Full Text (OCR Extracted)
DIVERSION CHANNELS TO BE RELOCATED AS REQUIRED THROUGHOUT CONSTRUCTION TO SEPARATE WORK AREAS FROM ACTIVE FLOW. (LOCATION APPROX.) PROPERTY_LINE DIVERSION CHANNELS TO BE MAINTAINED WITHIN POND AT ALL TIMES DURING CONSTRUCTION TO MINIMIZE INFLOW OF STORMWATER INTO ISOLATED WORK AREAS. INSTALL SILT SACK INTO EXISTING CATCH BASIN (TYP) POST DREDGING TYPE II PUMPING SETTLING BASIN SEE CIVIL DRAWINGS FIELD LOCATION OF THE DE-WATERING BASIN SHALL BE REVIEWED BY THE PROJECT ENGINEER AND THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF DE-WATERING AND CONSTRUCTED TO ACCOMMODATE THE REQUIRED VOLUME AND OUTLET CONTROLS BASED ON THE ANTICIPATED PUMPING RATE. Waterford Civic Triangle — Permit C-22-10 Universal Access & Pond Improvements Sheet L-2.0 ESC Plan:1”=30 Feet J BxISTING 157 RMP + —+—++ POST DREDGING SEDIMENT TRAP — “a * ss a pam Isp INSTALL SILT SACK INTO » 2 A >, EXISTING CATCH BASIN (TYP) ~~) aD l /