Conceptual Cost Opinion - Renovate as New - 052925
document center
| Pages | 5 |
|---|---|
| File Size | 2.0 MB |
| Folder | Departments/Town Clerk |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Oswegatchie Fire Station - Renovation Proposed Renovate as New Conceptual Rough Order of Magnitude Cost Opinion DATE: May 29th, 2025 ESTIMATE LEVEL: Conceptual – No Documents ARCHITECT: TBD CONTENTS: • Executive Summary • General Summary • Basis of Conceptual Cost Opinion May 29, 2025 Project: Oswegatchie Fire Station – Renovate-As-New Conceptual Cost Opinion Downes Construction is pleased to present the enclosed conceptual cost opinion for your review, outlining the budget and assumptions for the proposed Fire Station Renovation This conceptual cost opinion is based on previous Fire Station renovation projects and site visits, no documents have been developed at this stage. The total construction cost is projected at $7,935,921, which equates to $654 per square foot. This includes allowances for design contingency (10%), escalation (6%), CM fees, bonding, and construction contingency. The cost opinion reflects anticipated market conditions, current historical cost data, and pricing benchmarks derived from comparable projects from Downes portfolio. Cost drivers include full MEP system replacement, a complete roof and window replacement, and minor upgraded site access elements. We trust that this budget will serve as a reliable foundation for project planning and are happy to discuss any specific aspects or assumptions in greater detail. Sincerely, Downes Construction Company Chip Natsis Preconstruction Manager Oswegatchie Fire Statilon Renovate as New CONCEPTUAL ESTIMATE Waterford Connecticut Drawings Dated: None Estimate Date: 05/28/2025 COST / AREA 1 AREA 1 TOTAL 12,142 sf 17 /sf $ 206,414 $ 206,414 $ 1 /sf $ 12,142 $ 12,142 $ - $ - $ 10 /sf $ 121,420 $ 121,420 $ - $ - $ 17 /sf $ 206,414 $ 206,414 $ 11 /sf $ 133,562 $ 133,562 $ 10 /sf $ 121,420 $ 121,420 $ 10 /sf $ 121,420 $ 121,420 $ 18 /sf $ 218,556 $ 218,556 $ 2 /sf $ 24,284 $ 24,284 $ 20 /sf $ 242,840 $ 242,840 $ 25 /sf $ 265,606 $ 265,606 $ 2 /sf $ 24,284 $ 24,284 $ 10 /sf $ 121,420 $ 121,420 $ 15 /sf $ 182,130 $ 182,130 $ 35 /sf $ 424,970 $ 424,970 $ 6 /sf $ 72,852 $ 72,852 $ 14 /sf $ 169,988 $ 169,988 $ 10 /sf $ 121,420 $ 121,420 $ 15 /sf $ 182,130 $ 182,130 $ 4 /sf $ 48,568 $ 48,568 $ 2 /sf $ 24,284 $ 24,284 $ - $ - $ - $ - $ 10 /sf $ 121,420 $ 121,420 $ 18 /sf $ 218,556 $ 218,556 $ 80 /sf $ 971,360 $ 971,360 $ 70 /sf $ 849,940 $ 849,940 $ 42 /sf $ 509,964 $ 509,964 $ TOTAL TRADE COST 471 /sf $ 5,717,364 $ 5,717,364 $ 10.00% Design & Estimating Contingency 47 /sf $ 571,736 $ 571,736 $ 6.00% Escalation 31 /sf $ 377,346 $ 377,346 $ General Conditions & Staffing 46 /sf $ 560,000 $ 560,000 $ 0.80% General Liability Insurance 5 /sf $ 57,812 $ 57,812 $ Builder's Risk Insurance By Owner By Owner 1.00% Local Building Permit Wavied Wavied 0.026% State Education Fund 0 /sf $ 1,894 $ 1,894 $ 0.71% CM Payment & Performance Bond 4 /sf $ 51,732 $ 51,732 $ 5.00% CM Fee 30 /sf $ 366,894 $ 366,894 $ 3.00% Construction Contingency 19 /sf $ 231,143 $ 231,143 $ TOTAL CONSTRUCTION COST 654 $ 7,935,921 $ 7,935,921 $ 12,142 sf RENOVATION CONCEPTUAL BUDGET TOTALS BUILDING DEMOLITION SELECTIVE DEMOLITION CAST-IN-PLACE CONCRETE PROJECT REQUIREMENTS CONTAMINATED SOIL HAZARDOUS ABATEMENT FINAL CLEANING CARPENTRY THERMAL & MOISTURE PROTECTION MASONRY STRUCTURAL STEEL DOORS, FRAMES & HARDWARE WINDOWS AND GLASS GYPSUM BOARD ASSEMBLIES SIDING & EXTERIOR PANELS SHINGLE ROOFING FIREPROOFING & STOPPING SPECIALTIES EQUIPMENT FURNISHINGS ACOUSTICAL CEILINGS & TREATMENT FLOORING & TILE PAINTING PLUMBING HVAC ELECTRICAL SPECIAL CONSTRUCTION ELEVATORS FIRE PROTECTION SITEWORK Basis of Conceptual Cost Opinion Oswegatchie Fire Station Renovation 441 Boston Post Rd, Waterford, CT Documents Utilized • Visits to existing facility • Aerial imagery via Google Earth • Historical cost data and Downes estimating benchmarks Scope of Work • The renovation project consists of a complete interior gut renovation of approximately 12,142 SF. • Demolition and replacement of all interior finishes, MEP systems, and select architectural elements • New full coverage Fire Sprinkler System. • Roof replacement and window system upgrades • New casework, flooring, ceilings, partitions, and restroom improvements • Site access improvements including stairs, ramps, and sidewalks • Selective masonry patching and repointing Inclusions • All trade costs and general conditions • Prevailing wage rates • Full replacement of MEP systems (VRF system) • Finishes and interior partitions • Roofing, window systems, and minor masonry work • Site concrete and ramps and limited drainage • Temporary protections and general requirements • CM Fee, bonds, escalation, and contingency Exclusions • Building addition or expansion • LEED certification or sustainability documentation • Owner-supplied FF&E and technology systems • Builder’s Risk Insurance (by Owner) • Offsite utilities or infrastructure upgrades • Building permit assumed waived. • Premiums for non-standard work times. • Soft costs such as design fees, surveys, testing, or permit reviews, this additional cost can range between 10% -20% of the construction hard costs • Cost associated to tariffs, while outside of contractor control, can significantly impact total project cost if not proactively managed. Downes Construction will continue to monitor market conditions and provide updated recommendations should these risks escalate. Assumptions • Costs based on a Construction Manager at Risk method • Documents have not been produced on anticipated layout or finishes; final design may alter scopes and quantities • Construction duration is 8 months • Bathrooms remain generally in current locations • Scope and cost assumptions are drawn from the grading plan and Google Earth observations. No underground utilities or major site development are assumed • No significant environmental remediation or unknown site conditions • Project is assumed to be occupied with 4 phases of construction assumed • The attached estimate accounts for escalation through the construction start date of July 1, 2026, if construction does not start on time, include an additional 6% annual escalation per year Estimating Methodology • Quantities extracted from existing lay out as shown on sheet A010 of the CD Documents dated 5/16/25. • Pricing based on Q1 2025 market rates and historical Downes project data • Unit costs based on in-house historical data, and recent comparable projects • Unit pricing includes labor, material, equipment, and general contractor markup • Trade cost structured by CSI Division • Contingencies applied for design evolution and pricing risk Next Steps This estimate is intended to guide design development, budget validation, and project planning efforts. It is recommended that all major scope assumptions be validated through continued coordination with the design team and Owner.