Commission Fee Schedule (P&Z, CC & ZBA) (PDF)
document center
| Pages | 2 |
|---|---|
| File Size | 0.2 MB |
| Folder | Departments/Planning & Development |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
\\TOWDATA\Permit\PUBLIC\WS\F E E S C H E D U L E.doc
Updated 03/31/21
TOWN OF WATERFORD, CT – FEE SCHEDULE
COMMISSIONS
PLANNING & ZONING, CONSERVATION COMMISSION AND ZONING BOARD OF APPEALS
Zoning Compliance Permit
Single Family Residential
$110.00
Single Family Additions & Accessory Structures
$ 55.00
Non-Residential/Multi-Family
$ 10.00 per $1000 of the value of the site improvement work, site preparation work and erosion control
measures except building(s).
Subdivision
$ 10.00 per $1000 of value of erosion control measures and work as defined in the subdivision regulations
Sign Applications
$ 55.00
Home Occupation Applications
$ 55.00
Temporary Structure & Sale(s)
$ 55.00
Residential filling & grading
$ 55.00
Zoning Status Opinion
$ 55.00
Accessory Apartment
$ 50.00
Accessory Dwelling Unit
$110.00
Lot Division or Split
$110.00
Planning & Zoning Commission Applications - All of the following fees are subject to an additional $60 fee for the State of Connecticut.
Site Plan
$300.00 Base Fee Plus the following based on Building Size (Sq Ft):
New Construction
<25,000 sq ft: $200
25,000 – 100,000 sq ft: $300.00
>100,000 sq ft: $400.00
Modified Site Plan
<25,000 sq ft: $100.00
25,000 – 100,000 sq ft: $150.00
>100,000 sq ft: $200.00
Subdivision
$300.00 Base Fee Plus:
$100.00 /Lot
$1.00/linear foot of new road (pavement area)
Actual cost of legal notices
Special Permit
$300.00 Base Fee Plus the following based on Building Size (Sq Ft):
<25,000 sq ft: $200
25,000 – 100,000 sq ft: $300.00
>100,000 sq ft: $400.00
A plan review fee based on Building Size (sq ft):
New Construction
<25,000 sq ft: $200.00
25,000 – 100,000 sq ft: $300.00
>100,000 sq ft: $400.00
Actual cost of legal notices
Zone District Change
$300.00 Plus:
Actual cost of legal notices
Zone Regulation Change
$300.00 Plus:
Actual cost of legal notices
Subdivision Regulation Change
$200.00
CGS 8-24 Municipal Improvement
0.00
Coastal Area Management: Paid in addition to other fees.
Subdivision
$ 25.00 per lot
Single Family Residential
$200.00
Commercial/Industrial/Multi-Family
$500.00
Variances
$100.00
Miscellaneous:
Temporary Structures
$ 50.00
Home Occupations
$ 50.00
Outdoor Entertainment
$ 0.00
\\TOWDATA\Permit\PUBLIC\WS\F E E S C H E D U L E.doc
Updated 03/31/21
Location Approval
$ 0.00
Conservation Commission Applications - All of the following fees are subject to an additional $60 fee for the State of Connecticut.
Minor Impact:
Residential Improvement & Additions
$ 50.00
New Residential
$ 50.00
New Residential Subdivision
$100.00 (3 or more lots)
Commercial/Industrial Development
$100.00
Permit Extension or Modifications
$ 50.00
Significant Impact:
$300.00 This is determined by the Conservation Commission
Public Hearing:
$400.00
Zoning Board of Appeals Applications - All of the following fees are subject to an additional $60 fee for the State of Connecticut.
Residential
$200.00 Base Fee Plus:
$100.00 additional for each requested bulk item approved, modified or denied.
Non-Residential & Multi-Family
$350.00 Base Fee Plus:
$150.00 additional for each requested bulk item approved, modified or denied.
Location Approval
$350.00