J.M. ALBAINE ENGINEERING, LLC
14 Lincoln Road, Waterford, CT 06385
Phone & Fax: 860-439-1111 Mobile: 860-705-1631
Email: jma724@snet.net
[ENGINEERING |
February 5, 2011
Mr. Mark Shenking
Chief of Fire Station
Oswegatchie Fire Station
441 Boston Post Road
Waterford, CT 06385
RE:
Update on Structural Shoring for Damaged Roof Section
Ref. Drawings:
JM Albaine Engineering, Dwgs S-1 to S-6 dated 10/25/10
Dwgs. S-6, S-7 rev. 1, (DCN #1) dated 01/26/11
Project # JMA10-327-06
Dear Mark,
| visited the site on February 4 for an inspection of the on-going work, and to meet with the
foreman for Noble Construction, John, and go over some issues that have came up during
the implementation of the shoring. Herein is a summary of our meeting (see new DCN #2,
drawings # DC2-1, and DC2-2, dated 2/05/11):
1. All the shoring in the Apparatus Room has been constructed in accordance with our
specification and drawings referenced above.
Columns P7, P8, & P9 in the Dispatcher Room and surround areas will be
supported on existing foundations, eliminating the need to carry them down one
more level.
The temporary beams supporting the exterior edges of the roof, at both above the
Hall Room and Kitchen (second floor, see Sections A, B, & C (Dwgs S-2, S-3 and S-
4) will be installed at a lower elevation, with a short double stud (one king and one
jack) above it, to make room for the potential installation of the future new ceiling
joist.
The new temporary roof supporting beams over the first floor Day Room and
Kitchen will need to be increased to triple LVL’s from double LVL’s since we will
need to cantilever those beams at each end of the room to avoid additional
expensive work on the exiting features in the these rooms.
Most of the ceiling has been removed, and the condition of the roof framing exposed
so far is considered dismal, especially in the area where the two roofs intersect, and
at the flat section of the adjacent roof. We discussed the need for current work to
be done very careful in this area to avoid the possibility of any potential partial
Page 2
collapse that may cause injury to the workers. Once the temporary shoring is
installed, this whole area will need to be surveyed completely to determine the
actual framing condition for the future repair.
6. We looked at the roof area right above the Kitchen at the second floor, and some
column relocation may be required, as we are trying to minimize the work around
the ceiling over the Kitchen.
The new changes proposed on this report are done for the purpose to minimize the
amount of disruption on existing features, and to ease the installation of the future roof
reinforcement framing. As more area becomes accessible we expect additional adjustment
to the design drawings.
If you have any questions or desire further information regarding this update report, please
contact me at your convenience.
Respectfully submitted,
Jose-Miguel Albaine, M.S., P.E.
Structural Engineer
cc. Robert Avena
Frank Hoagland
Steve Cardelle
Rocco Braciaelli
Ed Noble
\ 1)
TEMPORARY SUPPORT BEAM: (3) 13/4 x 9 1/2" LVL é 4
ft 2 A DCN #2 1g
_ Je o 5
ap o. g 5
spp 3? i 2 RY
r > n a 2° - W es bid
<8 13°-O" +/ | he 13°-8" +/ g as
2s;
CANTILEVER z yss
MAX.2’-6" KO THE FINAL LOCATION OF THESE 3 COLUMNS = _8b5
TO BE DETERMINED AFTER CEILING IS REMOVED | SES
* of2 Hy
ite) os ae?
N - 5 peeese
INTERSECTION PLANE BETWEEN = 1 =| gsi?
THE TWO MAIN ROOFS = | 5[2geze®
FRAMING FOUND IN A VERY Zot gy] gpeess
"WEAKENED STATE - SURVEY COMPLETELY a | pbs: a?
| AFTER THE INSTALLATION OF THE SHORING oe 1232 32
——
EaGaess
2
nN
y
? 0
EXIST. W21 x 62 BEAM af Td 0) Q
, aan
|
WEY
Ss
—~ | > Q
fF < ae dk
6 us {op oS
{o) nN <i :
8 8 Nov §
x WE Wy s
Ss SHk 3
= ) Q ¢ >
4p» — DRAWING No.
v
mt DC2- 1
le 27-3" 4+/- . WAC REV. 2
STRUCTURAL ARRANGEMENT PLAN FOR ROOF SHORING ne Je Atens HB
e
(FRONT)
JDATE:
02/05/11
(2) 2x4 STUD WALL
(24"
SPACING)
-
TYP.
RAFTER w/ (2) #10 X 3 1/2" SCREWS
POSSIBLE FUTURE LOCATION
OF NEW CEILING JOISTS
ti:
EXTERIOR
SHORING
BEAM:
tt
LIGHT
GAGE
ANGLE
A23
(3)
13/4"x
91/2"
LVL
BEAM
(SIMPSON
OR
APPROVED
EQUAL)
(TYP.
2
PLACES)
|
ON
EACH
SIDE
2
i}
|
2
POST
BEYOND-TYP
_
SEE
DWG.
S-1
FOR
LOCATIONS
>
EXIST. STEEL BEAM
THIS
SECTION
IS
APPLICABLE
FOR
SECTIONS
A,
B,
&
C
FOR SECTIONS A & B (DWGS. S-2 & S-3), THE EXTERIOR BEAMS
ARE: (2) 13/4 x 9 1/2 LVL
FOR
SECTION
C
(DWG.
S-4)
ALL
THE
BEAMS
ARE
(3)
13/4x
9
1/2"
LVL
)}
1S)
=!
=
2
5
2
3
= ~
& =
@ $
< ySe
= eos
S
pore)
3] 38a
3] ES
~|
>b2es.
Sot gl) eegete
2 | 5] £22322
t
yw =~)
a8
w
OG
v <
TOO
Va
Taq
6k
ae i
S
szu
§
QU
S
0E
HO
$
Quis
ES
DC2-2
JDATE:
02/05/11
J.M. ALBAINE ENGINEERING, LLC
14 Lincoln Road, Waterford, CT 06385
Phone & Fax: 860-439-1111 Mobile: 860-705-1631
Email: jma724@snet.net
[ENGINEERING |
March 6, 2011
Mr. Mark Shenking
Chief of Fire Station
Oswegatchie Fire Station
441 Boston Post Road
Waterford, CT 06385
RE: Structural Shoring for Damaged Roof Section
Ref. Drawings:
JM Albaine Engineering, Dwgs S-1 to S-6 dated 10/25/10
As-built Dwgs. S-1 to S-8, dated March 5, 2011 Rev. 2
Project # JMA10-327-06
Dear Mark,
On February 26 and March 5, 2011, | conducted the final inspection of the installed shoring
frame work. | have attached the revised As-built drawings (S1 to S-8) showing the final
shoring installation.
We also observed that the exterior North wall has a bow (outward displacement at the top
of wall) of approximately 3”, with the East and West exhibiting bow in the order of 2” or
more. Here are a couple of options deemed to provide a practical repair in term of
construction, economics, and long term performance.
OPTION “A”
Reinforce existing roof in place as shown on Dwg. S-5. This option will not remove the
current deflection (sag) on the ridge, but it will provide a strong roof capable of resisting the
current building code load requirement. The “roof “sag” will not be noticeable from the
inside as the new inside ceiling finish will be plumb and straight.
Note that this is a conceptual design and that more analysis is required to develop the final
design reinforcement to fit the existing condition.
OPTION “B”
Remove the entire roof frame from both affected buildings, and provide temporary support
in the areas where adjacent roof abut the affected roof.
Under this option two paths may be followed:
Page 2
1. Rebuilt a new roof framework using conventional “stick framing” and/or
engineering lumber where required, and adjusting the configuration to conform to
the bowed exterior supporting walls.
2. Installed a new system of prefabricated metal connected wood trusses, in which
case we'll recommend that all the exterior walls be replaced with new 2 x 6 walls.
In all cases, we recommend that the upper exterior wall be either reinforced (Option A &
Option B, case 1), or completely replaced (Option B, case 2), since the structural integrity
of these walls have been seriously compromised by the large thrust (lateral) forces from the
roof framing vertical downward displacement.
For the two lower bearing exterior walls (East & West walls) housing the Apparatus Room,
we recommend that there walls be repaired and reinforced as well, since the sill plates at
the floor level shows advanced degree of deterioration.
Please note that the installed temporary shoring served the function of stabilizing the roof to
prevent a sudden roof collapse. The shoring are designed to provide a safe working
area/platform during the projected work to repair or replace the roof; this framework has
been designed for temporary application as other elements such as the exterior walls are
subject to local or global failure (such as from high wind pressure or suction induced by
hurricane forces).
We will work with Noble Construction to develop an estimate of the construction cost for the
options described in this report. We strongly recommend that work proceeds expediently
since the installed shoring are only designed for temporary application.
If you have any questions or desire further information regarding this report, please contact
me at your convenience.
Respectfully submitted,
& -~ fit} .
Jose-Miguel Albaine, M.S., P.E.
Structural Engineer
cc. Robert Avena
Frank Hoagland
Steve Cardelle
Rocco Braciaelli
Ed Noble
hoz 1 <0 coraIva
a)
90-42E-O1VNI" "ON 392f044
H
NV1d Ady 9 SALON TVAANAD
S8GESQIO 1D ‘dAHOAAALYM
AYOA LSOdA NOLSOG
Udad ASla AIDLYOAMSO
ALVWIXOSdd¥ JAY NMOHS SNOISNANIG TV ‘ALON
(LNOwS)
ONIAOHS 400A AOA NV 1d LNAWSONVAAY TWANLONALS
“AaNLINALS JOOA ONUSIXA AHL AOS
ANANRAOINISS / SIVA TWNid SHL SO INANSSASSY TINd V BLFIdWO2 O1 YACAO NI GAAOWAA ATINSaYVI
3d GINOHS JONYWAOsAAd JANN ONIAING AHL AOA GAAINDAA LON SWALI YSHLO ANY ‘NOLLYINSNI
ANBMONIMY 6002 ¥ INANTTUUNS ANIUIINNOD GOO *COOZ 2A! "3007 ONIATING LNUTINND? 49 AVIS ®
9xz(¢) lzd 9xz(e) Old ONIMAI/OULY BAHL TY 40 TVAOWSA 3L31dW09 SHL ‘ SDV 1d NI SI SANLINSLS ONIAOHS TY AAs
9xz(e) Oza 9xz(e) 6d ‘aaLa14N02
3d GINOHS DLLLY SH NI ONISOHS ONINIVNAS SHL ‘G3TIVLSNI SI DLLLY/ ONINIED MO1ag AHL 4O
OX? (g) 6ld 2xz (¥) ed Lad AOPWW FHL 39NO “SaMLINALS ONIBOHS AHL TIVLSNI OL YAGYO NI 3NOG Ad GINOHS
9xz(e) ld 9xz(¢) ld le ee oo 4 ONITAD ONILSIXA HL 40 IWAOWA2A WILAVd “AANLONALS JOOA AHL NO ANOd SI YAOM al¥daa
I GLE TWNId ANY 3¥04ad GaLNAWA4 1d 3d TIVHS SONIMVAG ASBHL NO NMOHS NV1d ONIYOHS AHL
9xz(e) Lid 9xz(e) 9d #ALON
9x24) ld 9xz(¢) Sa | |
QxZ(p) Gld 2xz(¥) dba _ ~% gs),
ful \ Vv
9xz(¢) ld 9xZ(b) Ved A wr
um
$
9xz(¢) ld oxz(b) ed ay 7 Ss “NOUIZASNI Od AVS SI
3 g i ra MAO NBHM BY7T ONUSAL "OBYINOIA NAHM ASILON TIVHS YOLOVALNOD SHL “TWI2IS40
ae x ONIDUNG 1V901 AO 3409 SHL Aa GAdINDIA SNOLLIAdSNI ANY NOLLOMALSNOD TY
9xz(¢) ald Qxz(¥) 2d — 85 g 40 ALITVND AOA F1GISNO4STY SI YOLDVAINOD 3HL “SONIMVYO NOISI 3S3HL HAIN
ree aWhnione = E = BONVITANOD WWASN39 YOs WAOM IWNI4 SHL BAXASGO T1VHS GAOITy 40 WAaNIONA
9xe () Wd 9X% (¥) bd awn 4304dN¢ 4OMALG 3 8 zs Qo “NOLLINALSNOD 30 LAVIS OL YORd YABNIONT GNV "AANMO HLM ONL
a _ Ey 3 NOLLINILSNOD-34d Y 31NG3HIS YOLIVALNOD FHL LVHL OZONAWNOITA ATONOALS SLI
AINGAHIS 1SO04 Fs BNMLINYIS 3HL 40 BONVINNORIDd
> WARL-ONO1 BHL 404 A ISNOAS3Y CTA 3d YO “HOM BHL BA0¥d4Y LON TUM
‘UABNIONZ FSWYISHIO "GACIIA JO AAANIONT IML AG ONULEAM WI AAO EY
3d TIVHS SONMYAd NO44 NOULYIAIG ‘SONIMWHd 3S3HL NO NMOHS STIVLA0
es ee eee ee ¥ ‘JHA HUA ATAINOD O1 ASITIBISNOASTA SAOLIVALNOD AHL SLI LON
H r “NOUWLYIZLLON ONISZANIONA 3¥INDIY LON OG ANY 31GV1d499¥ Sav ‘NI 9 NIHLIM
‘ ‘S3INVUSIOL WWNOISNANIG - ADNYdIAISIO YOCVW ANY 40 YIBNION FHL ASLLON ONY "WHOM AVIS OL BOIad
k ASAINS AL@VIONALSNOD V LINGNOD GINOHS YOLIVALNO 3HL “ALYNIKOAdY FAV NOIHS SNOISNZMIO TV
H ard
"ALON
: | WV3d Z9 *IZM ISK ¢, e
Z — 1 La
(U¥oddns yors3iNI 404 4A) !
WIL LX HE (Z)90_ | ie i - j
WW3d 1¥O4dNS AMVAOINAL ep g es H
a
&
~
7
y
|
ay |
ae : aon au aan (233 Mae Tie aaah ota °
pot | ss HEINOUS cn Seto oa Saris LVN NAO
ea = j NIBA0D TIVHS SININAMNDIS
? Sh SNGONTHSS 160M 3H “SNOUYOLIOAMS ONY '61YS30"S3)ON WABN0 3ML NBBML3GJOMANDD 40 35V3 Nl“
ZOXIZM i; —|. = “sos Sun.ovno9 3k 38 TS SINaMNSO8123P0ad BH HN DNVMLONNOD 493001 THO ID
WV4d 1931S ONILSIXA ONILYOdANS FAV Bhd 9 ‘Gd “Zd ‘ld S1SOd (b . mn” _— ome _ “se
m oe _—_— “WOLIVAINOS BHA 40 ALI@'SNOdSIY FIOS HI ISV NOUMNSNO? ONUSKA 40
a =U ll ————_§}— _-W1.26 * #7¢ 1 (2) eva Laodans Auvaoawal ONOWAG GNY ‘ONTIOHS ANVAO 'ALBvS 311s @or z
‘GWVAG 14a1S ONILSIXA NO a or <moma‘puoesascnnos Dua’sniavo Ano saoion was
GALYOsANS TAY OZd ¥ Eld ‘Bid ‘Gld ‘Zid ‘Id ‘9d ‘Gd ‘Ved S1SOd (S BS, a "pwaneALivinasus Seiler erga Oa are ra
a od i, m N pu ¥R0V3H WT. 6x we +(e) EG
‘dFAOT1AXS ANV GAN340 JAY SVB 3 S
AaLaV NOLINSLSNOD ONIN dalslaaA 4d OL NOLYTIVLSNI = z wine sie (©) san.avanvve 3h Hun soNvoRODOV N OBTIVIGM 20-TIVHE S¥OLz=NNOD YaGNNM
HL ANY 13A37 LS4MO01 SH OL NMOd Awa 3d OL 34N TIM = = wv30 ¥2iNz0 40d i504 9%2 (+) TM "
a Ms 4 ri ‘ . pa Ki 3 is A154 O1L* SL = (A1) 4340 vie
IZd 8 O@d ‘6ld ‘@ld ‘Lid “bld 'Eld ‘Old ‘Gd ‘Gd ‘Ld S1SOd (Z S s ‘ence womses tive wa
1.20 6 * vie | (e) VIG 1¥OdsNS ANVNOANAL oS gs SneeasneS
SONIMVAd ASAHL NO GAIIidad ONIYOHS GaSOdOwd AHL / scuuuesreaacs
OL SAONVHI ANOS ASNYI AVA SIHL “STVINALWW T1¥ Le = Ls bier 140¢= ovo1MoNs enn039"s
dO d4aVa19 JILLV SHL 9 GSAOWSY SI ONINIAD AHL AINO yd op = y001s ¢no736 No over Nousnasnos
ANAWLSNCAY ONIYOHS 44xINDZy TIM VAaY SIHL (1 4 snd aay Iv avo} woUTaNEHOD
a
| 9|° 9/2 ‘ONE! UY 9 4008 40 IHOIaM Ov3G 1
‘SALON iB ay — W120 6* /E 1 (2) WY30 190ddNS ANVHOSHEL SCIVOTNSREIO
| “a 1 RIVONOSITS
sxs309Na 11930
“BSINISHIO O41ON SSTIN NOWIAT 1S4L1 FHL 3S “193Oud BHA NO GSHTADIAIA HOM TIY 20
*NOIS3q 3H O1 AT4d¥
Enray
SaaVaNVIS
ONY
55000
¥
SSHION NOUINUISNOD ON TWaNLanasS TWaNED
oz 19050731
a)
ON “OMA
ya = t1e A126
ST
2
3 DH
8 TMm
z 9
a =
= S
5
=
O-k*
2
BWIE
& & WT NAT AIC
Som VY NOILIAS
8
me
=
—
S
=nn = > SS SS
7 =
D
Es
“aA
.
=}
dV1¢
1249N09
01
SMIYIS
YOHINY
t
Ale
ae
Bova
ef
m
B139NOD
GH
NAL
¢*.ZA
(2)
(vN0a
aBA0YAdY YO
NOSAHIS
m
Gza1*
e410)
ro!
€2v
FIONY
39VO
AHO
~ 2/0 .¥2 GAIVES SMIAIS
nn
NOT A8
X
9X9
FIONY -
Zi
aivid
INae
BLYINOD GH
NEU
ZAO*
Zn
Mm
Zs
ow
2
ia
é
0074
31BXONOI
“SKE
OL
MEAIS
>
:
BLV1d
¥BNM9
¥z
(Z)
mM
vaa
SIHL
NI
m
TVA
AsyaOgNaL
Zz
NOISIAZA
303
9-S
"OMG
44S
i
ddA
HLM
NIT
NE
-
—
||
_
a1e1ss04
sv
36070
sv
=
GATIVISNI
OL
OTAIA
ma)
S30v1d2
dk
|
>
—
240
WZ
BWM
ANUS
9XZ
3
Zz
270.9,
03945
9*Z()
x
TIVM
L80ddNS
YORADA
ob
W430
>
eae
geeiY)
rae
39VaG
TWNOOVIA
1
LNIOd
OZIHL
LY
a
.
AYBLS
IOV
8
*.9
FOIE
Cc
NOT
wh/S
*
LUO
VIG
SNVHS
Hy
jBNALSW4
SOB
WH
(+)
.
(emywz
au)
Wd
12316
OL
Nid
by
TWA
BOCKEIS
“LSS
&
ube
W140
ops
{3015
Hoya
NO
3NO)
9*
¥'NOUAO
S3019VAINOD
Ss . 9NO1.2*9% 9 STONY - Zi 39V9 IVT INIG - SMAIS «ZN +x O1 # (2)
=
vad
com
ests
i
IM
S1SI0F
40013
OL
M3495
f
“di
oe
LJ
ALV1d
33017
9
*Z
(2)
i
|
7
4
“AL-
SISIO?
2007S
“ISG
OL
3015
HIV
NO
=
a
=
o————
to
|
|
~~~
Gna
aasoyzav ¥o
Nosawis)
S v iy SMBIIS ZA» X O18 (2) MINS €2¥ FIONY FOV SHOT
O0
AAV
1d
B37 Zt
¥
2
(Z)
i
S 3015 HOV3 NO |
4
0)
BS
~
Gyno
aaA0aday
40
NOSANIS)
||
wan
gzv
TONY
Z9va
IHON
1
ag
s
-
q
Zz
>
S1S10F
¥O013
ONUSIXG
40
.9
NIL
G3TWVISNI
©
VW
NoUv201
ONS
HIVaAY
BAY
S¥30V3H
YOd
S1S0d
LVL
33NSNS
>
a
00
22%
oe
(2)
36n
GiAld
3HL
NI
YBLV1
G2NINY3IZ0
36
01
S¥AOVBH
40
NOLYION
|
0
Tt
JHOFBHAIN
LY
dvas
AHOWAIS
ON
HO¥A
LY
SONS
314N0G
¥
S¥30V3H
9X4
30
9*Z(Z}
\|
“0
_
1
SONINSSO IOUK
.0-.¥
-
{Z)
3QA0SS
(ey
a4
it
|
SMBS
ZA
GX
O18
(@)
m
aNLS
ONTY
NELSVS
“AAL-
210
62
@
SAMI
9*Z
(sovr
3No
9
ONT
BNO)
4A
q
|
|
|
210
#2
©
TVA
GMS
9
Xz
(2)
YOR
|
9
>,
C4AL)
NOtLY201
NS
Hava
LY
KOUYI01
GUS
HOVa
LY
SNZIIS
ONO]
WE
¥
@8
(2)
BOBS
5
4
li
4
wd
‘5MaUD6
ONOT
2
98
(2)
HAM
ONES
#73
OL
NBISVS
30V¥d
TVNOOVIG
FxZ
LO
SOE
SINOS
a
iV
Q
‘ONIDVd
TwNALVT
SONNUND 9
XZ
B39 .ZM
*
Ol
(1)
/M
SAU
YALSVY
OL
NBLEYS
a
QO
m
BLvid
BQN
9
xz
(2)
-
qv
910.62 @
9*2
“$3
ALIVE
LSU
i
SMBS
ZN
SX
O18
(2)
/m
BALA
SNUSG
OL
GS
ONINAESYS
=
euanee
peer
5)
Sovou—
“AL
-
(SNID¥dS
#2)
—
NOUVI01
Balsa
HIVE
LY
aA
(ora
3NO
®
YOVP
3NO)
I
—
2
2/9
628
9*Z
S¥aLavs
1509
i
[a
a
|
—
210
2
@Y*Z
ANUS
ISK
g
[=
SMIYIS
O1€
(Z)
1M
BOTY
SHA
OL
ANUS
ONIN
NALSV4
(Qiave BNO 8 ONTY ZNO) 2/0 42 @ SAMUS 9 xz (Z)
@-s (Sas ensos
wna d NOMDAS
0-4 = hte 31v95]
ooo
9O-L2E-OLWWT “ON 299/044
WAOAddY S.AZANIONA 4HL HLM GaSN 3a AVA
ONIONS AAGNIL GIIOS "WVAd 1341S SHL NO A1LI4¥IG GATIVISNI 3a LNV2 160d JI ‘SON ¥*
SAV 1d € “dAL
a0014 GNOIAS LV ONIAOHS 4O MAIA NOLLVAS14
ad
NOILOaS
VaaV AFHILVdSId LY NOLLIAS
woos 3HI1vASIa MOTTA
ONT W/E * LLNO VId INVHS
(201% .@'0) Pos (¥) m 1604 OL NBISYS
— (gals Hova NO 3NO)
9NO1.9*9%9 TONY - 21399 aIVId INIA ye
HOB TASH ONnING
_GSZIT¥Nd 39 01 NOUTANNDD -
373431 4NO1 3H OL MNOS
WV¥3d 29 iz“ LSia
Wad 432132 (Sxove ze
SMF4IS ONO .2M ¥ * "Vi «ere (2) ASN
|
|
\ |
‘SNOUVIOI 2042-5 OMG ZAS
|
i
usw
tA
= AL - QNOARE 1504
SEBO LD “AxAOsSAALYM
AVYOA LSOd NOLSO”DG
_ {s30v1d Z"dAl)
(a34399¥15) 3015 HOva NO WSTZH oWVad ONTAOHS Yo!aLa
VAT QL WEL G
anus xovF 04 onus ons 9 ¥aav2N Os ane ones) SEW OETA NOGHES Wadtaats tote
(ax HovaaAs)- SVN NoWNOD FoI E | SPiV3d ONIIOHS ZOREUNI |
9% ¥ NOW S:3OLIVBINOD _ au * =
> M2299 2/ ¥<ols (0) TM S3U yaLsva OL NAISYS
o BIV1d B3GWN19 xz (Z} — |
aoy
S3LL YUVA 4O GNA HOVELY
SMIAIS ONOT EX Zie (€) BAADAS
A450 Aaa AIWDLYOAMSO
|
|
——— _WY3¢ 141 ONIdOHS ] ow 1 (STIVN 40 1317 NI SMI¥9S ZA * 6s 350) | ' =
|
2/0 #2 © OXZ ‘S3U YALAVY ISDE
(smdsz) y Wad 11 GNy 3adva
‘70.210
O1.2AC* en
Sas
NOSaNtS
-
a|
See aan
ry hoz orien
/0.eZOV*Z ANAS
TOPs
E08 1) Beka,
Poa nema
2
(GOVE 2NO 9 ONT 3NO) 20.62 @ Sans 9*Z{Z)
O77 bupoourdug vrwery wr
2
want aaainoaa ad TIM LNAWLSNay d1al4 _
v-S FONIS 12Ou P On GNOILIAS OL LNANILAAd VAAV SIHL JO ees
ON" ONIAOHS IWNi4 SHL SSANIONG /* ALYNIGAOOD OL AOLOVALNOD i Ga Da ——
aero "30N »/ NOUWOAS
= oxi
—
: — —
g
=
S
&
|
8
m
9
pent aay 391340 ¥BHILYESIa
Ss ‘BHI Y3A0 SWV3@ ONTOS ¥O2 1504
ae
x
Pal =_== > i aos
2
i)
=
2 e20e NOUISS LV GalsldgaA Se O1 WV 3e GOOM
x =
Zs
=)
ee
m 1 +
=
> V34¥ 391430 Y3HIVASIO
pas HL 3340 SHV3d ONRIOHS ¥Os 1S04
oe
&
VaaV 391440 HOLVd4SId =
=
Q
9
.
WAOSddV
S.AIANIONA
SHI
HLM
aaSn
a¢
AVN
> 9 i()) SONIAOHS N04 GAN3d0 SI VANV FHL FINO S1S0d ASAHL 4O ONIIIOTE SIGNI GII0S ‘WV4d 1441S SHL NO A1L9ZaId GATIVISNI 3d LNYI 1S0d 4I‘ALON
0)
it 4 < NOIUVI01 AHL ASANIONA /M FLVNIGIOOD OL YOLOVALNOD L oeTM au iene
a : i) "ALON
O43
0 9 9 €-S "ONG - .G. NOUIAS
Yor
33d ONIDYBS TYNODVIG
— NY id 43S - W¥3d 1331S NO
Q 7 ii 1504 9*2 (+)
q -
O05
Son
gd
Vy Q waLdv4 OL ONT
g VaBV 301440 BHOVESIG BU BBLS OL OWE or
a BH ¥3A0 SMV3G ONTICHE ¥Od ISOS aui-aans ano 2x2(2) 7s — WYRE AT.ZN OX .H/E 1 (Z)
a
FIONY
ONINYSS
ONTSOHS
YOSLN!9
AOI9ALKa
= Tr 9% + NOILAO S3OLIVALNOD * eee J
2n0z 3305 ZA bX Ol# (1) TM Sau Falvey O1 NSISVS a a ZN 02
j avid 820192 (z) * —_—
3 ia XZ Sau vals ISG
; ° 9 42% 8 92 *S¥UsVA ISNA
®
i SMZIIS ZA S* O18 (Z) /* SOA “1S1X3 01 ANUS ONIS NALS¥3
E (SOF NO 2 ONIN NO) 2/9 .¥z @ SONS 9*Z (2)
hig2 1901 ¢0 7380
ZAM
G-S
“ON OMG
PS
(1S09 ALVWILSA NOILONALSNOD AYVNIWI14ed 404)
INAWS9AOANIZA 400A AOS NOISAG WWNLASINOD
90-22E-O1VT “ON 399[014
“4 NOWIaS | |
C1130 33S __
Asior sumia3 @*2 37@n0d man
‘JAL - Oa G2aVaYHL ‘via Zit (<) “dAL- L100 NYHL ZA (2).
“4A - GO" G3GV3¥HL ‘Vid Zi (€)
SIVLdd % LNINZIA0ANIFa TVN1LdFINOD NOILIAS
|
Sa 30 33S uN |
(gansva 40 301 Hoa 3NO) s >> |
Asior onr39 @%2 31¢n00 NaN i | ) peated EERE EES
JNM ATAOANITA VBLIVA XZ NAN | eusereiels puecensannetaretaae |
Lu. SES AASAS ECE ae a 210.4 @ 9X7 SAMAVY'1SKA
reouvu ono PIS Oe !
OCCU IHL SEMEN nS SS “AAL-7/.$Z @O*Z UALS MIN
(galdva 40 301s HOv3 NO 3NO)
9*2(2):3u yyTIO? NEN “AAL- Sioa M¥HL ZA (e)
| v€n WWL3d
s5i0r ONNTIRD @ «z aNaNDG MAN ~~ SAIV 1d €“dAL
NMOHS SY a34309V15 2/9 .¥2 a30v45, 40014 GNOIAS LY ONIAOHS 40 MAIA NOUVAATA
N01 .9 ¥ #/ SMBIIS MAS NOSAMNS
| “3 NURS
210 $2 030VaS
901.9% ax2
(Z)
sxo01g ¥aTIId cn souvriise ona
nouvaeNat ou waLaY
_
gzmvied 30
01
KOUTINNOD-
STRAT IH07 34 01 RW
= BANUNOD 01 1604 aH3
S8SPGO 1D “dAOAAaALWM
AYOA LSOd NOLSO”G
Udad Axia AIWNDLYDAMSO
(2n4*.9pr0) poi te) 1s02 04 NaLS¥A
P {30:5 Hova WO ano}
eS Siv3a Gna (SuD¥e-z ON . ONDT.9<9X9 TONY - Zi 30VO FW WAINGA
un WWLAG “dA - ON HOA LY
SMBUS ONOT.ZN «wid 278 (Z) 350
vad
3aez
tau
1508
) Xe
Yr
Hess § eo
eae 2/921 GAD¥s6 SANDS .0n 6.909324 _NMOHS SY OBNI09VIS 272 21 030¥46 =
EEE
enone?
|
Ese
25"
op
=z cry
Zn
9-S
“ON “OMG
eee
€-S
“OM
|
#
NOd
WO
WOOd
SNLVaAVddV
NI
XALVSH
GNNOAV
ONINVAS
+S.
WV
LAd
QO-LZC-ONV “ON 490/045
(Cynda
Gaaguday
xO
NoSanis)
2¥
ZIONY
3O¥9
JHONIIM
(1 #NOq ‘433)
ONINVAd JOO AAMOT SHL AOA LIINA-SV
swveusoseuso
b-S
“OM
|
#
NOG
Woes
7
WOON
SALVAVddY
7
TAAd1
NAMO1
SHL
LY
AYNLONALS
ONIXOHS
L1INd-Sv
20 0-2. 8 9X2 (2) —
2-S'9Ma~
b
3vI30
335
“
——
.
ONDE
WHAT
NGI
9*Z
7
GLE
NydS 14 9 - 330V3H O1*z (¢) 1 7
wienexwer()
3
Zs
;
g
Y
was
210 «2 @ TIYM ONS 9*Z Fe =
=U
TIM
13044NS
YOINELS
28
8
aE
B
JHOISH
GIM
LY
1504
39va8
=
ab
&
g
—
GNA
HOV3
LY
1S04
9
<z
(€)
3aIAOad
5
=
9
b
NvdS
14
9
-
33GV3H
O1xZ
(¢)
&
=
g
e
wWizn
exei
(2)
AY
x
#
‘
4
$3did
YATINIAS
ass
Z-S
"OM
|
#
N90
WOXs
ie
“aero
nana
tovasv
e092)
Ham
rO
Q
NOILVaad0
400d
GVAHAAAO
MOTIV
OL
WOO
SNLVAVddY
LV
SANLS
ALVNASLIV
:
Ord
JAG
INVdS
TA1Z/
6
x
¥/¢|
(2)
B3QVBH
WZ
>
Yu
WIA
pou}
Yea]
revaaz0
iow
3500
oy
2
+8
oa
gS.
a
O09
Y¥
NOWOaS
A1.ZA
6
¥
1G|
(2)
WY3G
1¥OddNS
ABVAOANAL
|
a
iE
aa
y
Seis
(Ux04dns
TI¥M
OrraIXa
30s
“4AL
H
uy
NA
1
Saree
te
neonatal|
W126
*
¥/¢|
(Z)
WV3d
1¥OddNS
ABVAOANAL
7
:
Q
Os
Gz
(asn)
eySey
STONY
39V9
HON
i
Hq
ea
“a
>
A
I
7€
OL
OC 10
372,
029¥AS
SMBLIS
—
N)
m
‘BIZYINOD
GH
NAIL ZA
9X.Z/
i
ie
G0
YOOTS
BIB¥INOD
“ISK
OL
MESIS
#
db
0
TIVM
YONA
“1SIK2
Oe
BLV1d
S37
9
xz
(2)
g
g
m
TIVM
4OINaDG
“ISG
ao
AS
O
3
9*2"139
ONNOOTA
=
9%z
"130
ONNOOTA
B
“le
210 wy @ STIVN NOWNOD POL 2-4 °ONG- 1. Wvs30 335_ > 2/0. @ STWN NOMWOD PO! aN 5 =
Pal
WOLLOd
BHI
YV3N
‘3S
3NO
ONDA
WARY
NOI
9
*Z
WiOLLOG
3HL
3V3N=13S
3NO
@oTM
<
=
|
AHOIBHGIN
3V3N
13S
3NO
AHOISHQIN
YBN
12S
2NO
g
&
401
3HL
BV3N
5135
3NO~
Adid
“150
ONIGOVALS
aid
160
ONIGavaIS
401.
3H
van
5136
3NO
S
z
MLS
JN-L1INg
40
30S
HO¥3
NO
2/0
2
@
OLS
#2
(2)
270
62
@
anus
¥%2
(2)
anus
4n-11ING
40
3016
H9¥3
NO
2
=
ZA
XZ
SX
XML
Wel
j
—
AZL*
20
GX
SOL
WA
5
S
§
$39¥ad
GOOMATS
YEE
CANES
——
sz
=
$3040
GOOMATA
&
3
g
210
OG
UXZ
9%
¥:NOUSO
S¥OLIVALNOD
FT
ea
=
SNBIIS
-Z/l
¥
*OI
#
(Z)
“dAL
-
SISIOF
BOOT
1S0G
OL
Sas
tava
no
4
SISIOF
ACOTS
OL
bei
mS BUYTs 42H 9*Z
eae
pees
x2(z)
—
(nna
aaA0%aay
40
NOSANIS)
WOO2
23220
HL
Ni
|
(esn)
ey
e2y
31ONV
39V9
1HON
Y2UY
SIHL
Ni
L4O4aNS
B04
@-S
"ONO
MBN
33S
#BLON
We
PON THE
— 7 so
Trae
‘90 23 pane,
971 tasoesug sumary WT
1
hog $0/ co ava
7
L-S
“ONOMG
3
_
sind
8s
*
BSR
ay
m
cS
mn
m
aN)
x
S
S
7
ay
>
ES
Pas
9
vO
$38
4H
An
aXg
azy
Qa4
a
99
Yor
“
Q 05
SA
gon
an
ay
nq
Tora
‘Sei 12 "Reson
Poe soma
OTT “sandy euwary Wr
NOUI31430
ANVIIINDIS
HLM?
ASTIVA
V33¥
TIVM
ONS
404
is04
IwNOUGaY
Al .2A 6 HEA CZ)
é-290
“OMG
2
#
NOG
WOdSs
W1.2/l 6 X o/¢ | (€) AV SWVAd 3H TIV (¥-S ‘OM) D NOLLIZS 4O4
SWV4d YOIALXa SHI ‘(S-S 9 Z-S SOMA) a? V SNOILIAS YO4
29 ‘d‘V SNOILIAS AOS ATAVIMddV SI NOILIAS SIHL
Wv3¢
13416
‘1Sha
|
|
i
II
I
\
i
t
| SNOUVIO1 YOs I-S “OMA 33S
z
z
3015
HOV
NO
j
(s30v1d2"4A)
(wna
a2A0¥sa¥
¥O
NOSANIS)
Wg
TA1.2A
6
*
bie
1
(2)
€2¥
FIONY
39V9
1HON
t
*W¥3d
ONIIOHS
303A
cA
SMIAIS .ZM € X O1F (2) /* WALAVA
Sisior Onra9 maN 40 ONUSIXa O1 GNIS ONINAISWS
Nolv201 3anins a1¢ISs04 “ads - (ONIDV4S #2)
Z-NOUY201 ¥aldva HIva AV
(ours 3NO 9 ¥OVvP BNO)
TIM Ons + * 2 (2)
TaAd1 Saddn SHL LV ASNLONALS ONISOHS Liind-Sv
— ee
7
_
Ba)
—
F
any ~ N¥dS 4¥3TO 12
2 5 loz (¢) =uzqv3H MaN oa
8a 8 z
as es
g
as
_|
eS = S w€.9 ~ NVAS YVIT,
z @ 4% z (2) NBaVaH MAN
x 3S HT
x
a
9*2
(¢)
3aavaH
NaN
8
6Q
33 eS
3 53
O1TMz
(Z)
aBavaH
MeN
&
z
g
ee < i betostieass Fg 3
i ‘ WV3d Z9 * IZM “LSIXa |
i
32
i
Pa
ro
0
a
‘a.
: pe i a8 ‘3 \
: = i a =.
i 3 3 3
= 8 = fare
H 9*z(@) z loxzq «#2 U4, 2x2) gi |
ans a H A, Yes Aes |
Wd + Old
12 6 X HE | (2)
“y
g
Gs a
Lid « / g =
Qld g 2 gid =
fe5 wm Ulti6xviet(e) Ses
mn
et >
= =
=
FS 8
x x
o a
ro 9
led
O@d
6ld
@ld
WA1u2l 6 ¥ ¥/¢ | (2)
|
eras ese T : oy Sei ea |
a
ES
It
J.M. ALBAINE ENGINEERING, LLC
14 Lincoln Road, Waterford, CT 06385 Email: jma724@snet.net
www.JMAlbaineEng.com
Oswegatchie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 --- October 31, 2022
ENGINEERING
Att. Michael Howley
Director of Fire Services
Public Safety Building
204 Boston Post Road
Waterford, CT 06385
Subject: Oswegatchie Fire Station
Inspection /Assessment: Building Structural Safety
Project # JMA22-327-062
The following report objective is to provide an update of the current structural condition
of the overall building shoring as designed and constructed per our recommendations. |
met with Rocco Bracciale at the premises for an inspection / walk through conducted on
October 15', 2022.
Reference Documents
1) Report / Letter dated March 6", 2011 by JM Albaine Engineering - Project # JMA10-
327-06.
2) Report / Letter dated February 5, 2011 by JM Albaine Engineering - Project # JMA10-
327-06
3) Design /As-Built Drawings By JM Albaine Engineering S-1 to S-7, Revision 2, dated
March 05, 2011.
Executive Summary:
The installed temporary shoring on the original building under scope, built in 1928, is in
good condition and no significant sign of distress or deficiency was observed nor
detected that may indicate a concern regarding the safety of the building in the current
condition as supported by the shoring. The shoring is holding up the damaged main roof
over the Apparatus Room, Day Room, Hall Room, and Kitchen, all located in the older
building, the subject of the shoring.
Moreover, the intersecting roof framing between the 1928 structure and the flat roof
from the 1985 structure is a critical area where lots of damage on the roof rafters have
been observed sue to the flat roof bearing on the older 1928 roof.
JM Albaine Engineering, LLC - 860-705-1631 860-439-1111 Page 1 of 4
Oswegatchie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 --- October 31, 2022
However, it is also our opinion that the temporary shoring is not a substitute for the
overall building stability as stated in Reference 1 above and quoted below:
“Please note that the installed temporary shoring served the function of stabilizing the roof to
prevent a sudden roof collapse. The shoring are designed to provide a safe working
area/platform during the projected work to repair or replace the roof; this framework has
been designed for temporary application as other elements such as the exterior walls are
subject to local or global failure (such as from high wind pressure or suction induced by
hurricane forces).”
It is factual that since the installation of the shoring, the building has been subject
to two major hurricane forces, Irene in August 2011 and Sandy in October 2012.
These hurricanes had wind velocity of 66 mph & 80 mph respectively, and the
building withstood these forces with no major consequences.
The deficient roof framing is being supported by the shoring, however it is
subject to deterioration if water intrusion is present which will further weaken
such framing. It is imperative to keep the existing roof framing in a dry condition.
Furthermore, the current Connecticut Building Code (2022) requires building to
be designed for a wind velocity of 108 mph in Waterford, which translates to
building forces increment of 82% above those from Hurricane Sandy, therefore
presenting a high risk of building damage and stability in the case that such
storm may come through our area.
Conclusion:
The shoring installed in 2011 are providing the required support as originally
intended, mainly reinforced the weaken roof framing over the Apparatus Room,
Dispatcher Room, Day Room, Hall Roo, and the kitchen. These shoring were
installed principally because of the dismal condition of the roof framing (see Ref.
#2).
The shoring was found in good conditions with negligent movement changes
since they were installed, thus ensuring the safe function of those areas under
potential heavy snowstorms.
However, the existing roof framing was stabilized by providing vertical supports
at the peak (ridge) down to solid structure and reinforcing the existing rafter tie
connections to the existing rafters (refer to Reference 3, Section “A”, Dwg S-2
and Section “B” Dwg. S-3). The existing rafters (2 x 6 @ 24” on-center) were not
reinforced at the time due to the nature of the work (temporary), and they remain
the weakest link in the chain as water intrusion from the roof will further
deterioration on such elements of the roof framing.
JM Albaine Engineering, LLC - Waterford, CT 06385 860-705-1631 Page 2 of 4
Oswegatchie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 --- October 31, 2022
Regarding the building lateral stability caused by hurricane induced lateral forces
and to a lesser degree seismic forces, the area of the building under
consideration is vulnerable as reported previously due to the weakened state of
the exterior walls specially in the Apparatus Room as previously reported.
Although the building has withstood two significant hurricane events in the last 12
years, there still exist a significant risk of building overall stability if a significant
hurricane passes through the areas because of the condition of the exterior
bearing wall (shear walls) and the existing roof rafters that were not reinforced at
the time of the installation of the shoring.
| trust this information is adequate for your needs. If you have any questions or desire
further information regarding this report, please contact me at your convenience.
Respectfully submitted,
U
Jose-Miguel Albaine, M.S., P.E.
Consulting Design-Structural Engineer
JM Albaine Engineering, LLC - Waterford, CT 06385 860-705-1637 Page 3 of 4
Oswegatchie Fire Station Temporary Framing Inspection
441 Boston Post Road, Waterford CT REPORT #1 --- October 31, 2022
JM Albaine Engineering, LLC - Waterford, CT 06385 860-705-1631 Page 40f 4