State Stormwater Permit Requirement (DOCX)
document center
| Pages | 1 |
|---|---|
| File Size | 0.0 MB |
| Folder | Departments/Planning & Development |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Developers and/or contractors are required to be incompliance with the DEEP’s General Permit for the Discharge of Stormwater and Dewatering Wastewaters Associated with Construction Activities (Construction General Permit). If a proposed development or redevelopment project disturbs one or more acres or land, either individually or collectively, as part of a larger common plan, and results in a point source discharge to the surface waters of the state directly or through the Town’s Separate Storm Sewer System (MS4), then they are potentially obligated to obtain authorization under the DEEP’s Construction General Permit. As part of the DEEP’s Construction General Permit, developers and/or contractors may be obligated to provide a copy of the Stormwater Pollution Control Plan to the Town upon request. Additional information regarding the requirements for the DEEP’s Construction General Permit can be found at the following website: http://www.ct.gov/deep/cwp/ view.asp?a=2721&q=558612&DEEPNav_GID=1654