Conservation Commission Regular Meeting Materials (linked)
agenda center agenda
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | August 25, 2022 |
| Pages | 1 |
| File Size | 1.0 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
INV, UUI=OO0.ULD - - \ \ \ SN PROPOSED CB#1 > ~ (TYPE “C-C WITH 2. SUMP. & OUTLET HOOD) * T.F.=60.0t 's INV. IN=56.6£.. ate \ D> “S * SECTION W/ WQV BIO—RETENTION BASIN INV. OUT=60.0+ PROPOSED CB#4 (TYPE °C’ WTH 4° SUMP. 94 & OUTLET HOOD) ‘Beech T.F.=63.9 INV. IN=60.4+.% INV. OUT=60.34 ; 4 y SECTION WA WQV Is Twin S\N N BIO—RETENTION BASINS} Ook) aoe INV. OUT=60,0+ Sk FN, \ MYO ey ek a % \ 12, Li ale. .6. Dia. £--)- VO aN PROPOSED CBYH3 7" a. AC’ m2 \ yA PS (TYPE 'C-C’ WITH 20 oM\ | pe? ee Gt pes 52 PS! SUMP. & OUTLET HOOD) 2X \ Mapl ee. eae Tain te Nee eee TF .=6 30+ 27-% 18” | NN ; vee 7 2h Maple Rea eb ti pee he INV. OUT=60.6+ Oak \Yy ype Ash D4 ge Soe eee eres Cee 1 oN ony PPB ISIE ES BEN pe Me PROPOSED MODIFIED ~ \’ 1 f 20’ WIDE BY 6’ HIGH SD Xen F RIPRAP SPILL WAY \ a ew a ell a Wl ee i 7% “ in oy y | De a _ oe L _ |S SIDED PRECAST. ALTERMATE.“B" B/ 922 fe CONC FOOTINGS et ep |: PROPOSED OUTLET CONTROL - Deo INV IN = 50.08 PE ZOL STRUCTURE (SEE DETAIL)’ pice INV QUT = 50.04 030, Ngee ee [nnn oop aa es ea 7 Paws eel eee ee oe Ge ge Fo og Ve 6 ewe a ee ee i eee eee eee ie 7 F