Conservation Commission Agenda (linked)
agenda center agenda
| Board/Commission | Conservation Commission |
|---|---|
| Meeting Date | January 23, 2025 |
| Pages | 6 |
| File Size | 1.9 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
TOWN OF WATERFORD
Application for Inland Wetland / Watercourse Permit
Type of Application: Agency Use:
Permitted Use, Section 4.1 ? \ Date Received: [4fas
Unregulated Activities, Section 4.2 — Received By:
Regulated Activities, Section 6 Fee: _ Mout Application Number: C-25~ 6/
L. Applicant; Erie H, Johor Phone: 260-397-6777
Address: 33 lade Road Pomfret Center State:_ CT Zip: OG2S9
Fax: E-Mail: eri els cegter @othnet
2. Owner: Ban Oo h Faems £ cP.
Phone:
Address: P. O. Box Wd Water Rnd State: CT _ Zip: OG32S”
Fax: E-Mail:
3. Agent: Phone:
Address: State: Zip:
Fax: E-Mail:
4, Property Address: | ite) : | GOR, a 2X, 43g Rope Ferry Road Weterfrad
5. Abutting Property Owners — Complete Attached Form
6. Activity to be Reviewed and / or Licensed (attach sheet if necessary): tem po ary we lead So A Crass ings
7. Description of Proposed Activity (attach sheet if necessary): k, mM her hoy es t ine fal wn ay re = (
of Commercially USS cable tree to Firewood - rema; ming Cousl
slashek so Hire Coat a (ess
8. Purpose of Activity (attach sheet if necessary): thir i] fand to dsceealsle S. Hocking level (s)
9a, Acreage of Property: asd 9b, Acreage of Wetlands: 6 2
10. Acreage of Wetlands Altered: ie)
11. Wetland Mitigation Proposed:
12. Section 7 and sections 8.1 & 8.2 of the Town of Waterford “Inland Wetlands and Watercourse Regulations”
have been complied with: (Review attached check list) Yes: L No
The applicant / owner hereby gives the Commission, its agent and consultants the right of free access to any
part of the property under consideration. The undersigned warrants the truth of all statements contained
herein and in all supporting documents according to the best of his / her knowledge, information and belief.
Applicant: Ex. u i Date: | Q- QA 2OBN
flan Lae 0/24 [orf
Agent: Date:
IWW Permit Application form
Updated 3 2011
(1Zors0 psrepdn
asr] Aupdosg rsstlpy 95
IWS Frey AINSy soy SEE fey Tpy
CMDS Fry AI sy hol Se em BU BISVET
ants Py ay Hy TET ARV Vy SF yay
ake pay ray sey Or ES APT PT
ie) Spee TAY Oy
£ = r J mal .
ei a ea i Prey Avey FY ETE 277 P59 PY PPPS Pwd
SRDS Proy An ay Seey hee TI pred
SsoIppy Sulieyy ssoippy Auadoig #OI [204eg ISEKO
+03 jusselpy semisdorg
PuoUIIeYY woyeoyddy jmieg
HOISSTUIMOD WovAissu0D
41° 18° 56"N
BS
B
cy
8
USDA
cy
Soi! Map—State of Connecticut, Eastern Part
Map Scale: 1:14,000 if printed on A portrait (8.5” x 11") sheet.
No 200
400
800 1200
Feet
1000
2000
0 500 3000
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
F 41° 18'S6'N
72 817 Ww
42/16/2024
Page 1 of 5
i
baat
|
NOTIFICATION OF TIMBER HARVEST
Town: Wotec find Date: _12Q-[(- 2.034
Property Location: A&_ Rope Facey Road
List all parcels:
Assessor’s Info: Map Block Lot OR: Unique ID
isa lyy 075
1s eyig) | 6997
152 Wt 7o35
152 16s 3667
Total acreage of property(s):_ 25 7 Total acreage of harvest area: _]} dS
Landowner(s) of Record: Benaie k Farms GP Primary Contact: A\on Gardi ner
Mailing Address: P.0. Box 29 Mailing Address: Po. 8% 717
Town: Waterfacd Zip OG335° Town: Wafecfork Zip 06335
Phone(__) Phone (Jey) 261 - Gt e 2
E-mail: E-mail:
Note: Timber harvesting is a Permitted as of Right Activity pursuant to the Inland Wetlands and Watercourses Act, except for
those practices regulated under Section 22a-36 through 22a-45 of the Connecticut General Statutes,
Is there a current forest management/stewardship plan for this property? Yes No
This timber harvest has been prepared by a State of Connecticut certified:
(Check one): Forester OR = __ Supervising Forest Products Harvester
Forest Practitioner Certificate #:_ - OOOO?
Name: _€ric: H, Solnson
Address: 3% Wade Roal Pomfcet Center, CT 96259
E-mail: eric h forester @attnel
Phone #: (Business) }$¢40-974- 2/2 (Cell) _PG60-377-G777
Prope: undaries: Timber Harvest Boundaries: ,
Bounds are marked: Dives | INo Have been marked or flagged: Yes | INo
Have owners of all lands within 100 feet of the harvest area been notified via first-class mail prior to filing this “Notification of
Timber Harvest’? Yes }{No
Estimated starting date of timber harvesting operations:_| / / AH
Description of Timber Harv
Objective: _eceate an ‘navatatn om timseven aged Sno est boy weaipulefine
(es Gompds- fica and ceating “gaps in the Conapy 9
Treatment: "S$ election hacvest Z .
Amount of forest products to be harvested:
al JO,009 Board feet AAG Cords Cubic feet Tons
How have the trees to be harvested been designated?
DxThey have been marked with paint at eye level and at ground level, Paint color(s): a all oy)
_/They have not been marked —-
This is not an official CT DEP form but it has been endorsed for town usage by: CT Farm Bureau Assoc., CT Forest &
Park Assoc., CT Professional Timber Producers, Society of American Foresters - CT Chapter, and others,
SOIL, WATER AND INLAND WETLANDS RESOURCES
Actions Being Performed On This Land
(Check all that apply and locate on attached Timber Harvest Area map -- see information below on maps.)
Crossings / Clearing Erosion and Sedimentation Control Measures:
‘Yremporary stream/drainage crossing (Xinstallation of water bars
Temporary wetlands crossing Grading
.,Removal of trees in wetlands Seeding
Removal of trees in upland review area Other (describe below)
Log landing area: Roads
Vanti-tracking pad Are new roads, other than skid trails, to be
curb cut . constructed for transport of logs or other
activities associated with this harvest?
LYes }No
Describe in further deta necessary:
as ¢ > os
The following maps are attached to this “Notification” (Check all that apply)
LI!Copy of USGS topographic map with property outlined
{Copy of Assessor’s map with property outlined
‘Timber Harvest Area map showing outline of harvest area, main skid road locations, log landing area, truck access
roads, inland wetlands, watercourses and any crossings
The undersigned hereby swear that the information contained in this application is true, accurate and complete to the best of
my (our) knowledge and belief and that the timber harvest will be conducted in accordance with the specifications outlined
in this “Notification of Timber Harvest.”
Signature of Landowner(s): lean. H. ee ae _ Date: ufis [a5
" Print/Type Name: ERODIAS CORP.
PA di
Jit. Gardiner, President
General Partner, Benajah Farm L.p
Signature of Landowner(s): Date:
Print/Type Name:
Signature of Certified Forest Practitioner: Eve i : ! hon Date:_| 2-117 Q4
Print Name:__ Eric. “Johnson
Certificate #; F-00001) Expiration Date: 10/_| /Q2V
lete and Si it to:
= The Municipal Inland Wetlands Agency/ies in which the property is located, and
« Acourtesy copy of this Notification Form should also be sent to The Department of Environmental Protection, Division of Forestry
79 Elm Street, Hartford, CT, Tel: (860) 424-3630
This is not an official CT DEP form but it has been endorsed for town usage by: CT Farm Bureau Assoc., CT Forest &
Park Assoc., CT Professional Timber Producers, Society of American Foresters - CT Chapter, and others.