WATERFORD CIVIC TRIANGLE
UNIVERSAL ACCESS & POND IMPROVEMENTS
Drawing Legend
Landscape Drawings
JIM WAS HERE
TOWN OF WATERFORD
615 ROPE FERRY ROAD
WATERFORD, CT 06385
PREPARED FOR:
PREPARED BY:
L-1.0
L-2.0
Site Grading
WETLANDS PERMIT SUBMISSION
AUGUST 23, 2022
TOWN OF GROTON
NEW LONDON COUNTY
L-5.0
Project Notes
Erosion and Sediment Control Plan
L-8.0
Site Planting
SITE
w w w
w w w
w w w
w w w
w
w
w
w w w
w w w
w w w
w w w
w w
w
w w w
w
w
w
w
w w
w
w w
Site Improvements
L-4.0
kentfrost com
14
13
15
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
Eastern Connecticut Office
516 Vauxhall Street - Suite 103
New London, Connecticut 06320
(860) 237-4773
Web: www.stadiaeng.com
E-Mail: Info@stadiaeng.com
S TADIA
E NGINEERING
A SSOCIATES, INC.
Site Survey
Site Design / Project Lead
Geotechnical Engineering
122 Church Street
Naugatuck, CT 06770
203-231-1061
Structural Engineering
Civil Engineer
191 NORWICH AVENUE
LEBANON, CT 06249
(860) 367-7264
L-2.1
Erosion and Sediment Control Details
D-4.06A
Existing Conditions Survey
L-3.0
Site Demolition
Wetland Soil Scientist
New England Environmental Services
Richard Snarski
155 Jerry Daniels Road
Marlborough, CT 06447
860-918-1970
Pond Dredging Base Bid
L-5.2
Pond Dredging Add. Alternate
L-5.3
Pond Sections
L-5.4
Wetland Disturbance
L-5.5
Civil Drawings
C1
Sediment Forebay Improvement Plan
L-1.1
Project Notes
L-8.1
Site Details
D-4.06B
Existing Conditions Survey
w
w
w
w
w
w
w
w
w
w w w
w
w
w
w w w
w w
w
w w w
w w w
w w w
w w w
w w w
w w
w
w
w
w
w
w
w
w
w w
w w w
w
w
w
w w w
w
w w
w
w
w
w w w
w w w
w w w
w w
w
w w w
w w w
w w w
w w w
w
w w
w
w
w
w w w
w
w
w
w w w
w
w
w
w
w
w
w
w
w
w
w
w
RUBBER
PLAYGROUND
SURFACE
PARKING LOT
GRASS
GRASS
GRASS
GRASS
GRASS
STANDING
WATER
STANDING
WATER
DUCK POND
GRASS
WOODED
AREA
WOODED
AREA
WOODED
AREA
WOODED
AREA
WOODED
AREA
WOODED
AREA
WOODED
AREA
WOODED
AREA
BITUMINOUS
PARKING
LOT
BITUMINOUS
PARKING
LOT
GRASS
GRASS
GRASS
LEDGE
GRASS
GRASS
BRUSH
WOOD
CHIPS
GRASS
GRASS
BRUSH
1 of 2
© copyright 2021 Stadia Engineering Associates, Inc.
JIM WAS HER E
INITIALS
DATE
J I M WAS HER E
J IM WAS HER E
JIM W AS HERE
JIM W AS HERE
JIM WAS HERE
JIM WAS HERE T OO
JI M WAS HERE
14
13
15
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
516 Vauxhall Street - Suite 103
New London, Connecticut 06320
(860) 237-4773
Web: www.stadiaeng.com
E-Mail: Info@stadiaeng.com
STADIA
ENGINEERING
ASSOCIATES, INC.
To my knowledge and belief, this map is substantially correct as noted hereon
17 August 2022
James V. Rossman, P.L.S. #70181
Date
This survey is not valid unless it contains the live signature and embossed seal
contained hereon. Subsequent revisions to this plan other than by the original
surveyor effectually void this certification.
A.R. & D.E.
August 2021
2021-119
August 2021
1 INCH = 30 FEET
D-406
A
17 August 2022
2021-119
D-406
A
TOWN OF WATERFORD
KENT + FROST LANDSCAPE ARCHITECTS
EXISTING CONDITIONS SURVEY
D.E.
ROPE FERRY ROAD
TOWN OF WATERFORD
NEW LONDON COUNTY
SITE
LOCUS
w w w
w w
w
w
w
w
w
w
w
w w w
w
w
w
w
w
w
w
w w
CIVIC
TRIANLE
NEVINS
BROOK
JORDAN
CEMETERY
MATCHMARK: SHEET 02
JR
ACOE wetlands & Expanded topography Revisions to plan
17 Aug 2022
w w w
w
w
w
w
w
w
w
w
w w
w
w
w
w
w
w
w
w w
w
w
w
w
w
w
w
w
w
w
w
w
w
RUBBER
PLAYGROUND
SURFACE
GRASS
GRASS
WOODED
AREA
WOODED
AREA
GRASS
LEDGE
WOOD
CHIPS
GRASS
GRASS
GRASS
WOODED
AREA
GRASS
GRASS
GRASS
INITIALS
DATE
J I M WAS HER E
J IM WAS HER E
JIM W AS HERE
JIM W AS HERE
JIM WAS HERE
JIM WAS HERE T OO
JI M WAS HERE
14
13
15
ENGINEERS ∙ ENVIRONMENTAL PLANNERS ∙ SURVEYORS
516 Vauxhall Street - Suite 103
New London, Connecticut 06320
(860) 237-4773
Web: www.stadiaeng.com
E-Mail: Info@stadiaeng.com
STADIA
ENGINEERING
ASSOCIATES, INC.
A.R. & D.E.
August 2021
2021-119
August 2021
1 INCH = 30 FEET
30 September 2021
2021-119
D-406
B
TOWN OF WATERFORD
KENT + FROST LANDSCAPE ARCHITECTS
EXISTING CONDITIONS SURVEY
D.E.
BOSTON POST ROAD
MATCHMARK: SHEET 01
2 of 2
© copyright 2021 Stadia Engineering Associates, Inc.
JIM WAS HER E
MATCHMARK: SHEET 01
D-406
B
JR
ACOE wetlands & Expanded topography Revisions to plan
17 Aug 2022
w w w
WATERFORD
CIVIC TRIANGLE
K+F Project No.
Date
Scale
Drawing No.
August 23, 2022
2021014
WETLANDS
PERMITTING
Revisions
Date
184 Boston Post Road
Waterford, CT 06385
191 NORWICH AVENUE
LEBANON, CT 06249
(860) 367-7264
L-1.0
PROJECT NOTES
APPROVALS AND REFERENCE
1.
NO CONSTRUCTION ACTIVITIES SHALL TAKE PLACE UNTIL THE
HEREIN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN
REVIEWED AND CERTIFIED BY THE TOWN OF WATERFORD OR
ITS DESIGNATED AGENT.
2.
ADDITIONAL STATE AND FEDERAL PERMITS MAY BE REQUIRED
PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION
ACTIVITY. THE CONTRACTOR SHALL VERIFY WITH THE TOWN
THAT ALL PERMITS HAVE BEEN RECEIVED.
3.
THE FOLLOWING STANDARDS OF CARE ARE INCLUDED BY
REFERENCE:
·
INLAND WETLAND & WATERCOURSE REGULATIONS FOR
THE TOWN OF WATERFORD- AS AMENDED
·
2002 CONNECTICUT GUIDELINES FOR SOIL EROSION
AND SEDIMENT CONTROL AND IT'S ERRATA SHEET
·
2004 CONNECTICUT STORMWATER QUALITY MANUAL
·
GENERAL PERMIT FOR THE DISCHARGE OF
STORMWATER AND DEWATERING WASTEWATERS FROM
CONSTRUCTION ACTIVITIES AS ADMINISTERED BY THE
CONNECTICUT DEPARTMENT OF ENERGY &
ENVIRONMENTAL PROTECTION
9.
THE MOST RECENTLY ADOPTED VERSION(S) OF THE
FOLLOWING GOVERNING CODES SHALL APPLY:
·
STATE OF CONNECTICUT BUILDING CODE 2018
·
2015 INTERNATIONAL BUILDING CODE
·
ICC/ANSI A117.1 ACCESSIBLE AND USABLE
BUILDINGS AND FACILITIES
·
2015 INTERNATIONAL EXISTING BUILDING CODE
·
2015 INTERNATIONAL PLUMBING CODE
·
2015 INTERNATIONAL MECHANICAL CODE
·
2015 INTERNATIONAL ENERGY CONSERVATION CODE
·
2017 NFPA 70, NATIONAL ELECTRIC CODE, OF THE
NATIONAL FIRE PROTECTION ASSOCIATION, INC.
·
2015 INTERNATIONAL RESIDENTIAL CODE OF THE
INTERNATIONAL CODE COUNCIL, INC.
·
UNIFORM FEDERAL ACCESSIBILITY STANDARDS -
AMERICANS WITH DISABILITIES ACT STANDARDS FOR
ACCESSIBLE DESIGN
GENERAL NOTES:
1.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY
ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION. "CALL
BEFORE YOU DIG" IS TO BE NOTIFIED PRIOR TO ANY
CONSTRUCTION. (800-922-4455). MARKINGS SHALL BE
PROTECTED THROUGHOUT CONSTRUCTION. IF ANY MARKING
IS ELIMINATED DUE TO CONSTRUCTION ACTIVITIES IT IS THE
CONTRACTORS RESPONSIBILITY TO HAVE CT CALL BEFORE
YOU DIG RE-ESTABLISH THE UTILITY MARKING.
2.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
APPLICABLE CONSTRUCTION PERMITS, PRIOR TO
CONSTRUCTION, FROM THE TOWN OF WATERFORD ALONG
WITH ANY OTHER APPLICABLE AGENCIES. ALL AGENCIES ARE
TO BE NOTIFIED AT LEAST 48 HOURS PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION. A PRE-CONSTRUCTION
MEETING IS TO BE HELD WITH THE MUNICIPAL AGENT,
LANDSCAPE ARCHITECT, AND CIVIL ENGINEER PRIOR TO THE
COMMENCEMENT OF ANY DISTURBANCE OR CONSTRUCTION.
3.
ALL EROSION AND SEDIMENTATION CONTROL MEASURES
APPLICABLE TO A GIVEN AREA OF CONSTRUCTION SHALL BE
IN PLACE AND APPROVED BY EITHER THE LANDSCAPE
ARCHITECT OR CIVIL ENGINEER PRIOR TO THE
COMMENCEMENT OF WORK IN THAT AREA.
4.
ALL DISTURBED SOIL SHALL BE HYDRO-SEEDED.
5.
ALL UPLAND AREAS OF PROPOSED FILL SHALL BE FINISH
GRADED WITH 4" OF TOPSOIL AND SEEDED WITH AN
APPROPRIATE SEED MIXTURE BASED ON RECOMMENDATION
APPROPRIATE FOR USE AND SEASON AS DELINEATED BY THE
CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENTATION CONTROL NARRATIVE.
6.
NO STUMPS, VEGETATIVE MATER, CONSTRUCTION DEBRIS, OR
OTHER MAN-MADE OBJECTS ARE PERMITTED TO BE BURIED
ON SITE.
7.
ALL FILL SHALL BE PLACED IN SIX INCH (6") LIFTS AND
MECHANICALLY COMPACTED. FILL UNDER HARDSCAPE SHALL
BE COMPACTED TO 95% OF MAXIMUM DENSITY AS
DETERMINED BY ASSHTO T-180(D). QUALITY AND METHOD
OF PLACEMENT SHALL CONFORM TO D.O.T. FORM 818 OR THE
MOST CURRENT VERSION AS AMENDED . SPECIAL CARE
SHALL BE TAKEN FOR FILL AREAS WITH LARGE ROCK.
COMPACTION IN ROCK FILL SHALL MEET THE 95% MAXIMUM
DENSITY AND A RECORD OF THE RESULT SUBMITTED TO THE
LANDSCAPE ARCHITECT FOR APPROVAL.
8.
ALL CLEARING LIMITS SHALL BE PHYSICALLY MARKED IN THE
FIELD AND APPROVED BY LANDSCAPE ARCHITECT PRIOR TO
ANY CLEARING OR GRUBBING. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR REPLACEMENT PLANTINGS SUITABLE TO
MUNICIPAL AGENT AND OR LANDSCAPE ARCHITECT FOR ANY
SIGNIFICANT ENCROACHMENT BEYOND CLEARING LIMITS.
9.
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
DISTANCES AND LOCATIONS AND QUANTITIES AS DEPICTED
ON THE APPROVED CONSTRUCTION DOCUMENTS. IF THERE
ARE ANY DISCREPANCIES OR CHANGES IN FIELD CONDITIONS
NOT ADDRESSED BY THESE DOCUMENTS, THE LANDSCAPE
ARCHITECT AND CIVIL ENGINEER SHALL BE NOTIFIED PRIOR
TO ANY CONSTRUCTION MODIFICATIONS.
10. ALL DRAINAGE CULVERTS, PROPOSED OR REPLACEMENT,
SHALL BE INSTALLED IN AN APPROPRIATE MANNER WITH
POSITIVE SLOPE AND COVER, WITH INLET AND OUTLET ENDS
CLEAR OF DEBRIS AND FREE FLOWING AS PART OF THE
REQUIRED CONSTRUCTION. SPECIFICATIONS SET FORTH BY
THE CONN. DEPT. OF TRANSPORTATION STANDARDS AND
SPECIFICATIONS FOR ROADS, BRIDGES AND INCIDENTAL
CONSTRUCTION FORM 818 OR THE MOST CURRENT VERSION
AS AMENDED, AND THE TOWN OF WATERFORD DRAINAGE
STANDARDS SHALL BE APPLICABLE.
11. ALL EXCESS MATERIAL RESULTING FROM EXCAVATION AND
CONSTRUCTION BECOMES PROPERTY OF THE CONTRACTOR
AND SHALL BE PROPERLY DISPOSED OF OFF-SITE. NO
MATERIAL SHALL BE PLACED BEYOND THE LIMITS OF
CONSTRUCTION OR WITHIN WETLAND AREAS.
12. THESE GUIDELINES SHALL APPLY TO ALL WORK CONSISTING
OF ALL TEMPORARY AND/OR PERMANENT MEASURES TO
CONTROL WATER POLLUTION AND SOIL EROSION AS MAY BE
REQUIRED DURING THE CONSTRUCTION OF THE PROJECT. IN
GENERAL, ALL CONSTRUCTION ACTIVITIES SHALL PROCEED IN
A WORKMANLIKE MANNER WITH THE STATED INTENTION TO
MINIMIZE THE TIME TO COMPLETION AS WELL AS THE
PREVENTION OF THE POLLUTION OF ANY INLAND WETLANDS,
WATERCOURSES, WATER BODIES OR CONDUIT CARRYING
SURFACE WATER. THE CONTRACTOR SHALL LIMIT, INSOFAR
AS POSSIBLE, THE SURFACE AREA OF EARTH MATERIALS
EXPOSED BY CONSTRUCTION METHODS, AND TO
IMMEDIATELY PROVIDE PERMANENT AND/OR TEMPORARY
POLLUTION CONTROL MEASURES TO PREVENT
CONTAMINATION OF ADJACENT WETLANDS, WATERCOURSES
OR WATER BODIES, AND TO FULLY MANAGE POSSIBLE
EROSION CONDITIONS THROUGHOUT THE CONSTRUCTION
LIMITS. NO CONSTRUCTION ACTIVITY SHALL COMMENCE
UNTIL THE HEREIN STATED SOIL EROSION AND SEDIMENT
CONTROL PLAN HAS BEEN CERTIFIED AND THOSE CONTROL
MEASURES DEPICTED HEREIN HAVE BEEN FULLY INSTALLED
AND ARE FUNCTIONAL.
13. CONTRACTOR IS RESPONSIBLE FOR ENGAGING THE PROPER
UTILITY COMPANIES FOR RELOCATION AND/OR REMOVAL OF
EQUIPMENT, NOT LIMITED TO UTILITY POLES, GUY WIRES,
AND OVERHEAD WIRES.
14. NOTIFY LANDSCAPE ARCHITECT AT LEAST 48 HOURS PRIOR TO
ANY ACTIVITY REQUIRING FIELD OBSERVATION
15. STOCKPILING OF BUILDING MATERIALS SHALL BE CONFINED
WITHIN THE AREAS OF CONSTRUCTION DISTURBANCE.
MATERIAL STOCKPILES SHALL BE MAINTAINED IN A SAFE AND
WORKMANLIKE MANNER. TRASH CONTAINERS AND
COLLECTION POINTS SHALL BE MAINTAINED THROUGHOUT
THE CONSTRUCTION PERIOD. ALL REFUSE IS TO BE REMOVED
TO AN APPROPRIATE FACILITY.
16. VEHICULAR MOVEMENT SHALL BE LIMITED TO ESTABLISHED
CONSTRUCTION ACCESS POINTS. UNNECESSARY
ENCROACHMENT OF CONSTRUCTION EQUIPMENT OR OTHER
VEHICLES SHALL NOT BE ALLOWED IN NON-CONSTRUCTION
PORTIONS OF THE PROPERTY. VEHICULAR ACCESS TO AREAS
OUTSIDE THE AREAS OF DISTURBANCE SHALL BE RESTRICTED
TO THE MINIMUM NECESSARY TO PERFORM ESSENTIAL AND
REQUIRED CONSTRUCTION ACTIVITIES.
17. ALL WORK ALONG STATE ROUTE 156 SHALL BE PERFORMED IN
ACCORDANCE WITH THE CONNECTICUT DEPARTMENT OF
TRANSPORTATION SPECIFICATION FORM 818 OR THE MOST
CURRENT EDITION AND ANY SPECIAL PROVISIONS.
18. ALL MATERIALS USED ON THE PROJECT SHALL BE IN
CONFORMANCE TO THE CONNECTICUT DEPARTMENT OF
TRANSPORTATION SPECIFICATION FORM 818 OR THE MOST
CURRENT EDITION OR AS SPECIFIED.
PEDESTRIAN CONTROL
1.
TEMPORARY CONSTRUCTION FENCING SHALL BE USED TO
PREVENT PEDESTRIAN ACCESS TO THE CONSTRUCTION SITE
UNTIL SUBSTANTIAL COMPLETION HAS BEEN REACHED FOR
THE PHASE OF THE PROJECT.
2.
THE PUBLIC SIDEWALK ALONG THE PARK FRONTAGE SHALL
REMAIN OPEN DURING CONSTRUCTION TO THE GREATEST
EXTENT POSSIBLE UNTIL THERE IS A THREAT TO PUBLIC
HEALTH, SAFETY OR WELFARE.
3.
WHEN IT IS UNSAFE FOR THE PUBLIC TO USE THIS WALKWAY
OR WHEN STREETSCAPE WORK IS BEING PERFORMED,
TEMPORARY PEDESTRIAN DETOUR SIGNAGE AND BARRIERS
SHALL BE PROVIDED BY THE CONTRACTOR. WESTBOUND
PEDESTRIANS SHALL BE DIRECTED TO CROSS AT THE TOWN
HALL CONTROLLED INTERSECTION, AND CONTINUE WEST ON
THE SOUTH SIDE OF ROUTE 156; EASTBOUND PEDESTRIANS
SHALL DIRECTED TO CROSS AT THE LIBRARY, AND CONTINUE
EAST ON THE SOUTH SIDE OF ROUTE 156.
CONSTRUCTION WITHIN TREE PROTECTION
AREAS:
1.
TREE PROTECTION AREA: THE LAND AREA DIRECTLY UNDER
THE TREE CANOPY AS MEASURED FROM THE TRUNK TO THE
OUTER MOST LEAVES OF THE CANOPY OR DRIP LINE. SOIL
COMPACTION AND, PHYSICAL OR CHEMICAL DAMAGE TO ROOTS
WITHIN THIS AREA CAN BE DETRIMENTAL TO THE HEALTH OF
THE TREE.
2.
A NUMBER OF EXISTING TREES SHALL BE PRESERVED AND
PROTECTED AS PART OF THIS PROJECT. MANY OF THESE
TREES WILL BE IMPACTED WITH THE INSTALLATION OF NEW
WALKWAYS, FOUNDATIONS AND UTILITIES. ALL CONSTRUCTION
ACTIVITIES WITHIN THESE AREAS SHALL BE DONE UNDER THE
DIRECT SUPERVISION OF THE LANDSCAPE ARCHITECT.
3.
EXISTING ROOTS PROXIMATE TO PROPOSED AND EXISTING
PAVING SHALL BE EXPOSED USING AN AIRSPADE OR BY HAND.
IN AREAS WHERE ROOTS MUST BE REMOVED FOR
CONSTRUCTION OF WALKS, FOUNDATIONS, WALLS, ETC, ROOTS
SHALL BE SEVERED PRIOR TO EXCAVATION TO ELIMINATE
UNNECESSARY TEARING OF ROOTS BY HEAVY EQUIPMENT.
4.
TREE ROOTS SHALL NOT BE PRUNED OR CUT UNLESS THEIR
REMOVAL IS UNAVOIDABLE OR ABSOLUTELY NECESSARY. THE
LANDSCAPE ARCHITECT SHALL BE NOTIFIED PRIOR TO ANY
OPERATION KNOWN OR SUSPECTED TO INVOLVE CUTTING OF
MORE THAN:
a. TWO ROOTS, THREE (3) INCHES OR MORE IN DIAMETER;
AND/OR
b. FOUR ROOTS BETWEEN TWO (2) AND THREE (3) INCHES IN
DIAMETER. THE ARBORIST SHALL BE NOTIFIED
IMMEDIATELY IN THE EVENT THAT ROOTS IN EXCESS OF
THAT DESCRIBED ABOVE ARE CUT, TORN, RIPPED, OR
OTHERWISE INJURED.
4.
WHEN EXCAVATING FOR CONSTRUCTION OF INLETS, WALLS,
FOUNDATIONS,ETC. EXCAVATED SOIL SHALL BE DEPOSITED IN
TRUCKS AND HAULED OFF OR DEPOSITED TEMPORARILY ON
3/4-INCH THICK PLYWOOD. EXCAVATED AND FILL SOIL SHALL
NOT BE DEPOSITED, EVEN TEMPORARILY, ON UNPROTECTED
NATURAL GRADE. EXCAVATED FILL SOIL SHALL BE RETURNED
AS BACKFILL WHERE POSSIBLE.
5.
ALL TRENCHING OR OTHER WORK UNDER THE DRIPLINE OF
ANY TREE SHALL BE DONE BY HAND OR BY OTHER METHODS,
WHICH WILL PREVENT BREAKAGE OR OTHER INJURY TO
BRANCHES AND ROOTS.
6.
LIMIT GRADING TO A MAXIMUM OF TWO (2) INCHES OF FILL
OVER NATURAL GRADE WITHIN CRITICAL ROOT ZONES. FILL
SHOULD CONSIST OF SANDY LOAM TOPSOIL. CLAY SOILS
SHALL NOT BE USED AS FILL. WHEN USING FILL SOIL, THE
EXISTING SURFACE TO RECEIVE FILL SHOULD BE SCARIFIED
PRIOR TO FILLING. ANY FILLING OPERATION SHOULD NOT
OCCUR DURING WATER SATURATED SOIL CONDITIONS.
WATERCOURSE AND WETLAND IMPACT
AVOIDANCE AND MINIMIZATION
MEASURES:
1.
THE FOLLOWING MEASURES WILL BE TAKEN TO AVOID OR
MINIMIZE IMPACTS TO WATERCOURSES AND WATERBODIES
DURING PROJECT ACTIVITIES. ALL WORK IN OR NEAR
WATERCOURSES AND WATERBODIES WILL BE IN
ACCORDANCE WITH PROJECT MAPPING AND THE 2002
CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL.
2.
INSTALL AND MAINTAIN TEMPORARY EROSION AND
SEDIMENTATION CONTROLS ALONG THE ROW WHERE
CONSTRUCTION ACTIVITIES DISTURB SOILS NEAR
WATERCOURSES. THESE CONTROLS WILL BE INSTALLED AND
MAINTAINED TO MINIMIZE THE POTENTIAL FOR
SEDIMENTATION INTO WATER RESOURCES. SEDIMENT THAT
ACCUMULATES BEHIND THESE CONTROLS WILL PERIODICALLY
BE REMOVED AND PLACED IN UPLAND AREAS, IN A MANNER
THAT WILL PRECLUDE THE POTENTIAL FOR SUBSEQUENT
DEPOSITION INTO WATERCOURSES, INLAND WETLAND AREAS,
OR WILL OTHERWISE BE DISPOSED OF OFF-SITE.
3.
CONSTRUCTION EQUIPMENT SHALL BE PROHIBITED FROM
FORDING STREAMS.
4.
EXCEPT FOR EQUIPMENT THAT IS NOT READILY MOBILE OR
MUST REMAIN ON-SITE FOR PROLONGED PERIODS TO SAFELY
COMPLETE A CONSTRUCTION TASK, CONSTRUCTION VEHICLES
AND EQUIPMENT WILL NOT BE REFUELED WITHIN 100 FEET OF
A WATERCOURSE OR OPEN WATERS. FOR REFUELING THAT
MUST BE PERFORMED LESS THAN 25 FEET FROM A
WATERCOURSE, APPROPRIATE SPILL PREVENTION MEASURES
AS DETAILED IN THE CONTRACTOR'S SPILL PREVENTION AND
CONTROL PLAN WILL BE APPLIED.
WETLAND RESTORATION PLAN:
1.
AS NECESSARY, WETLAND AREAS AFFECTED BY
CONSTRUCTION MAY BE STABILIZED TEMPORARILY WITH
ANNUAL RYEGRASS, OR AS DIRECTED BY THE LANDSCAPE
ARCHITECT. FOR LONG-TERM STABILIZATION IN AREAS
WHERE THE TOPSOIL LAYER (CONTAINING WETLAND SEEDS)
WAS DISTURBED BY CONSTRUCTION, ANNUAL RYE GRASS, A
WETLAND SEED MIX, OR AN EQUIVALENT MIX WILL BE
APPLIED AT THE LABEL-RECOMMENDED SEEDING RATE. IF
FINE GRADING IS NECESSARY, IT SHOULD BE PERFORMED
DURING THE GROWING SEASON AND IN A MANNER THAT
RETAINS THE EXISTING WETLAND TOPSOIL AND ROOT MASS
TO THE EXTENT PRACTICABLE. ONCE COMPLETE, DISTURBED
AREAS AFFECTED BY GRADING SHALL BE SEEDED
IMMEDIATELY.
2.
TEMPORARY EROSION AND SEDIMENT CONTROLS WILL BE
LEFT IN PLACE AND MAINTAINED UNTIL FINAL STABILIZATION
IS ACHIEVED. RESTORATION TYPICALLY WILL BE DEEMED
SUCCESSFUL BASED ON THE ESTABLISHMENT OF PERMANENT
VEGETATIVE COVER. BASED ON THE RESULTS OF
POST-CONSTRUCTION INSPECTIONS OF AREAS OF
STABILIZATION, THE LANDSCAPE ARCHITECT WILL DETERMINE
THE APPROPRIATE TIMEFRAME FOR THE REMOVAL OF ALL
TEMPORARY EROSION CONTROLS.
ENVIRONMENTAL BMP & PROTECTION:
1.
NO CONSTRUCTION SHALL PROCEED UNTIL PROPER
SEDIMENTATION AND EROSION CONTROL METHODS HAVE
BEEN INSTALLED AS THE SEQUENCE OF CONSTRUCTION
NECESSITATES.
2.
NO EQUIPMENT, MATERIALS OR MACHINERY SHALL BE
STORED, CLEANED OR REPAIRED WITHIN SEVENTY-FIVE (75)
FEET OF ANY WETLAND OR WATERCOURSE.
3.
NO OBJECTIONABLE MATERIALS RESULTING FROM ANY
CLEARING ACTIVITY SHALL BE DISPOSED OF IN ANY WETLAND
OR WATERCOURSE. THIS INCLUDES, BUT IS NOT LIMITED TO,
STUMPS, TREE ROOTS, MATTED ROOTS, WOOD CHIPS AND
OTHER DEBRIS.
4.
FORDING STREAMS WITH EQUIPMENT SHALL BE PROHIBITED
UNLESS SPECIFIED ELSEWHERE. APPROVAL FROM THE TOWN
OF WATERFORD CONSERVATION COMMISSION WILL BE
REQUIRED FOR ANY HAUL ROAD OR TEMPORARY STRUCTURE
PLACED IN WETLANDS OR WATERCOURSES.
5.
NO SOIL FILL OR OTHER MATERIALS SHALL BE DEPOSITED IN
SURROUNDING WETLANDS OR WATERCOURSES EXCEPT AS
OTHERWISE APPROVED BY THE TOWN OF WATERFORD
CONSERVATION COMMISSION AND DEPICTED HEREON.
6.
WHERE DEWATERING IS NECESSARY, THE PUMP SHALL NOT
DISCHARGE DIRECTLY INTO ANY WETLAND OR WATERCOURSE.
PROPER METHODS AND DEVICES SHALL BE UTILIZED, SUCH
AS PUMPING THE WATER INTO A TEMPORARY SEDIMENTATION
POOL, PROVIDING SURGE PROTECTION AT THE INLET AND THE
OUTLET OF PUMPS, FLOATING THE INTAKE OF THE PUMP, OR
OTHER METHODS TO MINIMIZE AND RETAIN THE SUSPENDED
SOLIDS. IF THE PUMPING OPERATION IS CAUSING TURBIDITY
PROBLEMS, SAID OPERATION SHALL CEASE UNTIL FEASIBLE
MEANS OF CONTROLLING TURBIDITY ARE DETERMINED AND
IMPLEMENTED.
7.
ALL TEMPORARY FILL, STORAGE OR STOCKPILE AREAS SHALL
BE PROPERLY STABILIZED TO PREVENT EROSION AND
SUITABLY CONTAINED TO PREVENT TURBID RUNOFF FROM
REENTERING A WETLAND OR WATERCOURSE. ALL AREAS
AFFECTED BY TEMPORARY FILLS MUST BE RESTORED TO
THEIR ORIGINAL CONTOURS, AND RE- VEGETATED WITH
SUITABLE VEGETATION. THE USE OF TEMPORARY FILL
AND/OR EXCAVATION SHALL BE MINIMIZED TO ONLY THAT
AREA REQUIRED TO PERFORM THE WORK.
8.
DUMPING OF OIL OR OTHER DELETERIOUS MATERIALS ON THE
GROUND IS FORBIDDEN. THE CONTRACTOR SHALL PROVIDE
A MEANS OF CATCHING, RETAINING AND PROPERLY
DISPOSING OF DRAINED OIL, REMOVED OIL FILTERS, OR
OTHER DELETERIOUS MATERIAL FROM EQUIPMENT USED ON
SITE. VEHICLE MAINTENANCE EXCEPT DAILY AND PERIODIC
PROCEDURES SHALL BE COMPLETED OFF SITE. ALL OIL
SPILLS SHALL BE IMMEDIATELY REPORTED TO THE
DEPARTMENT OF ENVIRONMENTAL PROTECTION/HAZARDOUS
MATERIALS OFFICE. FAILURE TO DO SO MAY RESULT IN THE
IMPOSITION OF FINES UNDER THE APPLICABLE CONNECTICUT
GENERAL STATUTES.
9.
EVERY PRECAUTION SHALL BE USED WHILE WORKING NEAR A
WATERWAY TO PREVENT AND MINIMIZE THE DEGRADATION
OF THE EXISTING WATER QUALITY. ALL ACTIVITIES SHALL BE
IN CONFORMANCE TO AND CONSISTENT WITH ALL
APPLICABLE WATER QUALITY STANDARDS AND MANAGEMENT
PRACTICES AS SET FORTH BY LOCAL, STATE AND FEDERAL
AGENCIES.
10. DURING THE PERIOD OF CONSTRUCTION, THE CONTRACTOR
IS RESPONSIBLE FOR ALL EROSION AND SEDIMENT CONTROL
MEASURES. SAID MEASURES SHALL BE INSPECTED WEEKLY
AND AFTER EACH RAINSTORM AND DURING A MAJOR STORM
EVENT. ACCUMULATED DEPOSITS OF SEDIMENT AND SILT
SHALL BE PERIODICALLY REMOVED FROM THE UPSTREAM SIDE
OF THE EROSION AND SEDIMENT CONTROL BARRIERS, AND
UPON ESTABLISHMENT OF PERMANENT SEEDING AND
MULCHING. SUCH MATERIALS REMOVED SHALL BE SPREAD
AND STABILIZED IN NON-WETLAND AREAS WHICH ARE NOT
SUBJECT TO EROSION, OR WHICH ARE NOT TO BE PAVED OR
BUILT UPON.
11. HAY BALES, SILT FENCING AND OTHER EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE REPAIRED,
CLEANED AND/OR REPLACED AS NECESSARY THROUGHOUT
THE CONSTRUCTION PERIOD IN ORDER TO MAINTAIN
COMPLETE AND INTEGRAL EROSION AND SEDIMENT CONTROL
PROTECTION. ONCE IN PLACE ALL EROSION AND SEDIMENT
CONTROL FACILITIES AND MEASURES ARE TO REMAIN IN
PLACE AND IN PROPER CONDITION AND BE CONTINUOUSLY
MAINTAINED UNTIL FINAL GRADING HAS BEEN COMPLETED,
ALL DISTURBED AREAS UPGRADIENT OF SAID FACILITIES
HAVE BEEN PERMANENTLY STABILIZED AND ALL NEWLY
GRASSED AREAS HAVE HAD AT LEAST TWO MOWINGS.
FOLLOWING SUCH PERMANENT STABILIZATION, THE
FACILITIES SHALL BE DISMANTLED, REMOVED, AND DISPOSED
OF IN AN APPROVED MANNER. ADDITIONAL EROSION AND
SEDIMENT CONTROL MEASURES BEYOND THOSE SHOWN ON
THE PLANS OR PRESCRIBED HEREIN SHALL BE PUT IN PLACE,
WHENEVER NECESSARY, TO ADDRESS FIELD CONDITIONS
AND/OR AS ORDERED BY THE TOWN.
12. DISTURBANCE OF THE LAND SHALL BE LIMITED TO THE
MINIMUM EXTENT NECESSARY TO COMPLETE THE PROPOSED
DEVELOPMENT. ALL EXISTING TREES AND SHRUBS SHALL BE
CONSERVED WHERE POSSIBLE, EXCEPT THOSE WHOSE
REMOVAL IS REQUIRED TO PERFORM THE PROPOSED WORK.
THE LIMITS OF DISTURBANCE SHALL BE ESTABLISHED IN THE
FIELD PRIOR TO STARTING ANY ACTUAL CONSTRUCTION
ACTIVITIES AND SHALL BE GENERALLY AS DEPICTED BY THE
GRADING/SITE DEVELOPMENT DRAWINGS.
EROSION AND SEDIMENT CONTROL
1.
THE CONTRACTOR SHALL BE RESPONSIBLE TO INSPECT THE
SITE IN ACCORDANCE WITH THE PROCEDURES AS OUTLINED
IN THE "GENERAL PERMIT FOR THE DISCHARGE OF
STORMWATER AND DEWATERING WASTE WATERS FROM
CONSTRUCTION ACTIVITIES" AS ADOPTED BY THE
DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION
EFFECTIVE ON OCTOBER 1, 2013.
2.
THE CONTRACTOR SHALL INSPECT ALL DISTURBED AREAS OF
CONSTRUCTION ACTIVITY THAT HAVE NOT BEEN FINALLY
STABILIZED, STRUCTURAL CONTROL MEASURES, AND
LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24
HOURS OF THE END OF A STORM THAT IS 0.5 INCHES OR
GREATER. WHERE SITES HAVE BEEN TEMPORARILY OR
FINALLY STABILIZED, SUCH INSPECTION SHALL BE
CONDUCTED AT LEAST ONCE EVERY MONTH FOR THREE
CONSECUTIVE MONTHS.
3.
DISTURBED AREAS AND AREAS USED FOR STORAGE OF
MATERIALS THAT ARE EXPOSED TO PRECIPITATION SHALL BE
INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR
POLLUTANTS ENTERING THE DRAINAGE SYSTEM. EROSION
AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN
SHALL BE INSPECTED TO ENSURE THAT THEY ARE OPERATING
CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE
ASSESSABLE, THEY SHALL BE INSPECTED TO ASCERTAIN
WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN
PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATERS.
LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE SHALL
BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT
TRACKING.
4.
A REPORT SHALL BE MADE SUMMARIZING THE SCOPE OF THE
INSPECTION INCLUDING THE FOLLOWING: NAME AND
QUALIFICATIONS OF PERSONNEL MAKING THE INSPECTION,
THE DATE OF THE INSPECTION, MAJOR OBSERVATIONS
RELATING TO THE IMPLEMENTATION OF THE STORMWATER
CONTROL PLAN, AND ACTIONS TAKEN. THE REPORT SHALL BE
RETAINED AS PART OF THE STORMWATER CONTROL PLAN FOR
AT LEAST THREE YEARS AFTER THE DATE OF INSPECTION AND
SHALL BE SUBMITTED TO THE TOWN.
5.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
BEYOND THOSE DEPICTED HEREIN SHALL BE PUT IN PLACE
WHENEVER NECESSARY TO ADDRESS FIELD CONDITIONS
AND/OR AS ORDERED BY THE TOWN, OR THEIR AGENT.
6.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR
IMPLEMENTING THIS EROSION AND SEDIMENT CONTROL PLAN
AND ENFORCING THE PRESCRIBED SAFEGUARDS DURING THE
CONSTRUCTION PERIOD. THIS RESPONSIBILITY INCLUDES
THE INSTALLATION AND MAINTENANCE OF CONTROL
MEASURES THROUGHOUT THE CONSTRUCTION PERIOD,
INFORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION
SITE OF THE REQUIREMENTS AND OBJECTIVES OF THE PLAN,
NOTIFYING THE PROPER MUNICIPAL AGENCIES AND OFFICIALS
OF ANY TRANSFER OF THIS RESPONSIBILITY.
7.
EROSION CONTROL MATTING IS REQUIRED ON ALL SEEDED
SLOPES GREATER THAN 1:6. SEE SPECIFICATIONS.
8.
ALL EXISTING CATCH BASINS TO REMAIN MUST HAVE FILTER
BAGS INSTALLED PRIOR TO MOBILIZATION.
9.
HAY BALES OR SILT WADDLES MUST BE USED IN ALL AREAS
WHERE SILT FENCE IS NOT FEASIBLE OR CANNOT BE
INSTALLED DUE TO SUBSURFACE OBSTRUCTIONS.
10. ALL SOIL STOCKPILES MUST HAVE E&S CONTROLS INSTALLED
ENTIRELY AROUND THE STOCKPILE TO PREVENT SEDIMENT
FROM ESCAPING DURING RAIN EVENTS AND COVERED TO
PREVENT EROSION BY WIND.
11. DURING PERIODS OF DROUGHT, EXPOSED SOILS NOT
STABILIZED SHALL BE IRRIGATED TO PREVENT EROSION BY
WIND.
12. THE CONTRACTOR MAY INCUR FINES IF E&S CONTROLS ARE
INSPECTED BY THE TOWN OR STATE AND FOUND TO BE
MISSING, DAMAGED, OR NOT CONTAINING SEDIMENT
ON-SITE.
DEMOLITION
1.
CONTRACTOR SHALL USE CAREFUL CONSTRUCTION
PRACTICES TO MINIMIZE DISTURBANCE OF ALL ITEMS TO
REMAIN.
2.
SITE CLEANUP AND DISPOSAL OF ALL DEBRIS AND
UNSUITABLES GENERATED BY DEMOLITION ACTIVITIES ARE
THE RESPONSIBILITY OF THE CONTRACTOR. ALL DEMOLITION
DEBRIS SHALL BE DISPOSED OF OFF-SITE PER LOCAL AND
STATE REGULATIONS.
3.
CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE
TO SURROUNDING PROPERTY AS A RESULT OF CONSTRUCTION
ACTIVITIES.
LAYOUT
1.
CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
LAYOUT DIMENSIONS IN THE FIELD. REPORT ANY
DISCREPANCIES OF THE DESIGN TO THE LANDSCAPE
ARCHITECT PRIOR TO COMMENCING CONSTRUCTION.
2.
STAKE OR OTHERWISE FLAG ALL DESIGN ELEMENTS AND
FEATURES IN THE FIELD. OBTAIN LANDSCAPE ARCHITECTS
APPROVAL PRIOR TO COMMENCING CONSTRUCTION.
3.
ALL DIMENSIONS ARE FROM THE FACE OF WALL OR CURB
UNLESS OTHERWISE NOTED. DIMENSIONS RELATING TO
BUILDING ARE FROM FACE OF THE BUILDING FOUNDATION
4.
ALL ANGLES ARE ASSUMED TO BE 90 DEGREES UNLESS
OTHERWISE STATED.
5.
ANY CHANGES TO PROPOSED DIMENSIONS SHOWN ON THIS
DRAWING SHALL BE APPROVED BY THE LANDSCAPE
ARCHITECT PRIOR TO COMMENCING CONSTRUCTION.
6.
JUNCTIONS BETWEEN EXISTING AND PROPOSED WALKS AND
WITH BUILDING THRESHOLDS MUST HAVE FLUSH
TRANSITIONS AND MUST BE DOWELED (IF APPLICABLE) TO
PREVENT SETTLING.
GRADING NOTES:
1.
PRIOR TO ANY RE-GRADING ACTIVITY, THE INSTALLATION OF
AN ANTI-TRACKING PAD SHALL BE COMPLETED AT THE
CONSTRUCTION ENTRANCE TO THE WORK AREA IN ORDER TO
REDUCE MUD AND OTHER SEDIMENTS FROM LEAVING THE
CONSTRUCTION SITE
2.
ALL MATERIALS USED SHALL BE APPROVED BY THE
LANDSCAPE ARCHITECT.
3.
ANY UNSUITABLE MATERIALS EXPOSED WITHIN
CONSTRUCTION AREAS ARE TO BE IDENTIFIED TO THE
LANDSCAPE ARCHITECT PRIOR TO THE REMOVAL AND
REPLACEMENT WITH SUITABLE MATERIAL AS DIRECTED BY
THE LANDSCAPE ARCHITECT.
4.
THE CUT FACE OF EARTH EXCAVATIONS SHALL NOT EXCEED
FINAL SLOPES GREATER THAN TWO HORIZONTAL TO ONE
VERTICAL (2:1).
5.
THE PERMANENT EXPOSED FACES OF AREAS OF FILL SHALL
NOT EXCEED FINAL SLOPES GREATER THAN TWO HORIZONTAL
TO ONE VERTICAL (2:1).
6.
THE CUT FACE OF ROCK EXCAVATION SHALL NOT EXCEED
FINAL SLOPES GREATER THAN ONE HORIZONTAL TO ONE
VERTICAL (1:1).
7.
NO FILL SHALL BE PLACED IN AREAS WHERE CONDITIONS
ALLOW THE MATERIAL TO SLIDE OR WASH UPON THE
PREMISES OF ANOTHER OWNER, OR INTO AREAS OF
ADJACENT WETLANDS, WATERCOURSES OR WATER BODIES.
8.
AS CONDITIONS REQUIRE, LATERAL WATER DIVERSIONS
SHALL BE INSTALLED ACROSS THE GRADED ROADWAY TO
PREVENT DOWN SLOPE OUTWASH AND EROSION. (WATER
BARS)
9.
PROVISIONS SHALL BE MADE TO CONVEY SURFACE WATER
SAFELY TO PERMANENTLY ESTABLISHED AREAS OF
VEGETATIVE COVER IN ORDER TO PREVENT SURFACE RUNOFF
FROM DAMAGING CUT FACES AND FILL SLOPES.
10. CONTRACTOR SHALL VERIFY ALL EXISTING GRADES IN THE
FIELD AND REPORT ANY DISCREPANCIES IMMEDIATELY TO
THE LANDSCAPE ARCHITECT PRIOR TO COMMENCING WORK.
THE STARTING OF WORK INDICATES THE CONTRACTOR HAS
REVIEWED AND ACCEPTED EXISTING CONDITIONS.
11. CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF
ANY CONFLICTS BETWEEN UTILITY PLANS, LANDSCAPE PLANS
AND GRADING PLANS.
12. CONTRACTOR SHALL BLEND NEW TOPSOIL FINISH GRADES
SMOOTHLY INTO EXISTING GRADES, PROVIDING VERTICAL
CURVES OR ROUNDED TRANSITIONS AT THE TOP AND BOTTOM
OF SLOPES.
13. PITCH EVENLY BETWEEN SPOT GRADES.
14. ALL PAVED AREAS MUST PITCH TO DRAIN AT A MINIMUM
SLOPE OF ONE-EIGHTH INCH (1/8") PER FOOT (1%). ANY SITE
CONDITIONS OR CONFLICTS PREVENTING THIS OCCURRENCE
SHALL BE REPORTED TO THE LANDSCAPE ARCHITECT PRIOR
TO CONTINUING THE WORK. NEW PAVEMENT AREAS MUST
HAVE POSITIVE DRAINAGE TOWARDS THE STREET CURB OR
TOWARDS DRAINAGE STRUCTURES. CROSS SLOPES OF
WALKWAYS SHALL NOT EXCEED ONE-QUARTER INCH (1/4")
PER FOOT (2%), CURB RAMP RUNNING SLOPE SHALL NOT
EXCEED ONE INCH (1") PER FOOT (8.33%) IN A MAXIMUM SIX
FEET (6'-0"), MAXIMUM SLOPES FOR WALKWAYS WITHOUT
HANDRAILS SHALL NOT EXCEED NINTEEN-THIRTY SECONDS
(19/32") PER FOOT (4.95%) . MAXIMUM SLOPES FOR RAMPS
WITH HANDRAILS SHALL NOT EXCEED ONE INCH (1") PER
FOOT (8.33%) FOR A MAXIMUM THIRTY FEET (30'-0") RUN.
LEVEL LANDINGS (AS DEFINED BELOW) ARE REQUIRED AT THE
TOP AND BOTTOM OF RAMPS (GRADES OVER 5%).
15. FINAL GRADES ADJACENT TO BUILDINGS SHALL HAVE 1/4" /
FT MIN. SLOPE AWAY FROM BUILDING. THE EXTERIOR SIDE OF
DOORWAYS SHALL HAVE A LEVEL LANDING NOT EXCEEDING
2% IN ANY DIRECTION FOR A MINIMUM RUNNING DIMENSION
OF FIVE FEET (5'-0") FROM THE THRESHOLD AND EQUAL TO
THE WIDTH OF THE WALKWAY SERVING THE DOOR, WITH A
MINIMUM WIDTH OF 36".
16. WALKING SURFACES SHALL NOT HOLD WATER, ANY WALKING
SURFACE WHICH PUDDLES WILL BE REJECTED.
17. FINAL GRADING OF ALL EARTHWORK SHALL BE AS DIRECTED
AND APPROVED IN THE FIELD BY THE LANDSCAPE ARCHTIECT.
18. CONTRACTOR SHALL PROVIDE DUST CONTROL FOR
EARTHWORK OPERATIONS AS NOTED IN THE EROSION AND
SEDIMENT CONTROL NOTES ON THIS SHEET.
19. RIM ELEVATIONS OF ALL DRAINAGE STRUCTURES AND OTHER
UTILITY STRUCTURES SHALL BE SET FLUSH WITH FINAL
SURROUNDING GRADES SO AS NOT TO CAUSE A TRIP
HAZARD.
20. THE CONTRACTOR SHALL MAINTAIN OR ADJUST TO NEW
FINISHED GRADES AS NECESSARY ALL UTILITY AND SITE
STRUCTURES SUCH AS LIGHT POLES, SIGN POLES, MANHOLES,
DRAINAGE STRUCTURES, HAND HOLES, WATER AND GAS
GATES, HYDRANTS, ETC., FROM MAINTAINED UTILITY AND
SITE SYSTEMS UNLESS OTHERWISE NOTED ON THE UTILITY
DRAWINGS OR AS DIRECTED BY THE LANDSCAPE ARCHITECT.
21. CONTRACTOR SHALL HYDROSEED ALL AREAS DISTURBED BY
THIS CONTRACT FOR WHICH NO OTHER SURFACE
RESTORATION IS INDICATED BY THE CONTRACT DOCUMENTS.
22. CURBING SHALL HAVE A 6" REVEAL UNLESS NOTED
OTHERWISE.
WATERFORD
CIVIC TRIANGLE
K+F Project No.
Date
Scale
Drawing No.
August 23, 2022
2021014
WETLANDS
PERMITTING
Revisions
Date
184 Boston Post Road
Waterford, CT 06385
191 NORWICH AVENUE
LEBANON, CT 06249
(860) 367-7264
Legend:
LIMIT OF WORK LINE
EXISTING CONTOUR MAJOR
EXISTING CONTOUR MINOR
PROPOSED CONTOUR
SPOT ELEVATION EXISTING
SPOT ELEVATION PROPOSED
EXISTING STONE WALL
PROPOSED RETAINING WALL
OVERHEAD WIRES
UNDERGROUND ELECTRIC
SANITARY LINE
WATER LINE
TELEPHONE LINE
GAS LINE
CHAIN LINK FENCE
HAYBALE BARRIER
SILT FENCE
SILT SOCK
TURBIDITY CURTAIN
TREE PROTECTION FENCE
WATER MANHOLE
WATER SHUT OFF
WATER VALVE
WATER METER
FIRE HYDRANT
GAS METER
GAS VALVE
DRAINAGE MANHOLE
CATCHBASIN
TELEPHONE MANHOLE
PEDESTRIAN LIGHT POLE
UTILITY COMPANY LIGHT
UTILITY POLE
EXISTING STREET SIGN
PROPOSED STREET SIGN
ROCK
EXISTING VEGETATION
EXISTING TREE
PROPOSED TREE
FLUSH TRANSITION
BENCH
TRASH & RECYCLING CAN
BIKE RACK
DEMO ASPHALT
DEMO CONCRETE
CLEAR AND GRUB
DEMO TREE
FULL DEPTH ASPHALT ROADWAY
ASPHALT SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK - WETLAND
POROUS PAVERS
STONE CURBING
ASPHALT CURB TO STONE CURB
TRANSITION
317.87 EX +
317.87 +
318
HP
HIGH POINT
LP
LOW POINT
TW
TOP OF WALL
BW
BOTTOM OF WALL
TC
TOP OF CURB
BC
BOTTOM OF CURB
TS
TOP OF STEP
BS
BOTTOM OF STEP
CB
CATCH BASIN
TF
TOP OF FRAME
INV
INVERT
MH
MAN HOLE
RCP
REINFORCED CONCRETE PIPE
VIF
VERIFY IN FIELD
FFE
FINISH FLOOR ELEVATION
VIF
VERIFY IN FIELD
EX
EXISTING
EQ
EQUAL
O/S
OFF SET
℄
CENTER LINE
±
PLUS/MINUS
PC
POINT OF CURVE
PRC
POINT OF REVERSE CURVE
PT
POINT OF TANGENT
LT
LEFT
RT
RIGHT
L
LENGTH
R
RADIUS
D
DEGREES
C
CHORD LENGTH
CNR
CORNER
BLDG
BUILDING
MAX
MAXIMUM
HDPE
HIGH DENSITY POLYETHYLENE
ABBREVIATIONS:
L-1.1
PROJECT NOTES
TEMPORARY AND PERMANENT VEGETATIVE
COVER
1.
IF FINAL GRADING MUST BE DELAYED FOR MORE THAN
THIRTY DAYS AFTER THE CONSTRUCTION ACTIVITIES ARE
COMPLETED AND/OR IF PERMANENT SEEDING IS NOT
SEASONABLY POSSIBLE WITHIN THIRTY DAYS OF COMPLETION
OF FINAL GRADING, TEMPORARY SOIL STABILIZATION
MEASURES CONSISTING OF HEAVY MULCHING OR TEMPORARY
SEEDING SHALL BE PERFORMED. THIS SHALL ALSO APPLY TO
SOILS STOCKPILED IN EXCESS OF SIXTY DAYS. TEMPORARY
SEEDING SHALL USE ANNUAL RYEGRASS APPLIED AT A RATE
OF 2 LBS. /1000 SQ. FT. TEMPORARY MULCH SHALL BE WEED
FREE HAY OR STRAW, OR AIR-DRIED WOOD CHIPS FREE OF
COARSE MATTER, TREATED WITH TWELVE POUNDS OF
NITROGEN PER TON. APPLICATION RATE FOR THE MULCH
SHALL BE SEVENTY TO NINETY POUNDS PER ONE THOUSAND
SQUARE FEET (70-90 LBS. /1000 SQ. FT.) FOR HAY OR STRAW,
AND 185-275 LBS. /1000 SQ. FT. FOR WOOD CHIPS.
2.
ALL SOIL SHALL BE TESTED TO DETERMINE THE BEST
FERTILIZER APPLICATION RATE; HOWEVER, THE FOLLOWING
RATES SHALL GENERALLY APPLY. LIMESTONE SHALL BE
APPLIED AT A RATE OF NINETY POUNDS PER ONE THOUSAND
SQUARE FEET (90 LBS. /1000 SQ. FT.). WHERE A PERMANENT
SEEDBED IS TO BE ESTABLISHED, THERE SHALL BE A
MINIMUM DEPTH OF FOUR INCHES OF TOPSOIL SPREAD,
FINE-GRADED AND RAKED TO REMOVE LARGE STONES AND
OTHER DEBRIS.
3.
SPRING SEEDING
·
PRIOR TO SEEDING, 300 POUNDS OF 10-10-10
FERTILIZER PER ACRE (7 LBS./1000 SQ. FT.) SHALL BE
WORKED UNIFORMLY INTO THE TOPSOIL TO A DEPTH
OF FOUR INCHES WITH A WHISK, A SPRING TOOTH
HARROW OR OTHER SUITABLE EQUIPMENT; THEN SIX
TO EIGHT WEEKS LATER SURFACE APPLY AN
ADDITIONAL 300 POUNDS OF 10-10-10 FERTILIZER PER
ACRE.
4.
FALL SEEDING
·
PRIOR TO SEEDING, 600 POUNDS OF 10-10-10
FERTILIZER PER ACRE (14 LBS. /1000 SQ. FT.) SHALL
BE WORKED UNIFORMLY INTO THE TOPSOIL TO A
DEPTH OF FOUR INCHES WITH A WHISK, A SPRING
TOOTH HARROW OR OTHER SUITABLE EQUIPMENT.
5.
PERMANENT SEEDBEDS ARE TO BE PLANTED BETWEEN MARCH
15 TO JUNE 15 (SPRING) AND AUGUST 15 TO OCTOBER 15
(FALL). ALL FERTILIZING/PLANTING APPLICATIONS SHALL BE
PERFORMED PARALLEL WITH THE FINAL GRADING OF THE
SLOPE. AFTER SEED APPLICATION, COVER GRASS AND
LEGUME SEEDS WITH NOT MORE THAN 1/4 INCH OF SOIL
WITH SUITABLE EQUIPMENT (EXCEPT WHEN HYDROSEEDING).
6.
SELECT ADAPTED SEED MIXTURE FOR ALL FINISHED GRASSES
AS FOLLOWS:
WETLAND AREAS
NEW ENGLAND WETMIX
100%
18 LBS/AC
WETLAND SEED MIX IS COMPOSED OF A WIDE VARIETY
OF NATIVE SEED SPECIES: CAREX LURIDA, CAREX
SCOPARIA, VERBENA HASTATA, CAREX LUPULINA,
SCIRPUS ATROVIRENS, PANICUM RIGIDULUM,
DESCHAMPSIA CESPITOSA, BIDENS ARISTOSA,
ELEOCHARIS PALUSTRIS, JUNCUS EFFUSUS, CAREX
CRINITA, MIMULUS RINGENS, ASTER PUNICEUS,
EUPATORIUM PERFOLIATUM, GLYCERIA CANADENSIS,
ASCLEPIAS INCARNATA, HELENIUM AUTUMNALE,
PENTHORUM SEDOIDES.
FULL TO PARTIAL SUN AREAS
KENTUCKY BLUEGRASS
45%
20 LBS/AC
(0.50 LBS/1000 SQ. FT.)
CREEPING RED FESCUE
45%
20 LBS/AC
(0.50 LBS/1000 SQ. FT.)
PERENNIAL RYEGRASS
10%
5 LBS/AC
(0.10 LBS/1000 SQ. FT.)
SHADY AREAS
CREEPING RED FESCUE
90%
50 LBS/AC
(1.00 LBS/1000 SQ. FT.)
PERENNIAL RYEGRASS
10%
5 LBS/AC
(0.10 LBS/1000 SQ. FT.)
DROUGHTY AREAS
CREEPING RED FESCUE
65%
40 LBS/AC
(0.90 LBS/1000 SQ. FT.)
TALL FESCUE
35%
20 LBS/AC
(0.50 LBS/1000 SQ. FT.)
7.
IMMEDIATELY FOLLOWING SEEDING, THE SEEDBEDS SHALL BE
MULCHED WITH STRAW OR HAY FREE FROM WEEDS AND
COARSE MATTER AT A RATE OF SEVEN TO NINE POUNDS PER
ONE THOUSAND SQUARE FEET (7-9 LBS/1000 SQ. FT.) MULCH
SHALL BE ANCHORED IMMEDIATELY AFTER SPREADING BY
APPLICATION OF A LIQUID MULCH BINDER OR MULCH NETTING
APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
PLANTING
1.
PLANTING BEDS AND SEEDED LAWN AREAS SHALL RECEIVE
TEMPORARY IRRIGATION UNTIL PLANTINGS HAVE BEEN
ESTABLISHED IF NO IRRIGATION SYSTEM IS PLANNED, THE
LANDSCAPE ARCHITECT SHALL DETERMINE WHEN TEMPORARY
IRRIGATION MAY BE REMOVED.
2.
PLANT LOCATIONS ARE TO BE STAKED BY CONTRACTOR AND
APPROVED BY THE LANDSCAPE ARCHITECT. INDIVIDUAL
STAKES SHALL BE PLACED FOR TREES AND SHRUBS. EDGE OF
PLANTING BEDS SHALL BE PAINTED. NOTIFY LANDSCAPE
ARCHITECT 48 HOURS PRIOR TO DESIRED APPROVAL.
3.
PLANTS SHALL COMPLY WITH SIZING AND GRADING
STANDARDS OF THE LATEST EDITION OF "AMERICAN
STANDARDS FOR NURSERY STOCK". PROVIDE STOCK TRUE
TO BOTANICAL NAME AND LEGIBLY TAGGED. PLANTS SHALL
BE FREE OF DEFECTS, DISEASES AND ALL FORMS OF INSECT
INFESTATIONS.
4.
ALL PLANTS SHALL BE PLANTED TO SAME DEPTH AS AT PLACE
OF GROWTH, EXCEPT WHERE NOTED OTHERWISE.
5.
ALL PLANTING BEDS SHALL RECEIVE 12" OF SPECIFIED SOIL
MIXTURE: 11" SCREENED LOAM, 1" OF COMPOST. BLEND
COMPOST INTO TOP 4" OF SOIL. PLANTING SOIL MIXTURE
SHALL BE FREE OF SUBSOIL, LUMPS, STONES, PLANTS,
ROOTS, AND OTHER FOREIGN MATTER.
6.
ALL LAWN AREAS SHALL RECEIVE A MIN. OF 4" OF SCREENED
LOAM.
7.
ALL PLANTING BEDS SHALL BE MULCHED WITH FINELY
SHREDDED, HARDWOOD BARK MULCH. TREES AND SHRUBS
SHALL RECEIVE 3 INCHES, PERENNIAL AND GROUNDCOVER
BEDS SHALL RECEIVE 2 INCHES. PROVIDE LANDSCAPE
ARCHITECT WITH A 1 GALLON ZIP-LOCK SAMPLE FOR
APPROVAL. KEEP ALL MULCH AWAY FROM TRUNKS AND PLANT
CROWNS.
8.
NO SUBSTITUTIONS OF PLANT SPECIES OR CULTIVARS IS
ALLOWED BY THE CONTRACTOR UNLESS AUTHORIZED BY THE
LANDSCAPE ARCHITECT. THE CONTRACTOR SHALL NOTIFY THE
LANDSCAPE ARCHITECT IN WRITING OF PLANT AVAILABILITY
ISSUES AS PER THE SPECIFICATIONS.
9.
BURLAP, TWINE, AND WIRE SHALL BE COMPLETELY REMOVED
OR CUT AWAY FROM TOP 1/3 OF ROOT BALL AT TIME OF
INSTALLATION (SEE SPECIFICATION) .
10.
SEE SPECIFICATIONS FOR PLANT WARRANTY.
11.
ALL DISTURBED AREAS NOT DESIGNATED FOR OTHER
IMPROVEMENTS SHALL BE HYDROSEEDED AS LAWN.
HYDROSEED GRASS MIX SHALL BE DETERMINED BASED ON
SEASON OF INSTALLATION.
12.
ALL GRASS, OTHER VEGETATION AND DEBRIS SHALL BE
REMOVED FROM ALL PLANTING BEDS PRIOR TO PLANTING OR
BACKFILLING. CONTRACTOR SHALL REMOVE ALL DEBRIS FROM
SITE AS WORK PROGRESSES.
13.
CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM
ALL STRUCTURES. SEE GRADING PLAN AND NOTES.
14.
ALL TOP SOIL STRIPPED FOR REUSE SHALL BE SENT TO AND
TESTED BY AN ACCREDITED SOIL TESTING LABORATORY AND
AMENDED PER THEIR REQUIREMENTS. IF SOILS ARE
UNSUITABLE THEY MUST BE REMOVED FROM SITE AND
DISPOSED OF OFF PROPERTY PER LOCAL, STATE, AND
FEDERAL LAW.
POND DREDGING, BOARDWALK AND
FOREBAY SEQUENCE OF CONSTRUCTION
1.
CONTRACTOR SHALL PERFORM ALL WORK IN THE DRY.
2.
THE CONTRACTOR IS RESPONSIBLE FOR FINAL DESIGN OF THE
DEWATERING SYSTEM. THIS INCLUDES QUANTITY AND SIZING
OF WELL POINTS, PUMP, CONVEYANCE PIPING AND THE
SEDIMENT SETTLING BASIN.
3.
INSTALL NON-DISRUPTIVE EROSION AND SEDIMENT (E&S)
CONTROL MEASURES, SILT SOCKS, SILT SACK'S, TURBIDITY
CURTAINS AND CONSTRUCTION FENCING AS DOCUMENTED
AND AS DIRECTED BY THE LANDSCAPE ARCHITECT OR
WETLANDS AGENT.
4.
REMOVE NECESSARY VEGETATION AND INSTALL
ANTI-TRACKING PADS AT THE DESIGNATED CONSTRUCTION
ACCESS POINTS AND SILT FENCING.
5.
DEMO TREES AND BRUSH DESIGNATED FOR REMOVAL.
6.
INSTALL THE REMAINING E&S MEASURES FOR POND DREDGING
INCLUDING SEDIMENT SETTLING BASINS AND DREDGE SOIL
STOCKPILES.
7.
PLACE EROSION CONTROL MATTING ALONG THE FOREBAY,
STREAM AND POND EDGES AS INDICATED ON THE DRAWINGS
TO PREVENT SCOUR.
8.
STRIP TOPSOIL AS REQUIRED FOR THE FOREBAY
INSTALLATION, STOCK PILE FOR RE-USE.
9.
EXCAVATE TO THE REQUIRED GRADES INDICATED ON THE CIVIL
DRAWINGS.
10. INSTALL THE FOREBAY COMPONENTS AS DIRECTED ON THE
CIVIL DRAWINGS
11. POND LIFE PROTECTION - CONTRACTOR SHALL EITHER
PROVIDE TEMPORARY HOLDING AREA FOR POND FISH AND
AMPHIBIANS OR RELOCATE POND FISH AND AMPHIBIANS TO
ANOTHER WATER BODY WITHIN THE TOWN OF WATERFORD, AS
APPROVED BY THE WETLAND AGENT.
12. BEGIN THE INITIAL POND DEWATERING BY DRAWING DOWN THE
POND WATER ELEVATION WITH A SCREENED INLET ON A PUMP
INTAKE HOSE.
13.
WHEN THE WATER LEVEL HAS REACHED ITS LOWEST POINT,
CAREFULLY INSTALL WELL POINTS AS REQURIED TO FURTHER
DE-WATER THE POND AND SUBGRADE.
14.
WHEN THE MUCK TOP LAYER IS SUFFICIENTLY DRY, USE EARTH
MOVING MACHINES TO SCRAPE THE MUCK FROM THE POND
AND STREAM AND MOVE TO THE IN-POND PRIMARY
DEWATERING AREA NOTED ON THE PLANS. USE CARE NOT TO
DISRUPT THE GRAVELY POND SUB-BASE.
15.
ALLOW THE MUCK TO DEWATER PRIOR TO MOVING IT TO THE
SECONDARY DEWATERING AREA.
16.
AFTER SECONDARY DEWATERING, THE DRIED MUCK MAY BE
HAULED TO THE STORAGE AREA FOR LONG TERM STORAGE.
17.
WHILE WAITING FOR THE PRIMARY DEWATERING TO OCCUR,
POND DREDGING, FOREBAY AND BOARDWALK CONSTRUCTION
MAY BEGIN CONCURRENTLY.
18. REGRADE POND BOTTOM TO THE GRADES AND ELEVATIONS
NOTED ON THE POND DREDGING DRAWINGS.
19. EXCAVATED SAND/GRAVEL LAYER SHALL BE MOVED TO THE
SAND/GRAVEL DEWATERING AREA NOTED ON THE PLANS,
DEWATERED THEN HAULED AND DISPOSED OF OFF-SITE.
20. REMOVE SEDIMENT STOCKPILE E&S CONTROLS ONCE ALL
SEDIMENT HAS BEEN REMOVED FROM THE SITE.
21. REPAIR THE POND DAM IF REQUIRED
22. DEMO THE BRIDGES
23. INSTALL THE BOARDWALK AND BRIDGES AS DIRECTED ON THE
STRUCTURAL ENGINEERING DRAWINGS AND AS PER THE
GEOTECHNICAL ENGINEER.
24. INSTALL ANY ELECTRICAL CONDUITS ACROSS BRIDGES AND
BOARDWALKS.
25. WHEN THE BOARDWALK SUB-STRUCTURES ARE IN PLACE,
REPLACE STOCKPILED TOPSOILS.
26. INSTALL PERMANENT VEGETATION TO WITHIN 5' OF THE
WATERS EDGE AS PER THE PLANTING PLAN
27. REMOVE ANY SEDIMENT DEPOSITS WITHIN THE LOW POINTS OF
THE POND.
28. REMOVE DEWATERING EQUIPMENT, SEDIMENT SETTLING
BASINS AND ALLOW THE POND TO FILL.
29. CONTRACTOR MAY MODIFY THIS SEQUENCE WITH WRITTEN
APPROVAL FROM THE WETLANDS AGENT, LANDSCAPE
ARCHITECT AND CIVIL ENGINEER.
REMAINING BOARDWALK, POND SIDWALK
AND STREETSCAPE SEQUENCE OF
CONSTRUCTION
1.
DEMOLISH ALL REMAINING ITEMS INCLUDING THE ROUTE 156
STREETSCAPE.
2.
STRIP TOPSOIL AND STOCKPILE ON-SITE.
3.
ROUGH GRADE THE SITE.
4.
INSTALL THE STREETSCAPE CURBS AND STONE WALLS
5.
INSTALL LIGHT POLE FOOTINGS
6.
INSTALL ELECTRICAL SERVICE CONDUITS,
METER/DISTRIBUTION PEDESTAL, BRANCH CONDUITS.
7.
INSTALL THE STONE MEMORIAL PLAZA WALLS AND GRANITE
MONUMENT
8.
INSTALL CONCRETE WALKS,STAIR, AND RAMPS
9.
INSTALL BOARDWALK DECKING, HANDRAILS, SEATING
ELEMENTS AND ELECTRICAL CONDUITS.
10. INSTALL LIGHT POLES & COMMISSION LIGHTING SYSTEM
11. INSTALL SITE FURNISHINGS
12. MIX POND MUCK WITH EXISTING STRIPPED TOP SOIL, PLACE
AND FINE GRADE SOIL.
13. HAUL EXCESS POND MUCK OFF-SITE OR AS DIRECTED BY THE
TOWN
14. INSTALL TREES, SHRUBS, PERENNIALS, AND REMAINING
WETLAND PLANTS.
15. REMOVE ANTI-TRACKING PADS AND INFILL WITH TOPSOIL
16. HYDROSEED ALL TURF
17. ESTABLISH AND IRRIGATE TURF UNTIL TWO MOWINGS
18. REMOVE CONSTRUCTION FENCE
19.
CLEAN ALL SURFACES TO LIKE NEW CONDITION
20. REMOVE E&S CONTROLS & REPAIR BARE SOIL
w
w
w
w
w
w
w
w
w
w w
w
w
w
w
w w w
w w
w
w w w
w w
w
w w w
w w w
w w w
w w
w
w
w w
w
w
w
w w
w
w w w
w
w w
w w w
w
w w
w
w
w
w w w
w
w w
26
31
28
27
25
24
27
28
30
29
23
32
24
33
25
23
23
24
23
23
23
23
23
22
23
24
24
25
29
31
23
26
26
22
25
21
21.5
21
22
22
22
22
34
35
30
32
33
34
33
32
31
30
29
28
27
26
25
24
22
23
10 ' S
TONE
ACCES
S TO
DE-WAT
ERING
AREA
10 ' STON
E ACCESS
TO DE-
WATERIN
G AREA
SEE INSET FOR
ADDITIONAL DETAIL
FORBAY TO BE USED AS A SEDIMENT TRAP
DURING CONSTRUCITON, SEE CIVIL
DRAWINGS FOR ADDITIONAL INFORMATION
61B
W
60B
62C
306
23A
306
6
L-2.1
TYPE II PUMPING SETTLING
BASIN
7
L-2.1
TYPICAL DEWATERING
SUMP PIT
5
L-2.1
HAYBALE BARRIER
INSTALLATION
CELL 1
CELL 2
SEE CIVIL DRAWINGS
2
L-9.3
TREE PROTECTION FENCING
2
L-2.1
SILT FENCE
1
L-2.1
TEMPORARY
CONSTRUCTION ENTRANCE
10 '
STONE
ACCE
SS TO D
E-WAT
ERING
AR
SEE INSET
ADDITIONA
WATERFORD
CIVIC TRIANGLE
K+F Project No.
Date
Scale
Drawing No.
August 23, 2022
2021014
WETLANDS
PERMITTING
Revisions
Date
0
30
1" = 30'
60
20
10
NORTH
NORTH
NORTH
NORTH
184 Boston Post Road
Waterford, CT 06385
191 NORWICH AVENUE
LEBANON, CT 06249
(860) 367-7264
L-2.0
EROSION AND
SEDIMENT CONTROL
PLAN
CONTROL MEASURE KEY:
(TC) TURBIDITY CURTAIN
(SS) SILT SOCK
(TC) TEMPORARY
CONSTRUCTION FENCE
(GSF) GEOTEXTILE SILT
FENCE
(HB) HAYBALE BARRIER
(CE) CONSTRUCTION
ENTRANCE
(TSS) TEMPORARY SOIL
STOCKPILE
(ISD) INLET SEDIMENT
CONTROL DEVISE
(WB) WASH OUT BOX
TEMPORARY CONSTRUCTION
FENCE (TYP)
INSTALL SILT SACK INTO
EXISTING CATCH BASIN (TYP)
ISD
WB
WB
ISD
ISD
ISD
CE
TC
TC
TC
TC
SS
SS
GSF
SS
SS
GSF
GSF
GSF
GSF
SS
TEMPORARY CONSTRUCTION
FENCE (TYP)
PROVIDE ACCESS TO
RESTROOM BUILDING DURING
CONSTRUCTION
GSF
SS
SB
HB
TSS
SILT SOCK WITHIN ROOT
ZONES OF EXISTING TREES
WATERFORD POLICE
STATION
11,600 SF MUCK DE-WATERING/
STORAGE AREA
ESTIMATED 1,500 CY @ 4' PILE HEIGHT
12,000 SQ FT PRIMARY POND SAND/GRAVEL LAYER STOCKPILE
ESTIMATED 7,000 CY @ 25' PILE HEIGHT
2,000 SF SECONDARY
MUCK DE-WATERING AREA
TSS
TSS
GSF
SS
GFS
SOIL CLASSIFICATION LEGEND
23A - Sudbury Sandy Loam (0-5%)
60B - Canton and Charlton Fine Sandy
Loam (3-8%)
61B - Canton and Charlton Fine Sandy
Loam (0-8%)
62C - Canton and Charlton Fine Sandy
Loam (3-15%)
306 - Udorthents - Urban Land Complex
W - Water
8
L-2.1
SILT SOCK
CE
2,000 SF IN-POND PRIMARY
MUCK DE-WATERING AREA
WATERFORD
CIVIC TRIANGLE
K+F Project No.
Date
Scale
Drawing No.
August 23, 2022
2021014
WETLANDS
PERMITTING
Revisions
Date
AS NOTED
184 Boston Post Road
Waterford, CT 06385
191 NORWICH AVENUE
LEBANON, CT 06249
(860) 367-7264
L-2.1
EROSION AND
SEDIMENT CONTROL
DETAILS
TEMPORARY CONSTRUCTION ENTRANCE
NTS
1
P-2021-014-WATE-02
PHYSICAL PROPERTIES
FILTERING EFFICIENCY
TENSILE STRENGTH AT
20% (MAX) ELONGATION
FLOW RATE
REQUIREMENTS
75% MINIMUM
EXTRA STRENGTH
50 LBS/LI (MIN)
STANDARD STRENGTH
30 LBS/LI (MIN)
0.30 GAL/SQ.FT./MINUTE
(MIN)
MINIMUM FILTER FABRIC REQUIREMENTS
WOOD STAKE, TYP
SYNTHETIC FABRIC FILTER FENCE
"ENVIROFENCE BY MIRAFI"
-SEE SPEC
COMPACTED BACKFILL
EXCAVATE 6"X6" TRENCH
ON UPSLOPE SIDE OF WOOD STAKES
GRADE
COMPACTED SUB-GRADE
FLOW
100°
8'-0" O.C. MAX
TYP
12" MIN DEPTH
SILT FENCE
NTS
P-2021-014-WATE-03
2
SECTION
CATCHBASIN SEDIMENT CONTROL DEVICE
NTS
OVERFLOW CUTOUT
CATCH BASIN
SILT SACK ®
1" REBAR FOR BAG
REMOVAL FROM INLET
DUMP STRAP
GRATE
GRATE
CATCH BASIN
2"X2"X3/4"
RUBBER BLOCK
EXPANSION
RESTRAINT
1/4" NYLON ROPE
SILT SACK®
PROPERTY
TENSILE STRENGTH AT
15% (MAX) ELONGATION
FLOW RATE
REQUIREMENTS
167 LBS
66 GAL/MINUTE/SF
MINIMUM FILTER FABRIC REQUIREMENTS
PERMITTIVITY
.862 SEC
UV STABILITY
96%
MULLEN BURST STRENGTH
900 LBS
P-2021-014-WATE-04
3
NOTE:
1. NO STAPLES TO BE OVER 24" APART CENTER TO CENTER.
2. INSTALL ON ALL SLOPES STEEPER THAN 6:1
FOLD NETTING UNDER
STONE 6" AT THE TOP &
BOTTOM OF SLOPES
6" STAPLE (TYP.)
STAPLE ALL EDGES ON
12" CENTERS
STAPLES ARE 12" APART
ON INSIDE EDGES
FOLD NETTING
UNDER 6" AS AT THE
TOP OF THE SLOPE
3" OVERLAP
STAPLE ALL EDGES
ON 12" CENTERS
STAPLES ARE 12" APART
ON INSIDE EDGES
EROSION CONTROL MATTING
NTS
3" OVERLAP WHEN
LAPPING ROLLS
6" FOLDED
UNDER
6" OVERLAP
WHEN
JOINING
ROLLS
6" FOLDED
UNDER
P-2021-014-WATE-69
4
HAYBALE BARRIER INSTALLATION
NTS
1.
EXCAVATE A TRENCH 4"
DEEP AND THE WIDTH OF
A HAYBALE
2.
PLACE AND STAKE HAYBALES,
TWO STAKES PER BALE
4.
BACKFILL AND COMPACT THE
EXCAVATED SOIL ON THE
UPHILL SIDE OF THE BALES
3.
(PLAN VIEW) WEDGE LOOSE
STRAW BETWEEN BALES TO
CREATE A CONTINUOUS
BARRIER
PACK STRAW
COMPACT
BACKFILL
5
P-2021-014-WATE-10
TYPE II PUMPING SETTLING BASIN
NTS
GEOTEXTILE SILT
FENCE (PLACE ON
ENTIRE INSIDE
FACE)
PUMP DISCHARGE
STAKE AND EMBED HAY
BALES IN ACCORDANCE
WITH HAY BALE BARRIER
STANDARD
PLACE MODIFIED RIPRAP
AT DISCHARGE OUTLET
EXCAVATED AREA
1'-6"
A
A
B
VARIES
PLAN
3'
6"
OUTLET SPILLWAY WEIR
FLAT BOTTOM
SECTION A-A
2' MIN
OUTLET SPILLWAY WEIR
BALE HEIGHT
MINUS 6"
1
VARIES
2
1
FLOW OUTLET TO WATER
COURSE OR SWALE
MODIFIED RIPRAP
CT DOT - #3 2# CRUSHED
STONE OR GRAVEL (6" DEPTH)
SECTION B-B
NOTE:
1.
DIMENSIONS VARY ACCORDING TO PUMPING RATES
2.
MINIMUM REQUIRED STORAGE IS CALCULATED FROM CREST OF
SPILLWAY WEIR
CELL 1
CELL 2
P-2021-014-WATE-105
6
DISCHARGE HOSE
12" SEE
NOTE 6
PERFORATED METAL OR
PLASTIC STANDPIPE SEE
NOTES 2 & 3
CLEAN CRUSHED STONE
OR GRAVEL SEE NOTE 4
12"
SEE NOTE 4
SIDE SLOPES TO MEET OSHA
TRENCHING REQUIREMENTS
PLACE PROPERLY DESIGNED
GEOTEXTILE AROUND
PERIMETER TO PREVENT PIPING
SEE NOTE 5
TOP OF STONE OR GRAVEL
NOTES:
1.
THE CONTRACTOR IS RESPONSIBLE FOR DESIGN OF THE DEWATERING SYSTEM AND
MUST COMPLY WITH THE REQUIREMENTS SET FORTH IN SECTION 2.04 "COFFERDAM
AND DEWATERING, COFFERDAM MATERIAL LEFT IN PLACE" OF THE CT DOT FORM 818
OR THE MOST CURRENT EDITION. THIS DETAIL AND THE FOLLOWING TEXT IS FOR
REFERENCE ONLY AND SHALL NOT BE USED AS A CONSTRUCTION DETAIL.
2.
OVERALL SUMP PIT DEPTH SHALL BE COMPATIBLE WITH ANTICIPATED SEEPAGE RATES
AND PUMP SIZE TO BE USED
3.
THE STANDPIPE DIAMETER AND NUMBER OF PERFORATIONS SHALL BE COMPATIBLE
WITH THE PUMP SIZE BEING USED
4.
PERFORATIONS IN THE STANDPIPE SHALL BE EITHER CIRCULAR OR SLOTS
PERFORATION SIZE SHALL NOT EXCEED 1
2" DIAMETER
5.
CRUSHED STONE OR GRAVEL SHALL BE NO SMALLER THAN CT DOT #67 SIZE NOR
LARGER THAN CT DOT #3 SIZE
CRUSHED STONE SHALL EXTEND A MINIMUM OF 12" BELOW THE BOTTOM OF STANDPIPE
6.
IF EXCESSIVE MOVEMENT OF THE FINE SOIL PARTICLES FROM THE SURROUNDING
EXISTING SOILS IS ANTICIPATED, A PROPERLY DESIGNED GEOTEXTILE SHALL BE
PLACED BETWEEN THE EXISTING SOILS AND THE CRUSHED STONE OR GRAVEL
BACKFILL
7.
THE STANDPIPE SHALL EXTEND A MINIMUM 12" ABOVE THE SURROUNDING GROUND
8.
EFFLUENT FROM DEWATERED WORK AREA(S) SHOULD NOT BE DISCHARGED DIRECTLY
INTO ANY WATERWAY, BUT BE PROCESSED THROUGH AND APPROPRIATE TREATMENT
STRUCTURE(S)
TYPICAL DEWATERING SUMP PIT
NTS
P-2021-014-WATE-106
7
STAKE ON 10'
LINEAR SPACING
FILTREXX COMPOST
SILTSOXX (OR