PHONE: 860-442-0553
www.waterfordct.org
FIFTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
Date: December 13, 2021
To: Waterford Planning & Zoning Commission
From: Maureen FitzGerald, Environmental Planner
RE: Report of Conservation Commission Action:
969 Hartford Turnpike— Inland Wetland Permit #C-21-11
Commissioners,
The Waterford Conservation Commission granted inland wetland permit #C-21-11 on October 28, 2021 for
regulated inland wetlands activities associated with the proposed multi-family apartment development on property
located at 969 Hartford Turnpike.
Authorized regulated activities include clearing, grading and filling within the100 ft. upland review area of inland
wetlands for site work and construction of a portion of a stormwater basin and water quality basin, and the discharge
of stormwater run-off to adjacent inland wetlands. The authorized activities are depicted on site plans entitled
“Waterford Apartment Community, 969 Hartford Turnpike, Waterford, Connecticut”, sheets 1-18, dated September
20, 2021; prepared by SLR.
The Conservation Commission rendered their decision in accordance with the Waterford Inland Wetlands and
Watercourses regulations based on the following considerations:
= — The proposal does not involve direct impacts to wetlands or watercourses.
= The stormwater treatment system is designed to capture and treat the water quality volume from the
impervious surface area, treat pollutant and thermal loading, and to detain the peak run-off rate prior to
discharge to the receiving wetlands.
= — Short-term impacts are minimized through the implementation of a detailed erosion and sediment control
plan, a phased construction sequence and required monitoring of construction erosion and sediment control
measures. Long-term impacts are mitigated by the stormwater treatment system in controlling water
quality impacts and detaining peak flows prior to discharge to the wetland.
= A wetland non-encroachment area has been established upgradient of inland wetlands to preserve a
vegetated buffer and to protect inland wetland resources from direct and indirect impacts associated with
adjacent land development.
Respectfully Submitted;
Maureen FitzGerald, Environmental Planner
attachment: Permit #C-21-11, 3 pp.
ce: Waterford Conservation Commission
M. Wujtewicz, Planner

PHONE: 860-442-0553
www.waterfordct.org
FIFTEEN ROPE FERRY ROAD
WATERFORD, CT 06385-2886
TOWN OF WATERFORD
Inland Wetlands & Watercourses Permit #C-21-11
969 Hartford Turnpike, Waterford, CT
The Waterford Conservation Commission, in their capacity as the Town’s Inland Wetland Agency,
hereby authorizes the applicant to conduct regulated activities in designated areas located at 908 Hartford
Turnpike, Waterford, CT, which are subject to jurisdiction in accordance with CT General Statutes,
Section 22a-36 through 22a-45, inclusive, as amended, and the Waterford Inland Wetlands and
Watercourses regulations.
This permit is a grant of approval to conduct the following regulated activities:
e Clearing, filling and grading within the 100 ft. Upland Review Area of inland wetlands for site
construction,
e Clearing, excavation and grading for construction of a portion of a stormwater basin, a water
quality basin and their respective outlet controls within the 100 ft. upland review area,
e Discharge of stormwater run-off to adjacent to inland wetlands.
These regulated activities are associated with the proposed construction of a multi-family residential
complex located at 969 Hartford Turnpike, Waterford, Connecticut. The proposed activities are shown on
a plan entitled; “Waterford Apartment Community, 969 Hartford Turnpike, Waterford, Connecticut”,
sheets 1-18, dated September 20, 2021, prepared by SLR.
The Conservation Commission authorizes the regulated activity with the following conditions of approval
to minimize impacts associated with the proposed regulated activity and protect the inland wetlands and
watercourses on this site:
SPECIAL CONDITIONS:
1) The final plan shall include details for stormwater basin plantings to provide an aquatic or emergent
wetland vegetation bench around the pools.
2) Following completion of finished grades, temporary disturbed areas within the upland review area
adjacent to basin 110, and water quality basins #4 and #6 water shall be replanted with native
vegetative cover to restore wetland buffer functions.
3) The limit of permanent clearing and disturbance adjacent to inland wetlands shall be identified on
the final plan as the wetland non-encroachment boundary. No activity, including but not limited to
clearing, grading, filling or removal of vegetation shall be conducted within the non-encroachment
area without specific authorization from the Conservation Commission. The purpose of this
vegetated non-encroachment area is to protect inland wetland resources from direct and indirect
impacts associated with adjacent land development. The non-encroachment boundary shall be
permanently marked at 50 ft. intervals with identification markers provided by the Conservation
Commission affixed to trees or 4x4 wooden posts.

Waterford Conservation Commission
Inland Wetland Permit #C-21-11
969 Hartford Tumpike
Page 2 of 3
4)
5)
6)
The stormwater treatment basins and the subsurface infiltration system shall be inspected during
construction by the design engineer to verify the construction is consistent with the approved design
plans.
An as-built survey of the stormwater system components shall be submitted to the Commission
with written verification from a licensed engineer that the system was constructed in accordance
with the approved design plans. This submittal shall be completed prior to the issuance of a
Certificate of Compliance.
Monitoring of the stormwater basin vegetation establishment, permanent pool depth, slope and
substrate stabilization shall be conducted by a wetland scientist or other qualified professional for a
period of two (2) years following completion of the basins to document vegetation establishment
and functioning of the 3 stormwater basins. Invasive plant species such as Lythrum and Phragmites
shall be removed from the basins. A monitoring report shall be submitted to the Conservation
Commission by October 30th of each monitoring year after completion of the basin.
STANDARD CONDITIONS:
1.
The Conservation Commission’s agent shall be notified at least 48 hours prior to commencement of
any regulated activity.
Final stabilization of disturbed soil areas, including all temporary and permanent soil disturbances,
shall be stabilized with the application of loam, seed and appropriate erosion control measures.
At all times during site work and until soil areas are stabilized, the applicant shall install and
maintain erosion and sediment control measures such as fabric filter fence, staked hay bales or
other measures deemed necessary by the Commission’s agent to prevent erosion and sedimentation
impacts to wetlands and watercourses.
Erosion control and soil stabilization measures shall comply with the approved plans and the
guidelines as established in the Connecticut Guidelines for Soil Erosion and Sediment Control,
2002, CTDEEP Bulletin 34.
Upon direction of the Commission’s agent, erosion and sediment control measures shall be
removed by the applicant following stabilization of the site.
All work and all regulated activities conducted pursuant to this authorization shall be consistent with the
terms and conditions of this permit. Any structures, excavation, deposition of fill, obstructions of flow,
encroachments or other regulated activities not specifically identified and authorized herein shall
constitute a violation of this permit and may result in permit modification, suspension or revocation.
In the event that any additional wetland or watercourse regulated activities are required as a result of other
agency permitting to support the proposed activity, the Waterford Conservation Commission reserves the
right to reconsider the proposed regulated activity and may require modifications to minimize the impact
to wetland resources.
In evaluating this application, the Commission has relied on information provided by the applicant. If
such information subsequently proves to be false, incomplete and/or inaccurate, this permit may be
modified, suspended or revoked.

Waterford Conservation Commission
Inland Wetland Permit #C-21-11
969 Hartford Turnpike
Page 3 of 3
This permit shall be valid for a period of 5 years. Permit extensions may be authorized in accordance
with CT General Statutes § 22a-36 through 22a-45 inclusive. If the regulated activity is not completed
within this time frame, the permit may be held to be invalid by the Conservation Commission or the
applicant may be required to petition the Commission for an extension or re-issuance of the permit. The
Commission may require the applicant to furnish additional information at that time.
The Conservation Commission renders this Summary Ruling in accordance with the Waterford Inland
Wetlands and Watercourses Regulations based on the following considerations:
A.
B.
The activity does not involve direct impacts to inland wetlands or watercourses.
The stormwater treatment system is designed to capture and treat the water quality volume from
impervious surface areas and to detain the peak rate of surface run-off prior to discharge to the
receiving wetland. The hydrology report indicates the project will not increase post-construction
discharge to receiving wetlands.
The stormwater basin design incorporates permanent pools that increase residence time of
stormwater in the pond to treat pollutant and thermal loadings prior to discharge to the on-site
wetland.
Short-term impacts are minimized through the implementation of a detailed erosion and sediment
control plan, a phased construction sequence and required monitoring of construction erosion and
sediment control measures.
Long-term impacts are mitigated by the stormwater treatment basins in controlling water quality
impacts and detaining peak flows prior to discharge to the wetland.
A wetland non-encroachment area has been established upgradient of inland wetlands to preserve
a vegetated buffer and to protect inland wetland resources from direct and indirect impacts
associated with adjacent land development.
Strict adherence to the terms and conditions of this inland wetland permit will protect the quality
of inland wetlands and surface water on this property.
This permit will be strictly enforced. If the Conservation Commission finds that the applicant has not
complied with the permit conditions or has exceeded the scope of this permit as set forth herein, or, if the
intended use of the general site is not as represented by the application or the plan of record, the
Commission may suspend or revoke this permit, direct the Environmental Officer to issue a cease and
desist order, require the applicant to modify, extend or revise the site work, or require the applicant to
restore the area to its original condition.
Date Issued: October 28, 2021
Issued By:
Effective Date:
Chairman, Richard F. Muckle
Waterford Conservation Commission