FY2022 APPROVED CAPITAL PLAN
document center
| Pages | 4 |
|---|---|
| File Size | 0.5 MB |
| Folder | Departments/Finance/Annual Budgets |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
DEPT/AGENCY: 55738 TOWN OF WATERFORD GENERAL FUND 2022 - 2026 CAPITAL IMPROVEMENT PLAN (CIP) 10138 FLEET MANAGEMENT PLAN CURRENT YEAR CAPITAL IMPROVEMENTS BOS 2/10/21 Approved 1,000,000 ae 900,000 800,000 10,00 800,000 800,000 800,000 900,000 0,000 900,000 906,00 900,000 INFORMATION TECHNOLOG 55805 HARDWARE REFRESH 22,233 0 0 |. 55862 PURE ARRAY 74,000 74,000 FD NETWORKED COMPUTER, 55845 PHO SUBTO® 112.6 27,120 55864 BODY CAMERAS 98,250 110,100 55837 INFRARED CAMERAS IN CARS 14,812 14,350 55858 ACCIDENT INVESTIGATION 13,391 55846 POLICY DIRECTIVE REVAMP 30,000 NEW CYBER CRIME TAKS FORCE EQUIPMENT 11,000 11,000 11,000 11,000 NEW TRAFFIC MESSAGEBOARDS 28,000 28,000 28,000 28,000 |. 0 0 0 0 NEW IMPOUND YARD IMPROVEMENTS 28,500 28,500 28,500 28,500 0 0 0 0 MARINE OUTBOARD MOTORS 38,500 38,500 38,500 38,500 0 0 0 0 L SE PLATE READERS 27,120 27,120 0 0 0 0 NEW EQUIPMENT REPLACEMENT PLAN 75,000 75,000 75,000 75,000 NEW JORDAN - WINDOW REPLACEMENT 50,000 50,000 QUAKER HILL - EMERGENCY NEW GENERATOR 30,000 NEW QUAKER HILL - REAR PARKING LOT 50,000 NEW QUAKER HILL ROOF PROJECT 100,000 NEW GOSHEN BUNKROOM RENOVATIONS 50,000 NEW GOSHEN APPARATUS FLOOR DRAINAGE 25,000 NEW OSWEGATCHIE CASCADE SYSTEM 80,000 GOSHEN - AIR CONDITIONING SYSTEM NEW REPLACEMENT . 25,000 25,000 25,000 25,000 25,000 NEW COHANZIE EMERGENCY GENERATOR 50,000 55847 COHANZIE - ROOF REPLACEMENT 0 0 60,000 60,000 60,000 60,000 DEPT/AGENCY: 55865 SUBTOTAL FIRE DEPARTMEN 10138 GOSHEN- HALL FLOOR REPLACEMENT BRIDGES/CULVERTS (OVER 20 FT) TOWN OF WATERFORD GENERAL FUND - 2022 - 2026 CAPITAL IMPROVEMENT PLAN (CIP) CURRENT YEAR CAPITAL IMPROVE BOS 2/10/21 Approved Bloomingdale Rd/Hunts Brook Cross Rd/Jordan Brook Chapman/Brandee Lake BRIDGES/CULVERTS (UNDER 20-FT) — CONCRETE CURB REPLACEMENT SIDEWALK REPLACEMENT Norman/Concrete Panels 80, 100 80,100 80,100 80,100 William Street/Concrete Sidewalk 42,300 42,300 42,300 42,300 Summer Street/Concrete Sidewalk 33,420 33,420 33,420 33,420 David Street/Concrete Sidewalk 43,680 43,680 43,680 43,680 Cross Road/Asphalt 69,800 69,800 69,800 69,800 Rope Ferry Road (Federal Grant Funds) 304,000 304,000 304,000 304,000 ROAD RESURFACING/PAVING: Daniels (Reclaim) 0 451,462 Niantic River #194-Rt. 1 (Reclaim) 319,840 Quarry-Leary-Shore (Reclaim) 332,685 Goshen-Spinmaker-C Club (Reclaim) 396,765 Oil Mill (Reclaim) 487,285 Section A, Area 1(P) - (Olive, Vivian Ct, Orient, Louse, Monroe) 334,473 334,473 334,473 334,473 Section A, Area 1(P) & Areas 2 - (Norman, Summer, David, William, Wild Rose Ave, Wild Rose Pl and Avenue.A) 239,096 Section B, Area 8 - (Milstone Rd West, Summer Rest, Larson, Hanson, George & 1 Allen) 192,645 Section B, Area 6 -(Wood, Bishop & Mago Blvd) 161,705 Section C, Area 1 - (Perry, Linda, Alice, Oak, Betty, Lee, Anita & Division) 493,475 Gardiner Wood Road 3,000,000 ) DEPT/AGENCY TOWN OF WATERFORD GENERAL FUND 2022 - 2026 CAPITAL IMPROVEMENT PLAN (CIP) 10138 CURRENT YEAR CAPITAL IMPROV. NTS 5 _ BOS 2/10/21 Approved MUNICIPAL BUILDINGS MAINTENANC Eversource Affected - (Milton & pune) 215,813 215,813 215,813 215,813 NEW MISCELLANEOUS MS4 Retro Fits and DCIA Sea Level Rise Traffic Signal Replacement Guild Rail Replacement _ Retaining Walls Transfer Station (Scale & Scale House) 106,548 106,548 106,548 106,548 BLOOMINGDALE SOUTH-MILL 55866 &PAVE. ; 131,300 0 0 NEW MILLSTONE EAST NEIGHBORHOOD . 0 0 55868 GALLOWS LANE- Reclaim/Pave 134,080 0 0 REMOVE UNDERGROUND UST- 55867 Cohanzie Fire 299,000 0 0 VAUXHALL ST. (Hunts Brook Mill & 55860 Pave 251,237 SUBTOTAL PUBLIC WORKS 251,237 | 1,037,898 | 55851 ADA IMPROVEMENTS SB/PD 80,700 80,700 0 0 $5852 TOWN HALL BATHROOMS 25,000 25,000 0 0 57857 CIVIC TRIANGLE UPGRADES 150,000 150,000 150,000 150,000 0 0 0 0 NEW UNDERGROUND TANK REPLACMENT 250,000 250,000 250,000 250,000 0 0 0 0 AC UNIT REPLACEMENT AT EMERGENCY NEW RADIO SITES 60,500 60,500 60,500 60,500 0 0 0 “0 EUGENE O'NEILL MANSION ROOF REPLACEMENT (co-funded with Eugene O'Neill) 35,000 35,000 35,000 35,000 0 0 0 0 SW SCHOOL DEMOLITION 106,000 BREW CCTV Camera & Lateral Launching System 120,000 - 120,000 120,000 120,000 CONTROL PANEL RETRO-FIT (GORMAN- NEW RUPP STATION) 30,000 30,000 30,000 30,000 30,000 30,000 30,000 NEW ROOF & SIDING REPLACEMENT 50,000 50,000 50,000 50,000 50,000 50,000 25,000 55871 EVERGREEN PUMP STATION 375,000 375,000 0 0 IN-LINE WASTEWATER SOLIDS 55821 GRINDERS 85,000 85,000 0 0 0 0 85,000 85,000 0 0 > cat DEPT/AGENCY TOWN OF WATERFORD GENERAL FUND - 2022 - 2026 CAPITAL IMPROVEMENT PLAN (CIP) 10138 CURRENT YEAR CAPITAL IMPROV BOS 2/10/21 Approved RECREATION & PARK VETERAN'S FIELD LIGHT REPLACEMENT 341,000 EQUIPMENT STORAGE PLAN 21,000 21,000 21,000 21,000 VETERAN'S GARAGE ADDITION PLAN 0 MAGO POINT LIGHT REPLACEMENT 25,990 LEARY PARK IRRIGATION 0 CHILDREN'S PLAYGROUND EQUIP. 55838 (GRANT & CNR FUNDS) 0 0 0 0 50,200 0 BOARD OF EDUC! SUBTOTAL BOARD. OF EDUCATION: = [DOG PARK FENCE REPLACEMENT HIGH SCHOOL FIELD ENHANCEMENTS _ FEDERAL/STATE GRANTS 0 0 Rope Ferry Road Sidewalk (304,000) (304,000) (304,000) (304,000) EUGENE O'NEIL MANSON ROOF CO- FUNDING (25,000) (25,000) (25,000) TOTAL OFESETS - CONTRIBUTED GIFT GRANT (REC & PARK) CHILDREN'S PLAYGROUND EQUIPMENT (36,000) (36,000) (25,000) (36,000) (36,000)