DIVERSION CHANNELS TO BE
RELOCATED AS REQUIRED
THROUGHOUT CONSTRUCTION TO
SEPARATE WORK AREAS FROM ACTIVE
FLOW. (LOCATION APPROX.)
PROPERTY_LINE
DIVERSION CHANNELS TO BE
MAINTAINED WITHIN POND AT ALL
TIMES DURING CONSTRUCTION TO
MINIMIZE INFLOW OF STORMWATER
INTO ISOLATED WORK AREAS.
INSTALL SILT SACK INTO
EXISTING CATCH BASIN (TYP)
POST DREDGING
TYPE II PUMPING SETTLING
BASIN SEE CIVIL DRAWINGS
FIELD LOCATION OF THE DE-WATERING BASIN SHALL BE
REVIEWED BY THE PROJECT ENGINEER AND THE
CONTRACTOR PRIOR TO THE COMMENCEMENT OF
DE-WATERING AND CONSTRUCTED TO ACCOMMODATE THE
REQUIRED VOLUME AND OUTLET CONTROLS BASED ON THE
ANTICIPATED PUMPING RATE.
Waterford Civic Triangle —
Permit C-22-10
Universal Access & Pond Improvements
Sheet L-2.0 ESC Plan:1”=30 Feet
J BxISTING
157 RMP
+ —+—++
POST DREDGING
SEDIMENT TRAP
— “a *
ss
a pam Isp INSTALL SILT SACK INTO
» 2 A >, EXISTING CATCH BASIN (TYP)
~~) aD l /