ADDENDUM_1
document center
| Pages | 1 |
|---|---|
| File Size | 0.1 MB |
| Folder | Departments/Purchasing |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
ADDENDUM #1 Issue Date: 1/4/24 Project Name: Clark Lane Chiller Replacement Project No.: 2019141.02 GENERAL: Modifications described herein as Addendum items supersede specific parts of the Contract Documents for the above-named project. All bids and the construction contract shall be based on the inclusion of these modifications. CLARIFICATION TO DRAWINGS Clarifications: Contractor states Item #1 below. Item #1 “Chiller spec (ME-100) is calling for the chiller to have factory mounted pumping package, yet underneath the chiller schedule is the pump schedule calling for the pumps to be by Taco.” Please clarify intent. CLARIFICATION ITEM 1: Response, Chiller pumping package is provided by Trane. Pumps and all accessories are packaged by Trane, manufactured by Taco. CLARIFICATION TO PERMIT FEES Clarifications: Contractor states item#2 below. Item #2 “Are permit fees waived for this project?” CLARIFICATION ITEM 2: Response, No. END OF ADDENDUM T:\2019\2019141.02\Addenda\ADDENDUM.#1docx.docx Page 1 of 1