-2 =—@—HB-3 =—@=—HB-4 A, 0.8 & ro) (\/3W) N-EON €Z AON €¢ un 77 AON ec une TZ AON tT unr OZ AON oz unt 61 AON | et unr 8T AON > stunt LT AON ZT une QT AON 9T une st ~oO ST unf | vt-~o prune €T-PO er-unp ?@T-PO0 eT-unf TT-PO Tr-unf OT-PO ot-unr | 60-PO 60-uny 80-20 go-uny £0-P0 Lo-une 90-20 90-unf S0-PO so-unr p0-PO vo-unr €0-PO €o-une 70-PO | zo-unr T0-PO To-unf 00-90 oo-unr 66-DO 66-unf Sample Date